Vous êtes sur la page 1sur 7

DR. VIRINDRA K.

RAINA - RESUME (CV) structures, buildings, aircraft hangars, chimneys, cooling


towers, water tanks & towers, reservoirs, silos, port
structures, etc.
CONTACT : Designed and supervised construction of over 100,000
lane-meters of concrete bridges in different countries on
- in the U.S.A.~ various types of foundations in different substrata conditions.
[Prestressed and reinforced concrete straight / skew /
C/o Mr. S.G. Athavale curved - continuous, semi-continuous and determinate
8180, Greensboro Drive, Ste. 550 decks (voided slabs, boxes, beams-and-slab),
McLean, VA 22102, USA constructed segmentally, in-place or precast inplace /
Work Phone + (703) 893-3104 launched; on caisson / pile / open foundations].
Home Phone + (301) 230-1962
E-mail: rainavk1@rediffmail.com , sathavale@alaengr.com A highly qualified and experienced practising
professional civil engineer with sustained private sector
experience, a Ph.D. from London University, Professional
- Memberships of two globally recognized Civil
- at present ~
AT Engineering Institutions (Institution of Civil Engineers
London, UK, and Professional Engineers of Ontario,
Dr. V.K. Raina,
Techl.Advisor to Govt.of Bahrain: Bahrain Qatar Causeway Toronto, Canada), a track record of relevant experience,
Flat 26, Building 1110, Road 3223, Mahooz, skill and thorough understanding, corroborated by
Manama332, Bahrain (Middle East) numerous Publications and authorship of 7 Books in the
Phones. (M): + 973-39188863, Work : +973-17545807 / 748 relevant fields.
E-Mail : rainavk1@rediffmail.com, rainavk@bahrain.gov.bh
MAIN CAPACITY :

Policy Design and Executive Direction (civil engineering,


PROFESSION : including transportation, design and construction sectors)

Civil Engineering (Management, Construction, Design, Business Development (International)


Training)
Institution building : establishing parameters, drafting
DATE OF BIRTH : 25th November, 1940 Terms of Reference, managing Engineering (project
preparation / procurement / implementation) and personnel,
PROFESSIONAL MEMBERSHIPS : assistance in establishing Roads Authority

Contract Management and Monitoring


Member, Institution of Civil Engineers, London, UK (MICE)
Membership No. : 31437991 Procurement, including review of Bidding Documents to the
Chartered Engineer, London, UK (C.Eng.) requirements of International Organizations (World Bank,
United Nations, African Development Bank, European
Professional Engineer, Ontario, Canada (P.Eng.) Union, etc.) : Consultant Services, Works Contracts
Membership No. : 37971017
Member, Indian Roads Congress, New Delhi, India (MIRC) Construction Management, including investigation of
L M No. : 5546 Construction Failures / Claims / Dispute Resolution /
Solutions / Rehabilitation
Member of various professional civil engineering committees
dealing with drafting of codes of practice for design, Project Appraisal and Review and Construction
construction and specifications. Previously : Member of Supervision (Consultants and Contractors works)
Committees for fixing budget and management criteria for
various works, reviewing technical books and papers, Human Resource Management, Job Descriptions and
monitoring work of certain research projects and selection requirements, selection and recruitment of higher-level
and recruitment of engineers engineers for design / construction / procurement; and
manpower training
KEY QUALIFICATIONS :
PUBLICATIONS :
Presently: Technincal Advisor to Govt of Bahrain: Bahrain
Qatar Sea link (40km long Causeway through the Arabian authored eight practical reference-class books in civil
Gulf). engineering (based on extensive professional experience in
several countries). The Titles are :
Completed a Consultancy assignment with the African
Development Bank and carried out the Evaluation of - Field Manual for Highway and Bridge Engineers,
Bank Group Assistance to Transport Sector in Malawi 2005
- Concrete Bridges Handbook, 1999;
Operations Advisor (Bridge Engineering, Contract
Management, Training in Design and Construction- - Analysis, Design and Economics (Concrete Bridges), 1994;
Supervision) and Business Development in various countries - Inspection, Repair, Strengthening, Testing and Load Capacity
- as an Independent Consultant. Evaluation of Concrete Bridges, 1994;
- Consultancy and Construction Agreements for Bridges,
Well rounded Consultant engineering experience 15 including Field Investigations, 1989;
years experience as a Senior Expert and Consultant to the
United Nations and to the World Bank, and 23 years - Concrete for Construction Facts and Practice, 1989;
competitive practising professional experience with - Construction, Maintenance and Rehabilitation (Concrete
International Consulting Engineers in the Private sector, in Bridges), 1988; and
developed as well as developing countries. - Construction Management Practice - The Inside Story, 1988
Established and managed a fully-fledged Consulting (Publishers : McGraw Hill, New York , Tata-McGraw Hill,
engineering practice for ten years (1972 -1982) in various SHROFF-Publishers: Bombay and Galgotia Publications,
fields of civil engineering, covering bridges, industrial New Delhi).

