Status of Grid Connected Ground mounted Solar Power Projects

Phase-I:70MWs Solar Power


LOA No:KREDL:RE:021:RFP:2011-12 Date of allotment:8.6.2012
Original Locations

Scheduled
Sl Capacity Techno Tariff Commissioned date Commissioned
Name of the Company ESCOM Present project location
No (MWs) logy (`) PPA date Village Taluk District 18/30 months from date
PPA for PV/ST

Varavukaval village, Nayankanahatty


1 Helene Power Pvt Ltd 10 SPV 7.94 BESCOM 25.7.2012 Varavukaval Nayankanahatty Chitradurga 25-01-2014 Court case
taluk, Chitradurga
Kalamarahalli village, Challakere taluk,
2 Jindal Aluminium Ltd 10 SPV 8.25 BESCOM 25.07.2012 Kalamarhalli Challakere Chitradurga 25-01-2014 5-Jun-13
Chitradurga dist.
3 ESSEL Infrastructure Ltd. 5 SPV 8.37 HESCOM 31.08.2012 Nimbal village, Indi taluk, Bijapur Nimbal Indi Bijapur 28-02-2014 30-Jul-14
4 ESSEL Infrastructure Ltd. 5 SPV 8.46 HESCOM 31.08.2012 Nimbal village,dist
Indi taluk, Bijapur Nimbal Indi Bijapur 28-02-2014 30-Jul-14
dist Humnabad taluk,
Bemal Kheda village,
5 GKC Projects Limited 10 SPV 8.46 GESCOM 28.7.2012 Bheema Kheda Humnabad Bidar 28-01-2014 30-Aug-14
Bidar dist
Thallaku village, Challakere taluk,
6 SaiSudhir Energy Ltd 10 SPV 8.49 CESC 30.08.2012 Thallaku Challakere Chitradurga 28-02-2014 Court case
Chitradurga district.
Vijalapura village, Mulabagal taluk,
7 United Telecoms Limited 3 SPV 8.46 BESCOM 17.8.2012 Vijalapura Mulabagal Kolar 17-02-2014 28-Aug-14
Kolar dist
Welspun Solar Kannada Pvt Nagasamudra village, Molakamuru taluk,
8 7 SPV 8.50 MESCOM 27.7.2012 Nagasamudra Molakamuru Chitradurga 27-01-2014 9-Dec-13
Ltd Chitradurga dist.
Nagalapura village, Pavagada taluk,
9 Atria Power Corpration Ltd 10 ST 11.32 GESCOM 30.08.2012 Fsun Pavgada Tumkur 08-01-2015
Tumkur district.
Total 70

Phase-II:70MWs Solar Power


LOANo:KREDL: RE: 021: 130MWs: RPO: LOA: 2013-14:1952 Date of allotment: 23.08.2013
Original Locations
Scheduled
Sl Capacity Techno Tariff Commissioned date Commissioned
Name of the Company ESCOM Present project location
No (MWs) logy (`) PPA date Village Taluk District 12/30 months from date
PPA for PV/ST

Sharda Construction and Chantal village, Aurad (B) taluk, Bidar


1 6 SPV 6.93 GESCOM 9.01.2015 Santpur Aurad Bidar 9.01.2016 26-Jun-15
Corporation Private Ltd dist.
Rangenahalli, Sidlayyanakote and
Bhoruka Power Corporation
2 10 SPV 7.16 BESCOM 3.02.2014 Bidarakere villages, Hiriyur taluk, Rangenahalli Hiriyur Chitradurga 3.02.2015 12-Nov-14
Limited Chitradurga dist.
Waa Solar Private Kolihal village, Yelburga taluk, Koppal
3 5 SPV 7.2 CESC 25.2.2014 Kolihal Yelburga Koppal 25.2.2015 11-Aug-15
Limited_Tumkur1 dist
Waa Solar Private Kolihal village, Yelburga taluk, Koppal
4 5 SPV 7.47 CESC 25.2.2014 Kolihal Yelburga Koppal 25.2.2015 11-Aug-15
Limited_Tumkur2 dist
Azure Power Karnataka Harthikote village, Hiriyur taluk,
5 10 SPV 7.47 BESCOM 18.01.2014 Harthikote Hiriyur Chitradurga 18.01.2015 8-Jan-15
Private Limited Chiradurga dist.
Murudi village, Devasamudra hobli,
6 Hero Future Energies Pvt Ltd 10 SPV 7.47 HESCOM 19.02.2014 Ramjogihalli Chitradurga 19.02.2015 14-Aug-15
Molakalmur taluk, Chitradurga district
Raghu Infra Pvt Ltd (Assigned 6.5.2016 Bevinahalli & Sankaour villages, Sira
7 3 SPV 7.85 CESC (original Bavenhalli, Shira taluk, Tumkur District 06.11.2017 under process
to Asian fab tech ltd) taluk, Tumkur dist.
23.05.2014)

