Académique Documents
Professionnel Documents
Culture Documents
GS 01R04B04-00E-E 19th edition April 16, 2014-00 All Rights Reserved. Copyright 2003, Rota Yokogawa
25
Customer insulation / Heating /S2 Terminal box on extension for high or low process temperature not with /T1, /T2, /T3
Factory Insulating / Heating /T1 Insulation not for RCCS39/XR
/T2 Insulation + Heat carrier heating not for RCCS39/XR
/T3 Insulation + Heat carrier heating with ventilation (purge) not for RCCS39/XR
X-Ray Examination /RT X-ray examination of flange welding RCCS30LR to 33 and RCCS34 with /K4, /K6 or /LT
only one-sided; not with HC
PMI Certificate /PM4 PMI Test on pressurized parts RCCS30LR to 33 4) not RCCS34 to 39/XR
/PM6 PMI Test on pressurized parts RCCS34 to 39/XR not RCCS30LR to 33
Dye Penetrant Test /PT Dye Penetrant Test acc. DIN EN ISO 3452-1 at the weldings of the process con-
nection, with certificate
Stainless steel cable gland /BS Cable gland stainless steel
Delivery to Japan /PJ For meters which are delivered to Japan
Delivery to Korea /KC With KC-mark for Korea
Quick Delivery /QD Delivery within 24 hours from factory Delivery scope please refer to Quick Delivery Possibili-
ties or contact Yokogawa sales office.
Special order /Z Special design must be specification an extra sheet
1)
Select affiliated converter RCCF31/RCCR31 with the same approval type (e.g. ATEX).
2)
Select affiliated converter RCCF31 with the same approval type (/Q01 or /Q20).
3)
Calibration order sheet must be delivered with the order. This is available on the Flow Center Page at Coriolis/RCC3/Technical Information.
Volume calibration: Mass flow calibration converted by density to volume flow.
4)
Measuring tube PMI test is performed per delivery batch.
All Rights Reserved. Copyright 2003, Rota Yokogawa GS 01R04B04-00E-E 19th edition April 16, 2014-00