Page 1 of 7
Numerous Papers and Technical Advisories (all included POSITION (CURRENT):
in the above 8 books) and Operational Procedures (on
construction, design, rehabilitation and contract Technical Advisor to Govt of Bahrain for the BAHRAIN-
QATAR SEALINK (~ a 40km. Long causeway.. BRIDGES
management & monitoring) for manpower training through
& Embankments) through the ARABIAN GULF.
specialist refresher courses, and Assessment of engineering
services. A partial list of these Papers is given in Annexure
1. EMPLOYER
Ministry of Works & Housing,
COUNTRY EXPERIENCE: P.O .Box 5, Manama, Bahrain

i. Bahrain PERIOD
ii. Bangladesh x. Lesotho (Southern Africa) Dec. 2003 onwards
iii. Bhutan xi. North Yemen
iv. Bosnia Herzegovina xii. Saudi Arabia
v. Canada xiii. Serbia BRIEF WORK SUMMARY
vi. Croatia xiv. Sri Lanka - Planning, Design, Investigations, Surveys, Route-location,
vii. Englandxv. USA Quantities, Costing, Contract Documents, Construction &
viii. India xvi. Yugoslavia Constn. Methods Appraisal, and Q.A.& Q.C. for the Bahrain
Qatar Sealink.
ix. Iraq xvii. Zambia
- Advise Roads Directorate / Ministry on Policy Matters,
EDUCATION: Objectives and Business & Strategic Plans.
Ph.D. (Civil Engineering), London University (Imperial College), - Training of Senior Engineers in various Aspects of Design,
London, England, 1966 Construction and Maintenance & Rehabilitation of Bridges,
and Contract, Contract Management and Procurement of
Major field : Concrete Structures and Technology Consultancy and Construction Services.
D.I.C. (Concrete Structures and Technology) Masters Degree,
Imperial College, London, England, 1964 POSITION

B.Sc. (Civil and Municipal Engineering), Banaras University, Consultant


India, 1961. Awarded two gold medals for merit, 1st Class 1st
EMPLOYER
OTHER TRAINING RECEIVED:
African Development Bank, lvory coast, West Africa
at : in :
PERIOD
- Battersea College of Tall Buildings (Analysis and
Technology, London, UK Design) June Sept., 2002
- City University, London, UK Bridge Decks (Transverse
- Regent St. Polytechnic, Load Distribution) BRIEF WORK SUMMARY
London, UK Soil Mechanics and
Foundation Design carried out the Evaluation of Bank Groups
Structural Analysis assistance to Transport Sector in MALAWI, during the
Construction Management previous 25 years, covering Road, Rail, Lake and Air
Contract Management transportation modes.

