1.00 ESTRUCTURAS
1.01 OBRAS PRELIMINARES
1.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40 m 1 1.00 1.00 Glb
1.03.03 EXCAVACIN PARA CIMIENTOS CORRIDO ARMADO, SOBRE TERRENO NORMAL HASTA 1.50m DE PROFUNDIDAD 48.98 m3
EJE A, DE 1 A 3 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
1.00 1.10 0.40 1.15 0.51
1.00 4.14 0.40 1.15 1.90
EJE A, DE 5 A 6 1.00 4.05 0.40 0.60 0.97
CAFETIN (SEMI CIRCULO) 1.00 6.77 0.40 0.60 1.62
EJE B, DE 1 A 3 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
EJE C, DE 1 A 4 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
1.00 1.05 0.40 1.15 0.48
EJE D, DE 1 A 3 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
1.00 1.05 0.40 1.15 0.48
EJE E, DE 1 A 3 1.00 2.00 0.40 1.15 0.92
1.00 5.75 0.40 1.15 2.65
EJE 1, DE A - E 1.00 3.50 0.40 1.15 1.61
1.00 4.10 0.40 1.15 1.89
1.00 4.65 0.40 1.15 2.14
1.00 3.63 0.40 1.15 1.67
3.00 1.12 0.40 1.15 1.55
1.00 4.07 0.40 1.15 1.87
1.00 1.59 0.40 1.15 0.73
EJE 2, DE A - E 1.00 3.58 0.40 1.15 1.65
1.00 4.74 0.40 1.15 2.18
1.00 3.63 0.40 1.15 1.67
EJE 3, DE A - E 1.00 1.38 0.40 1.15 0.63
1.00 1.72 0.40 1.15 0.79
1.00 3.50 0.40 1.15 1.61
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
1.04.02 CONCRETO F'C: 100 Kg/cm2 + 30% P.M, PARA CIMIENTO CORRIDO 27.65 m3
EJE A, DE 1 A 3 1.00 18.63 0.40 0.60 4.47
EJE B, DE 1 A 3 1.00 5.25 0.40 0.60 1.26
EJE C, DE 1 A 4 1.00 6.30 0.40 0.60 1.51
EJE D, DE 1 A 4 1.00 11.25 0.40 0.60 2.70
EJE E, DE 1 A 3 1.00 7.75 0.40 0.60 1.86
EJE 1, DE A - E 1.00 18.25 0.40 0.60 4.38
EJE 2, DE A - E 1.00 13.33 0.40 0.60 3.20
EJE 3, DE A - E 1.00 11.84 0.40 0.60 2.84
EJE 4, DE C - D 1.00 4.05 0.40 0.60 0.97
EJE 6, DE A - B 1.00 2.84 0.40 0.60 0.68
JARDIN FRENTE A CAFETIN 1.00 11.42 0.30 0.50 1.71
JARDIN FRENTE A SS. HH. 1.00 13.73 0.30 0.50 2.06
EJE E
DE 1 a 2 1.00 3.20 0.15 0.30 0.14
EJE 1
DE A a B 1.00 4.40 0.15 0.30 0.20
DE B a C 1.00 5.00 0.15 0.30 0.23
DE C a D 1.00 5.55 0.15 0.30 0.25
DE D a E 1.00 5.80 0.15 0.30 0.26
EJE 2
DE A a B 1.00 3.50 0.15 0.30 0.16
DE B a C 1.00 3.37 0.15 0.30 0.15
DE D a E 1.00 2.70 0.15 0.30 0.12
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE 3
DE A a B 1.00 4.40 0.15 0.30 0.20
DE B a C 1.00 2.72 0.15 0.30 0.12
DE C a D 1.00 3.70 0.15 0.30 0.17
EJE 6
DE A a B 1.00 4.50 0.15 0.30 0.20
EJE E
DE 1 a 2 2.00 3.20 0.30 1.92
EJE 1
DE A a B 2.00 4.40 0.30 2.64
DE B a C 2.00 5.00 0.30 3.00
DE C a D 2.00 5.55 0.30 3.33
DE D a E 2.00 5.80 0.30 3.48
EJE 2
DE A a B 2.00 3.50 0.30 2.10
DE B a C 2.00 3.37 0.30 2.02
DE D a E 2.00 2.70 0.30 1.62
EJE 3
DE A a B 2.00 4.40 0.30 2.64
DE B a C 2.00 2.72 0.30 1.63
DE C a D 2.00 3.70 0.30 2.22
EJE 6
DE A a B 2.00 4.50 0.30 2.70
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
1.04.05 CONCRETO F'C=100 KG/CM2 PARA FALSO PISO e =10 cm. 295.11 m2
JEFATURA 1.00 4.85 3.35 16.25
JEFATURA (PUERTA) 1.00 0.90 0.15 0.14
SALA DE REUNIONES 1.00 4.70 4.08 19.15
SALA DE REUNIONES (PUERTA) 1.00 0.90 0.15 0.14
BAO (1.00) AREA= 3.37 (3.37)
ADMINISTRADOR Y SECRETARIA 1.00 5.65 5.00 28.25
ADMINISTRADOR Y SECRETARIA (INGRESO) 1.00 1.40 0.15 0.21
ANTES DE ESCALERA 1.00 1.90 1.85 3.52
SALA DE REUNIONES Y RECIBIDOR 1.00 7.65 5.85 44.75
SALA DE REUNIONES Y RECIBIDOR (INGRESO) 1.00 1.85 0.15 0.28
PASADIZO 1.00 6.95 2.10 14.60
CAFETIN 1.00 AREA= 27.48 27.48
CAFETIN (MURO) (1.00) 6.60 0.15 (0.99)
VEREDA 1.00 AREA= 53.88 53.88
PATIO FRENTE A CAFETIN 1.00 AREA= 31.00 31.00
JARDIN FRENTE A CAFETIN (1.00) AREA= 8.56 (8.56)
ESTACIONAMIENTO 1.00 AREA= 34.06 34.06
PATIO FRENTE SS. HH. 1.00 AREA= 47.61 47.61
JARDIN FRENTE A SS. HH. (1.00) AREA= 13.27 (13.27)
1.05.04 COLUMNAS
1.05.04.0 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS 6.87 m3
COLUMNA 1 14.00 0.30 ### 4.20 5.29
COLUMNA 2 4.00 0.25 ### 3.60 0.90
COLUMNA 3 (circular: r = 15 cm) 3.00 Area= 0.02 4.20 0.22
COLUMNA 4 3.00 0.30 0.15 3.35 0.45
1.05.05 VIGAS
1.05.05.0 CONCRETO f'c= 210 kg/cm2 EN VIGAS 12.10 m3
EJE A, DE 1 A 3 1.00 7.05 0.30 ### 0.63
EJE A, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE A, DE 5 A 6 (CAFETIN) 1.00 4.70 0.25 0.30 0.35
EJE B, DE 1 A 3 1.00 7.05 0.30 ### 0.63
EJE B, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE B, DE 5 A 6 (CAFETIN) 1.00 4.70 0.25 0.30 0.35
EJE C, DE 1 A 4 1.00 7.05 0.30 ### 0.63
1.00 1.87 0.25 0.30 0.14
EJE C, (VOLADO) 1.00 0.85 0.30 0.20 0.05
EJE C, (VOLADO) 1.00 0.83 0.30 0.20 0.05
EJE D, DE 1 A 4 1.00 7.05 0.30 ### 0.63
1.00 1.87 0.25 0.30 0.14
EJE D, (VOLADO) 1.00 0.85 0.30 0.20 0.05
EJE D, (VOLADO) 1.00 0.83 0.30 0.20 0.05
EJE E, DE 1 A 2 1.00 3.00 0.30 ### 0.27
EJE E, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 1, DE A - E 1.00 19.25 0.30 0.40 2.31
