THE CONSTRUCTION OF KANCHPUR, MEGHNA, GUMTI 2ND BRIDGES

AND REHABILITATION OF EXISTING BRIDGES (PACKAGE NO. PW-01)

CONSTRUCTION RECORD SUMMARY


Kanchpur Pier No. 3
Joint Nos: 1
Hammer Pile No. 62

Date (d/m/yy) : 27/3/2017


Work Item : 9.01.1: Steel Pipe Sheet Pile D1.0m, t=14mm
Name of the Part: Bridge/Pier No./Pile No.: Kanchpur/P1/62
Base on: Method statement / Shop Drawing / RFI No. : OSJI-RFI-K_

Joint Position Lower Upper

Construction Date / Weather / 14/03/17 / Sunny

Temperature () 26

Loading Crane Type Crawler 150 MT

Vibro / Hammer / Silent Piler Type IHC S 150 HT

Pile Length (m) 16.00 12.00

Construction Time (Installation time)

Damage Condition N/A

Stroke Energy* : Eh (kJ) - 65

Penetration* : S (mm) - 3.20

Bearing Capacity* Ru : (kN) - 28508.77

Remarks
(Switch timing etc)

Memo, K= 5 mm * Check the Final setting of


The calculated formula; SPSP(Upper Pile only)

2.5 * 65
= = 28508.77 kN
+ /2 (3.2 + 5/2)/1000

f : efficient of hammer (2.5)

Checked by CIVIL Inspected by Verified by THE


Checked by OSJI PIC
MANAGER INSPECTOR ENGINEER