Filling crusher run base course, 150mm thick, compacted in layers of 75mm thick
maximum [RM/M2]
Material
Labour
Machine output
Labour output
Overheads 8%,
Profit 2%
Filling dense graded hot-mix carpet wearing course, 100mm thick, laid and compacted
[RM/m2]
Material
Plant
[Transportation cost for each plant to and fro site is charged at RM1200/tonne of materials laid for the
project]
Labour
Foreman RM60.00/day
Machine output
Labour output
Overheads 8%,
Profit 2%
[Take area of road 1.00m2]
A. Material
C. Labour
C. Labour
3 nr @ RM1200/nr RM3600
| 3500m2 | RM 3.99
|3.88m2/tonne | RM91.81
A. Material
E. Labour