EJE 1, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 2, DE A - E 1.00 19.25 0.30 0.40 2.31
EJE 2, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 3, DE A - E 1.00 14.95 0.30 0.40 1.79
EJE 3, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 4, DE C - D 1.00 5.44 0.25 0.30 0.41
EJE 5, DE A - B (CAFETIN) 1.00 4.50 0.25 0.30 0.34
EJE 6, DE A - B (CAFETIN) 1.00 4.50 0.25 0.30 0.34
1.05.06 DINTEL
1.05.06.0 CONCRETO f'c= 175 kg/cm2 EN DINTELES 0.93 m3
MAMPARAS
M-1 1.00 2.45 0.15 0.20 0.07
M-2 1.00 2.32 0.15 0.20 0.07
PUERTAS
P-1 2.00 1.50 0.15 0.20 0.09
P-2 5.00 1.30 0.15 0.20 0.20
VENTANAS
V-1 3.00 2.60 0.15 0.20 0.23
V-2 3.00 1.30 0.15 0.20 0.12
V-3 1.00 2.55 0.15 0.20 0.08
V-4 1.00 2.45 0.15 0.20 0.07
TRAMO "B"
EJES C - D, CON 1 - 2 1.00 5.55 3.20 0.20 3.55
2.00 3.20 0.85 0.20 1.09
EJES C - D, CON 2 - 3 1.00 5.55 3.85 0.20 4.27
2.00 3.85 0.85 0.20 1.31
EJES C - D, CON 3 - 4 1.00 5.55 1.83 0.20 2.03
2.00 1.83 0.85 0.20 0.62
VOLADO EJE 1 CON C-D 1.00 7.25 0.85 0.20 1.23
VOLADO EJE 4 CON C-D 1.00 7.35 0.85 0.20 1.25
TRAMO "C"
EJES D - E, CON 1 - 2 1.00 3.45 3.20 0.20 2.21
VOLADO EJE 1 CON D-E 1.00 4.30 0.85 0.20 0.73
VOLADO EJE 2 CON D-E 1.00 4.30 0.85 0.20 0.73
VOLADO EJE E CON VOLADO 1.00 4.90 0.85 0.20 0.83
VOLUMEN DE LADRILLOS (VOL. =0.30X0.30X0.15=0.0135 M3) CANT.= ### (1.00) 0.0135 (19.98)
TRAMO "B"
EJES C - D, CON 1 - 2 1.00 5.55 3.20 17.76
2.00 3.20 0.85 5.44
EJES C - D, CON 2 - 3 1.00 5.55 3.85 21.37
2.00 3.85 0.85 6.55
EJES C - D, CON 3 - 4 1.00 5.55 1.83 10.13
2.00 1.83 0.85 3.10
VOLADO EJE 1 CON C-D 1.00 7.25 0.85 6.16
VOLADO EJE 4 CON C-D 1.00 7.35 0.85 6.25
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
TRAMO "C"
EJES D - E, CON 1 - 2 1.00 3.45 3.20 11.04
VOLADO EJE 1 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE 2 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE E CON VOLADO 1.00 4.90 0.85 4.17
1.05.07.0 LADRILLO HUECO DE ARCILLA 15 X 30 X 30 cm. PARA TECHO ALIGERADO ### Pza.
METRADO DE LADRILLOS POR UNIDAD 8.3333
TRAMO "A"
EJES A - B, CON 1 - 2 1.00 4.40 3.20 14.08
EJES A - B, CON 2 - 3 1.00 4.40 3.85 16.94
VOLADO EJE 1 CON A-B 1.00 4.40 0.85 3.74
VOLADO EJE 3 CON A-B 1.00 4.40 0.85 3.74
EJES B - C, CON 1 - 2 1.00 4.15 3.20 13.28
EJES B - C, CON 2 - 3 1.00 4.15 3.85 15.98
AREA DE ESCALERA (1.00) AREA= 4.01 (4.01)
VOLADO EJE 1 CON B-C 1.00 4.15 0.85 3.53
VOLADO EJE 3 CON B-C 1.00 4.15 0.85 3.53
VOLADO EJE A CON 1-VOL. 1.00 0.85 ### 0.72
VOLADO EJE A CON 1-2 1.00 3.20 0.85 2.72
VOLADO EJE A CON 2-3 1.00 3.85 0.85 3.27
VOLADO EJE A CON 3-VOL. 1.00 0.85 ### 0.72
TRAMO "B"
EJES C - D, CON 1 - 2 1.00 5.55 3.20 17.76
2.00 3.20 0.85 5.44
EJES C - D, CON 2 - 3 1.00 5.55 3.85 21.37
2.00 3.85 0.85 6.55
EJES C - D, CON 3 - 4 1.00 5.55 1.83 10.13
2.00 1.83 0.85 3.10
VOLADO EJE 1 CON C-D 1.00 7.25 0.85 6.16
VOLADO EJE 4 CON C-D 1.00 7.35 0.85 6.25
TRAMO "C"
EJES D - E, CON 1 - 2 1.00 3.45 3.20 11.04
VOLADO EJE 1 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE 2 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE E CON VOLADO 1.00 4.90 0.85 4.17
1.05.08 ESCALERAS
1.05.08.0 CONCRETO f'c=210 kg/cm2 PARA ESCALERAS 2.02 m3
CANTIDAD
PASOS TRAMO 1 Y 2 17.00 0.90 0.25 0.19 0.71
PASOS EN DESCANSO 1.00 1.85 0.85 0.19 0.29
GARGANTA TRAMO 1 Y 2 2.00 2.60 0.90 0.15 0.70
GARGANTA EN DESCANSO 1.00 1.85 0.85 0.20 0.31
1.00 ESTRUCTURAS
1.01 OBRAS PRELIMINARES
1.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40 m 1 1.00 1.00
1.03.03 EXCAVACIN PARA CIMIENTOS CORRIDO ARMADO, SOBRE TERRENO NORMAL HASTA 1.50m DE PROFUNDIDAD 48.98
EJE A, DE 1 A 3 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
1.00 1.10 0.40 1.15 0.51
1.00 4.14 0.40 1.15 1.90
EJE A, DE 5 A 6 1.00 4.05 0.40 0.60 0.97
CAFETIN (SEMI CIRCULO) 1.00 6.77 0.40 0.60 1.62
EJE B, DE 1 A 3 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
EJE C, DE 1 A 4 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
1.00 1.05 0.40 1.15 0.48
EJE D, DE 1 A 3 1.00 2.30 0.40 1.15 1.06
1.00 2.95 0.40 1.15 1.36
1.00 1.05 0.40 1.15 0.48
EJE E, DE 1 A 3 1.00 2.00 0.40 1.15 0.92
1.00 5.75 0.40 1.15 2.65
EJE 1, DE A - E 1.00 3.50 0.40 1.15 1.61
1.00 4.10 0.40 1.15 1.89
1.00 4.65 0.40 1.15 2.14
1.00 3.63 0.40 1.15 1.67
3.00 1.12 0.40 1.15 1.55
1.00 4.07 0.40 1.15 1.87
1.00 1.59 0.40 1.15 0.73
EJE 2, DE A - E 1.00 3.58 0.40 1.15 1.65
1.00 4.74 0.40 1.15 2.18
1.00 3.63 0.40 1.15 1.67
EJE 3, DE A - E 1.00 1.38 0.40 1.15 0.63
1.00 1.72 0.40 1.15 0.79
1.00 3.50 0.40 1.15 1.61
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
1.04.02 CONCRETO F'C: 100 Kg/cm2 + 30% P.M, PARA CIMIENTO CORRIDO 27.65
EJE A, DE 1 A 3 1.00 18.63 0.40 0.60 4.47
EJE B, DE 1 A 3 1.00 5.25 0.40 0.60 1.26
