Vous êtes sur la page 1sur 20

Iss u e N o .

3 , 2 0 1 1

Feature story

InSite 4.0: Visualising a


Better Mine Production
Management System
The latest version of the Gemcom InSite mine production management
solution hit the market 3rd August, introducing exciting new Shift
Management and Central Monitoring capabilities. Charlie Forrest,
Product Manager for InSite, walks us through the new features and
gives a behind-the-scenes look at how they came into development.
+ Click here to read the full story (page 2)

customer story
Gold Fields Ghana Utilises
Gemcom Whittle to Improve
Cash Flow at Tarkwa Operation
Gold mining operation uses Gemcom Whittle and Gemcom Surpac to rapidly
generate and evaluate multiple designs, allowing the optimal scenario to be selected.
+ Click here to read the full story (page 4)

Product News and Tips Regional News


+ AUSTRALASIA (page 5)
Gemcom Surpac Gemcom MineSched
+ EUROPE, MIDDLE EAST AND
+ learn more (Page 10) + Learn more (page 14) NORTH AFRICA (page 6)
+ INDO-AFRICA (page 7)
Gemcom GEMS Gemcom PCBC + LATIN AMERICA (page 8)
+ Learn more (page 11) + Learn more (page 16)
+ NORTH AMERICA (page 9)

Gemcom Minex Gemcom Hub


+ Learn more (page 12) + Learn more (page 17) global events calendar
+ see where
Gemcom Whittle Gemcom InSite to find us
(page 19)
+ Learn more (page 13) + Learn more (page 2)

Gemcom Support Gemcom Services Gemcom community


+ Learn more (page 19) + Learn more (page 18)
+ Learn more (page 20)

Disclaimer and copyrights


This document gives only a general description of products and services and except where expressly provided otherwise shall not form part of any contract.
Changes may be made in products or services at any time without notice. Copyright 2011, Gemcom Software International Inc. Gemcom, the Gemcom logo,
combinations thereof, and Surpac, GEMS, Minex, MineSched, Gemcom InSite, Whittle, PCBC and Gemcom Hub are trademarks of Gemcom Software
International Inc. All other names are trademarks, registered trademarks, or service marks of their respective owners.
Mining Software Solutions
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Feature story
Gemcom
InSite 4.0:
Visualising a Better
Mine Production
Management Solution

Charlie Forrest, Product Manager


Mine Production Management

The latest
version of the
award-winning
Gemcom InSite
mine production
management
solution was
released on 3rd
August. A leader
Central Monitoring module provides a real time schematic for open pit and underground operations.
in material
movements, stockpile management
The ability to monitor data from Shift feature of this release. Being able to
and reconciliation, InSite records and
Management along with all other not only review data in real time, but
evaluates data for service, support
operational data allows you to react also to visualise it graphically makes
and production activities from the
quickly to changing conditions and it so much easier to monitor tasks
mine through to saleable product. The
solve problems as they arise. and their progress.
much anticipated InSite 4.0 features
two new modules to accurately What Capabilities are Behind the Scenes, What Goes
visualise and manage operations. You Most Excited About? into Determining the Need for a
Im most excited about the visual Particular Module or Feature?
Charlie Forrest, Product Manager for
InSite, gives us the behind-the-scenes component and the technology were Well, conducting market research is
info on the development of version using. The new technology is web- one way to ensure a new release will fit
4.0, and tells us about its exciting based which means the retrieval and into the current market from a company
new features. analysis of data is much quicker. perspective and a revenue perspective,
With traditional mine production but the biggest determining factor is
Whats New for InSite 4.0? visiting client sites.
management systems, you enter
The biggest features of this release data, and then wait for a report, and I spend a lot of time travelling and
are the two new modules: Shift by the time you find out about any visiting both our own client sites
Management and Central Monitoring. issues, theyve already been causing as well as other non-InSite client
The Shift Management module problems in production. InSite 4.0 sites. I see how theyre performing,
provides transparency into shift functions in real time, so as data how they operate and find out what
planning and operations, allowing comes in, you can be alerted, get their challenges are. For existing
you to execute and manage tasks trending on it and perform analysis clients, I see how our software is
against a plan, within a shift. right away. It gives the shift boss, performing, what they like and where
Basically, it ensures shift time is engineer or geologist the ability to the deficiencies are. If clients are
used as efficiently as possible, and make informed decisions about an not using InSite, I find out what their
highlights and eliminates conflicts issue during the shift, rather than needs are and how InSite could be
and bottlenecks. looking at a report at the end of the developed to work for them.
The Central Monitoring module day and realising they missed the Additionally, by going around the
provides a graphical real time display shift target. globe I can get a consensus on
of your entire operation, with visual The visual component provided by the similar issues across the board.
representations of all active tasks. graphical user interface is a major During my last trip, I started in

2 I nside G emcom Iss u e N o . 3 , 2 0 1 1


home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Australia and saw that there was a


need for retrieval of data from the
manual data capture system. Next
I went to Africa and saw the same
thing, then to North America, and
so on. Getting out into the market
means I can get validation on
common issues pretty quickly.
The impetus behind 4.0 was
predominantly cost control and
operational efficiency improving
efficiencies by capturing and
reporting on data and reducing
the time it takes to find and solve
operational issues.

What are the Key Problems


Operations are Able to Solve
with InSite? Shift Management module provides visibility into executing and tracking shift progress.

