Assignment Cover Sheet

Faculty of Science and Technology


NAME: Mani Nakhaei______________________________
STUDENT ID: 900003313__________________________
UNIT CODE: SEP490______________________________
ASSIGNMENT/PRAC NAME: ________________________
DUE DATE: 13/2/2012____________________________

Plagiarism and collusion


Plagiarism occurs when a student passes off as the students own work, or copies without
acknowledgment as to its authorship, the work of any other person.

Collusion occurs when a student obtains the agreement of another person for a
fraudulent purpose with the intent of obtaining an advantage in submitting an
assignment or other work

Declaration
I certify that the attached work is entirely my own (or where submitted to meet the
requirements of an approved group assignment is the work of the group), except where
work quoted or paraphrased is acknowledged in the text. I also certify that it has not
been submitted for assessment in any other unit or course.

I agree that Deakin University may make and retain copies of this work for the purposes
of marking and review, and may submit this work to an external plagiarism-detection
service who may retain a copy for future plagiarism detection but will not release it or
use it for any other purpose.

DATE: 13/02/2012_______________________________

An assignment will not be accepted for assessment if the declaration appearing above
has not been duly completed by the author.

All items requiring information on this page must be completed


otherwise your submission will not be accepted for assessment.
School of Engineering

SEP490: Engineering Work


Experience
Work Experience Report

Student Name : (Mani Nakhaei)


Student ID : (900003313)
Course Code : (s367)
(e.g., S367)

Course Name : (Bachelor of Engineering)


(e.g., Bachelor of Engineering, Bachelor of Technology)

Major Sequence : (civil)


(Civil, Electronics, Mechatronics & Robotics, Mechanical)

Date : (13/02/2012)

Report Submission Checklist


Instructions:
1. Put an x in the right-hand box for each item in this checklist if it has been
x
completed, attached, or included in your report submission.
2. A complete report should have all items checked with an x on this list.
Documentation and information is provided for the minimum number of full working
days of work experience required for your currently enrolled engineering course at
x
Deakin University?
(Minimum requirement is 60 days for a BE course and 40 days for a BTech course)
Your name and student ID details have been provided on this page? x
The Assignment Coversheet at the front of this document has been completed? x
The Table of Contents in this report has been updated and is complete?
x
(Right-click on the table of contents and then select update field)
All questions in this report have been answered fully and completely? x
Scans of your Employer/Organisation letters are provided in this report?
x
(Or have been included as separate document files with your online submission?)
Has this report been double-checked to make sure it is complete with no omissions? x

v1.0 Page 1
School of Engineering

v1.0 Page 2
School of Engineering

Table of Contents

TABLE OF CONTENTS 2
SUMMARY OF WORK EXPERIENCE 3
Summary for Placement #1 5
Summary for Placement #2 6
Summary for placement #3
6
Summary for placement #4
7

DESCRIPTION OF WORK EXPERIENCE PLACEMENTS 6


Description of Work Experience Placement #1 8-9
1. About the Organisation 8
2. Position(s) occupied in the Organisation 8
3. Tasks and duties performed 8
4. The value of this experience 9
5. Overall assessment of this experience 9
PROFESSIONAL ENGINEERING GRADUATE ATTRIBUTES 10
Placement #1s Relevance to Graduate Attributes 10
APPENDICES 11
Employer/Organisation Letter(s) 11

v1.0 Page 3
School of Engineering

Summary of Work Experience

Abstract
NARGAN is an engineering, procurement, construction, and project management company
with nearly 4 decades of experience in the design and development of industrial projects
particularly inthe oil, gas and petrochemical Fields.
They are a privately owned company, with over 1200 qualified technical and support
personnel, specialized in the engineering, procurement and construction
management/supervision of advanced oil, gas and petrochemical Projects.
They have earned their reputation over decades of high quality work and safe & on time
delivery of more than 300 projects.