TRAINING IMPARTED TO SENIOR ENGINEERS IN POSITION


VARIOUS COUNTRIES :
Operations Advisor (Bridge Engineering, Contract Management and
Areas of training, imparted In-house, are indicated in Training in Design and Construction Supervision) and Business
Annexure 2 and these cover : Development in various countries, as an Independent
Consultant
A. Concrete for Construction . Facts and Practice
B. Bridges and Flyovers (Design and Construction) Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT),
C. workman-like Highway Construction-Administration covering New Delhi
Administration, Management and Monitoring
D. adopting a workman-like Field-Handbook approach for Highway PERIOD :
Projects
Apr. 1999 Nov. 2003 (when in India)
E. Contract Management and Monitoring
BRIEF WORK SUMMARY :
AWARDS :
Training of Bridge Design and Construction Supervision
Two gold Medals for merit at Engineering Graduation Engineers, Business Development in different countries,
(1st class 1st), topped in the University preparation of Technical Proposals, and mounting Technical
Commonwealth Scholar, London University, London, UK Audits on Projects in India, Ethiopia, Bangladesh and
Cited in the Who is Who, India Mangolia.

Citation for various Professional Papers

EMPLOYMENT RECORD :

As a practising professional, so far : POSITION :


15 years with the UNITED NATIONS and the WORLD Technical Assistance Consultant - Contracts Manager
BANK as a senior Expert and Consultant
23 years with International Consultants EMPLOYER :
- in seventeen countries World Bank, Ministry of Works, LESOTHO (Southern Africa)
PERIOD :
Feb. 1997 Feb. 1999 (2 years)
BRIEF WORK SUMMARY :

Page 2 of 7
- Road Rehabilitation and Maintenance Project : responsible for the UNs Field Administration and Logistics Division) spread over
contract management and monitoring and procurement of 160,000 sq. km.; recommendations for streamlining the
consultancy services and works contracts, Manpower operations and reducing costs of resources of manpower
Training of Engineers and preparing manuals of operational and materials (Confidential Report).
systems and procedures for the eventual use of
Roads Authority. Authoreda global Systems Contract for Engineering
Management Services for Field Missions
- For establishing and managing a Roads Authority, examined
issues such as :
Purpose of Roads Authority (RA) POSITION & EMPLOYER :
Mission of RA
Self Employed, India, USA, UK, Canada
Jurisdiction of RA
setting up a Road Board (RB)
PERIOD :
setting up a Road Fund (RF)
setting up a Road Fund Board (RFBd.) Jun. 1993 Aug. 1994
Format of RA
RA Staffing BRIEF WORK SUMMARY :
RA HQ Organogram
Measures needed to expedite / streamline RA working Delivered Lectures and completed the Book titled Inspection,
Handling redundant staff from parent Ministry Repair, Strengthening, Testing and Load Capacity Evaluation
Rolling Corporate Plan of RA of Concrete Bridges.
Managerial accountability
Introducing sound business practices into RAs working
Financial Accounting System (RA FAS) POSITION :
Financial Statement
Cost Accounting System (RA CAS) UN Expert (grade L6 i.e. D-I : Step VII) and Team Leader of UN
Management Info Systems (MIS) for roads and bridges, Team of Experts and Consultant, UNDP and DESD in Saudi
i.e. Road Management System (RMS) Arabia..UN Index # 180026
Key Indices for measuring Performance of RA
Duties of Planning Unit in RA EMPLOYER :
Developing domestic contractors for road maintenance
Allocating funds from RF to various road agencies United Nations, New York
Some typical road maintenance costs (Southern Africa)
Bodies that manage different types of roads & PERIOD :
requirements
Jul. 1982 - May 1993 (11 years)
POSITION : BRIEF WORK SUMMARY :
Consultant Highways
Worked on multi-billion dollar Highway Development and
EMPLOYER : Rehabilitation Projects including bridges, tunnels and culverts in
Saudi Arabia covering :
World Bank (New Delhi)
PERIOD : Coordinating work in the field of transportation/traffic
studies and economic evaluation of highway networks,
Jul. 1995 end of 1996, (multiple short terms) hydrological studies and investigations, structural design,
BRIEF WORK SUMMARY : construction and repair of highways, bridges and
associated structures, geotechnical and foundation
- Technical Audit, contract monitoring, supervision-missions for problems, materials and testing, slope stability and rock
ongoing works, analysis and time framing of work programs, slide studies, and operation and evaluation of routine and
construction schedules and over-runs of Bank funded highway preventive maintenance
projects in India.
Prequalifications, Tenders, Evaluations, Contracts
- Examining appropriateness of Design Consultants
structural solutions (for optimization of Quantities and Programme and Liaison with Consultants, Contractors and
adequacy of construction techniques) Authorities
- Adequacy of quality of construction supervision Providing technical support for project proposals, designs
- Inspecting and examining for : and procurement
Percentage physical progress of work Planning, analysis, design, economics, detailing
Percentage financial progress of work
Percentage time elapsed in construction Maintenance and rehabilitation
Catch-up construction programme for the balance works
Manpower training of engineers
Corresponding monthly cash flow projections
Identification of commitments of each participant with Providing direct on-call expertise to the Ministry
cut-off dates
Investigation of structural failures
Adequacy of the Contractors Resource Management
Plan of his manpower, plant, material and its optimized in- Writing / reviewing consultancy / construction contract
flow agreements
QA and QC checks and certification
Investigating and evaluating construction claims, dispute
Identifying critical issues and their resolution
resolution
Conducting technical audits of various projects in various
POSITION : countries, the mid term and end-of-term evaluation of on-
Chief : Special Tasks Unit going projects and appraisal of projects in pipeline (e.g. the
UNDP funded Railway Project in India)
EMPLOYER :
Inspection, evaluation and rehabilitation of damages to the
United Nations, New York for UNPROFOR in Croatia, Bosnia - infrastructure on Sanna-Hudaida highway including about
Herzegovina, Macedonia, Serbia, and Belgrade 70 bridges (1984) Republic of Yemen (A major
PERIOD : Rehabilitation Work in Republic of Yemen)