InSite helps with cost control and


crusher feed may be 80%. Without actual data.
operational efficiency in several
InSite, you would be unaware that the
areas. One way it does this is by How Does InSite Work with Geology
identifying issues quickly. Traditional throughput of the crusher could be
and Mine Planning Software?
production management systems improved. There are numerous ways
that InSite can identify bottlenecks or Geology and mine planning software
generally find issues after the fact.
inefficiencies that affect throughput. provides the initial starting point for
Say for example, a loader has a
breakdown. It may be out for some Additionally, InSite improves InSite the geological model which
time before the downtime is recorded. efficiencies in regards to the skills gives the location, volume, cross-
With InSite, you will be alerted shortage. For a lot of operations, sectional area and grade of material
immediately, allowing you to react to finding skilled employees is an issue. to be removed. Once material starts
the downtime and keep in line with Having software thats easy to use, being removed, InSite tracks it
production targets. with easy transfer of knowledge through the mining value chain. It
Another way is by helping with end-of- means fewer people are needed to also tracks all drilling and blasting
month processes. A typical operation manage the operation. pre-production and production data.
takes about five days to gather data
How Does InSite Work with What Has the Market Reaction to
for end-of-month financial reporting
Scheduling Software Such as InSite 4.0 Been Like So Far?
and for compliance and auditing. If
Gemcom MineSched?
you have InSites production system The market reaction has been great.
which links data throughout the mining InSite is integrated with MineSched to Clients really like the overall look and
system, you can produce your end-of- bring in short, medium and long term feel, how intuitive the new version is
month reports in only a few hours. target-based scheduling. For example,
and how easy it is to navigate. Theyre
InSite can also easily identify and MineSched will plan material
excited about the ability to see
solve bottlenecks in the operation movements (move this material, from
visually how things are performing,
that you may not even be aware this pit to this stockpile, with this
and the quick response time for
of. For example, you could have a piece of equipment, by this employee)
issues. Overall, the shift away from a
crusher feed that appears to be fine and InSite will receive that info for all
traditional model is a big change and
from a systems standpoint. However, activities during the day or week. As
the activities occur, InSite will match people love the new technology.
once InSite analyses the data, the
utilisation on the crusher may turn them up to the plan values to allow To learn more about InSite, visit
out to be at 70% where an optimal comparison between plan data and gemcomsoftware.com/insite.

3 I nside G emcom Iss u e N o . 3 , 2 0 1 1


home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

CUSTOMER STORY
Gold Fields Ghana Utilises Gemcom Whittle
to Improve Cash Flow at Tarkwa Operation
Gold Fields Tarkwa Gold Mine is says Lucette Hugo, Chief Strategic
located in South Western Ghana with Planning Engineer, Gold Fields Ghana.
an infrastructure consisting of six She explains further, The ability to
open pits, two heap leach facilities quickly generate over 300 scheduling
and a CIL plant. The operation scenarios and apply different
is currently mining multiple-reef production criteria to both existing
horizons from open pits and there and new cutbacks allowed us to see
is potential for future underground the value loss or gain each scenario About Gold Fields
mining. Tarkwa has a mineral would create for the business. This Headquarters: Johannesburg,
resource of 12.6 million gold ounces South Africa
has enabled us to reach our targets
and a mineral reserve of 9.2 million without sacrificing cash flow. We Symbols: JSE, NYSE, NASDAQ, NYX,
ounces. SWX: GFI
couldnt possibly have scheduled all
The Tarkwa mine uses Gemcom these scenarios using our previous Gold Fields is one of the worlds
largest unhedged producers of gold,
Whittle to generate and select the scheduling and financial modelling
with operating mines in Ghana,
standard optimal pit shells from software within a reasonable time Australia, Peru and South Africa.
which they calculate their reserves. frame.
Website: goldfields.co.za
They then export the pit shells Gemcoms software has allowed
to Gemcom Surpac to develop the operation to explore a much
scheduling designs. wider range of options. Hugo says, course significantly enhanced our
Whittle has enabled them to rapidly Our previous software only allowed understanding of how to generate
generate multiple scenarios, and the us to choose three or four different value through pit and phase selection
minimum mining width feature has scenarios. Being able to run hundreds
and scheduling. It allowed us to
helped them create an improvement of scenarios has allowed us to explore
integrate concepts we werent
in cash flow through the scheduling options previously not considered
previously utilising and meet our
of internal cutbacks. feasible, and conclusively demonstrate
internal targets. She also adds,
The software allowed us to find their value to the business.
Gemcoms technical support is
scenarios that showed a clear Hugo recommends Gemcom products
excellent; their response time is fast
improvement over the base cash flow for their efficiency and flexibility, and
and answers are relevant and helpful.
and also to see where production adds that Gemcoms training services
targets may be reducing cash flow. and technical support have also For more customer stories,
We were able to quickly select and been invaluable to their operation. visit gemcomsoftware.com/
re-evaluate internal cutbacks, Attending an optimisation training customer-stories.

Gold Fields Tarkwa Gold Mine.

4 I nside G emcom Iss u e N o . 3 , 2 0 1 1


home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Regional News
AUSTRALASIA

Herding Emus Gemcoms MPF is designed to


integrate staff and technology across
Gemcoms MPF can analyse gaps
in how information travels, and can
with Gemcoms the mining value chain, increasing evaluate ways the systems used can
business efficiency and profitability. Its work more efficiently. Since the MPF
Mining Process benefits extend across each end of the is scalable to cover single or multi-

Framework mining process delivering a strategic


plan for mining from start to finish.
mine environments, it is a valuable
tool for mine operations who want
The Gemcom Mining Process to decrease production costs and
Recent additions to the AustralAsia
Framework (MPF) is back in the spotlight optimise the extraction of resources.
Services team, Vladislav Trashliev
after this years Diggers and Dealers Using Gemcoms suite of software
and Ross Corben (Principal
event in Kalgoorlie, Western Australia. products, the entire mining value
Consultants Geology), were in
Likening the day-to-day running of chain is covered through the MPF.
attendance at Diggers and Dealers
mining operations to the chaos of to highlight how the MPF works If you would like more information
herding emus, our MPF promotion and how it can benefit mining on the MPF and how we can help to
highlighted the impact the MPF can operations. Highly experienced in make your mine site more efficient,
have on the mining process, and how geology and underground engineering, please contact:
the framework can help take control our Services team has been busy sales-aa@gemcomsoftware.com.
of productivity issues and minimise visiting mine sites and working with Read more regional news at:
the dilution of knowledge once engineers, geologists and surveyors gemcomsoftware.com/company/
someone in the team leaves. to implement the MPF. regional-news.