They provide complete consultancy and technical services for the development of industrial
projects particularly in the oil, gas and petrochemical fields.
Our services extend to every aspect of such projects, from the initial concept of feasibility
studies to the provision of Know-How and License, Basic Design, Front-End and Detail
Engineering, followed by procurement, supply services, construction supervision and
management.
During the 12 weeks work placement I have been dealing with the civil drawing of the
following Project:
1. South Pars Gas Field Development Project Phase 15 & 16
2. Butene I & LLDPE/HDPE Plants in Lorestan and Mahabad in Tehran

Establishment of South Pars Gas Field Development Project Phase 15 & 16 is one of NIOC's
objective development projects, and Pars Oil & Gas Company as fully owned affiliate of IOC

v1.0 Page 4
School of Engineering

intends the project under its defined requirements as set forth in the contract
documents.
The Plant located at Bandar Assaluyeh, in the Iranian sector of Persian Golf.
The Plant consists of the ON-SHORE GAS PROCESSING PLANT ON-SHORE GAS
PROCESSING PLANT includes following Units:

The Process Units & Process Units Licensed:


Unit No. Description Unit No. Description
100 Inlet facilities 109 Sour Water Stripper
101 Gas Sweetening 110 Back Up Stabilization
103 Condensate Stabilization 111 Propane Refrigeration
105 Ethane Removal 113 Caustic Regeneration
106 Export Gas Compression and Metering 114 Propane Treatment Unit
107 NGL Fractionation 115 Butane Treatment Unit
108 Sulphur Recovery Unit and Tail Gas Treatment 116 Ethane Decarbonisation and
Dehydration
The Onshore Utilities and Supporting Facilities:
102 MEG Regeneration 131 Diesel System
104 Gas Dehydration Packages 132 Cooling Water System and Distribution Network
120 Electrical Generation and distribution network 140 Flares and Blowdown
121 Steam and Condensate and Distribution network 141 Utilities and offsite drain System
122 Fuel Gas System and distribution Network 142 Burn Pit
123 The instrument Air Service, 143 Condensate Storage and Export
124 Nitrogen Generation System, network and integration 144 Sulphur Storage and
Solidification
125 Sea Water Supply intake Distribution Network 145 Propane Refrigerant Storage Unit
126 Sea Water Desalination Distribution network 146 Chemical Storage
127 Water Polishing 147 Propane Storage and Export
128 Potable Water 148 Butane Storage and Export
129 Waste Effluent Disposal and network 149 Propane Loading Facilities
130 Fire Water System 150 Butane Loading facilities

The Following table will specify the task which I did during the 12 weeks placement:
Date Task
17/02/2009-3/03/2009 Drafting and editing sites
6/02/2010-9/03/2010 Checking the civil drawing of south pars
projects
19/06/2010-18/07/2010 Checking the civil drawing of Butene I &
LLDPE/HDPE Plants in Lorestan
22/10/2010-22/11/2010 Drafting the new map for south pars project

v1.0 Page 5
School of Engineering

Summary for Placement #1

Name of Employer / Organisation: Alireza Salehian

Starting date of placement: 17/02/2009

Ending date of placement: 3/03/2009

Number of full working days claimed: 13

Position / Job Title (if applicable): Civil Engineering Trainee

Was this work performed as an


employee (paid) or non-employee Employee
(unpaid)?

v1.0 Page 6
School of Engineering

Summary for Placement #2

Name of Employer / Organisation: Alireza Salehian

Starting date of placement: 6/02/2010-9/03/2010

Ending date of placement: 9/03/2010

Number of full working days claimed: 28

Position / Job Title (if applicable): Civil Engineering Trainee

Was this work performed as an


employee (paid) or non-employee Employee
(unpaid)?

Summary for Placement #3

Name of Employer / Organisation: Alireza Salehian

Starting date of placement: 19/06/2010

Ending date of placement: 18/07/2010

Number of full working days claimed: 28

Position / Job Title (if applicable): Civil Engineering Trainee

Was this work performed as an


employee (paid) or non-employee Employee
(unpaid)?

v1.0 Page 7
School of Engineering

Summary for Placement #4

Name of Employer / Organisation: Alireza Salehian

Starting date of placement: 22/10/2010

Ending date of placement: 22/11/2010

Number of full working days claimed: 28

Position / Job Title (if applicable): Civil Engineering Trainee

Was this work performed as an


employee (paid) or non-employee Employee
(unpaid)?

Description of Work Experience Placement

1. About the Organisation

v1.0 Page 8
School of Engineering

NARGAN is an engineering, procurement, construction, and project


management company with nearly 4 decades of experience in the design and
development of industrial projects particularly in the oil, gas and petrochemical Fields.
They are a privately owned company, with over 1200 qualified technical and support
personnel, specialized in the engineering, procurement and construction
management/supervision of advanced oil, gas and petrochemical Projects.
They have earned our reputation over decades of high quality work and safe & on time
delivery of more than 300 projects.