EJE C, DE 1 A 4 1.00 6.30 0.40 0.60 1.51
EJE D, DE 1 A 4 1.00 11.25 0.40 0.60 2.70
EJE E, DE 1 A 3 1.00 7.75 0.40 0.60 1.86
EJE 1, DE A - E 1.00 18.25 0.40 0.60 4.38
EJE 2, DE A - E 1.00 13.33 0.40 0.60 3.20
EJE 3, DE A - E 1.00 11.84 0.40 0.60 2.84
EJE 4, DE C - D 1.00 4.05 0.40 0.60 0.97
EJE 6, DE A - B 1.00 2.84 0.40 0.60 0.68
JARDIN FRENTE A CAFETIN 1.00 11.42 0.30 0.50 1.71
JARDIN FRENTE A SS. HH. 1.00 13.73 0.30 0.50 2.06
EJE E
DE 1 a 2 1.00 3.20 0.15 0.30 0.14
EJE 1
DE A a B 1.00 4.40 0.15 0.30 0.20
DE B a C 1.00 5.00 0.15 0.30 0.23
DE C a D 1.00 5.55 0.15 0.30 0.25
DE D a E 1.00 5.80 0.15 0.30 0.26
EJE 2
DE A a B 1.00 3.50 0.15 0.30 0.16
DE B a C 1.00 3.37 0.15 0.30 0.15
DE D a E 1.00 2.70 0.15 0.30 0.12
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE 3
DE A a B 1.00 4.40 0.15 0.30 0.20
DE B a C 1.00 2.72 0.15 0.30 0.12
DE C a D 1.00 3.70 0.15 0.30 0.17
EJE 6
DE A a B 1.00 4.50 0.15 0.30 0.20
EJE E
DE 1 a 2 2.00 3.20 0.30 1.92
EJE 1
DE A a B 2.00 4.40 0.30 2.64
DE B a C 2.00 5.00 0.30 3.00
DE C a D 2.00 5.55 0.30 3.33
DE D a E 2.00 5.80 0.30 3.48
EJE 2
DE A a B 2.00 3.50 0.30 2.10
DE B a C 2.00 3.37 0.30 2.02
DE D a E 2.00 2.70 0.30 1.62
EJE 3
DE A a B 2.00 4.40 0.30 2.64
DE B a C 2.00 2.72 0.30 1.63
DE C a D 2.00 3.70 0.30 2.22
EJE 6
DE A a B 2.00 4.50 0.30 2.70
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
1.04.05 CONCRETO F'C=100 KG/CM2 PARA FALSO PISO e =10 cm. 295.11
JEFATURA 1.00 4.85 3.35 16.25
JEFATURA (PUERTA) 1.00 0.90 0.15 0.14
SALA DE REUNIONES 1.00 4.70 4.08 19.15
SALA DE REUNIONES (PUERTA) 1.00 0.90 0.15 0.14
BAO (1.00) AREA= 3.37 (3.37)
ADMINISTRADOR Y SECRETARIA 1.00 5.65 5.00 28.25
ADMINISTRADOR Y SECRETARIA (INGRESO) 1.00 1.40 0.15 0.21
ANTES DE ESCALERA 1.00 1.90 1.85 3.52
SALA DE REUNIONES Y RECIBIDOR 1.00 7.65 5.85 44.75
SALA DE REUNIONES Y RECIBIDOR (INGRESO) 1.00 1.85 0.15 0.28
PASADIZO 1.00 6.95 2.10 14.60
CAFETIN 1.00 AREA= 27.48 27.48
CAFETIN (MURO) (1.00) 6.60 0.15 (0.99)
VEREDA 1.00 AREA= 53.88 53.88
PATIO FRENTE A CAFETIN 1.00 AREA= 31.00 31.00
JARDIN FRENTE A CAFETIN (1.00) AREA= 8.56 (8.56)
ESTACIONAMIENTO 1.00 AREA= 34.06 34.06
PATIO FRENTE SS. HH. 1.00 AREA= 47.61 47.61
JARDIN FRENTE A SS. HH. (1.00) AREA= 13.27 (13.27)
1.05.04 COLUMNAS
1.05.04.0 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS 6.87
COLUMNA 1 14.00 0.30 0.30 4.20 5.29
COLUMNA 2 4.00 0.25 0.25 3.60 0.90
COLUMNA 3 (circular: r = 15 cm) 3.00 Area= 0.02 4.20 0.22
COLUMNA 4 3.00 0.30 0.15 3.35 0.45
1.05.05 VIGAS
1.05.05.0 CONCRETO f'c= 210 kg/cm2 EN VIGAS 12.10
EJE A, DE 1 A 3 1.00 7.05 0.30 0.30 0.63
EJE A, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE A, DE 5 A 6 (CAFETIN) 1.00 4.70 0.25 0.30 0.35
EJE B, DE 1 A 3 1.00 7.05 0.30 0.30 0.63
EJE B, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE B, DE 5 A 6 (CAFETIN) 1.00 4.70 0.25 0.30 0.35
EJE C, DE 1 A 4 1.00 7.05 0.30 0.30 0.63
1.00 1.87 0.25 0.30 0.14
EJE C, (VOLADO) 1.00 0.85 0.30 0.20 0.05
EJE C, (VOLADO) 1.00 0.83 0.30 0.20 0.05
EJE D, DE 1 A 4 1.00 7.05 0.30 0.30 0.63
1.00 1.87 0.25 0.30 0.14
EJE D, (VOLADO) 1.00 0.85 0.30 0.20 0.05
EJE D, (VOLADO) 1.00 0.83 0.30 0.20 0.05
EJE E, DE 1 A 2 1.00 3.00 0.30 0.30 0.27
EJE E, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 1, DE A - E 1.00 19.25 0.30 0.40 2.31
EJE 1, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 2, DE A - E 1.00 19.25 0.30 0.40 2.31
EJE 2, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 3, DE A - E 1.00 14.95 0.30 0.40 1.79
EJE 3, (VOLADO) 2.00 0.85 0.30 0.20 0.10
EJE 4, DE C - D 1.00 5.44 0.25 0.30 0.41
EJE 5, DE A - B (CAFETIN) 1.00 4.50 0.25 0.30 0.34
EJE 6, DE A - B (CAFETIN) 1.00 4.50 0.25 0.30 0.34
1.05.06 DINTEL
1.05.06.0 CONCRETO f'c= 175 kg/cm2 EN DINTELES 0.93
MAMPARAS
M-1 1.00 2.45 0.15 0.20 0.07
M-2 1.00 2.32 0.15 0.20 0.07
PUERTAS
P-1 2.00 1.50 0.15 0.20 0.09
P-2 5.00 1.30 0.15 0.20 0.20
VENTANAS
V-1 3.00 2.60 0.15 0.20 0.23
V-2 3.00 1.30 0.15 0.20 0.12
V-3 1.00 2.55 0.15 0.20 0.08
V-4 1.00 2.45 0.15 0.20 0.07
TRAMO "B"
EJES C - D, CON 1 - 2 1.00 5.55 3.20 0.20 3.55
2.00 3.20 0.85 0.20 1.09
EJES C - D, CON 2 - 3 1.00 5.55 3.85 0.20 4.27
2.00 3.85 0.85 0.20 1.31
EJES C - D, CON 3 - 4 1.00 5.55 1.83 0.20 2.03
2.00 1.83 0.85 0.20 0.62
VOLADO EJE 1 CON C-D 1.00 7.25 0.85 0.20 1.23
VOLADO EJE 4 CON C-D 1.00 7.35 0.85 0.20 1.25
TRAMO "C"
EJES D - E, CON 1 - 2 1.00 3.45 3.20 0.20 2.21
VOLADO EJE 1 CON D-E 1.00 4.30 0.85 0.20 0.73
VOLADO EJE 2 CON D-E 1.00 4.30 0.85 0.20 0.73
VOLADO EJE E CON VOLADO 1.00 4.90 0.85 0.20 0.83
VOLUMEN DE LADRILLOS (VOL. =0.30X0.30X0.15=0.0135 M3) CANT.= ### (1.00) 0.0135 (19.98)
TRAMO "B"
EJES C - D, CON 1 - 2 1.00 5.55 3.20 17.76