Gemcoms Rebecca Kellam (left) and Anna Hipper (right) with a client at Diggers and Dealers.

Get your team and operations aligned with the Gemcom Mining Process Framework
Get your team and operations aligned with the
Constantly herding emus? Gemcom Mining Process Framework

Monitoring & Control


Surveying
A7

Manage Exploration
& Resource Data
A1

Manage Geological
Mining Data
A2
Update Mining
Block Models
A3 LOM/LT
Optimisation &
Mine Planning A4 Scheduling &
Targeting Operational Planning
A5
& Task Execution
A6

Track & Reconcile


Production
A8

Gemcom Mining Process Framework promotional flyer.


Mining Software Solutions
G E M C O M M I N I N G P R O C E S S F R A M E W O R K
- 2 - - 3 - G E M C O M M I N I N G P R O C E S S F R A M E W O R K

5 I nside G emcom Iss u e N o . 3 , 2 0 1 1


home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

EUROPE, MIDDLE EAST AND NORTH AFRICA

Classroom Training
Special Offers
Gemcom offers a variety of training
courses for beginner, intermediate
and advanced users of Gemcom
software. Courses are available on
both a scheduled and request basis
and can be tailored to suit your
needs. We can also conduct training
at your site using your data.
Classroom courses offer a cost-
effective way of quickly updating
your staff skill sets. Our regional
classroom courses take place at our
Coalville office which is conveniently
located in the heart of the UK, close
Gemcoms Ross Pemberton at a classroom training course.
to Birmingham and East Midlands
Airports. The classroom courses
TCL Scripting Specialised Workshop
listed are taught in English but we
can offer training in a wide range of 21 24 November 2011. Register
languages; please contact us with before 21 October to qualify for
details of your requirements. the discount.
For more information or to book
Special Offers
training, please email:
We are currently offering a 25%
training-eu@gemcomsoftware.com
discount on two of our most popular
or call +44 1530 835554.
courses for advance bookings!
You can also register online at:
Resource Estimation and
gemcomsoftware.com/training.
Geostatistics Specialised
Workshop 17 20 October 2011. Read more regional news at:
Register before 16 September to gemcomsoftware.com/company/ Gemcoms Glenn Barlow leading
qualify for the discount. regional-news. classroom training.

Upcoming Classroom Training Courses Include:

Product Course Location Date

Surpac Foundation, Solids and Block Modelling Quick Start Course. CPD Endorsed Coalville 10 12 Oct 2011

Surpac Resource Estimation and Geostatistics Specialised Workshop. Coalville 17 20 Oct 2011

Surpac TCL Scripting Specialised Workshop. Coalville 21 24 Nov 2011

Surpac Foundation and Geology Quick Start Course. CPD Endorsed Coalville 12 14 Dec 2011

Minex Foundation and Engineering Quick Start Course. CPD Endorsed Coalville 19 22 Dec 2011

6 I nside G emcom I s s u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

LATIN AMERICA
INDO-AFRICA

Wed also like to congratulate Efet


Banda from The Mineral Corporation
for winning the prize for delivering
the best user presentation, and
Yomeshka Moodley from Xstrata
Alloys for winning the runner up prize.
Read more regional news at:
gemcomsoftware.com/company/
regional-news.

Heres What Some of


Check out the short video of the User Conference posted on the Gemcom website. See the beautiful the Delegates Had to Say:
Zebula Golf Resort & Spa, and hear firsthand about the experiences of the delegates and attending
Gemcom staff. I found the User Conference a
fantastic platform to network and
exchange ideas. Not only do you
2011 Gemcom The program for the User Conference
included company updates from
get to meet other Gemcom product
users, but you get an opportunity
South African senior management, along with to learn new industry practices
and discover ways of working more
product roadmap information from our
User Conference product experts and managers. User
efficiently and effectively.
Efet Banda, Geologist,
a Great Success presentations allowed attendees to
The Mineral Corporation
gain insight into what other users are
Located on 1,600 hectares of pristine I enjoyed every part of the
doing with the software, and to share
African Bushveld in the shadows of the User Conference from the user
ideas and best practices. Workshop
Waterberg mountain range, youll find presentations and interactive
sessions were also held to provide
Zebula Golf Resort & Spa; the only 5 sessions to the fun activities at
delegates with hands-on experience the immaculate Zebula Golf Estate.
Star graded Golf Estate, Nature Reserve
on how to utilise the latest Gemcom It was truly a once in a life time
and Health Spa combination in the
software updates. experience.
whole of Africa. This was the chosen
While there was time for learning, Daniel Maunge,
venue for Gemcoms South African User
there was also lots of time to Senior Resource/Projects Geologist,
Conference 2011. The Gemcom Africa Konkola Copper Mines
team was delighted to host guests network and have fun. Guests were
at Zebula from 17th to 19th August for treated to an activity of their choice: The product workshops were
archery, clay target shooting or a very helpful in discovering how to
another successful User Conference.
utilise the latest Gemcom software
game drive. Everyone had great fun!
We see User Conferences as a updates.
platform to further build and grow Wed like to thank all our guests for Thulani Maupa,
our Gemcom community. Participants their attendance and participation Divisional Geologist, Coal of Africa
get the opportunity to connect at the South African User Group.
and network with other mining
professionals and Gemcoms product
experts. It is also a great time to
share knowledge and learn industry
best practices, with users being
able to demonstrate how they have
leveraged Gemcoms software and
services to increase the efficiency
and productivity of their operations,
said Mike Kersten, Regional Vice
President, Gemcom Indo-Africa. Group photo at the South African User Conference.