BESCOM has
Bandethimalapura village, TalakuHobli, Bandethimalap TalakuHobli,
8 United Telecoms Ltd 3 SPV 7.92 BESCOM 21.05.2014 Chitradurga 21.05.2015 put up a note
Challakere taluk, Chitradurga dist ura Challakere taluk
for decision

ESD Builders and Developers Pandlijeevi village, Pavagada taluk, Pendlijeevi,


9 3 SPV 7.98 BESCOM 13.02.2014 Pavagda Tumkur 13.02.2015 Court case
Private Limited Tumkur district. Nagalamadike
Welspun Solar Kannada Nagasamudra & Hiriyur villages,
10 10 SPV 8.05 MESCOM 21.01.2014 Nagasamudra Molakamuru Chitradurga 21.01.2015 11-Apr-14
Private Ltd. Molakamuru taluk,Chiradurga dist.
Heidelberg Solar Pvt Ltd
11 5 SPV 8.05 BESCOM 6.02.2014 Bagepalli taluk, Chikkaballapur dist. Bagepalli Chikballapur 6.02.2015 Court case
(Pin point Energy K1Pvt Ltd)
Total 70

Phase-III:50MWs Solar Power


Date of allotment: 24.07.2014
PPA date Original Locations

Scheduled
Sl Capacity Techno Tariff Commissioned date Commissioned
Name of the Company ESCOM Present project location
No (MWs) logy (`) Village Taluk District 18/30 months from date
PPA for PV/ST

Azure Power India Private Halagaladdi village, Hiriyur taluk,


1 10 SPV 6.66 BESCOM 27.09.2014
Limited Chitradurga dist. Halagaladdi Hiryur Chitradurga 27-03-2016
K K Rao Engineering Works Kodambal village, Humnabad taluk,
2 3 SPV 7.17 MESCOM 21.10.2014 Bidar 21-04-2016 21-May-16
Pvt Ltd Bidar dist. Kodambal Humnabad
Bhadresh Trading Corporation Nagalamadike village, pavagada taluk,
3 10 SPV 7.37 BESCOM 27.09.2014 under process
Limited tumkur dist. Nagalamadike Pavagada Tumkur 27-03-2016
Saunshi village, Kundagol taluk,
4 Dosti Realty Limited 10 SPV 7.39 HESCOM 25.09.2014 under process
Dharwad dist Nimbal Indi Bijapur 25-03-2016
Interocean Shipping India Nagalamadike village, pavagada taluk,
5 3 SPV 7.39 MESCOM 1.10.2014 01-04-2016 under process
Private Limited tumkur dist. Nagalamadike Pavagada Tumkur
Sharda Construction And Chatnal (Santpur) village, Aurad taluk,
6 4 SPV 7.65 MESCOM 21.10.2014 21-04-2016 18-04-2016
Corporation Private Limited Bidar dist. Santpur Aurad Bidar
Venkatapura village Pavagada taluk,
7 Emami Power Limited 10 SPV 7.74 CESC 25.09.2014 17-Mar-16
Tumkur dist. Venkatapura Hiryur Chitradurga 25-03-2016
Total 50
Phase-IV:500MWs Solar Power
Date of allotment: 22.11.2014
PPA date Original Locations

