Vous êtes sur la page 1sur 6

Project Proposed CEB Substation (L)

Client Sierra Construction (Pvt) Ltd) Made by Date Page


Location Soil spring calculation for pile foundation (BH5) SLS 14-Feb-17 -
Pile diameter = 600 mm Checked Revision Job No
SM - -
1. Calculation of lateral soil subgrade modulus for piles

Lateral soil subgrade modulus to be used in the piled supported analysis model is calculated
based on the geotechnical parameters given in site investigation report and the approch
presented by Glick.G.W (1948 and Bowels.J.E (1996). In this sample calculation a 600 mm
diameter pile in subsoil condition in encountered Borehole 5 is considered. The following
geotechnical data is used as extracted from the geotechnical report.
At the bottom, a pined support is considered for the pile since it is socketed in to basement rock.
The controlled fill is also considered to have no lateral stiffness on the pile.
Bowles,
1996

Glick,
1948

Node h/(m) h/(m) SPT (N) Es (kPa) ks' ks (kN/m3)


1 0.6 0.00 30 11250 11354 18924
2 0.6 -0.60 30 11250 11354 18924
3 0.6 -1.20 30 11250 11354 18924
4 0.6 -1.80 30 11250 11354 18924
5 0.6 -2.40 30 11250 11354 18924
6 0.5 -3.00 12 6750 6813 11354
7 0.5 -3.50 12 6750 6813 11354
8 0.526 -4.00 18 8250 8327 13878
9 0.526 -4.53 18 8250 8327 13878
10 0.526 -5.05 18 8250 8327 13878
11 0.526 -5.58 18 8250 8327 13878
12 0.526 -6.10 18 8250 8327 13878
13 0.5 -6.63 18 8250 8327 13878
14 0.5 -7.13 18 8250 8327 13878
using end area method

bowles
1996

K1 946 ks6 = 946 kN/m


K1' 946
K2 2839 ks7 = 3785 kN/m
K2' 2839
K3 1892 ks8 = 4731 kN/m
K3' 2839
K4 2839 ks9 = 5677 kN/m
K4' 2839
K5 2839 ks10 = 5677 kN/m
K5' 2839
K6 2050 ks11 = 4889 kN/m
K6' 2050
K7 1419 ks12 = 3469 kN/m
K7' 1419
K8 1555 ks13 = 2974 kN/m
K8' 1604
K9 1825 ks14 = 3429 kN/m
K9' 1825
K10 1825 ks15 = 3650 kN/m
K10' 1825
K11 1825 ks16 = 3650 kN/m
K11' 1825
K12 1825 ks17 = 3650 kN/m
K12' 1825
K13 1825 ks18 = 3650 kN/m
K13' 1825
K14 1825 ks19 = 3650 kN/m