7 I n s ide G emcom I s s u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

LATIN AMERICA

Services and design and mining operations. work, there have also been several
data management projects involving
What are Some Examples of
Training in Gemcom Services Your Team has
GEMS in Chile, Argentina, Colombia
and Honduras. Part of each
Latin America Provided for Our Clients?
implementation was the improvement
We recently There are a lot of different ways we
of workflows to increase productivity
welcomed work with our clients, whether its
in geology, engineering and planning.
Senior Mining providing them with the knowledge and
Engineer workflows they need to improve mining What Sort of Training do you Offer?
efficiency, or assisting them with Training is one of the most popular
Guillermo
specific projects when they dont have services we provide for our clients.
Olivares to
the staff or in-house skills available.
the Gemcom We offer beginner through advanced
Latin America Some of our most recent projects training on all of our products.
services team. throughout the region include Upcoming classes can always be
Guillermo Olivares, Guillermo geological modelling for mines in found on our training web page at
Senior Mining Engineer Peru, Honduras, Chile and Colombia.
has been gemcomsoftware.com/training.
busy employing his expertise in In Argentina, we developed a Custom training at client sites is also
mine planning and design to help methodology for reserve estimation
offered. Clients can learn more by
Gemcom clients maximise their use for an open pit client. We also
emailing us at:
of our software. Here he tells us a developed a similar methodology
sales-la@gemcomsoftware.com.
but with a different scope for two
little about the services offered by
underground operations in Chile. For more information about Gemcom
Gemcom in Latin America.
Also in Chile and Argentina, we services, contact:
Tell us a Little About the completed several strategic mine servicios@gemcomsoftware.com
Services Team in Latin America. plans for clients, providing them with or contact Guillermo at:
Our Services team is made up of the information needed to increase golivares@gemcomsoftware.com.
over 20 professionals with diverse business performance in both the Read more regional news at:
experience and skills in geology, short term and long term. gemcomsoftware.com/company/
engineering, mine planning and In addition to geology and engineering regional-news.

Gemcom Latin America booth, at Colombia Minera 2011.

8 I nside G emcom Iss u e N o . 3 , 2 0 1 1


home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

NORTH AMERICA
What makes the program unique is with Gemcoms industry leading
that we build ongoing partnerships that software.
go beyond incorporating our software
Program Overview
into the curriculum. We ensure
educators receive training that will help The North American University Program
them in the classroom and can access is a partnership with accredited
technical support when they need it. geology and mining educational
institutions, including universities and
Key Benefits Provided
colleges. It supports computer lab
by Participation in the
training and project work, providing
University Program:
students and educators with geology
North American Opportunities for participation
(without cost) in Gemcom North
and mine planning software. The
program includes one network license
University Program America events. that manages access to the software
Equipping Students Classroom training courses. for up to ten concurrent users.
Webinars. Additional connection options are
for Opportunities in
available to meet those educational
the Mining Industry Technical Seminars in your area.
institutions with larger requirements.
Gemcom will provide a Company Academic licenses are valid for one
At Gemcom, we understand that
presentation at the start of the year.
educational institutions need to year and can be renewed annually if
incorporate the latest industry Access to technical support and ongoing participation criteria are met.
technology into the programs they software updates.
For more information on the North
offer. This is why we have developed Datasets and training materials American University Program, please
the North American University available to help build curriculum. contact Martina Barnett at
Program an extension to our Substantially reduced rate for mbarnett@gemcomsoftware.com.
Academic License Program. The software license renewal. Read more regional news at:
North America University Program Greater employment opportunities gemcomsoftware.com/company/
is a partnership between our North exist for students experienced regional-news.
American Business Unit and tertiary
learning institutions in the USA,
Canada and Mexico to provide
Gemcom software for classroom use
at a substantially reduced rate.
The University Program is designed
to meet the needs of the mining
industry as well as instructors and
students by:
Decreasing the industry skills
gap by increasing the numbers of
skilled employees ready to use
the software on site, directly out
of school.
Increasing the relevancy of courses
to the modern mining industry.
Increasing students personal
marketability due to an increased
skill set and providing a crucial
edge in finding employment.

9 I n s i d e G emcom I s s u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Products
example is provided in the
Gemcom Surpac table below.
Fig. 1

