* routine plant visit and allot works to manpower as per plan i.e
filling stator of 10 hp , and sagrigation of stock material done
* dismantle the 10 hp saer motor for winding data done
* discussion with girdhar for plan and what are the things which
are hampering the production and fill the sheet of work alloted to
man power in plant and submit it to hr madam done
9 TO 11 2 hr
11-1.00 2 hr
1.30-4.00 2.5 hr
4-5.00 1 hr
5-6.30 1.5 hr
9-10.00 1 hr
10-12.00 2 hr
12-2.00 1.5 hr
2-5.00 3 hr
5-6.30 1.5 hr
9-10.00 1 hr
10-12 pm 2 hr
12-1.00 1 hr
2-3.00 1 hr
3-6.30 3.5 hr