Sep. 1994 Jun. 1995 Analysis of proposals for Institutional restructuring

BRIEF WORK SUMMARY : Conducting professional interviews for selecting and


recruiting the Resident Engineers, Bridge Engineers, Civil
Detailed assessment of engineering in the vast operations (of Engineers, Materials Engineers, etc., for various highway

Page 3 of 7
projects. 36 Palermo Court, Brampton
Ontario L6Z 3E9, CANADA
Phone : +(905) 846 8112 e-
POSITION : mail : andrzejw@rogers.com
Chief Executive Consultant
EMPLOYER :
Gilcon Project Services Ltd., Consulting Engineers, New Delhi 3. Mr. A.D. Narain
Director General (RD) & Addl. Secretary (Retd.)
PERIOD : Ministry of Surface Transport (MORTH)
B-186, Sector 26, NOIDA 201301 (UP), India
1972 1982 (10 years)
Phones : +(91)-98100-94174, +(91)-11-26863000
BRIEF WORK SUMMARY : +(91)-120-2527712
e-mail : ict@vsnl.com, cmd@ictonline.com
For works in India, Zambia, Iraq, etc.
Total engineering from reconnaissance and feasibility studies
through detailed engineering and contract documentation to
construction supervision, in the fields of bridges, flyovers,
aqueducts, water reservoirs, tanks, storage silos, industrial structures,
cooling towers, chimneys, aircraft hangars and port structures.
CERTIFICATION :

POSITION : I, the undersigned, certify that to the best of my knowledge and belief, this
biodata correctly describes my qualifications and my experience.
Senior Engineer - Design and Construction, London, UK and
Toronto, Ontario, Canada
EMPLOYER :
R. Travers Morgan and Partners and Harry Brompton and Partners, ________________________ Date : ____________
Consulting Engineers, London, UK, and Department of Highways [Signature]
of Ontario, Toronto, Canada
Dr. Virindra Kumar Raina
PERIOD :
1966 1972 (6 years)
NOTE:
BRIEF WORK SUMMARY :
Reconnaissance, site selection, field investigations, design, project My 8th Book ( FIELD MANUAL FOR HIGHWAY AND
estimating, detailed engineering, prequalification of bidders, tender BRIDGE ENGINEERS ) is directed at being a BRIEFCASE-
bids, evaluations, negotiations, work-awards, construction COMPANION, an 'on-call-compendium-teacher' , for the
supervision, quality control checks, diagnostic testing, load testing, Engineers engaged on a major composite Transportation
contract disputes, evaluation of cost and time overruns, manpower
training, initial taking-over and maintenance, and final taking-over of Project . and 'impromptu' tells them (almost) ALL the
the facilities. chain ACTIONS they must take ( at each level of
Engineering-decision-making from the sides of the
PERIOD : SUPERVISING( ie the Consultant's) Team, the EXECUTING
(ie the Contractor's) Team and the MANAGER's ( ie the
1963 1966 Client's) Team.
Carried out post-graduate research and study for Ph.D. and D.I.C.
at Imperial College, London University, London, England.