Slope Angles Colouring If the algebraic expression you


DTM Triangles by Value entered is satisfied and returns
true, the associated colours will
Leon Dickinson, be displayed.
Technical Product The Graphic Indicates:
Manager Surpac
1. The majority of the pit walls are
Colouring DTM between 50 and 75 degrees slope
triangles by dip as shown by the yellow colour.
value is useful 2. The berm and pit floor are coloured
when designing pits and stopes, to cyan because they are level. Fig. 2
ensure that wall angles do not exceed
3. The ramp is coloured blue as the
maximum design slope. Exceeding
slope is between 0 degrees and
maximum design slope may break
20 degrees.
mines department rules, or surpass the
rock strength and result in wall failure. 4. The section of the north-western
wall of the pit, above the decline
Heres How to Colour is coloured green and indicates
DTM Triangles by Value: Fig. 3
the slope angle is between 20
Launch Surpacs Surface or solid and 50 degrees slope.
with colour banding dialog box in one 5. Sections of the north-western
of the following ways: side of the pit are coloured
From the softwares main pink, indicating the wall slope is
navigation menu, choose Display between 75 and 80 degrees.*
> Surface or solid with colour *Point 5 indicates that the pit design
banding Fig. 1 . includes walls that meet the criteria of
OR Type DRAW SHELLS (DSH) interest. A wall slope between 75 and
or DSH into Surpacs Function 80 degrees may exceed the maximum
Chooser Fig. 2 . slope angle legally allowed by the mines
Once the Surface or solid with department, or exceed rock competency.
colour banding dialog box opens, Thanks to the visual appropriate action
select the appropriate Layer can now be taken in regard to pit design
name from the drop-down list. and monitoring of walls.
Next, under Banding Type, select Note that Surface or solid with
the using algebraic expressions colour banding can also be applied
radio button. Fig. 3 . to triangles based on the direction of
the maximum dip (dipdir).
Finally, enter the appropriate
The image above shows an open pit DTM
information into Colour, For more information about Surpac, with colour banding generated through
Expression, and Label. An visit gemcomsoftware.com/surpac. algebraic expressions.

Colour Expression Label Result


r=0.4
g=1.0 dip = 0 0 Triangles with a dip equal to 0 degrees are coloured cyan.
b=1.0
blue dip>0&&dip<=20 >0<=20 Triangles with a dip greater than 0 degrees and less than or equal to 20 degrees are coloured blue.
green dip>20&&dip<=50 >20<=50 Triangles with a dip greater than 20 degrees and less than or equal to 50 degrees are coloured green.
yellow dip>50&&dip<=75 >50<=75 Triangles with a dip greater than 50 degrees and less than or equal to 75 degrees are coloured yellow.
pink Dip>75&&dip<=80 >75<=80 Triangles with a dip greater than 75 degrees and less than or equal to 80 degrees are coloured pink.
red dip>80&&dip<=90 >80<=90 Triangles with a dip greater than 80 degrees and less than or equal to 90 degrees are coloured red.

Example: Data Entry into the Colour, Expression and Label text fields of the Surface or solid with colour banding dialog box.

1 0 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom GEMS of points or lines you can create an


inclined plane using the best fit
You can accept or cancel the next
dialog depending on whether you
Creating a Best Fit method by following the procedure: want to keep the resulting surface
Inclined Plane Definition Surface > Create > Create Surface triangulation Fig. 2 .
from Active Data.
from Existing Data Finally, use the View > Create
Create the surface using the option
Sections > From Current view to
Ed Thornton, Product Analyst Create on: The (temporary) best-fit
name and save the inclined section
plane and ensure you check the
Have you ever (plane). The properties of the new
box for After creating the surface,
wanted to easily inclined section can be viewed
change the current view to the best
calculate an average
fit plane Fig. 1 . from the Profiles Tab in the Project
Strike or Dip value
view window Fig. 3 .
for a set of points Press OK you will be prompted
or lines? In GEMS, to confirm that the direction of the To learn more about GEMS, visit
for any collection plane is correct Fig. 1 . gemcomsoftware.com/GEMS.

Fig. 1 Fig. 2 Fig. 3

New GEMS Product Demo Videos

GEMS 6.3 video: Direct Triangular Editing with Gemcom GEMS 6.3. GEMS 6.3 video: Improved Interaction with Gemcom GEMS Using the 3D mouse.

To watch GEMS product demo videos, visit: gemcomsoftware.com/gems/videos.

1 1 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom Minex below on the top of Fig. 1 ). By default under Choose Template. This will
initiate the wizard Fig. 3 that guides
Minex applies variations of this colour
Seam Differentiation to the different grids. Sometimes, you through the steps needed to
this can cause individual grids to create the Seam Model file.
Using a Seam Model File
become indistinguishable from one After the Seam Model file has been
Andre Broodryk, another as show in the image on the created (SEAM_MODEL.sml in Fig. 4
Technical Product Manager Minex bottom of Fig. 1 . below), it will be added to the Minex
Youll be happy to know theres an Explorer window where it can be
Have you ever easy way to apply colours to different expanded and the model displayed.
displayed a Minex seams. Seams can be differentiated You can sort your grid files by seam
seam model in by assigning a unique colour to each (the default option) or by suffix. With
3D yet found the and by referencing the folder that the Seam Model file selected in the
individual seams contains the grids in a Seam Model Minex Explorer, right click and select
hard to see file (which you will recognise by the Swap Seam/Variable Order to toggle
because the colour you selected .sml extension). between these options. When sorted
didnt provide enough differentiation? The first step is to navigate to by suffix, simply click on the SF suffix
Heres a handy tip that will allow you BoreholeDB > Edit > Create/Edit and select Display to display all of
to clearly identify them by applying Seam Sequence to select the colours the SF grids in the specified colours
unique colours to each one. to use for each seam in the Borehole Fig. 4 .

When you choose to display a gridded Stratigraphic Sequence file as The results show individual seams
seam model in 3D, Minex will apply illustrated below Fig. 2 . displayed with different colours in
colour to the individual grids based on Next, to create the Seam Model file, Minex as seen in Fig. 5 .
the initial colour you select from its navigate to File > New and select For more information about Minex,
colour map (as shown in the dialog box SeamModel.sml template from the list visit gemcomsoftware.com/minex.

