Risks Likelihood Impact Risk Risk Management

Score

Improper 0.5 0.8 40 Mitigate- Receive a


Budgeting budget sign off
from Michelle

Lack of 0.5 (Depends on 0.4 20 Avoid-


Executive whether Michelle Receive sign-off on
Support likes the project the project from
plan) Michelle before
beginning

Poorly Defined 0.3 (Depends on 0.4 12 Mitigate-


Requirements the requirements Define
gathering requirements
techniques) through proper
requirement
elicitation
techniques and
consult all
stakeholders

Scope Creep 0.5 (Depends on 0.2 10 Accept-


(Unrealistic how the project Accept that this
Deadlines) plays out over could happen, but
time) try to follow the
project schedule as
closely as possible
and track resources

Inadequate 0.3 (Depends on 0.4 12 Mitigate-


Stakeholder requirements Consult with all
Engagements gathering stakeholders when
techniques) gathering
requirements and
check in with them
throughout the
duration of the
project

Failed 0.5 0.8 40 Mitigate- Perform


Application and extensive research
System on options for
Architecture application and
system
architecture;
Inquire about
recommendations
from professionals
that have built a
similar system

Failure to 0.3 0.9 27 Mitigate- Meet


Manage End with some current
User customers and ask
Expectations about what their
expectations of an
online system/app
would be

Inadequate 0.2 0.9 27 Mitigate- Perform


Security extensive research
Features Built on what similar
into the System solutions have used
for security and
how they
implemented those
solutions

Insufficient 0.3 0.8 24 Avoid- Do not


Software Testing release the
application until
adequate testing
has been completed
and Michelle has
signed off on the
product. Even if
schedule becomes
pushed out because
of additional
testing, do not
decrease the
intensity of the
tests.

Poor Project 0.3 0.6 18 Mitigate-


Team Dynamic Encourage
interactive team
management in
order to address
issues when they
arise; encourage
collaborative, open
communication
among team
members

Constant 0.7 0.8 56 Mitigate- Come up


Changes in the with a change
Requirements management
process; Develop
the product in
increments,
allowing for testing
and sign-off after
each sprint

Technical 0.4 0.9 36 Mitigate- Interview


Inablity and hire developers
that meet the
required technical
requirements

Gold Plating- 0.3 0.5 15 Avoid- Make sure


Unnecessary the requirements
Features contain only the
Developed bare minimum
features needed to
release the
application and that
Michelle signs off
on those
requirements;
Make sure the
developers are very
clear on the
requirements and
do not attempt to
implement
unnecessary, flashy
features

Tension between 0.5 0.8 40 Mitigate-


Developers and Prototypes will
Customers/Mich help with aligning
elle the developers and
Michelles vision;
Provide Michelle
with weekly
deliveries that
allow her to assess
the state of the
project

High Workload 0.5 0.7 35 Mitigate- When


on Developers hiring developers,
make sure it is
clear what is being
asked of them and
that they feel their
abilities are up to
par