C E M E N T I N G T E C H N O L O G Y

A ONE-TRIP EXTERNAL-CASING-PACKER
CEMENT-INFLATION AND
STAGE-CEMENTING SYSTEM
A primary concern in horizontal drilling is nent inflation fluid as a primary isolation damage the sealing capability of the cups when
wellbore isolation to prevent unwanted liquid tool. Cement is the only inflation fluid that they are run through the cementing valve.
or gas from choking off production from the can be classified as permanent. ECP-inflation Inflation of an ECP can be hindered by the
desired production interval. The two main tools were developed to introduce cement presence of a sealed annulus above it. As the
areas of the wellbore that require isolation are into the production liner safely. These tools ECP inflates, it displaces the annular fluid
the horizontal lateral and the build section. In are run on an inner wash string inside the behind it up the well. For complete inflation of
early horizontal wells, if the lateral section production liner and enable positive location the ECP, all the annular fluid behind the ECP
required isolation, a standard cement job was of the ECP, enable isolation of the ECP-valve must be displaced up the hole so, if the annu-
performed and the lateral perforated. If no iso- system used to inject cement into the ECP, lus is sealed above the ECP, there is no place for
lation was required, the lateral was completed and retain the inflation cement when moving the fluid to go. To avoid these problems, the
as an open hole or with continuous sections between ECPs. build section of horizontal wells completed
of slotted pipe, preperforated pipe, or some In early openhole-completed wells, the with cement-inflated ECPs usually is isolated
form of production screen. A standard cement build section was isolated by placing an ECP with an ECP at the base of the build section
job in the lateral section provided limited iso- at the end of the build with a hydraulic stage- and a liner-top packer not with a cement job.
lation because of difficulty in achieving ade- cementing valve located above it. The ECP
quate mud displacement. isolated the openhole completion from the CEMENT-INFL ATION SYSTEM
The full-length paper describes a new, build-section cement job. The ECP was inflat- An inflation tool conveyed on an inner
integrated system that allows the production ed, then a cement job was performed through workstring inside the liner has been used
liner to be run into the wellbore and a liner- the stage-cementing valve. This method successfully since 1992 to inflate multiple
top hanger system set, selective cement infla- worked well until the use of cement-inflated ECPs. The liner is conveyed on a drillpipe
tion of multiple external casing packers ECPs in the lateral became readily accepted. workstring by use of a hydraulically released
(ECPs) at target locations, and cementing of Cement inflation in the lateral required liner-running tool with an inner washpipe
the radial section of the production liner. development of an inflation-tool system. run inside the production liner. The inflation
However, use of an inflation tool is incompati- tool is placed in the washpipe string and
L ATERAL ISOL ATION ble with standard stage-cementing equipment. positioned below the lowermost ECP when
As fully cemented liners fell from favor, ECPs Because the stage-cementing tool and its plugs run in the hole. A packoff system, such as a
gained acceptance as a means to isolate vari- must be drilled out before running the inflation slick stinger/packoff combination, is run
ous sections of the horizontal lateral. Sections tool, debris can plug the inflation tool or the below the inflation tool to enable circulation
of slotted pipe, preperforated pipe, produc- liner. The sealing mechanism on some inflation through the drillpipe to be displaced
tion screens, or sliding sleeves were posi- tools is opposed cups designed to seal on the through the bottom of the liner.
tioned between the ECPs. Fig. 1 shows a typ- inside of the production liner. An improperly Once the liner is run to total depth, the hole
ical openhole completion with a slotted liner drilled out stage-cementing valve can reduce is conditioned as needed before the liner hang-
or screen and ECPs positioned for zonal iso- the inside diameter of the production liner and er is set. A plug or ball is circulated to a seat
lation. Initially, ECPs were inflated with well-
bore fluid (mud or brine) because of low risk 95/8-in. CASING
and simplicity of installation. However, the
life expectancy of a fluid-inflated ECP is not
very well quantified and is subject to chang- 41/2-in.x7-in. LINER HANGER

ing wellbore conditions. Many operators


came to rely on an ECP filled with a perma- 41/2-in. 11.6-LBM/FT LINER 41/2-in. ECP
41/2-in. ECP
7-in. CASING 41/2-in. SLOTTED
41/2-in. ECP
This article is a synopsis of paper SPE LINER OR SCREEN

39345, Development of a One-Trip


ECP Cement-Inflation and Stage- 81/2-in. OPEN HOLE
Cementing System for Openhole
INDICATING SUB
Completions, by M.P. Coronado, SPE, HPC INDICATING SUB
SLOTTED LINER OR
SOLID LINER

and M.J. Knebel, SPE, Baker Oil Tools, INDICATING SUB


SCREEN INDICATING SUB

originally presented at the 1998


IADC/SPE Drilling Conference, Dallas, Fig. 1Typical openhole completion with slotted liner or screen and ECPs positioned for
zonal isolation.
36 March.