Fig. 2

Fig. 3

Fig. 1 Fig. 5 Fig. 4

1 2 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom Whittle the interdependencies between these


processes and generates different
plant feed with other computational
tools. However, even then, obtaining
Comparing Two Approaches feasible combinations which will an optimal solution equivalent to that
to Optimisation with yield an overall optimal solution. By of SIMO is not guaranteed.
Different Whittle Modules avoiding the optimisation of each
SPCO presents the theoretical and
of these processes in isolation, it
practical problem of determining the
Steph Cantin, ensures maximum value is derived.
best mine plan to optimise, which is
Product Line What are the Differences Between not an easy issue to overcome. Thats
Manager, with
Whittles SIMO and Stockpile and because SPCO needs a mine plan
Claudio Varas and
Cut-off Optimisation Modules? to generate an optimisation, while
Sergio Navarrete
The Stockpile and Cut-off (SPCO) SIMO includes the mining plan as a
Of all the module optimises two key parameters parameter to be optimised. Further,
optimisation modules available of value: cut-off grades and when not using SIMO, the planning
in Whittle, the potential of the stockpiles, whereas SIMO optimises:
algorithms in Whittle schedule the
Simultaneous Optimisation Module cut-off grades, blending, stockpiling
(SIMO) stands out. SIMO is a next- total mineral reserves, which is not
and sequencing. Therefore, to
generation multivariate optimiser and a necessarily the best condition as it
perform an optimisation with SPCO
powerful tool for strategic mine planning. doesnt maximise NPV. With SIMO, the
at the same level of SIMO, the user
planning horizon can be defined.
In one step, SIMO optimises four would have to find the best mine plan
key processes which impact the net to enter into SPCO, optimise it with For more information about Whittle,
present value (NPV). SIMO considers SPCO and then optimise the mix of visit gemcomsoftware.com/whittle.

Results returned using the Stockpile and


Cut-off module.

Results returned using the Simultaneous


Optimisation module.

Above are the results of a test with real data comparing the optimisation with SPCO and with SIMO. According to the results obtained, SIMO provided a higher NPV.

1 3 I n sid e G e mcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom
MineSched
Calculating Truck
Requirements

Steph Cantin, Product Line Manager


A commonly asked
MineSched question
is, How do I
calculate the number
of trucks required
to move material to
my waste dumps, The image above is from the MineSched Haulage tutorial data and shows a pit, two external waste
dumps, two stockpiles and the defined haul routes between them.
stockpiles and processing plant?
Heres how this is done.
reported within user defined haul Truck mass capacity per load.
MineSched Inputs
route gradient ranges. MineSched Average truck speed full per
In MineSched, the user is able to
also reports mass mined per period. gradient range.
associate haul routes with material
movement. A haul route is a string file Calculations Average truck speed empty per
that contains one or more segments gradient range in reverse direction.
The required number of trucks per
representing the different route Available hours per truck
scheduling period is calculated using
options. If multiple route options exist, calculated using calendar hours in
the values listed below. The first two
MineSched will determine the route the scheduling period * availability %
with the shortest total haul distance values are reported by MineSched.
* utilization % * efficiency % (where
from source to destination. The remaining values are obtained
efficiency % factors in queuing and
from historical records, provided by the other operating delays).
MineSched Outputs
equipment supplier, or estimated based
MineSched reports mass mined Fixed time for truck spotting
on expected operating conditions.
(in tonnes) multiplied by distance and loading.
travelled (in kilometres), which is TKM by gradient % ranges. Fixed time for truck turning
referred to as TKM. TKM can be Mass mined. and dumping.

A Simple Example MineSched Report:


Scheduling Period Tonnes Mined TKM gradient < 5% TKM gradient > = 5%
1 10,000,000 20,000,000 10,000,000
2 10,000,000 20,000,000 15,000,000
3 10,000,000 20,000,000 20,000,000

Known Values:
Truck load capacity 100 tonnes/load
Avg. speed gradient < 5%, full 30 km/h
Avg. speed gradient >= 5%, full 15 km/h
Avg. speed < 5%, empty in reverse direction 40 km/h
Avg. speed >= 5%, empty in reverse direction 40 km/h
Spotting and loading time 3 minutes (0.05 h)
Turning and dumping time 2 minutes (0.033 h)
Available hours per truck 365 x 24 x 80% x 80% x 75% = 4,204.8 h/truck

1 4 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Calculations (Using Period 1 Values)


1. First, calculate the total distance for each gradient range. This is the reported TKM divided by the reported tonnes mined,
multiplied by 2 (to take into account the return distance).

Tonnes Mined TKM < 5% TKM > = 5%

10,000,000 t 20,000,000 tkm 10,000,000 tkm

(TKM / Tonnes Mined) x 2 = 4.0 km 2.0 km

2. Calculate the driving time per load for each gradient range. This is the total distance divided by the average speed (full and
empty) for each gradient range.

TKM < 5% TKM > = 5%

Total distance per load 4.0 km 2.0 km

Avg. speed 35 km/h 27.5 km/h

Total distance per load / avg. speed = 0.114 h 0.073 h

3. Calculate the total time per load. This is the sum of the driving times for each gradient range plus the spotting and loading time plus
the turning and dumping time.
Total time per load = 0.114 + 0.073 + 0.05 + 0.033 = 0.27

4. Calculate the number of loads by dividing the tonnes mined by the tonnes per load.
Number of loads = 10,000,000 / 100 = 100,000

5. Calculate the number of hours by multiplying the number of loads by the time per load.
Number of hours = 100,000 x 0.27 = 27,000

6. Calculate the required number of trucks by dividing the number of hours by the available hours per truck.
Number of trucks = 27,000 / 4,204.8 = 6.42
Performing the above calculations in a spreadsheet for each period, the number of trucks per period is:

Period Number of trucks

1 6.42

2 7.29

3 8.15

The calculations above are only an estimate because the calculation uses the average velocity along a haul route within a
defined gradient range. In practice, additional factors such as intersections and road conditions also determine truck velocities.
An upcoming version, MineSched 7.1, will read truck velocities from the haul route string files and report truck hours and truck
requirements directly in the Dashboard.
For more information on MineSched, visit gemcomsoftware.com/minesched.