POSITION :
Design and Construction Engineer, India
EMPLOYER :
U.S. Dugal & Co., Engineers & Contractors, New Delhi
PERIOD :
1961 1963 (2 years)
BRIEF WORK SUMMARY :
Detailed design of prestressed concrete bridges, aircraft hangars
and a launching girder, preliminary design and preparation of tender
bids for seven bridges, and construction supervision.

Referees :
1. Mr. Shri G. Athavale
President
Athravale, Lystad & Associates
8180 Greensboro Drive
Suite 550, Mclean, VA 22102
USA
Phone : +(703)-893-3104
e-mail : cyn1.green@alaengr.com, sathavale@alaengr.com

2. Mr. A.A. Witecki


Consulting Engineer / Advisor

Page 4 of 7
Annexure - 1 1992 (Dr. V.K. Raina).
21. ECONOMICS OF ALTERNATIVE BRIDGE STRUCTURE SCHEMES
**
A PARTIAL LIST OF TECHNICAL PUBLICATIONS 22. ASSUAGING DISTRESS IN STRUCTURAL CONCRETE **

.in addition to the 7 books mentioned earlier : 23. CRACKING IN CONCRETE BRIDGE DECKS **
24. SOME IMPORTANT CONSTRUCTION CONSIDERATIONS **
1. ESTIMATION OF LOAD CARRYING CAPACITY OF CONTINUOUS
** Produced by Dr. V.K. Raina for the Saudi Ministry of Communications,
PRESTRESSED CONCRETE BEAMS Consulting Engineer, July
Seminar, May 1989
1967, London (Dr. V.K. Raina).
25. MAINTENANCE OF BRIDGES Annual Bulletin of the ING of IABSE
2. DISTRIBUTION OF LONGITUDINAL HORIZONTAL FORCES (Zurich), 1993 (Dr. V.K. Raina).
AMONG BRIDGE SUPPORTS TAKING INTO ACCOUNT
DEFORMATION OF BEARINGS, FLEXING OF PIERS AND 26. ECONOMICS AND QUANTITY TRENDS IN ALTERNATIVE
ROTATION OF FOUNDATIONS 1st International Symposium on CONCRETE BRIDGE STRUCTURE SCHEMES Journal of the
Concrete Bridge Design, American Concrete Institute, Special Indian Roads Congress, New Delhi, October November, 1992
Publication 23, April 1967, Toronto (Dr. V.K. Raina and A.W. Witecki). (Dr. V.K. Raina).
3. LIMIT STATE DESIGN OF CONTINUOUS PRESTRESSED 27. CONSULTANCY SERVICES FOR MAINTENANCE
CONCRETE BEAMS Seminar on Problems in Prestressing ING of MANAGEMENT SYSTEM FOR BRIDGES (SOME ASPECTS) The
IABSE (Zurich) IRC, February 1970, Madras (Dr. V.K. Raina). Bridge & Structural Engineer, ING of IABSE (Zurich) Vol. 20, No. 4,
Dec. 1990 (Dr. V.K. Raina).
