Collusion occurs when a student obtains the agreement of another person for a
fraudulent purpose with the intent of obtaining an advantage in submitting an
assignment or other work
Declaration
I certify that the attached work is entirely my own (or where submitted to meet the
requirements of an approved group assignment is the work of the group), except where
work quoted or paraphrased is acknowledged in the text. I also certify that it has not
been submitted for assessment in any other unit or course.
I agree that Deakin University may make and retain copies of this work for the purposes
of marking and review, and may submit this work to an external plagiarism-detection
service who may retain a copy for future plagiarism detection but will not release it or
use it for any other purpose.
DATE: 13/02/2012_______________________________
An assignment will not be accepted for assessment if the declaration appearing above
has not been duly completed by the author.
Date : (13/02/2012)
v1.0 Page 1
School of Engineering
v1.0 Page 2
School of Engineering
Table of Contents
TABLE OF CONTENTS 2
SUMMARY OF WORK EXPERIENCE 3
Summary for Placement #1 5
Summary for Placement #2 6
Summary for placement #3
6
Summary for placement #4
7
v1.0 Page 3
School of Engineering
Abstract
NARGAN is an engineering, procurement, construction, and project management company
with nearly 4 decades of experience in the design and development of industrial projects
particularly inthe oil, gas and petrochemical Fields.
They are a privately owned company, with over 1200 qualified technical and support
personnel, specialized in the engineering, procurement and construction
management/supervision of advanced oil, gas and petrochemical Projects.
They have earned their reputation over decades of high quality work and safe & on time
delivery of more than 300 projects.
They provide complete consultancy and technical services for the development of industrial
projects particularly in the oil, gas and petrochemical fields.
Our services extend to every aspect of such projects, from the initial concept of feasibility
studies to the provision of Know-How and License, Basic Design, Front-End and Detail
Engineering, followed by procurement, supply services, construction supervision and
management.
During the 12 weeks work placement I have been dealing with the civil drawing of the
following Project:
1. South Pars Gas Field Development Project Phase 15 & 16
2. Butene I & LLDPE/HDPE Plants in Lorestan and Mahabad in Tehran
Establishment of South Pars Gas Field Development Project Phase 15 & 16 is one of NIOC's
objective development projects, and Pars Oil & Gas Company as fully owned affiliate of IOC
v1.0 Page 4
School of Engineering
intends the project under its defined requirements as set forth in the contract
documents.
The Plant located at Bandar Assaluyeh, in the Iranian sector of Persian Golf.
The Plant consists of the ON-SHORE GAS PROCESSING PLANT ON-SHORE GAS
PROCESSING PLANT includes following Units:
The Following table will specify the task which I did during the 12 weeks placement:
Date Task
17/02/2009-3/03/2009 Drafting and editing sites
6/02/2010-9/03/2010 Checking the civil drawing of south pars
projects
19/06/2010-18/07/2010 Checking the civil drawing of Butene I &
LLDPE/HDPE Plants in Lorestan
22/10/2010-22/11/2010 Drafting the new map for south pars project
v1.0 Page 5
School of Engineering
v1.0 Page 6
School of Engineering
v1.0 Page 7
School of Engineering
v1.0 Page 8
School of Engineering
They provide complete consultancy and technical services for the development of
industrial projects particularly in the oil, gas and petrochemical fields.
Their services extend to every aspect of such projects, from the initial concept of
feasibility studies to the provision of Know-How and License, Basic Design, Front-End and
Detail Engineering, followed by procurement, supply services, construction supervision
and management.
In the past four decades They have made major contributions to the development of
energy industries in Iran at various capacities of consultant, EPC contractor and/or
project manager.
NARGAN has been awarded Grade 1 accreditation by Iran Management and Planning
Organization for rendering services to
My Task was checking the drawing of each projects map with the drawing standards and
policy. Basically Ill receive the map from the architects and check the overall of map
whether or not they are comply with the standards.
The experience which I gain from this project is that communication is very important
element in order to achieve the desired expectation of each project. Since I was dealing with
so many architects and their drawing I had to have a strong communication skill with them in
order to finish the project on time and provide the effective work to my employer.
My Task was checking the drawing of each projects map with the drawing standards and
v1.0 Page 9
School of Engineering
policy. Basically Ill receive the map from the architects and check the overall
of map whether or not they are comply with the standards.
The experience which I gain from this project is that communication is very important
element in order to achieve the desired expectation of each project. Since I was dealing with
so many architects and their drawing I had to have a strong communication skill with them in
order to finish the project on time and provide the effective work to my employer.
Since I was dealing with so many architects and their drawing, I had to have a strong
communication skill with them in order to finish the project on time and provide the effective
work to my employer. I have lots of meeting with architects in order to discuss about the
errors on each map which was not comply with the standards. Communication skills and
teamwork was the most important element for doing this project on time.
After doing this experience I had come up with practicing so many skills for completing this
experience such as:
1. Communication skills: The important ability in order to receive and send the required
input and outputs in the organisational system. For this task I have used an Intranet for
sending and receiving the information from the architects and my employer in order
to finish each projects on time.
2. Technical skills: I have practiced AutoCAD for drawing each projects map.
3. Time Management skills: I have done a good time management skills in order to
finish each works on time
v1.0 Page 10
School of Engineering
During the 12 weeks work placement, I have been working under the guidance of
experienced engineers of Nargan consultancy in order to gain their valuable experience. I
have been practicing of reviewing the projects map detail which was drawn by several
Architects. I have used my technical drawing skills and general knowledge in order to check
the map whether or not they comply with Standards. If there was any problem I have used my
own problem solving skills with the advice of my supervisor to maintain a good solution.
Communication skills and the way of using intranet which was a local portal of company has
played an important role for doing this project.
During the 12 weeks work placement, I have been working under the guidance of
experienced engineers of Nargan consultancy in order to gain their valuable experience. I
have been practicing of reviewing the projects map details which was drawn by several
Architects. I have used my mathematical and material knowledge in order to check the map
whether or not they comply with Standards. I have checked the concrete mix and the strength
of material which was used in the south pars project.
During this 12 weeks I have practiced the several abilities such as communicating effectively
with the engineering team, ability to manage information and documentation, Understanding
the professional and ethical responsibilities, ability to function effectively, capacity for life
time learning and professional attitudes. Teamwork has played an important role during the
work commitment. It had helped me a lot in order to complete each projects.Doing the these
projects required a good management skills and understanding a high ethical responsibilities.
In order to gain these abilities Ive been touch with my supervisor a lot in order to learn each
concept very well.
v1.0 Page 11
School of Engineering
Appendices
v1.0 Page 12