Vous êtes sur la page 1sur 3

4.1 401 Granular Sub-base with Well Graded Material (Table 400.

1)

(A) By Mix in Place Method


Construction of granular sub-base by providing well graded material,
spreading in uniform layers with Tractor mount grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with smooth wheel roller to achieve the desired density,
complete as per Technical Specification Clause 401.

(i) For Grading I Material


Unit = cum
Taking output = 300 cum
a) Labour
Mate day 0.48 291.66
Mazdoor (Skilled) day 2.00 291.66
Mazdoor (Unskilled) day 10.00 291.66
15 %loss of manpower
b) Machinery
Tractor mount Grader 110 @ 25 cum per hour 12.00 1,192.00
hour
Three wheel 80-100 kN static roller @ 10 hour 30.00 745.00
cum per hour
Tractor with Rotavator 25 cum per hour hour 12.00 688.00

Water tanker 6 kl capacity hour 5.00 500.00


6% machinery loss
c) Material
Well graded granular sub-base material as cum 360.00 1,132.52
per Table 400.1
Water kl 30.00
d) Add 10% C.P and 2.5% O.H
e) Add 1% labour cess
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
Say Rs.
140.00
583.32
2,916.60
545.99

14,304.00

22,350.00

8,256.00

2,500.00
2,844.60

407,707.20

0.00
57,768.46
5,199.16
525,115.33
1,750.38
1,750.40
RATES OF CARRIAGE OF MATERIAL
S.No Description Rate per Weight of materials Rate per Lead as per Rate per
M.T. Unit Weight in Km. per lead chart cum as per
Km.weight tonne tonne (in km.) M.T. for
of materials total lead
1 GSB 3.54 Per cum 1.60 5.66 148.00 837.68