4. TALL SLENDER BRIDGE SUPPORT ANALYSED BY SECOND
ORDER THEORY Journal of Madras Highways Special Issue, 28. EFFECT OF LINEAR TRANSFORMATION OF TENDON PROFILE
1970 (Dr. V.K. Raina). ON ULTIMATE STRENGTH IN CONTINUOUS PRESTRESSED
CONCRETE BEAMS The Bridge & Structural Engineer, ING of
5. ELASTIC AND ULTIMATE DESIGN AGAINST DIAGONAL IABSE (Zurich) Vol. 21, No. 4, Dec. 1991
CRACKING IN PRESTRESSED CONCRETE MEMBERS UNDER (Dr. V.K. Raina).
COMBINED TORSION, FLEXURE AND SHEAR Seminar on
Problems in Prestressing, ING of IABSE (Zurich) IRC, February 29. BEARINGS FOR BRIDGES The Bridge & Structural Engineer, ING
1970, Madras (Dr. V.K. Raina). of IABSE (Zurich) Vol. 21, No. 4, Dec. 1991 (Dr. V.K. Raina).
6. DESIGN AND CONSTRUCTION OF A WELDED STEEL AIRCRAFT 30. EXPANSION JOINTS FOR BRIDGES The Bridge & Structural
HANGAR Annual Bulletin ING of IABSE (Zurich) 1970 (Dr. V.K. Engineer, ING of IABSE (Zurich) Vol. 21, No. 4, Dec. 1991
Raina and G.S. Sawhney). (Dr. V.K. Raina).
7. VOLUME CHANGE EFFECT ON DISTRIBUTION OF HORIZONTAL 31. BRIDGE PARAPETS The Bridge & Structural Engineer, ING of
FORCES AMONG SUPPORTS IN CURVED AND SKEWED IABSE (Zurich) Vol. 21, No. 4, Dec. 1991 (Dr. V.K. Raina).
CONCRETE BRIDGES The Bridge and Structural Engineer, ING of
IABSE (Zurich), Vol. 2, No. 2, Dec. 1972 (Dr. V.K. Raina and A.W. 32. VIBRATION OF BRIDGE DECKS The Bridge & Structural
Witecki). Engineer, ING of IABSE (Zurich) Vol. 22, No. 1, March 1992
(Dr. V.K. Raina).
8. DESIGN AND CONSTRUCTION OF TWO BRIDGES IN DELHI The
Indian Concrete Journal, November 1972 (Dr. V.K. Raina). 33. REPAIR AND STRENGTHENING OF CONCRETE STRUCTURES
BY EXTERNALLY BONDED STEEL PLATES The Bridge &
9. TRANSVERSE ANALYSIS OF SOME TYPICAL PRESTRESSED Structural Engineer, ING of IABSE (Zurich) Vol. 17, No. 4, Dec. 1987
CONCRETE BOX SECTION BRIDGE DECKS The Indian Concrete (Dr. V.K. Raina).
Journal, October, November, December, 1974 and in The Bridge and
Structural Engineer, ING of IABSE (Zurich), Vol. 5, No. 2, June 1975 34. MAINTENANCE OF BRIDGES The Bridge & Structural Engineer,
(Dr. V.K. Raina). ING of IABSE (Zurich) Vol. 23, No. 4, Dec. 1993 (Dr. V.K. Raina).

