Project : Sukhothai Block 7 Lot 6

Location : The Racha Mansions


Subject : Progress Report
Contractor :
Date : August 15, 2016

ITEM DESCRIPTION WT%

1.0 GENERAL REQUIREMENTS 1.60


1.1 Mobilization 0.14 50%
1.2 Demobilization 0.14
1.3 Insurance & Bond Premiums 0.30 90%
1.4 Temporary Facilities 0.30
1.4.1 Barracks 0.10 100%
1.4.2 Warehouse 0.10 100%
1.4.3 Perimeter Fence 0.10 50%
1.5 Power & Water Consumption 0.52 50%
1.6 As-Built Plans (All Trades) 0.20
2.0 EARTHWORKS 2.00
2.1 Clearing And Grubbing 0.40 100%
2.2 Lay out & Staking 0.10 100%
2.3 Excavation 0.35
2.3.1 Isolated Footing 0.10 100%
2.3.2 Wall Footing 0.12 100%
2.3.3 Septic Tank 0.05
2.3.4 Grease Trap / Catch Basin 0.05
2.3.5 Service Entrance 0.03
2.4 Backfilling and Compaction 0.40
2.4.1 Isolated Footing 0.13 100%
2.4.2 Wall Footing 0.17 100%
2.4.3 Septic Tank 0.10
2.5 Base Preparation / Compaction of Ground Slab 0.25 50%
2.6 Soil Poisoning 0.25 50%
2.7 Cleaning and Lot Leveling 0.25 50%
3.0 CONCRETE WORKS 7.00
3.1 Isolated Footing 0.60 100%
3.2 Wall Footing 0.80 100%
3.3 Ground Floor Columns 0.65 100%
3.4 Second Floor Beams 0.70 100%
3.5 Second Floor Slab 0.65 100%
3.6 Second Floor Columns 0.60 100%
3.7 Roof Beams 0.35 100%
3.8 Lintel Beams 0.20 100%
3.9 Stairs 0.30 85%
3.10 Canopy 0.15
3.11 Slab on Grade 1.25
3.12 Service Counter 0.15
3.13 Service Entrance 0.15
3.14 Grease Traps / Catch Basin 0.20
3.15 Septic Tank 0.25
4.0 FORMWORKS 8.50
4.1 Ground Floor Columns 1.00 100%
4.2 Second Floor Beams 2.00 100%
4.3 Second Floor Slab 1.50 100%
4.4 Second Floor Columns 1.00 100%
4.5 Roof Beams 0.65 100%
4.6 Lintel Beams 0.65 100%
4.7 Stairs 0.36 85%
4.8 Canopy 0.20
4.9 Service Counter 0.17
4.10 Service Entrance 0.30
4.11 Grease Traps / Catch Basin 0.50
4.12 Septic Tank 0.17
5.0 REBARS 7.80
5.1 Isolated Footing 0.30 100%
5.2 Wall Footing 0.20 100%
5.3 Ground Floor Columns 1.00 100%
5.4 Second Floor Beams 1.26 100%
5.5 Second Floor Slab 0.54 100%
5.6 Second Floor Columns 1.00 100%
5.7 Roof Beams 0.45 100%
5.8 Lintel Beams 0.20 100%
5.9 Stairs 0.94 85%
5.10 Canopy 0.20 100%
5.11 Slab on Grade 0.75
5.12 Service Counter 0.05
5.13 Service Entrance 0.25
5.14 Grease Traps / Catch Basin 0.36
5.15 Septic Tank 0.30
6.0 MASONRY WORKS 10.00
6.1 CHB Laying 6.40
6.1.1 Ground Floor 2.70
6.1.1.1 Exterior 1.40 85%
6.1.1.2 Interior 1.30 85%
6.1.2 Second Floor 2.70
6.1.2.1 Exterior 1.40 85%
6.1.2.2 Interior 1.30 85%
6.1.3 Septic Tank 0.72
6.1.4 Grease Trap 0.12
6.1.5 Catch Basin 0.16
6.2 Plastering Works 2.90
6.2.1 Ground Floor 1.20
6.2.1.1 Exterior 0.75 85%
6.2.1.2 Interior 0.45 85%
6.2.2 Second Floor 1.20
6.2.2.1 Exterior 0.75 85%
6.2.2.2 Interior 0.45 85%
6.2.3 Septic Tank 0.25
6.2.4 Grease Trap 0.10
6.2.5 Catch Basin 0.15
6.3 Floor Topping 0.25
6.3.1 Ground Floor 0.10
6.3.2 Second Floor 0.15
6.4 Granite Counter Top 0.45
7.0 ROOFING WORKS 14.00
7.1 Main Roof 9.80
7.1.1 Roof Frame 3.00 85%
7.1.2 Under Sheeting 1.88
7.1.3 Roof Tiles 3.71
7.1.4 Fascia Board 0.70
7.1.5 Gutter 0.51
7.2 Lower Roof 4.20
7.2.1 Roof Frame 1.31 50%
7.2.2 Under Sheeting 0.80
7.2.3 Roof Tiles 1.59
7.2.4 Fascia Board 0.30
7.2.5 Gutter 0.20
8.0 DOORS AND LOCKSETS 4.50
8.1 Doors and Jambs 3.47
8.1.1 Main Entry 0.25
8.1.2 Carport 0.15
8.1.3 Dining Area 0.80
8.1.4 Guest Room 0.18
8.1.5 Maids T&B 0.13
8.1.6 Guest T&B 0.13
8.1.7 Powder Room 0.13