1 5 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom PCBC Running the Best


Height of Draw (HOD)
the option to analyse and report
different scenarios for sequences
Multi-Lift Modelling After you run the best HOD, PCBC and production rates. Additionally, two
will show an independent surface for new keywords have been created to
Tony Diering, each level and then you can evaluate avoid potential undermining or lead/
Vice President Caving Business Unit lag situations, saving time and several
graphically the combination of this
iterations to get the final schedule. The
PCBC has been result, as in the image below.
graph below Fig. 1 shows an example
improved to work
of the multi-lift schedule with production
more efficiently with
from each sector clearly identified.
multi-lift projects.
Every step in Playback
the PCBC model This tool has been improved to
creation workflow display independent surfaces for each
has been adjusted and improved, level to enable graphical analysis
enabling the evaluation of long-term of the results of the schedule and
plans and combining all draw points to prevent any possible issues of
in different levels even if the undermining. An example of HOD
footprints on different levels overlap. Running Production profile in the Playback tool is shown
Schedule and Playback below Fig. 2 .
Creating the Slice File
Now you can run a production To learn more about PCBC, visit
There is a new option to allow the
schedule combining all lifts and have gemcomsoftware.com/pcbc.
creation of a slice file in one step.
Previously this would require five
Fig. 1 Lift1 Lift2 Lift3 Lift4 CU
steps (initialise, compute block
2.0 1.60
fractions, transfer data from the block
1.8
model, pre-mixing and save the slice 1.40

file). Now you can do these steps 1.6


1.20
using the single option: Build slice 1.4
Tonnage (Mt)

1.00

Cu Grade (%)
file. It requires you to define several 1.2

inputs using the advanced profile, 1.0 0.80


and to identify each level using the 0.8
0.60
Sector field per draw point. Using 0.6
0.40
this option you can create a slice 0.4
file with several lifts and replace the 0.2
0.20
broken material from a lift above with
0.0 -
default values or with material from 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
a different block model. The image Period (Year)
below shows an example of a slice
file created using four lifts.
Fig. 2

1 6 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom Hub
Overcoming Communication Issues
When Sharing Data from Remote Locations

Kevin Ward, Product Manager Hub


While it has only to bring the files into
been available for synchronisation, and if so
just over six months, how much of the data is
Hub has been different. Therefore, the
deployed globally by server need only transfer
operations in places the changes made at
as diverse as Australia, Mexico and either end since the last Hubs progress dialogue box, showing that less data was
Mongolia. A key reason why you will synchronisation event, transferred than the total file size. Depending on the nature of
find it in different parts of the world is rather than continually the changes made and the original file sizes, this can approach
90%+ saving versus an FTP transfer.
its ability to solve the communication transferring the entire
issues remote projects face when file back and forth. This
sharing data. Hub has a couple of is done at a binary level, and is Hub can work effectively within an
different strategies to help with this not contingent on file types or data organisations Wide Area Network
common issue. formats. This is a major advantage
(WAN), it can additionally be used
The first way Hub does this is by over mainstream data sharing
with a public facing portal, allowing
using a versioning methodology to offerings such as FTP, SharePoint, or
simple network mounted drives. remote users the flexibility of
compare the files held on a remote
users computer with the master Another way Hub manages securely accessing data without the
versions held on the server communication issues is by using restrictions and network sensitivities
potentially many miles away and secure HTTP (the same as you use of remote access solutions like a
connected via poor or expensive to communicate with your bank) Virtual Private Network (VPN).
networking infrastructure. This allows to communicate with the remote
Additionally, Hub and its remote
Hub to determine whether any data client, ensuring total security of
needs to be transferred in order the data being transferred. Though software clients can detect any
network glitches and automatically
retry or pause/resume in order to
avoid resending already transferred
data unnecessarily. This can
be particularly important when
transferring large technical files such
as block models which can potentially
reach upwards of a gigabyte in size.
Hub also ensures that the already
optimised differences are additionally
compressed to squeeze as much
value out of every byte transferred
as possible. This minimises the
time needed to update a remote
file, as well as minimising the cost
of expensive infrastructure, such as
satellite links.

Huge satellite dish outside the minesite office surrounded by boxes of core samples. This satellite
For more information about Hub, visit
transfers the data from the minesite back to Ulaanbaatar. gemcomsoftware.com/hub.

