Work Experience:
Managing monthly KPI (Key Performance Indicators) targets like Revenue expenditure,
breakdown hours, Inventory targets and Over-time.
Maintaining a thrust on Condition based maintenance with goal of zero breakdowns and
carrying out reliability audits
Planning & Execution of maintenance & trouble-shooting activities on plant equipment
including, Variable Speed Drives, Gas & Steam turbines, Sub-stations, Screw compressors,
Cooper Turbo Compressors, , Control valves, PLC System, field instrumentations, Dual Fired
Boiler instrumentations, Energy management system and data acquisition systems.
Designing, configuration, integration of Allan Bradley and Siemens PLC &HMI
Designing, configuration, integration of Red Lion controllers
Monitoring, maintenance and Up gradation of fire alarm system of Soda Ash Plant
Designing selection and Sizing Control valve
Testing of critical instrumented protective system and Programmable electronic system
procedures
Testing, analysis and review of critical machines control system
Up gradation of boilers trips and interlock securities according to NFPA standards
Identification of Electrical hazards and hazardous area classification
Carrying out Behavior Based Safety Audits & giving daily safety/Tool box talk in workshop.
Carrying out monthly Safety Improvement Team meetings
Meeting requirements of companys Asset Integrity Guidelines (AIG) & Management of
Change (MoC) procedures applicable to all Electrical and instrumentation equipment.
Proposing, budgeting and implementation of yearly capital projects in Area of concern
(instrumentation related projects)
Planning and Execution of Annual Turn around
Failure analysis of critical machines
Inventory management
Projects
Worked as Team Lead E&I in Installation and commissioning of 5.5MWSolar T-60 Gas
Turbine
Worked as Team Lead E&I in Installation and commissioning of 91KTPA Refine sodium
carbonate plant
Worked as Team Lead E&I in Installation and commissioning of 300 Tons/Day RSB Packing
Machine
Worked as Team Lead E&I in Installation and commissioning of 300 Tons/Day DAP Packing
Machine
Worked as Team Lead E&I in Installation and commissioning of 15TPH Dual fired boiler (Gas
& Furnace oil)
Worked as Team Lead E&I in Installation and commissioning of 60 m3/hr RO plant
Worked as Team Lead E&I in Installation and commissioning of 160m3/hr EDI plant
Worked as Team Lead E&I in Installation and commissioning of Absorber Vacuum Engine
Worked as Team Lead E&I in Installation and commissioning of Boilers Dosing system
Worked as Team Lead E&I in Installation and commissioning of Boiler House Automation
projects
Worked as Team Lead E&I in Installation and commissioning of Filter vacuum Engine
To prepare and review preemptive maintenance schedule for furnace oil Gen sets, gas
Gen Set, and boilers
To conduct preemptive maintenance of HFO Get Sets, gas Gen sets, VFDS, Circuit
breakers, CT, PT, Motors, HT switch gear, LT switch gear, VFDS Overhead 11KV distribution
system, thermocouples, temperature switches, isolators, Underground 11KV distribution
system and boilers.
Designing, selection and seizing of Control valves
Automation of boilers and process plant
Professional Development
Computer Skills
Personal
Nationality Pakistani
NIC 17102-1848139-1
DOB 20th Nov 1989
IEEE Membership 90455899
References