10. TWO DECK CONSTRUCTION TECHNIQUES FOR CONTINUOUS 35. ESTABLISHING AND MANAGING A ROADS AUTHORITY. the
PRESTRESSED CONCRETE BRIDGE DECK ON TALL SUPPORTS AFRICAN perspective the Indian Roads Congress Session Jan.
The Indian Concrete Journal, 1974 (Dr. V.K. Raina). 2004..Was also delivered as a Lecture at the NATIONAL
HIGHWAYS AUTHORITY OF INDIA, New Delhi, (Dr. V.K. Raina).
11. R.C. SECTION SUBJECTED TO AXIAL THRUST AND ANY AXIS
BENDING The Bridge & Structural Engineer, ING of IABSE (Zurich) 36. FAST-TRACK DESIGN AND CONSTRUCTION OF BRIDGES IN A
Sept. 1975 Vol. 5, No. 4 (Dr. V.K. Raina). MAJOR HIGHWAY PROJECT The Souvenir Issue. Seminar on
Fast Track Construction of Bridges and Structures, ING of IABSE
12. ANALYSIS AND DESIGN OF SLENDER EXPOSED R.C. PILES (Zurich) and Road Construction Dept. (Bihar), Feb. 2001, and in the
The Bridge & Structural Engineer ING of IABSE (Zurich) Dec. 1976 Special Number of the Bridge & Structural Engineer ING of IABSE
Vol. 6, No. 4 (Dr. V.K. Raina and M.A. Easwaran). (Zurich), Dec. 2001 (Dr. V.K. Raina and K.K. Kapila).
13. TRANSVERSE ANALYSIS OF TWIN BOX DECK OF TAWI BRIDGE 37. TRAINING PLAN FOR INSTITUTIONAL STRENGTHENING for
The Bridge & Structural Engineer ING of IABSE (Zurich) Dec. 1978 rapid development of Roads in Africa and Asia *** (Dr. V.K. Raina)
Vol. 8, No. 4 (Dr. V.K. Raina and G.L. Varma).
38. MANAGEMENT IDEAS for rapid development of Roads in
14. APPROPRIATE TECHNOLOGY FOR DEVELOPING COUNTRIES Africa and Asia *** (Dr. V.K. Raina)
The Bridge & Structural Engineer, ING of IABSE (Zurich) Vol. 13, No.
*** International Seminar on Sustainable Development in Road
4, Dec. 1983 (Dr. V.K. Raina). Transport, New Delhi (Nov. 2001), IRC - PIARC
15. TEMPERATURE STRESSES IN CONCRETE BRIDGE DECKS
SIMPLE DESIGN METHOD The Bridge & Structural Engineer ING
of IABSE (Zurich) Vol. 15, No. 4 (Dr. V.K. Raina).
16. CONSTRUCTION MANAGEMENT FUNCTIONS AND BID
STRATEGY The Bridge & Structural Engineer ING of IABSE
(Zurich) Vol. 15, No. 4, Dec. 1985 (Dr. V.K. Raina).
17. BRIDGE ENGINEERING SOME TOPICAL REFLECTIONS Saudi
Ministry of Communications Seminar at King Saud University, Riyadh,
March 1986 (Dr. V.K. Raina).
18. ECONOMICS AND QUANTITY TRENDS IN ALTERNATIVE BRIDGE
STRUCTURE SCHEMES The Bridge & Structural Engineer ING of
IABSE (Zurich) Vol. 16, No. 4, Dec. 1986 (Dr. V.K. Raina).
19. BRIDGE DECK CONSTRUCTION TECHNIQUES 3rd Middle East
International Road Federation Conference, February 1987, Riyadh (Dr.
V.K. Raina).
20. BLUE-PRINT FOR GUIDING TECHNICAL DEVELOPMENT IN THE
FIELD OF CIVIL ENGINEERING PUBLIC WORKS IN DEVELOPING
COUNTRIES Special Publication, ING of IABSE (Zurich) March