1 7 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom Services
Gemcom Services In Central Canada, we developed a
set of macros for an underground
now entirely in Surpac, it combines
seamlessly with the rest of their
Surpac Automation: gold mining operation which helps operational data.
them create very large, detailed
Beyond the Basics At an underground base metals
geological maps. When they enter
mine in Western Canada, we wrote
new geological data, they simply run
Chawki Jreige, Principal Consultant, a systems maintenance macro that
the macro and they have a whole
Gemcom North America runs at midnight. It automatically
new set of plans and maps. To assist
cleans up files, removes unneeded
If you are a Surpac with surveying, we implemented
ones, and finds files that are in
user, you probably macros which automate the workflow
the wrong place and moves them
know about of downloading new survey data and
to the right one. Once the files are
its automation merging it with master data. They
organised, it locates the data it needs
capabilities. You also have automated ring design plots
and creates updated status plots of
may have even built a few automation for mine planning that are issued
scripts, called macros, to save time regularly to drillers and blasters. the underground surveys Surpacs
and reduce routine button-clicking. contribution to a stress free morning
For an open pit iron ore mine in
But there is a lot more which can be for its users.
Northern Mexico, we wrote macros to
done with automation to make a real enable new functionality for Surpac. Note that there are over 70 macros
difference for you and your operation, This operation has a very unique available from the downloads
saving huge amounts of time, and method of doing grade control that is section of the Gemcom Support site
eliminating errors. distinct from most mines in the world. gemcomsupport.com.
Not a problem for Surpac we were For more information about our
Heres a Brief Overview of What Can
able to create macros that mimic Surpac automation services,
be Automated in Surpac:
the way they need to work and draw email info@gemcomsoftware.com.
Workflow automation allows you to
on data from disparate departments Learn about other Gemcom
record and playback all the steps
(survey, geology and engineering). services offerings at
in a workflow, enabling them to be
Because the grade control system is gemcomsoftware.com/services.
repeated with the click of a button.
Systems integration enables
Surpac to read and write data to/
from files or databases it doesnt
inherently support.
New functions youd be amazed at
the CAD functionality, reporting and
other capabilities that can be created in
Surpac. For example, we can create a
macro that adds commands to Surpac
to draw dimension lines, or another
which designs planned drillholes.
Of course, some of the work we do
is more routine, such as fixing client-
created Surpac macros when they
upgrade to a newer version of the
software. Whatever we do, were sure
to create reference manuals for them
that document inputs and outputs.
As a services provider (and Surpac
fanatic), one of the most exciting
parts of my job is seeing the positive
impact automation makes for our
software users. The following are a
few of my favourite stories. Screenshot of Surpac 6.2.1 displaying drillholes, topography, and a pit design.

1 8 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom Support
Gemcom Support To sign up and create a personal
login to access the site, you must
If your entry is accepted, an email will
be sent to the specified email address.
Whats the Best Way to obtain your company account login Click on the link in the email within one
information. Your company account
Submit Bugs or Share login will be something similar to this:
hour to activate your personal profile.

Ideas for Software Company Username: 23900


You are now ready to login to the
Gemcom Support site.
Enhancements? Company Password: kazoo
Submit your bug or software
To Create Your Personal Account
Janice Martin, enhancement requests click
on the Support Website Home Page:
Global Customer Support Manager Submit a Ticket (see below).

Our Support website


gemcomsupport.com
is designed to allow
You can participate with other users
you direct access
to our support and in the Gemcom User Community and
product management Click the option Create New Account. share ideas about the products click
teams, and to connect you with other Enter the company support login Discussion Forum (see below).
Gemcom users in the Discussion (5 numbers) and company support
Forum. From the Support website you password (5 letters).
can also Submit a Ticket when you Enter your email address, name, your
want to get product support, report a chosen password, telephone number For more information, please email
defect or suggest an enhancement. and security question and answer. support@gemcomsoftware.com.

global events calendar


Upcoming Gemcom Events
For the latest update on where you can see Gemcom, visit
the events section of our website.

Event Date Location

Forum of Mining Engineers 2011 12 15 October 2011 Dnepropetrovsk, Ukraine

International Mining Convention 2011 26 29 October 2011 Acapulco, Mexico

8th Fennoscandian Exploration and Mining FEM 2011 1 3 November 2011 Lapland, Finland

Mineral Resources Review 2011 3 5 November 2011 St. Johns, Canada

Quebec Exploration 2011 21 24 November 2011 Quebec City, Canada

NWMA Annual Meeting 2011 30 November 2 December 2011 Reno, United States

Mines and Money London 2011 6 7 December 2011 London, UK

1 9 I n side G emcom I ss u e N o . 3 , 2 0 1 1
home | Feature story | Customer Story | Regional News | PRODUCTS | Services | Support & Events Calendar | Community

Gemcom community
Gemcom Software
Mining Blog
The Gemcom Software Mining Blog
has arrived! Weve created a mining
blog to keep you in-the-know about
the latest mining news, industry
trends and Gemcom product updates.
Well be writing and posting several
unique articles a day, so check
the Gemcom Software Mining Blog
frequently for articles on:
Mine productivity and efficiency.
Mining services.
Mining trends.
Product tips and tricks (coming soon).
Gemcom updates.
Join the Gemcom community! Share
articles with friends and colleagues, and
comment on posts to let us know what
you think. We want to hear your feedback.
Visit gemcomsoftware.com and click
on the Gemcom Software Mining Blog
link on the homepage. Make Gemcom
your source for mining industry news.

A random prize draw for an


upcoming Award Phase.

Pool Prizes include:


$2,500 USD cash prize.
iPad 2 with Wi-Fi 64GB.
iPod Touch 64GB.

Its Not Too The battle to be crowned rugby


champions of the world began 9th
Match balls, scarves, caps

Late to Join! September, but there are still several


and backpacks.
opportunities to win exciting prizes if Time is Running Out, So Register Now!
Win Prizes in the Gemcom you enter now! Thats because weve
World Fantasy Rugby Pool! divided the Pool into three different Congratulations to Maeve Murphy
Award Phases. from Canada for winning Award
To celebrate the biggest worldwide
Phase One, and to Patrick Perez from
event in rugby, Gemcom created You Can Still Win:
Canada for being the random winner.
a free (no strings attached) and Award Phase Three based on your
exclusive World Fantasy Rugby Pool picks for games played between To enter, visit gemcomsoftware.com/
for our clients in the mining industry. 823 October. fantasyrugbypool.

Follow us on Facebook and Linkedin to keep in touch with the Gemcom community online.

2 0 I nsi d e G e mcom I ssu e N o . 3 , 2 0 1 1

Vous aimerez peut-être aussi