Scheduled
Sl Capacity Techno Tariff Commissioned date Commissioned
Name of the Company ESCOM Present project location
No (MWs) logy (`) Village Taluk District 12/30 months from date
PPA for PV/ST
Photon suryakiran Pvt Ltd varavu village, nayakanahatty hobli,
1 20 SPV 6.71 HESCOM 12.01.2015 Pavagada Chitradurga 12.07.2016 under process
(M/s. Today Green Power Pvt. challakere district
2 Ltd.) Asian Fab Tec Limited
M/s. 10 SPV 6.74 BESCOM 12.01.2015 Sira taluk, Tumkur dist Sira Tumkur 12.07.2016 under process
Photon suryakiran Pvt Ltd
varavu village, nayakanahatty hobli,
3 (M/s. Today Green Power Pvt. 20 SPV 6.81 GESCOM 14.01.2015 Challakere Chitradurga 14.07.2016 under process
challakere district
Ltd.)
Sun Edison Energy Holdings Nelagettanahatty village, Nayakanahatty
4 30 SPV 6.83 HESCOM 18.12.2014 Nelagettanahatty Challakere Chitradurga 18-06-2016 under process
Singapore Pte Ltd hobli, Challakere, Chitradurga dist.
Sun Edison Energy Holdings Nagalamadike village, pavagada taluk,
5 30 SPV 6.86 BESCOM 18.12.2014 Pavagada Tumkur 18-06-2016 under process
Singapore Pte Ltd tumkur dist.
Kandekere, gollahalli village, hiriyur
Azure Sunrise Power Limited
taluk, chitradurga and kapparahalli,
6 (M/s. Azure Power India 50 SPV 6.89 CESC 8.01.2015 Rangenahalli Hiryur , Chitradurga 8.07.2016 under process
holikunte and jadekunte villages,
Private Ltd) challakere taluk, chitradurga
Sun Edison Energy Holdings
7 30 SPV 6.89 BESCOM 18.12.2014 Pallavalli, Pavagada, Tumkur dist Pavagada Tumkur 18-06-2016 under process
Singapore Pte Ltd
Sun Edison Energy Holdings Nelagettanahatty village, Nayakanahatty
8 30 SPV 6.92 BESCOM 18.12.2014 Challakere Chitradurga 18-06-2016 under process
Singapore Pte Ltd hobli, Challakere, Chitradurga dist.
Azure Power (Raj) Private golahalli, kandekere villages, hiriyur
9 LimitedM/s. Azure Power 40 SPV 6.93 HESCOM 14.01.2015 taluk, chitradurga dist and kapparahalli Sanekeri Hiryur Chitradurga 14.07.2016 under process
India Private Limited village, challakere taluk, chitradurga
10 M/s. Asian Fab Tec Limited 5 SPV 6.94 CESC 12.01.2015 Sira taluk,district.
Tumkur district Sira Tumkur 12.07.2016 under process
Photon suryakiran Pvt Ltd
varavu village, nayakanahatty hobli,
11 (M/s. Today Green Power Pvt. 10 SPV 6.95 HESCOM 12.01.2015 Challakere Chitradurga 12.07.2016 under process
challakere district
Ltd.)
Kandekere village, hiriyur taluk,
M/s. Azure Power India
12 40 SPV 6.96 GESCOM 24.01.2015 chitradurga and kapparahalli, jadekunte PD Kote Dharampur Chitradurga 24.07.2016 under process
Private Limited villages, challakere taluk, chitradurga
Sun Edison Energy Holdings Nagalamadike village, pavagada taluk,
13 30 SPV 6.97 BESCOM 18.12.2014 Pavagada Tumkur 18-06-2016 under process
Singapore Pte Ltd tumkur dist.
SPV
Kodihalli village, Darmpura hobli,
M/s. Welspun Renewables 34 Kodihalli ,Hiriyur taluk Chitradurga 14.07.2016 signed
14 50 7.01 BESCOM 14.01.2015 Hiriyur taluk,Chitradurga
Energy Pvt. Ltd.
Rajapura village, molakalmuru taluk,
16 Rajapura Molakalmuru Chitradurga 14.07.2016 16-04-2016
Chitradurga
M/s. Bhoruka Power Kanajanahalli village, Hiriyur taluk,
15 20 SPV 7.02 MESCOM 26.02.2015 Hiryur Chitradurga 26.07.2016 under process
Corporation Limited Chitradurga district
Photon suryakiran Pvt Ltd
varavu village, nayakanahatty hobli,
16 (M/s. Today Green Power Pvt. 10 SPV 7.05 BESCOM 13.01.2015 Challakere Chitradurga 12.07.2016 under process
challakere district
Ltd.)
M/s. Welspun Renewables Bedareddyhalli, Thalak (Hobli)
17 50 SPV 7.09 BESCOM 14.01.2015 Kusthagi Koppal 12.07.2016 under process
Energy Pvt. Ltd. Challkere, Chitradurga District
Mallapura,
18 M/s. Kavit Industries Limited 5 SPV 7.1 GESCOM 09-02-2015 Hanumasagar village, Koppal district Challakere Chitradurga 09-08-2016 under process
Nayakanahatti
M/s. Surana Telecom and
19 10 SPV 7.12 MESCOM 12.02.2015 Madhugiri,Tumkur Yelaburga Koppal 12-08-2016 under process
Power Limited
Photon suryakiran Pvt Ltd
varavu village, nayakanahatty hobli,
20 (M/s. Today Green Power Pvt. 10 SPV 7.12 MESCOM 5.02.2015 Challakere Chitradurga 05-08-2016 under process
challakere district
Ltd.)
Total 500
Phase-V:1200 MWs Solar Power
Alloted For 910 MW
PPA date Original Locations
Scheduled
Commissioned date
Sl Capacity Techno Tariff Commissioned
Name of the Company ESCOM Present project location 12 months from
No (MWs) logy (`) Village Taluk District date
approval of PPA
from KERC