Page 5 of 7
Annexure 2 5. The Superstructure
- Reinforced Vs. prestressed concrete superstructure
- Slab-type decks (solid / voided)
AREAS OF TRAINING, IMPARTED IN-HOUSE
- Beam and slab type decks
A. Concrete for Construction . Facts and Practice - Box type decks
- Economic spacing between Beams in a deck
1. Practical Concrete Mix Design and Grading of Aggregates
- Simply supported decks
2. Batching, Mixing, Transporting, Placing, Vibrating and Finishing of
Concrete - Balanced cantilever decks
- Continuous decks
3. Control of Surface Evaporation, and its Importance
- Segmental deck-construction (cantilever construction)
4. Construction Joints, Cold Joints and Movement Joints
-Economics various considerations
5. Under-water concreting
6. Economics and Quantity Trends in alternative bridge-structure
6. Inspecting, Sampling and Testing for Structural Concrete schemes
7. Curing and Protection of Concrete 7. Construction Techniques
8. Admixtures: Retarders, Accelerators and Plasticisers - Substructures
9. Effects of the following on concrete : - Reinforced earth walls (for retaining walls, abutments)
- Mix proportions - Superstructures
- W/C ratio - Temporary structures
- Curing and curing method 8. Construction Considerations
- Cement content and cement type - Excavation and back-fill
- Piles
- Aggregate type
- Concrete and concreting in adverse weather conditions
- Admixtures - Concrete exposed to sea-water (marine-conditions)
- Thermal changes - Shutters
- Age at test - Reinforcing steel
- Construction practices - Assembly and alignment of steel-decks in composite-construction
- Type of compression specimen (cylinder or cube) - Prestressed concrete
- Form and size of test specimen - Epoxy bonding agents
- Shotcrete
- Moisture content at time of testing
- Load-testing a superstructure
- End-bearing conditions - Various possible problems
- Rate of loading 9. Bridge and Culvert Maintenance / Rehabilitation
- Entrained air on freezing and thawing characteristics of concrete 10. Inspection Guidance for Bridge/Culvert Components
- Sulphate attack 11. Live Loads on Bridges
- Sewage water 12. Expansion Joints for Bridges
- Acids leaching by water - Sources of movements and loads at Expansion Joints
- Rusting of steel - Functional requirement of Expansion Joints
- Aluminium, copper, lead and zinc - Compression seals
- Large-movement Expansion Joints
- Carbonation
13. Parapets and Railings
- Reactive aggregates (alkali-aggregate reaction)
14. Pre-Tender Data Questionnaire
- Efflorescence
15. Bridge-Distress Reporting System
- Deleterious rocks / minerals in aggregates
- Various other substances (and recommended protective treatments) C. Workman-like Highway Construction-Administration covering
10. Relations between various types of concrete-strengths Administration, Management and Monitoring :
11. Causes of low rate of strength-gain 1. Construction Administration
12. Cracking of Concrete 2. Site staff
- In plastic stage 3. Construction Activities
- In hardening stage 4. Project Records and Diaries
- In hardened stage 5. Construction Files
13. Non-Destructive Tests 6. Construction Schedule
14. Thermal properties of concrete, heat-Resistance of concrete 7. Quality Assurance
15. Pumped Concrete 8. Standard Forms for :
16. Crack-and Wound-repair in concrete - Quality Assurance
- Quality Measurement
B. Bridges and Flyovers : - Site Administration
1. Development of Bridge-form D. Adopting a workman-like Field-Handbook approach for
2. The Substructure Highway Projects :
- Open-foundations
1. Administration
- Pile foundations 2. Site clearance
- Under-reamed pile foundations 3. Earthworks
- Caisson foundations (well foundations) 4. Drainage
- Piers 5. Pavement
6. Structures
- Abutments
7. Finishes
3. Estimating Safe Bearing Capacity of substrata for open- 8. Utilities
foundations, caissons and piles 9. Day works
4. Bridge Bearings 10. Maintenance
- Superstructure movements E. Contract Management and Monitoring :
- Development of Bearings
- Types of bearings recommended for different span-lengths and support 1. Contract Management System
flexibility conditions - Procurement and Contract Procedures
- Neoprene Bearings - Bidding Process
- Pot Bearings and PTFE - Evaluation and Evaluation-Report Formats
- Spherical Bearings 2. Checklists for :
- Cylindrical Bearings Bidding Process for ~
- Concrete Bearings
(a) Construction Tenders under Competitive Bidding
- Lessons from actual Distress experiences

Page 6 of 7
(b) Construction Tenders under Direct-Bidding
(c) Consultancy Tenders
(d) Goods Tenders
Bid Opening of ~
(e) Tenders for Construction and Consultants services
Bid Evaluation of ~
(f) Construction Tenders
(g) Consultancy Tenders
(h) Goods Tenders
3. Price escalation and how to pay for it
4. Interim Payment Invoice / Certificate (IPI/IPC)
5. Retention Money deduction and refund of
6. Mobilization and Machinery Advances payment and recovery of
7. Final Account of Contractors work
8. Liquidity Damage, Compensation Events and Extension of Time
9. How to Prequalify Contractors
10. Procedures for awarding Consultancy Contracts RFP, Technical
Evaluation, Financial Evaluation, and Negotiation
11. Contract Monitoring Process and Monthly Progress Report
12. Monitoring the effects of Plant-Production-Rates and Job-
Efficiency-Factors on Contract Management