2.00 3.20 0.85 5.44
EJES C - D, CON 2 - 3 1.00 5.55 3.85 21.37
2.00 3.85 0.85 6.55
EJES C - D, CON 3 - 4 1.00 5.55 1.83 10.13
2.00 1.83 0.85 3.10
VOLADO EJE 1 CON C-D 1.00 7.25 0.85 6.16
VOLADO EJE 4 CON C-D 1.00 7.35 0.85 6.25
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
TRAMO "C"
EJES D - E, CON 1 - 2 1.00 3.45 3.20 11.04
VOLADO EJE 1 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE 2 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE E CON VOLADO 1.00 4.90 0.85 4.17
TRAMO "B"
EJES C - D, CON 1 - 2 1.00 5.55 3.20 17.76
2.00 3.20 0.85 5.44
EJES C - D, CON 2 - 3 1.00 5.55 3.85 21.37
2.00 3.85 0.85 6.55
EJES C - D, CON 3 - 4 1.00 5.55 1.83 10.13
2.00 1.83 0.85 3.10
VOLADO EJE 1 CON C-D 1.00 7.25 0.85 6.16
VOLADO EJE 4 CON C-D 1.00 7.35 0.85 6.25
TRAMO "C"
EJES D - E, CON 1 - 2 1.00 3.45 3.20 11.04
VOLADO EJE 1 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE 2 CON D-E 1.00 4.30 0.85 3.66
VOLADO EJE E CON VOLADO 1.00 4.90 0.85 4.17
1.05.08 ESCALERAS
1.05.08.0 CONCRETO f'c=210 kg/cm2 PARA ESCALERAS 2.02
CANTIDAD
PASOS TRAMO 1 Y 2 17.00 0.90 0.25 0.19 0.71
PASOS EN DESCANSO 1.00 1.85 0.85 0.19 0.29
GARGANTA TRAMO 1 Y 2 2.00 2.60 0.90 0.15 0.70
GARGANTA EN DESCANSO 1.00 1.85 0.85 0.20 0.31
ESTRUCTURA
UND
Glb
Glb
m2
m2
m3
m3
m3
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
m3
m3
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
m2
m3
m3
m3
m3
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
m2
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
m2
m3
m2
m3
m3
m2
m3
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
m2
m3
m2
m3
m2
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
m3
m3
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
m3
m2
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
Pza.
m3
m2
STRUCTURA ADMINISTRATIVA DEL ANP-BPAM
ESTRUCTURA
UND
p2
p2
Und
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE E, 1 - 3
1/2" (LONGITUDINAL) 4.00 8.00 1.00 32.00 1.02 32.64
3/8" (ESTRIBOS) 1.48 21.00 1.00 31.08 0.56 17.40
EJE 1, A - E
1/2" (LONGITUDINAL) 21.95 8.00 1.00 175.60 1.02 179.11
3/8" (ESTRIBOS) 1.48 25.00 1.00 37.00 0.56 20.72
1.48 28.00 1.00 41.44 0.56 23.21
1.48 30.00 1.00 44.40 0.56 24.86
1.48 25.00 1.00 37.00 0.56 20.72
EJE 2, D - E
1/2" (LONGITUDINAL) 5.10 8.00 1.00 40.8 1.02 41.62
3/8" (ESTRIBOS) 1.48 25.00 1.00 37.00 0.56 20.72
EJE 3, A - D
1/2" (LONGITUDINAL) 16.85 8.00 1.00 134.8 1.02 137.50
3/8" (ESTRIBOS) 1.48 25.00 1.00 37.00 0.56 20.72
1.48 28.00 1.00 41.44 0.56 23.21
1.48 30.00 1.00 44.40 0.56 24.86
EJE 4, C - D
1/2" (LONGITUDINAL) 6.85 8.00 1.00 54.8 1.02 55.90
3/8" (ESTRIBOS) 1.48 19.00 1.00 28.12 0.56 15.75
1.48 19.00 1.00 28.12 0.56 15.75
1.05.04 COLUMNAS
1.05.04.03 ACERO DE REFUERZO FY=4200KG/CM2 GRADO 60 - PARA COLUMNAS 1,396.70
COLUMNA 1
5/8" - VERTICAL 5.49 4.00 14.00 307.27 1.55 476.27
1/2" - VERTICAL 5.49 4.00 14.00 307.27 1.02 313.42
3/8" - ESTRIBOS 1.08 23.00 14.00 347.76 0.56 194.75
COLUMNA 2
5/8" - VERTICAL 4.83 4.00 4.00 77.33 1.55 119.86
3/8" - ESTRIBOS 0.88 22.00 4.00 77.44 0.56 43.37
COLUMNA 3
1/2" - VERTICAL 5.49 6.00 3.00 98.77 1.02 100.74
3/8" - ESTRIBOS 0.84 23.00 3.00 58.04 0.56 32.50
COLUMNA 4
1/2" - VERTICAL 4.74 6.00 3.00 85.27 1.02 86.97
3/8" - ESTRIBOS 0.78 22.00 3.00 51.48 0.56 28.83
1.05.05 VIGAS
1.05.05.03 ACERO DE REFUERZO FY=4200KG/CM2 GRADO 60 - PARA VIGAS 1,609.88
EJE A Y EJE B, 1 - 3
1/2" - HORIZONTAL 10.55 4.00 2.00 84.40 1.02 86.09
1/2" - HORIZONTAL 8.25 2.00 2.00 33.00 1.02 33.66
1/2" - BASTONES 2.40 1.00 2.00 4.80 1.02 4.90
1/2" - BASTONES 1.95 1.00 2.00 3.90 1.02 3.98
1/2" - BASTONES 2.70 1.00 2.00 5.40 1.02 5.51
1/2" - BASTONES 1.60 1.00 2.00 3.20 1.02 3.26
1/2" - BASTONES 2.20 1.00 2.00 4.40 1.02 4.49
3/8" - ESTRIBOS 1.08 21.00 2.00 45.36 0.56 25.40
1.08 25.00 2.00 54.00 0.56 30.24
0.88 9.00 4.00 31.68 0.56 17.74
EJE C Y EJE D, 1-4
1/2" - HORIZONTAL 12.63 4.00 2.00 101.00 1.02 103.02
1/2" - HORIZONTAL 8.25 2.00 2.00 33.00 1.02 33.66
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE E , 1 - 2
1/2" - HORIZONTAL 5.72 4.00 1.00 22.88 1.02 23.34
1/2" - HORIZONTAL 4.02 2.00 1.00 8.04 1.02 8.20
1/2" - BASTONES 2.20 1.00 1.00 2.20 1.02 2.24
1/2" - BASTONES 1.60 1.00 1.00 1.60 1.02 1.63
1/2" - BASTONES 2.20 1.00 1.00 2.20 1.02 2.24
3/8" - ESTRIBOS (TRAMO 1-2) 1.08 21.00 1.00 22.68 0.56 12.70
3/8" - ESTRIBOS (TRAMO 1,2-VOLADO) 0.88 9.00 2.00 15.84 0.56 8.87
EJE 1 Y EJE 2, A - E
5/8" - HORIZONTAL 23.87 4.00 2.00 190.96 1.55 295.99
1/2" - HORIZONTAL 20.97 2.00 2.00 83.88 1.02 85.56
1/2" - BASTONES 2.60 1.00 2.00 5.20 1.02 5.30
1/2" - BASTONES 2.20 1.00 2.00 4.40 1.02 4.49
1/2" - BASTONES 3.50 1.00 2.00 7.00 1.02 7.14