76 AUGUST 1998
C E M E N T I N G T E C H N O L O G Y

below the inflation tool to provide a temporary annulus cementing around the production provides a redundant backflow sealing sys-
plug in the workstring to initiate liner-hanger liner in the build section. Previous systems tem to ensure that cement does not enter the
setting. Applied pressure in the workstring used a plug-actuated stage valve that liner. Any excess cement inside the work-
sets the liner hanger, releases the running tool required a drillout trip to reopen the pro- string is reverse circulated to the surface, and
from the liner, and arms the locating mecha- duction liner after the annulus-cementing the workstring, inner string, and inflation-
nism in the inflation tool so the tool can be operation. A newly designed hydraulically tool assembly are pulled from the well.
positioned across the ECPs for inflation. The operated cementing valve enables cement to
inflation tool is pulled up to a testing-profile be displaced through the workstring by use CURRENT SYSTEM LIMITATIONS
subassembly in the liner string and set, and the of the inflation tool to isolate the valve. The Annulus-cementing operations require that the
workstring-to-liner seals are pressure tested to hydraulic port collar (HPC) is run in the liner top be open to allow mud displacement
ensure that the tool is pressure tight before any liner immediately above the ECP at the bot- flow as the cement is placed in the annulus.
inflation cement is pumped into the well. tom of the build section. This ECP creates an This requires that the liner-top packer be set
After a successful pressure test, the annulus seal, which is required to provide a after the ECPs are inflated and cementing of
plug/ball is blown out to restore circulation base for the cement displaced into the annu- the build section is completed. In an operation
through the workstring, allowing the infla- lus through the HPC. The HPC is designed where ECPs are cement inflated and the build
tion cement to be spotted into the inflation to be opened hydraulically after the inflation section is to be cemented in one trip, hydraulic
tool. The inflation cement is isolated from tool is positioned and set across the valve. considerations are critical. Existing equipment
the mud system by a spacer fluid and wiper requires that the annulus cement slurry follow
plug run ahead of the slurry. The tail of the OPERATION OF THE HPC the inflation cement because a method to spot
inflation cement is isolated with a foam pig, After all ECPs in the wellbore have been inflat- the annulus cement to the tool after inflating
and spacer fluid is run behind the pig. ed with cement, the inflation tool is positioned the packers is not currently available. If the
Once the plug lands, inflation of the lower- across the HPC inlet ports. The workstring workstring hydraulic pressure caused by the
most ECP begins. The locating mechanism of contains the cement volume required to fill the additional cement for annulus cementing is too
the inflation tool (setdown dogs or tension col- annulus to the desired height. The inflation- large, the ECPs may be inflated in an uncon-
let) positions the inflation tool across the ECP- tool injection ports are opened, allowing trolled manner. There may be no surface indi-
valve system. The inflation-tool injection ports, hydraulic communication with the inside of cation that the packer is inflating if the hydro-
located between the annulus seals, are then the HPC. Pressure applied to the workstring static pressure is greater than the ECP-valve
opened either by workstring setdown weight shifts an internal locking piston in the valve opening pressure. If the hydraulic pressure is
or hydraulic pressure (Fig. 2). The valves in the that deactivates the mechanical lock used to less than the pressure differential required to
ECP are opened with applied pressure, and the prevent premature shifting of the closing open the ECP valves, normal ECP verification
packer element is inflated with cement. Once sleeve before the valve is opened. An increase methods are viable. A method is being
the element is fully inflated, the inflation tool is in workstring pressure then opens the valve to designed to spot the annulus cement to the
closed, retaining the inflation cement in the the annulus against a spring-loaded check inflation tool after inflation of all ECPs.
workstring, and released from the ECP. The valve inside the tool. After the cement volume
inflation tool is then picked up to the next ECP is displaced into the build section annulus, CONCLUSIONS
and the process repeated. workstring pressure is bled off, allowing the 1. Cementing the build section in hori-
An ECP may be run above the casing check valve inside the HPC to close. zontal openhole completions provides an
shoe to provide hydraulic isolation of the The inflation tool is released by picking up isolation mechanism between the open
production-liner top. This packer is inflat- the workstring, and the locating mechanism hole and upper wellbore.
ed with the inflation tool after the lateral- is then landed into a profile in the inner clos- 2. Openhole completions with cement-
isolation packers have been inflated. After ing sleeve of the HPC. Setdown weight is inflated ECPs and cemented build section can
all ECPs have been inflated, excess cement applied to the workstring to shear the inner be accomplished without drilling out the liner.
in the workstring is reverse circulated out sleeve down. Once completely down, exter- 3. Cementing of the build section of a
of the well before pulling the workstring. nal seals on the closing sleeve isolate the horizontal or highly deviated wellbore
annulus ports in the HPC. The inner sleeve should be performed after all ECPs in the
NEW STAGE-CEMENTING VALVE also locks in the closed position to prevent lateral are inflated.
The next step in enhanced wellbore isolation accidental opening of the valve during any 4. An ECP-inflation tool has been used
for openhole horizontal completions is later wellbore-intervention operations. This successfully to isolate a hydraulically
opened cementing valve during stage
cementing and to close the valve perma-
nently after the operation.
5. The annulus cement should be spotted
to the inflation tool after inflation of the
ECPs or the workstring fluid should be cir-
culated through the HPC ahead of the
cement slurry.

Please read the full-length paper for


additional detail, illustrations, and ref-
erences. The paper from which the syn-
Fig. 2Inflation assembly with injection ports open across the lowermost ECP.
opsis has been taken has not been peer
reviewed.

AUGUST 1998 77