They provide complete consultancy and technical services for the development of
industrial projects particularly in the oil, gas and petrochemical fields.
Their services extend to every aspect of such projects, from the initial concept of
feasibility studies to the provision of Know-How and License, Basic Design, Front-End and
Detail Engineering, followed by procurement, supply services, construction supervision
and management.
In the past four decades They have made major contributions to the development of
energy industries in Iran at various capacities of consultant, EPC contractor and/or
project manager.
NARGAN has been awarded Grade 1 accreditation by Iran Management and Planning
Organization for rendering services to

Oil Refining Industries, Gas Processing Facilities and Petrochemical Plants,

Transportation & Pipeline System,

Upstream On-Shore Facilities, and

Power Generation & Distribution

2. Position(s) occupied in the Organisation

My Task was checking the drawing of each projects map with the drawing standards and
policy. Basically Ill receive the map from the architects and check the overall of map
whether or not they are comply with the standards.
The experience which I gain from this project is that communication is very important
element in order to achieve the desired expectation of each project. Since I was dealing with
so many architects and their drawing I had to have a strong communication skill with them in
order to finish the project on time and provide the effective work to my employer.

3. Tasks and duties performed


(300 600 words)

My Task was checking the drawing of each projects map with the drawing standards and

v1.0 Page 9
School of Engineering

policy. Basically Ill receive the map from the architects and check the overall
of map whether or not they are comply with the standards.
The experience which I gain from this project is that communication is very important
element in order to achieve the desired expectation of each project. Since I was dealing with
so many architects and their drawing I had to have a strong communication skill with them in
order to finish the project on time and provide the effective work to my employer.

4. The value of this experience


(100 200 words)

Since I was dealing with so many architects and their drawing, I had to have a strong
communication skill with them in order to finish the project on time and provide the effective
work to my employer. I have lots of meeting with architects in order to discuss about the
errors on each map which was not comply with the standards. Communication skills and
teamwork was the most important element for doing this project on time.

5. Overall assessment of this experience


(100 200 words)

After doing this experience I had come up with practicing so many skills for completing this
experience such as:
1. Communication skills: The important ability in order to receive and send the required
input and outputs in the organisational system. For this task I have used an Intranet for
sending and receiving the information from the architects and my employer in order
to finish each projects on time.
2. Technical skills: I have practiced AutoCAD for drawing each projects map.
3. Time Management skills: I have done a good time management skills in order to
finish each works on time

Placement Relevance to Graduate Attributes

Name of Organisation: Nargan

v1.0 Page 10
School of Engineering

PE1 ENGINEERING ABILITY


(100 200 words)

During the 12 weeks work placement, I have been working under the guidance of
experienced engineers of Nargan consultancy in order to gain their valuable experience. I
have been practicing of reviewing the projects map detail which was drawn by several
Architects. I have used my technical drawing skills and general knowledge in order to check
the map whether or not they comply with Standards. If there was any problem I have used my
own problem solving skills with the advice of my supervisor to maintain a good solution.
Communication skills and the way of using intranet which was a local portal of company has
played an important role for doing this project.

PE2 ENGINEERING ABILITY


(100 200 words)

During the 12 weeks work placement, I have been working under the guidance of
experienced engineers of Nargan consultancy in order to gain their valuable experience. I
have been practicing of reviewing the projects map details which was drawn by several
Architects. I have used my mathematical and material knowledge in order to check the map
whether or not they comply with Standards. I have checked the concrete mix and the strength
of material which was used in the south pars project.

PE3 PROFESSIONAL ATTRIBUTES


(100 200 words)

During this 12 weeks I have practiced the several abilities such as communicating effectively
with the engineering team, ability to manage information and documentation, Understanding
the professional and ethical responsibilities, ability to function effectively, capacity for life
time learning and professional attitudes. Teamwork has played an important role during the
work commitment. It had helped me a lot in order to complete each projects.Doing the these
projects required a good management skills and understanding a high ethical responsibilities.
In order to gain these abilities Ive been touch with my supervisor a lot in order to learn each
concept very well.

v1.0 Page 11
School of Engineering

Appendices

v1.0 Page 12