1 Hero Solar Energy Pvt Ltd 20 SPV 4.69 BESCOM 26.05.2016 Madhugiri Tumkur 26.08.2017
2 Aditya Birla Nuvo Ltd 20 SPV 4.86 BESCOM 02.06.2016 Mulbagal Kolar 02-09-2017
3 AMPL Cleantech Pvt Ltd 20 SPV 4.89 BESCOM 25.05.2016 Holalkere Chitradurga 25.08.2017
4 Growthstreet Consultants Pvt 4 SPV 4.89 BESCOM 27.05.2016 Harapanahalli Davanagere 27.08.2017
5 Ltd Power Generation Pvt
OPG 20 SPV 4.97 BESCOM 03.06.2016 Hosadurga Chitradurga 03-09-2017
6 Ltd Jewellers Pvt Ltd
GRT 20 SPV 4.98 BESCOM 25.05.2016 Kannakapura Ramanagara 25.8.2017
Renew Solar Power Pvt
7 Ltd(Renew wind energy(MP 20 SPV 5.05 BESCOM 23.05.2016 Honnali Davanagere 23.08.2017
Three) Pvt.Ltd.)
8 OPG Power Generation Pvt 2 SPV 5.07 BESCOM 03.06.2016 Harapanahalli Davanagere 03-09-2017
9 Ltd Fab Tech Ltd
Asian 20 SPV 5.19 BESCOM 03.06.2016 Gowribidanuru Chikkaballapur 03-09-2017
10 Asian Fab Tech Ltd 15 SPV 5.19 BESCOM 03.06.2016 Nagamangala a
Mandya 03-09-2017
Chikkanayakana
11 Hero Solar Energy Pvt Ltd 20 SPV 4.69 BESCOM 26.05.2016 Tumkur 26.08.2017
halli
12 Renew Solar Power Pvt Ltd 20 SPV 4.84 BESCOM 23.05.2016 Turuvekere Tumkur 23.08.2017
13 Rishabh Buildwell Pvt Ltd 14 SPV 4.95 HESCOM 1.06.2016 Harapanahalli Davanagere 01-09-2017
14 Rays Power Expert Pvt Ltd 10 SPV 5.04 HESCOM 28-06-2016 Chikkabalapura Chikkabalapur 28-09-2017
Hero Solar Energy Pvt Ltd a
15 20 SPV 4.69 MESCOM 28.05.2016 Koratagere Tumkur 28.08.2017
[Clean Solar power(tumkur)
Pvt Ltd] Solar Power India
Sunedison Allotment cancelled on 29-6-16
16 20 SPV 5.47 MESCOM Bangarpet+KGF Kolar PPA not signed
Pvt Ltd based on firm's request
Hero Solar Energy Pvt Ltd Chamrajanagar
17 20 SPV 4.75 CESC 26.05.2016 Chamrajanagara 26.08.2017
[Clean Solar power(tumkur) a
Pvt Ltd]
Hero Solar Energy Pvt Ltd
Kollegala+Hann
18 [Clean Solar power(tumkur) 20 SPV 4.79 CESC 26.05.2016 Chamrajnagar 26.08.2017
ur
Pvt Ltd]
Hero Solar Energy Pvt Ltd
19 [Clean Solar power(tumkur) 20 SPV 4.86 CESC 26.05.2016 Gundlupet Chamrajnagar 26.08.2017
Pvt Ltd]
20 Renew Solar Power Pvt Ltd 20 SPV 4.85 BESCOM 23.05.2016 Yadgiri Yadgiri 23.08.2017
21 Renew Solar Power Pvt Ltd 20 SPV 4.85 BESCOM 23.05.2016 Bhalki Bidar 23.08.2017
22 Renew Solar Power Pvt Ltd 20 SPV 4.84 BESCOM 23.05.2016 Chincholli Kalburgi 23.08.2017
Renew Solar Power Pvt Ltd [
23 20 SPV 4.86 BESCOM 23.05.2016 Alland Kalburgi 23.08.2017