8.1.8 Master T&B 0.13
8.1.9 Master Bedroom 0.18
8.1.10 Bedroom 2 0.18
8.1.11 Bedroom 3 0.18
8.1.12 Guest Room 0.18
8.1.13 Maids Room 0.10
8.1.14 Common T&B 0.40
8.1.15 Balcony 0.35
8.2 Door Hardwares and Locksets 1.03
8.2.1 Main Door Locksets 0.17
8.2.2 Cylindrical Locksets 0.48
8.2.3 Sliding Door Locksets 0.05
8.2.4 Door Hinges 0.18
8.2.5 Door Stopper 0.15
9.0 WINDOWS 4.60
9.1 Window Openings 0.60
9.2 Aluminum Powder Coated Windows 4.00
10.0 CARPENTRY WORKS 10.50 10.50
10.1 Ceiling Works 3.91
10.1.1 Ground Floor 1.23
10.1.2 Second Floor 1.23
10.1.3 Ceiling Eaves and Vents 1.45
10.2 Celing Cornices 0.30
10.2.1 Ground Floor 0.15
10.2.2 Second Floor 0.15
10.3 Baseboards 0.30
10.3.1 Ground Floor 0.15
10.3.2 Second Floor 0.15
10.4 Bedroom Closets 2.48
10.4.1 Masters Bedroom 0.66
10.4.2 Bedroom 2 0.58
10.4.3 Bedroom 3 0.58
10.4.4 Guest Room 0.66
10.5 Stair Finishes 0.81
10.5.1 Stair Tread 0.55
10.5.2 Stair Riser 0.26
10.6 Downspout Cladding 0.20
10.7 Kitchen Cabinet 2.50
11.0 WALL AND FLOOR FINISHES 9.70 9.70
11.1 Wall Tiles 2.50
11.2 Floor Tiles 2.30
11.3 Stone Claddings 1.80
11.4 Mouldings 1.80
11.4.1 Doors and Walls 0.80
11.4.2 M1 - to columns @ porch, 50mm x 100mm 0.20
11.4.3 M2 - to columns @ balcony, 50mm x 100mm 0.35
11.4.4 M3 - to carport, 50mm x 100mm 0.10
11.4.5 M4 - to tubular accent at rear, 50mm x 100mm 0.25
11.4.6 M5 - to overlook window, 50mm x 100mm 0.10
11.5 Laminated Wood Floorings 1.30
12.0 METAL WORKS 1.00 1.00
12.1 Stair Railing 0.35
12.2 Balcony Railing 0.17
12.3 ACU Grills 0.10
12.4 Septic Tank Manhole Cover 0.08
12.5 Area Drain Cover 0.25
12.6 Grease Trap Cover 0.05
13.0 PAINTING WORKS 5.80
13.1 Ground Floor 2.33
13.1.1 Exterior Walls 0.60
13.1.2 Interior Walls 1.00
13.1.3 Ceiling 0.33
13.1.4 Doors and Jambs 0.20
13.1.5 Baseboard 0.10
13.1.6 Cornices 0.10
13.2 Second Floor 2.33
13.2.1 Exterior Walls 0.60
13.2.2 Interior Walls 1.00
13.2.3 Ceiling 0.33
13.2.4 Doors and Jambs 0.20
13.2.5 Baseboard 0.10
13.2.6 Cornices 0.10
13.3 Stair Planks 0.14
13.4 Stairs and Hallway Railing 0.22
13.5 Aircon Grills 0.08
13.6 Septic Tank Manhole, Area Drain, Catch Basin, Grease Trap 0.70
14.0 PLUMBING WORKS 6.50
14.1 Sewer Lines 1.00 50%
14.2 Drainage 1.00 50%
14.3 Water Line 0.90 50%
14.4 Downspout 0.70 50%
14.5 Plumbing Fixtures 2.68
14.6 Water Meter 0.12
14.7 Pressure Testing 0.10
15.0 ELECTRICAL WORKS 6.50 6.50
15.1 Service Entrance 1.40
15.2 Electrical Rough-ins Ground Floor 1.00 50%
15.3 Electrical Rough-ins Second Floor 1.00 50%
15.4 Wires and Cables 2.00
15.5 Electrical Devices 0.50
15.6 Panel Board 0.60
Accomplishment 100
TO DATE WT%

0.07%
0.00%
0.27%

0.10%
0.10%
0.05%
0.26%
0.00% 0.85%

0.40%
0.10%

0.10%
0.12%
0.00%
0.00%
0.00%

0.13%
0.17%
0.00%
0.13%
0.13%
0.13%

0.60%
0.80%
0.65%
0.70%
0.65%
0.60%
0.35%
0.20%
0.26%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.00%
2.00%
1.50%
1.00%
0.65%
0.65%
0.31%
0.00%
0.00%
0.00%
0.00%
0.00%

0.30%
0.20%
1.00%
1.26%
0.54%
1.00%
0.45%
0.20%
0.80%
0.20%
0.00%
0.00%
0.00%
0.00%
0.00%

1.19%
1.11%

1.19%
1.11%
0.00%
0.00%
0.00%

0.64%
0.38%

0.64%
0.38%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00% 6.63%

2.55%
0.00%
0.00%
0.00%
0.00%

0.66%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.50%
0.50%
0.45%
0.35%
0.00%
0.00%
0.00% 1.80%

0.00%
0.50%
0.50%
0.00%
0.00%
0.00% 1.00%
32.74%