1/2" - BASTONES 2.50 1.00 2.00 5.00 1.02 5.10
1/2" - BASTONES 3.85 1.00 2.00 7.70 1.02 7.85
1/2" - BASTONES 2.85 1.00 2.00 5.70 1.02 5.81
1/2" - BASTONES 3.60 1.00 2.00 7.20 1.02 7.34
1/2" - BASTONES 2.20 1.00 2.00 4.40 1.02 4.49
1/2" - BASTONES 2.55 1.00 2.00 5.10 1.02 5.20
3/8" - ESTRIBOS (TRAMO A-B) 1.42 28.00 2.00 79.74 0.56 44.66
3/8" - ESTRIBOS (TRAMO B-C) 1.42 31.00 2.00 88.29 0.56 49.44
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
3/8" - ESTRIBOS (TRAMO C-D) 1.42 34.00 2.00 96.83 0.56 54.23
3/8" - ESTRIBOS (TRAMO D-E) 1.42 28.00 2.00 79.74 0.56 44.66
3/8" - ESTRIBOS (TRAMO A,E-VOLADO) 0.88 9.00 4.00 31.68 0.56 17.74
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE 3, A - D
5/8" - HORIZONTAL 18.07 4.00 1.00 72.28 1.55 112.03
1/2" - HORIZONTAL 16.37 2.00 1.00 32.74 1.02 33.39
1/2" - BASTONES 2.60 2.00 1.00 5.20 1.02 5.30
1/2" - BASTONES 2.20 2.00 1.00 4.40 1.02 4.49
1/2" - BASTONES 3.50 2.00 1.00 7.00 1.02 7.14
1/2" - BASTONES 2.50 2.00 1.00 5.00 1.02 5.10
1/2" - BASTONES 3.85 2.00 1.00 7.70 1.02 7.85
1/2" - BASTONES 2.85 2.00 1.00 5.70 1.02 5.81
1/2" - BASTONES 2.95 2.00 1.00 5.90 1.02 6.02
3/8" - ESTRIBOS (TRAMO A-B) 1.42 28.00 1.00 39.87 0.56 22.33
3/8" - ESTRIBOS (TRAMO B-C) 1.42 31.00 1.00 44.14 0.56 24.72
3/8" - ESTRIBOS (TRAMO C-D) 1.42 34.00 1.00 48.42 0.56 27.11
3/8" - ESTRIBOS (TRAMO A,E-VOLADO) 0.88 9.00 2.00 15.84 0.56 8.87
EJE 4, C - D
1/2" - HORIZONTAL 6.37 6.00 1.00 38.22 1.02 38.98
3/8" - ESTRIBOS (TRAMO C-D) 1.12 17.00 1.00 19.11 0.56 10.70
3/8" - ESTRIBOS (TRAMO C-D) 1.12 17.00 1.00 19.11 0.56 10.70
1.05.06 DINTEL
1.05.06.03 ACERO DE REFUERZO FY=4200KG/CM2 GRADO 60 - PARA DINTELES 104.55
MAMPARAS
M-1
1/2" - HORIZONTAL 2.45 4.00 1.00 9.80 1.02 10.00
3/8" - ESTRIBOS 0.58 16.00 1.00 9.28 0.56 5.20
M-1
1/2" - HORIZONTAL 2.32 4.00 1.00 9.28 1.02 9.47
3/8" - ESTRIBOS 0.58 16.00 1.00 9.28 0.56 5.20
PUERTAS
P-1
1/2" - HORIZONTAL 1.50 4.00 1.00 6.00 1.02 6.12
3/8" - ESTRIBOS 0.58 12.00 1.00 6.96 0.56 3.90
P-2
1/2" - HORIZONTAL 1.30 4.00 1.00 5.20 1.02 5.30
3/8" - ESTRIBOS 0.58 11.00 1.00 6.38 0.56 3.57
VENTANAS
V-1
1/2" - HORIZONTAL 2.60 4.00 1.00 10.40 1.02 10.61
3/8" - ESTRIBOS 0.58 17.00 1.00 9.86 0.56 5.52
V-2
1/2" - HORIZONTAL 1.30 4.00 1.00 5.20 1.02 5.30
3/8" - ESTRIBOS 0.58 11.00 1.00 6.38 0.56 3.57
V-3
1/2" - HORIZONTAL 2.55 4.00 1.00 10.20 1.02 10.40
3/8" - ESTRIBOS 0.58 16.00 1.00 9.28 0.56 5.20
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
V-4
1/2" - HORIZONTAL 2.45 4.00 1.00 9.80 1.02 10.00
3/8" - ESTRIBOS 0.58 16.00 1.00 9.28 0.56 5.20
1.05.08 ESCALERAS
1.05.08.03 ACERO DE REFUERZO FY=4200KG/CM2 GRADO 60 - PARA ESCALERAS 86.73
TRAMO 1
BASTONES 1/2" 6.43 3.00 1.00 19.29 1.02 19.68
VARILLA 1/2" 4.00 3.00 1.00 12.00 1.02 12.24
BASTONES P/PASOS 3/8" 0.83 18.00 1.00 14.94 0.56 8.37
BASTONES P/PASOS 1/2" 0.83 1.00 1.00 0.83 1.02 0.85
DESCANSO
BASTONES P/PASOS 3/8" 0.83 13.00 1.00 10.79 0.56 6.04
TRAMO 2
BASTONES 1/2" 2.00 3.00 1.00 6.00 1.02 6.12
VARILLA 1/2" 3.46 3.00 1.00 10.38 1.02 10.59
3.52 3.00 1.00 10.56 1.02 10.77
BASTONES P/PASOS 3/8" 0.83 26.00 1.00 21.58 0.56 12.08
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
2.00 ARQUITECTURA
2.01 ALBAILERIA
2.01.01 MURO DE LADRILLO DE ARCILLA DE SOGA ### m2
EJE A
DE 1 a 2 1.00 3.20 3.10 9.92
DE 2 a 3 1.00 3.85 3.10 11.94
(1.00) 0.70 2.00 (1.40)
1.00 3.44 3.10 10.65
(1.00) 0.70 2.10 (1.47)
DE 5 a 6 1.00 4.70 3.10 14.57
EJE B
DE 1 a 2 1.00 1.95 0.90 1.76
1.00 1.95 0.70 1.37
1.00 0.35 3.10 1.09
1.00 0.90 1.10 0.99
DE 2 a 3 1.00 3.85 3.10 11.94
EJE C
DE 1 a 2 1.00 3.20 3.10 9.92
DE 2 a 3 1.00 3.65 3.10 11.32
EJE D
DE 1 a 2 1.00 3.20 3.10 9.92
DE 2 a 3 1.00 3.85 3.10 11.94
EJE E
DE 1 a 2 1.00 3.00 3.10 9.30
DE 2 a 3 1.00 6.25 3.10 19.38
EJE 1
DE A a B 1.00 1.85 0.90 1.67
1.00 1.85 0.70 1.30
1.00 2.55 3.10 7.91
DE B a C 1.00 3.00 3.10 9.30
1.00 2.00 0.90 1.80
1.00 2.00 0.70 1.40
DE C a D 1.00 3.55 3.10 11.01
1.00 2.00 0.90 1.80
1.00 2.00 0.70 1.40
DE D a E 1.00 13.59 3.10 42.13
1.00 1.53 2.00 3.06
1.00 1.53 0.50 0.77
6.00 0.70 1.10 4.62
EJE 2
DE A a B 1.00 3.56 3.10 11.04
1.00 0.90 1.10 0.99
1.00 0.70 1.10 0.77
DE B a C 1.00 3.30 3.10 10.23
EJE 3
DE A a B 1.00 5.60 3.10 17.36
1.00 2.00 0.90 1.80
1.00 2.00 0.70 1.40
DE B a C 1.00 1.72 1.10 1.89
1.00 2.98 3.10 9.24
DE C a D 1.00 3.70 3.10 11.47
1.00 1.85 1.10 2.04
EJE 6
DE A a B 1.00 4.50 1.15 5.18
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE D
DE 1 a 3 1.00 4.10 3.20 13.12
EJE 1
DE A a E 1.00 12.97 3.20 41.50
1.00 1.85 1.00 1.85
1.00 1.85 0.70 1.30
2.00 2.00 1.00 4.00
2.00 2.00 0.70 2.80
2.00 0.70 2.10 2.94
2.00 0.70 0.50 0.70
EJE 2
DE A a E 1.00 0.90 1.10 0.99
1.00 7.74 3.20 24.77
