Académique Documents
Professionnel Documents
Culture Documents
Mission Statement:
We are at our best when We are working together.
We will try to prevent times when We are separate, not on the same page, divided .
We love to be creative and think outside of the box.
We will find enjoyment in our personal life through being friendly and enjoying
ourselves.
We will find opportunities to improve areas of society such as Transportation, Energy,
Architecture, and Water.
We can do anything We set our mind to. We will build the perfect city that is:
sustainable, efficient, visually appealing, and a model for others.
Our company sets out to make every city better for everyone, the environment, and the
economy.
We will be people who are nice, friendly, hardworking, intelligent, resourceful, creative,
thinking people.
Our most important future contribution to others will be to contribute ideas and
innovations to the future of our society.
Overall goal:
It is our goal to make Southend by improving the environment, the economy, and
society.
Engineering South End Scenario:
The city is considering purchasing a vacant warehouse in a blighted section of town. The area was
once a busy manufacturing district along a riverfront near the downtown area. The city would like to
convert the warehouse to a facility that provides a community service. The goal is to encourage
redevelopment of the area.
What we did:
We designed a Business Center whose purpose is to:
Give themed job fairs every Saturday
Allow employers of large and small business get free advertisement and recruitment
Enable people from all over Charlotte (especially South End) can look for jobs
Provide Office rooms on second floor can be rented out for business meetings
Architectural Information:
2 Stories
40,000 square feet
200 x 200 x 23.5
Brick and Concrete outside (matches buildings beside)
Large windows provide max sunlight for office spaces
Movable walls change sizes of all rooms for any occasion
There is 11 feet of vertical space on each floor
Walls cost can range from $50-$300
(pictures
Transportation Information:
Energy Information:
We will install our walking power plates in the building to generate energy. See the
energy page for more information.
Other Architectural Issues:
From work to home to shopping and recreation, established buildings and areas
are sometimes underutilized. How can you revamp the current buildings and
resources in your area to better serve the public need? How can you improve the
sustainability of your area?
We found:
- Buildings can range anywhere from about one million to hundreds of
millions of dollars.
- There is a lack of knowledge and interest awareness about what it
takes to make a city or area sustainable.
Solutions:
1.) Incentives:
Offer financial incentives for property owners for either implementing renewable
energy sources into their building, or meeting an energy quota. We would provide
the money for these incentives using the about 5% of the money would save
using our different systems which would be:
4% from wastewater
1 % from transportation
2.) Create:
Community centers like libraries, theatres, and museums to draw more people
into South End. Reaching back to the roots of South end we could use these
buildings to also host events like art shows and science contests. We could use
these events to both make the community more environmentally aware, and
attract businesses.
Other Transportation Issues:
People need to get to and from work among other places. Traffic can be an issue almost
anywhere. How can you reduce traffic and gridlock? How can public transportation
better serve the residents of your area?
Solutions:
The Problems
- Gridlock in highly populated areas. Specifically the highways of South End
- The Charlotte Lynx Tram line not having enough accommodations for all of
South End
The Solutions
- The addition of 1 lane within all major highways of South End. Cost: $1
million
- The expansion of the tram line Cost: $503.5 million
The Design:
Basic Info
This design is great for efficiency as it is a fast moving train capable of
moving at speeds of 90mph and above (15 miles above normal) so people will
get to their destinations in a timely manner.
In my design the bullet train will also have ten cars accompanying what's
shown above so more of south end can get to where they need to be.
The tram will also have easy access to our business center as a stop will
be near.
Other Information
Reinforced Steel (2,130 feet for full tram $1.5 million
Bullet Proof Glass (PVB and $2 million
polycarbonate layers) 2,100 feet for full
tram
Stops 36
Hubs 1
Stationss 6
Pros:
- Having easy accessibility to the train
- Easy transport throughout all of South End
- Less gas emissions
Cons:
- Less use for cars causing a downfall in the automobile industry
- Some passengers may not use the train or they may not find it accessible
due to disability or handicap
- Gas and natural gas industries will lose revenue
Other Energy Issues:
Issue: Residents expect to have reliable source of power at a reasonable price. How
can you improve the supply of power and make it more sustainable? What energy
alternatives could be used to improve services?
Ultrasonic Cleaning
Ultrasound imaging
Speakers
Electric toothbrushes
Other Plumbing and Wastewater Issues:
Water is an essential service that must be delivered. How can you improve upon
the current delivery of clean water to homes in your area? How can the use of
water be made more efficient? How can you better use or process wastewater?
We found:
The main problem plaguing Charlotte plumbing is grease clogs.
Leading cause of sewer build-up
Spills occur virtually 5 times a week
Charlotte has over 100 clogs a year
Causes raw sewage to overflow into streets and
residential areas
Costs Hundreds of Thousands of dollars to repair
Solution:
Creation of a Vinegar integration system.