M/s Tarun kiran bhoomi pvt
24 ltd]
Parampujya Solar Energy Pvt 10 SPV 5.35 GESCOM 28.05.2016 Shorapur Yadgir 28.08.2017
Ltd Consultants Ltd
Karvy
25 10 SPV 5.13 CESC 25.05.2016 Shorapur Yadgir 25.8.2017
[Shorapur solar power system
ltd] Solar Energy Pvt Ltd
Hero
26 20 SPV 4.69 GESCOM 27.05.2016 Shahpur Yadgir 28.08.2017
[Clean Solar Energy Pvt Ltd]
Hero Solar Energy Pvt Ltd
27 20 SPV 4.83 GESCOM 27.05.2016 Chittapura Kalburgi 28.08.2017
[Clean Solar Energy Pvt Ltd]
Renew Solar Power Pvt Ltd
28 20 SPV 4.76 MESCOM 28.05.2016 Devadurga Raichur 28.08.2017
[Bhumi prakash pvt ltd]
Renew Solar Power Pvt
29 20 SPV 4.76 HESCOM 21.05.2016 Siraguppa Bellary 21.08.2017
Ltd(Renew Agni Power
Pvt.Ltd.)
Renew Solar Power Pvt Ltd
30 [Renew wind energy(karnataka 20 SPV 4.86 HESCOM 21.05.2016 Humnabad Bidar 21.08.2017
4) pvt ltd]
Hero Solar Energy Pvt Ltd
31 20 SPV 4.69 GESCOM 27.05.2016 Gangavati Koppalaa 27.08.2017
[Clean Solar Energy Pvt Ltd]
32 Essel Green Energy Pvt Ltd 20 SPV 5.2 BESCOM 26.05.2016 Indi Vijayapura 26.08.2017
33 Marikal Solar Parks Pvt Ltd 20 SPV 5.48 BESCOM 02.06.2016 Basavanabageva Vijayapura 02-06-2017
34 Mytrah Energy Ltd 15 SPV 5.44 BESCOM 31-05-2016 di
Sindagi Vijayapura 31-05-2017
Bijapura+Nagata
35 Essel Green Energy Pvt Ltd 20 SPV 5.3 BESCOM 26.05.2016 Vijayapura 26.05.2017
na
36 Marikal Solar Parks Pvt Ltd 20 SPV 5.48 CESC 02.06.2016 Naragund Gadag 02-09-2017
Marikal Solar Parks Pvt Ltd
37 [Tungabhadra Solar Parks Pvt 20 SPV 5.46 GESCOM 03.06.2016 Chikkodi Belgaum 03-09-2017
Ltd]
Essel Green Energy Pvt Ltd [
38 5 SPV 5.5 GESCOM 30.05.2016 Sindagi Vijayapura 30.08.2017
KN Sindagi Solar Energy Pvt
Ltd] Power Generation Pvt
OPG
39 20 SPV 5.03 GESCOM 03.06.2016 Shiggaon Haveri 03-09-2017
Ltd [Aavanti Solar Energy Pvt
Ltd] Green Energy Pvt Ltd
Essel
40 20 SPV 5.4 HESCOM 27.05.2016 Muddebihal Vijayapura 27.08.2017
[KN Muddebihal solar energy
pvt ltd] Birla Nuvo Ltd [ Aditya
Aditya
41 20 SPV 4.92 HESCOM 03.06.2016 Ramadurg Belagavi 03-09-2017
birla solar limited(ABSL)]
Aditya Birla Nuvo Ltd [ Aditya
42 20 SPV 4.97 HESCOM 03.06.2016 Shirahatti Gadag 03-09-2017
birla solar limited(ABSL)]
OPG Power Generation Pvt
43 Ltd [Mayfair renewable energy 20 SPV 5 HESCOM 03.06.2016 Ron Gadag 03-09-2017
pvt ltd]
44 Mytrah Energy Ltd 15 SPV 5.5 HESCOM hunagund bagalkot