1.00 7.35 3.20 23.52
3.00 4.10 2.00 24.60
EJE 3
DE A a E 1.00 11.83 3.20 37.86
1.00 2.00 1.00 2.00
1.00 2.00 0.70 1.40
1.00 1.72 1.10 1.89
1.00 1.85 1.10 2.04
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE 4-4
TRAMO C-D (COSTADOS) EXTERIOR 1.00 6.10 0.10 0.61
TRAMO C-D (COSTADOS) INTERIOR 1.00 5.44 0.10 0.54
TRAMO C-D (FONDO) 1.00 5.44 0.25 1.36
EJE A-A
TRAMO 1-3 (COSTADOS) EXTERIOR 1.00 7.95 0.10 0.80
TRAMO 1-3 (COSTADOS) INTERIOR 1.00 7.05 0.10 0.71
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE B-B
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE C-C
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE D-D
TRAMO 1-2 (COSTADOS) 2.00 3.20 0.10 0.64
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 2-3 (COSTADOS) EXTERIOR 1.00 4.15 0.10 0.42
TRAMO 2-3 (COSTADOS) INTERIOR 1.00 3.85 0.10 0.39
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE E-E
TRAMO 1-2 (COSTADOS) INTERIOR 1.00 3.20 0.10 0.32
TRAMO 1-2 (COSTADOS) EXTERIOR 1.00 3.80 0.10 0.38
TRAMO 1-2 (FONDO) 1.00 3.20 0.15 0.48
VIGA EN ESCALERA
LONGITUDINAL (COSTADOS) 2.00 2.72 0.10 0.54
TRANSVERSAL (COSTADOS) 2.00 1.70 0.10 0.34
TRANSVERSAL (FONDO) 1.00 1.70 0.15 0.26
CAFETIN
EJE A-A (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE A-A (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE A-A (TRAMO 5-6) (FONDO) 1.00 4.70 0.10 0.47
EJE B-B (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE B-B (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE B-B (TRAMO 5-6) (FONDO) 1.00 4.70 0.25 1.18
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) EXTER 2.00 5.00 0.30 3.00
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) INTERI 2.00 4.50 0.30 2.70
EJE 5-5 (TRAMO A-B) (FONDO) 1.00 4.50 0.25 1.13
2.03 CIELORRASOS
2.03.01 TARRAJEO EN CIELORRASO CON MORTERO 1:4, E=1.5CM ### m2
JEFATURA 1.00 AREA= 14.08 14.08
ADMINISTRADOR 1.00 AREA= 16.00 16.00
SALA DE REUNIONES 1 1.00 AREA= 16.94 16.94
SECRETARIA 1.00 AREA= 13.67 13.67
SALA DE REUNIONES 2 Y RECIBIDOR 1.00 AREA= 39.13 39.13
SS. HH. DAMAS 1.00 AREA= 6.72 6.72
SS. HH. VARONES 1.00 AREA= 6.56 6.56
PASADIZO 1.00 AREA= 10.22 10.22
VOLADOS DE LAS VEREDAS 1.00 AREA= 55.05 55.05
2.05 CONTRAZCALOS
2.05.01 CONTRAZCALO DE CERMICO NACIONAL H;10 cm. 92.72 m.
JEFATURA 1.00 14.21 14.21
SALA DE REUNIONES (EJE A,B) 1.00 16.01 16.01
SECRETARIA 1.00 24.95 24.95
SALA DE REUNIONES (EJE C,D) 1.00 24.15 24.15
RECIBIDOR 1.00 13.40 13.40
2.06 ZCALOS
2.06.01 ZCALO DE MAYOLICA BLANCA DE 20 X 30 cm DE 1RA 78.18 m2
SS.HH. PATIO
DAMAS Y VARONES 1.00 29.34 2.10 61.61
2.00 0.70 2.10 2.94
SS.HH. SALA DE REUNIONES 1.00 5.79 2.10 12.16
1.00 0.70 2.10 1.47
2.07 REVESTIMIENTOS
2.07.01 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO FROTACHADO 9.39 m2
PRIMER TRAMO 9.00 0.90 0.25 2.03
10.00 0.90 0.185 1.67
5.00 0.25 0.185 0.23
1.00 2.60 0.07 0.18
DESCANSO 1.00 1.85 0.85 1.57
SEGUNDO TRAMO 8.00 0.90 0.25 1.80
9.00 0.90 0.185 1.50
5.00 0.25 0.185 0.23
1.00 2.60 0.070 0.18
2.11 CERRAJERIA
2.11.01 SUMINISTRO Y COLOCACION DE CHAPA PRINCIPAL - 3 GOLPES, PESADA 2.00 Pza.
PUERTA 1 2.00 2.00
2.11.02 SUMINISTRO Y COLOCACION DE CHAPA TIPO PERILLA, PARA PUERTA INTERIOR 7.00 Pza.
PUERTA 2 7.00 7.00
2.12.02 VIDRIO INCOLORO 6mm, CON PERFIL DE ALUMINIO PARA VENTANA ### P2
VENTANA 1 3.00 2.00 1.50 9.00
VENTANA 2 3.00 0.70 0.60 1.26
VENTANA 3 1.00 1.95 1.50 2.93
VENTANA 4 1.00 1.85 1.50 2.78
2.13 PINTURA
2.13.01 PINTURA LATEX EN MUROS INTERIORES ### m2
EJE A
DE 1 a 3 1.00 12.75 3.20 40.80
DE 5 a 6 (CAFETIN) 1.00 4.70 2.55 11.99
EJE B
DE 1 a 3 1.00 9.60 3.20 30.72
2.00 1.95 1.00 3.90
2.00 1.95 0.70 2.73
2.00 0.90 1.10 1.98
EJE C
DE 1 a 3 1.00 15.35 3.20 49.12
EJE D
DE 1 a 3 1.00 4.10 3.20 13.12
EJE 1
DE A a E 1.00 12.97 3.20 41.50
1.00 1.85 1.00 1.85
1.00 1.85 0.70 1.30
2.00 2.00 1.00 4.00
2.00 2.00 0.70 2.80
2.00 0.70 2.10 2.94
2.00 0.70 0.50 0.70
EJE 2
DE A a E 1.00 0.90 1.10 0.99
1.00 7.74 3.20 24.77
1.00 7.35 3.20 23.52
3.00 4.10 2.00 24.60
EJE 3
DE A a E 1.00 11.83 3.20 37.86
1.00 2.00 1.00 2.00
1.00 2.00 0.70 1.40
1.00 1.72 1.10 1.89
1.00 1.85 1.10 2.04
EJE 6
DE A a B (CAFETIN) 1.00 4.50 1.20 5.40
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
VIGAS
EJE 1-1
TRAMO A-E (COSTADOS) EXTERIOR 1.00 20.75 0.20 4.15
TRAMO A-E (COSTADOS) INTERIOR 1.00 20.15 0.20 4.03
TRAMO A-E (FONDO) 1.00 19.25 0.15 2.89
EJE 2-2
TRAMO A-E (COSTADOS) 2.00 19.25 0.20 7.70
TRAMO A-E (FONDO) 1.00 19.25 0.15 2.89
TRAMO A-E (LIBRE) 1.00 10.55 0.15 1.58
EJE 3-3
TRAMO A-E (COSTADOS) EXTERIOR 1.00 15.63 0.20 3.13
TRAMO A-E (COSTADOS) INTERIOR 1.00 14.95 0.20 2.99
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE 4-4
TRAMO C-D (COSTADOS) EXTERIOR 1.00 6.10 0.10 0.61
