S.No Location meters rail used No From To 1 Up Main Line(Yard) 1187.982 1189.580 1598 251 251 2 Up Main Line(Yard) 1190.500 1191.750 1250 192 443 3 Up Main Line(NTC) 1191.750 1198.180 6430 989 1433 4 Down Main Line(Yard) 1187.982 1191.750 3768 580 2012 5 Down Main Line(NTC)* 1191.750 1196.360 4610 709 2721 6 Down Loop Line 1189.142 1191.500 2358 370 3091 7 Up Loop Line 1188.820 1191.140 2320 361 3452 8 Rails used in Gliath crane 93 3545 9 Hot Axel 14 3559 Rail sent to NAVKETAN for machine 10 11 3570 approval
11 Total rails at Cross-overs and Turnouts 80 3650
12 ITC Panels stacked at gantry 80 3730
1.5 m long sample preparation for
Parameter setting of FBW machine 13 27 3757 ,Welder qualification Test for FBW machine,RDSO approval
1.5 m long 38 sample preparation for
14 5 3762 Third party testing
15 Free rails in up main line at grantry 19 3781
16 Rejected Weld panel(ITC-2 Panel) 40 3821
17 Rejected Weld panel(Rahee-1 Panel) 20 3841
Rails cut and used for closer
18 21 3862 preperation For Providing closer at LC and for 19 making new joint in place of Rejected 16 3878 joint Total 13M rails consumed at Bhadan 3878 Total 13M rails stacked at Bhadan 1677 Total 13M rails recived at Bhadan store(asper store records) 5555
Note: * It includes Manual track linking at LC-43 UP and down line (Total rail used-18) Yard -1754 rail ITC-1780 rail