45 Mytrah Energy Ltd 15 SPV 5.5 GESCOM Raibagh Belagavi
46 Jindal Aluminium Ltd 10 SPV 5.5 BESCOM 15-06-2016 mayakonda Davanagere 15-09-2017
47 Sukhbir Solar energy pvt ltd 5 SPV 5.5 CESC 31.05.2016 Nagamangala Mandya 31.08.2017
MODULE MANUFACTURER CATEGORY
48 Tata power solar system ltd 20 SPV 6.1 BESCOM 03.06.2016 Srinivasapura kolar 03-09-2017
49 Tata power solar system ltd 10 SPV 6.1 BESCOM 03.06.2016 bidar rural bidar 03-09-2017
50 Tata power solar system ltd 17 SPV 6.1 HESCOM 03.06.2016 kanakagiri koppala 03-09-2017
Emmvee photovoltaic power
51 10 SPV 6.1 BESCOM 23.05.2016 bidar rural bidar 23.08.2017
pvt ltd
Emmvee photovoltaic power
52 10 SPV 6.1 MESCOM 23.05.2016 kunigal tumkur 23.08.2017
pvt ltd [ES energy]
Emmvee photovoltaic power chikkaballapur
53 20 SPV 6.1 BESCOM 23.05.2016 bagepalli 23.08.2017
pvt ltd a
54 Swelect energy systems ltd 10 SPV 6.1 CESC 28.05.2016 kunigal tumkur 28.08.2017
Microsun solar tech pvt ltd
55 3 SPV 5.94 GESCOM 30.06.2015 kanakagiri koppala 30.06.2017
[Megasun Solar Tech Pvt Ltd]
TOTAL 910
Alloted For 260 MW LOA 30-5-16
1 Adani Green Energy 20 SPV 4.79 HESCOM 29-06-2016 Byadagi Haveri 29-09-2017
2 Adani Green Energy 20 SPV 4.79 HESCOM 29-06-2016 Channapatanna Ramanagara 29-09-2017
3 week time
Chikkabalapur extension given
3 Krishi Technologies Pvt Ltd 10 SPV 5.35 HESCOM 14-07-2016 Chikkabalapura 04.08.2017
a for signing of
PPA
4 Asian Fab Tech Ltd 10 SPV 5.28 CESC 29-06-2016 Doddaballapura Bengaluru rural 29-09-2017
5 Adani Green Energy 20 SPV 4.82 BESCOM 29-06-2016 Gubbi Tumkuru 29-09-2017
6 Adani Green Energy 20 SPV 4.79 BESCOM 29-06-2016 Holenarasipura Hassan 29-09-2017
7 Adani Green Energy 20 SPV 4.81 GESCOM 29-06-2016 Jevargi Kalburgi 29-09-2017
8 Adani Green Energy 20 SPV 4.84 BESCOM 29-06-2016 K R Pet Mandya 29-09-2017
9 Adani Green Energy 20 SPV 4.89 MESCOM 29-06-2016 Maaluru Kolar 29-09-2017
10 Adani Green Energy 20 SPV 4.92 BESCOM 29-06-2016 Magadi Ramanagar 29-09-2017
11 Adani Green Energy 20 SPV 4.93 GESCOM 29-06-2016 Periyapattana Mysuru 29-09-2017
12 Adani Green Energy 20 SPV 5.17 BESCOM 29-06-2016 Ramanagara Ramanagar 29-09-2017
13 Adani Green Energy 20 SPV 4.79 CESC 29-06-2016 T Narasipura Mysuru 29-09-2017
14 Adani Green Energy 20 SPV 4.84 BESCOM 29-06-2016 Tipatturu Tumkur 29-09-2017
Total 260