TRAMO C-D (COSTADOS) INTERIOR 1.00 5.44 0.10 0.54
TRAMO C-D (FONDO) 1.00 5.44 0.25 1.36
EJE A-A
TRAMO 1-3 (COSTADOS) EXTERIOR 1.00 7.95 0.10 0.80
TRAMO 1-3 (COSTADOS) INTERIOR 1.00 7.05 0.10 0.71
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE B-B
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE C-C
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE D-D
TRAMO 1-2 (COSTADOS) 2.00 3.20 0.10 0.64
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 2-3 (COSTADOS) EXTERIOR 1.00 4.15 0.10 0.42
TRAMO 2-3 (COSTADOS) INTERIOR 1.00 3.85 0.10 0.39
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE E-E
TRAMO 1-2 (COSTADOS) INTERIOR 1.00 3.20 0.10 0.32
TRAMO 1-2 (COSTADOS) EXTERIOR 1.00 3.80 0.10 0.38
TRAMO 1-2 (FONDO) 1.00 3.20 0.15 0.48
VIGA EN ESCALERA
LONGITUDINAL (COSTADOS) 2.00 2.72 0.10 0.54
TRANSVERSAL (COSTADOS) 2.00 1.70 0.10 0.34
TRANSVERSAL (FONDO) 1.00 1.70 0.15 0.26
CAFETIN
EJE A-A (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE A-A (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE A-A (TRAMO 5-6) (FONDO) 1.00 4.70 0.10 0.47
EJE B-B (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE B-B (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE B-B (TRAMO 5-6) (FONDO) 1.00 4.70 0.25 1.18
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) EXTER 2.00 5.00 0.30 3.00
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) INTERI 2.00 4.50 0.30 2.70
EJE 5-5 (TRAMO A-B) (FONDO) 1.00 4.50 0.25 1.13
2.00 ARQUITECTURA
2.01 ALBAILERIA
2.01.01 MURO DE LADRILLO DE ARCILLA DE SOGA ### m2
EJE A
DE 1 a 2 1.00 3.20 3.10 9.92
DE 2 a 3 1.00 3.15 3.10 9.77
1.00 0.70 2.00 1.40
1.00 7.05 3.10 21.86
1.00 7.07 0.70 4.95
DE 5 a 6 1.00 4.70 3.10 14.57
EJE B
DE 1 a 2 1.00 1.95 0.90 1.76
1.00 1.95 0.70 1.37
1.00 0.35 3.10 1.09
1.00 0.90 1.10 0.99
DE 2 a 3 1.00 3.85 3.10 11.94
EJE C
DE 1 a 2 1.00 3.20 3.10 9.92
DE 2 a 3 1.00 3.65 3.10 11.32
EJE D
DE 1 a 2 1.00 3.20 3.10 9.92
DE 2 a 3 1.00 3.85 3.10 11.94
EJE E
DE 1 a 2 1.00 3.00 3.10 9.30
DE 2 a 3 1.00 6.25 3.10 19.38
EJE 1
DE A a B 1.00 1.85 0.90 1.67
1.00 1.85 0.70 1.30
1.00 2.55 3.10 7.91
DE B a C 1.00 3.00 3.10 9.30
1.00 2.00 0.90 1.80
1.00 2.00 0.70 1.40
DE C a D 1.00 3.55 3.10 11.01
1.00 2.00 0.90 1.80
1.00 2.00 0.70 1.40
DE D a E 1.00 13.59 3.10 42.13
1.00 1.53 2.00 3.06
1.00 1.53 0.50 0.77
6.00 0.70 1.10 4.62
EJE 2
DE A a B 1.00 3.56 3.10 11.04
1.00 0.90 1.10 0.99
1.00 0.70 1.10 0.77
DE B a C 1.00 3.30 3.10 10.23
EJE 3
DE A a B 1.00 5.60 3.10 17.36
1.00 2.00 0.90 1.80
1.00 2.00 0.70 1.40
DE B a C 1.00 1.72 1.10 1.89
1.00 2.98 3.10 9.24
DE C a D 1.00 3.70 3.10 11.47
1.00 1.85 1.10 2.04
EJE 6
DE A a B 1.00 4.50 1.15 5.18
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE D
DE 1 a 3 1.00 4.10 3.20 13.12
EJE 1
DE A a E 1.00 12.97 3.20 41.50
1.00 1.85 1.00 1.85
1.00 1.85 0.70 1.30
2.00 2.00 1.00 4.00
2.00 2.00 0.70 2.80
2.00 0.70 2.10 2.94
2.00 0.70 0.50 0.70
EJE 2
DE A a E 1.00 0.90 1.10 0.99
1.00 7.74 3.20 24.77
1.00 7.35 3.20 23.52
3.00 4.10 2.00 24.60
EJE 3
DE A a E 1.00 11.83 3.20 37.86
1.00 2.00 1.00 2.00
1.00 2.00 0.70 1.40
1.00 1.72 1.10 1.89
1.00 1.85 1.10 2.04
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE 4-4
TRAMO C-D (COSTADOS) EXTERIOR 1.00 6.10 0.10 0.61
TRAMO C-D (COSTADOS) INTERIOR 1.00 5.44 0.10 0.54
TRAMO C-D (FONDO) 1.00 5.44 0.25 1.36
EJE A-A
TRAMO 1-3 (COSTADOS) EXTERIOR 1.00 7.95 0.10 0.80
TRAMO 1-3 (COSTADOS) INTERIOR 1.00 7.05 0.10 0.71
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE B-B
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE C-C
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE D-D
TRAMO 1-2 (COSTADOS) 2.00 3.20 0.10 0.64
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 2-3 (COSTADOS) EXTERIOR 1.00 4.15 0.10 0.42
TRAMO 2-3 (COSTADOS) INTERIOR 1.00 3.85 0.10 0.39
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE E-E
TRAMO 1-2 (COSTADOS) INTERIOR 1.00 3.20 0.10 0.32
TRAMO 1-2 (COSTADOS) EXTERIOR 1.00 3.80 0.10 0.38
TRAMO 1-2 (FONDO) 1.00 3.20 0.15 0.48
VIGA EN ESCALERA
LONGITUDINAL (COSTADOS) 2.00 2.72 0.10 0.54
TRANSVERSAL (COSTADOS) 2.00 1.70 0.10 0.34
TRANSVERSAL (FONDO) 1.00 1.70 0.15 0.26
CAFETIN
EJE A-A (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE A-A (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE A-A (TRAMO 5-6) (FONDO) 1.00 4.70 0.10 0.47
EJE B-B (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE B-B (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE B-B (TRAMO 5-6) (FONDO) 1.00 4.70 0.25 1.18
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) EXTER 2.00 5.00 0.30 3.00
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) INTERI 2.00 4.50 0.30 2.70
EJE 5-5 (TRAMO A-B) (FONDO) 1.00 4.50 0.25 1.13
2.03 CIELORRASOS
2.03.01 TARRAJEO EN CIELORRASO CON MORTERO 1:4, E=1.5CM ### m2
JEFATURA 1.00 AREA= 14.08 14.08
ADMINISTRADOR 1.00 AREA= 16.00 16.00
SALA DE REUNIONES 1 1.00 AREA= 16.94 16.94
SECRETARIA 1.00 AREA= 13.67 13.67
SALA DE REUNIONES 2 Y RECIBIDOR 1.00 AREA= 39.13 39.13
SS. HH. DAMAS 1.00 AREA= 6.72 6.72
SS. HH. VARONES 1.00 AREA= 6.56 6.56
PASADIZO 1.00 AREA= 10.22 10.22
VOLADOS DE LAS VEREDAS 1.00 AREA= 55.05 55.05
2.05 CONTRAZCALOS
2.05.01 CONTRAZCALO DE CERMICO NACIONAL H;10 cm. 92.72 m.
JEFATURA 1.00 14.21 14.21
SALA DE REUNIONES (EJE A,B) 1.00 16.01 16.01
SECRETARIA 1.00 24.95 24.95
SALA DE REUNIONES (EJE C,D) 1.00 24.15 24.15
RECIBIDOR 1.00 13.40 13.40
2.06 ZCALOS
2.06.01 ZCALO DE MAYOLICA BLANCA DE 20 X 30 cm DE 1RA 78.18 m2
SS.HH. PATIO
DAMAS Y VARONES 1.00 29.34 2.10 61.61
2.00 0.70 2.10 2.94
SS.HH. SALA DE REUNIONES 1.00 5.79 2.10 12.16
1.00 0.70 2.10 1.47
2.07 REVESTIMIENTOS
2.07.01 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO FROTACHADO 9.39 m2
PRIMER TRAMO 9.00 0.90 0.25 2.03
10.00 0.90 0.185 1.67
5.00 0.25 0.185 0.23
1.00 2.60 0.07 0.18
DESCANSO 1.00 1.85 0.85 1.57
SEGUNDO TRAMO 8.00 0.90 0.25 1.80
9.00 0.90 0.185 1.50
5.00 0.25 0.185 0.23
1.00 2.60 0.070 0.18
2.11 CERRAJERIA
2.11.01 SUMINISTRO Y COLOCACION DE CHAPA PRINCIPAL - 3 GOLPES, PESADA 2.00 Pza.
PUERTA 1 2.00 2.00
2.11.02 SUMINISTRO Y COLOCACION DE CHAPA TIPO PERILLA, PARA PUERTA INTERIOR 7.00 Pza.
PUERTA 2 7.00 7.00
2.12.02 VIDRIO INCOLORO 6mm, CON PERFIL DE ALUMINIO PARA VENTANA ### P2
VENTANA 1 3.00 2.00 1.50 9.00
VENTANA 2 3.00 0.70 0.60 1.26
VENTANA 3 1.00 1.95 1.50 2.93
VENTANA 4 1.00 1.85 1.50 2.78
2.13 PINTURA
2.13.01 PINTURA LATEX EN MUROS INTERIORES ### m2
EJE A
DE 1 a 3 1.00 12.75 3.20 40.80
DE 5 a 6 (CAFETIN) 1.00 4.70 2.55 11.99
EJE B
DE 1 a 3 1.00 9.60 3.20 30.72
2.00 1.95 1.00 3.90
2.00 1.95 0.70 2.73
2.00 0.90 1.10 1.98
EJE C
DE 1 a 3 1.00 15.35 3.20 49.12
EJE D
DE 1 a 3 1.00 4.10 3.20 13.12
EJE 1
DE A a E 1.00 12.97 3.20 41.50
1.00 1.85 1.00 1.85
1.00 1.85 0.70 1.30
2.00 2.00 1.00 4.00
2.00 2.00 0.70 2.80
2.00 0.70 2.10 2.94
2.00 0.70 0.50 0.70
EJE 2
DE A a E 1.00 0.90 1.10 0.99
1.00 7.74 3.20 24.77
1.00 7.35 3.20 23.52
3.00 4.10 2.00 24.60
EJE 3
DE A a E 1.00 11.83 3.20 37.86
1.00 2.00 1.00 2.00
1.00 2.00 0.70 1.40
1.00 1.72 1.10 1.89
1.00 1.85 1.10 2.04
EJE 6
DE A a B (CAFETIN) 1.00 4.50 1.20 5.40
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
VIGAS
EJE 1-1
TRAMO A-E (COSTADOS) EXTERIOR 1.00 20.75 0.20 4.15
TRAMO A-E (COSTADOS) INTERIOR 1.00 20.15 0.20 4.03
TRAMO A-E (FONDO) 1.00 19.25 0.15 2.89
EJE 2-2
TRAMO A-E (COSTADOS) 2.00 19.25 0.20 7.70
TRAMO A-E (FONDO) 1.00 19.25 0.15 2.89
TRAMO A-E (LIBRE) 1.00 10.55 0.15 1.58
EJE 3-3
TRAMO A-E (COSTADOS) EXTERIOR 1.00 15.63 0.20 3.13
TRAMO A-E (COSTADOS) INTERIOR 1.00 14.95 0.20 2.99
METRADO INFRAESTRUCTURA ADMINISTRATIVA DEL ANP-BPAM
EJE 4-4
TRAMO C-D (COSTADOS) EXTERIOR 1.00 6.10 0.10 0.61
TRAMO C-D (COSTADOS) INTERIOR 1.00 5.44 0.10 0.54
TRAMO C-D (FONDO) 1.00 5.44 0.25 1.36
EJE A-A
TRAMO 1-3 (COSTADOS) EXTERIOR 1.00 7.95 0.10 0.80
TRAMO 1-3 (COSTADOS) INTERIOR 1.00 7.05 0.10 0.71
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE B-B
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
EJE C-C
TRAMO 1-3 (COSTADOS) 2.00 7.05 0.10 1.41
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE D-D
TRAMO 1-2 (COSTADOS) 2.00 3.20 0.10 0.64
TRAMO 3-4 (COSTADOS) INTERIOR 1.00 1.87 0.10 0.19
TRAMO 3-4 (COSTADOS) EXTERIOR 1.00 2.08 0.10 0.21
TRAMO 2-3 (COSTADOS) EXTERIOR 1.00 4.15 0.10 0.42
TRAMO 2-3 (COSTADOS) INTERIOR 1.00 3.85 0.10 0.39
TRAMO 1-3 (FONDO) 1.00 7.05 0.15 1.06
TRAMO 3-4 (FONDO) 1.00 1.87 0.25 0.47
EJE E-E
TRAMO 1-2 (COSTADOS) INTERIOR 1.00 3.20 0.10 0.32
TRAMO 1-2 (COSTADOS) EXTERIOR 1.00 3.80 0.10 0.38
TRAMO 1-2 (FONDO) 1.00 3.20 0.15 0.48
VIGA EN ESCALERA
LONGITUDINAL (COSTADOS) 2.00 2.72 0.10 0.54
TRANSVERSAL (COSTADOS) 2.00 1.70 0.10 0.34
TRANSVERSAL (FONDO) 1.00 1.70 0.15 0.26
CAFETIN
EJE A-A (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE A-A (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE A-A (TRAMO 5-6) (FONDO) 1.00 4.70 0.10 0.47
EJE B-B (TRAMO 5-6) (COSTADOS) EXTERIOR 1.00 5.20 0.30 1.56
EJE B-B (TRAMO 5-6) (COSTADOS) INTERIOR 1.00 4.70 0.30 1.41
EJE B-B (TRAMO 5-6) (FONDO) 1.00 4.70 0.25 1.18
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) EXTER 2.00 5.00 0.30 3.00
EJE 5-5 Y EJE 6-6 (TRAMO A-B) (COSTADOS) INTERI 2.00 4.50 0.30 2.70
EJE 5-5 (TRAMO A-B) (FONDO) 1.00 4.50 0.25 1.13
3.04.00 SALIDA PARA TOMACORRIENTE BIPOLARES SIMPLE CON PVC 14.00 Pto.
OFICINA DE ADMINISTRACION 14.00 14.00
4.01.07 TRAMPA "P" DE PVC SAL PARA DESAGUE DE 2" 5.00 Und.
OFICINA DE ADMINISTRACION 5.00 5.00
5.00 VARIOS
5.02.00 LIMPIEZA FINAL DE OBRA ### m2
PUESTO DE CONTROL 1.00 22.75 17.00 ###