Vous êtes sur la page 1sur 3

Whom to Contact

In Time Out Time Purpose


S.NO DATE Meet Number

1 4/1/2017 9:00 AM 7.00 pm FACTORY ROUTINE

2 4/4/2017 9:00 AM 6.30 pm FACTORY ROUTINE

3 4/5/2017 9.00 AM 6.30 PM FACTORY ROUTINE


Discussion/work Status

* give instruction to productiin people for making of 5.5 hp rotor


and coordinate with production people for sagrigation of material done
* testing of 10 hp monoblock and prepare testing data done
* dismantle monoblock 7.5 hp and 10 hp and provide the
material for pattern to rajendra sir done

* study the iss specification for centrifugal overall efficiency done


* discussion with raghvendra for volute design of 5.5 hp , 7. 5 hp
and 10 hp done

* routine plant visit and allot works to manpower as per plan i.e
filling stator of 10 hp , and sagrigation of stock material done
* dismantle the 10 hp saer motor for winding data done

* discussion with girdhar for plan and what are the things which
are hampering the production and fill the sheet of work alloted to
man power in plant and submit it to hr madam done

* give the details of material used in monoblock pumps to


raghvendra and discuss all the things 5.5 hp monobock done
* spend time in plant to moitorize the working of plant done
* Routine plant visit and allot works to the workers done

* send v4 7.5 hp rotor and v6 10 hp stator for brazing and argon


* follow up for the material which is required for monoblock and
v6 motors done
* work on the material in stock and ask for packing of extra
material done

* Arrange the material of the ismantle pumps model wise done


* check the material aavailable for nrv and start the assembly of
nrv and check the leakage in nrv per pcs done
Followup
Remark Resolution Timings Duration
Status

9 TO 11 2 hr
11-1.00 2 hr

1.30-4.00 2.5 hr

4-5.00 1 hr

5-6.30 1.5 hr

9-10.00 1 hr
10-12.00 2 hr

12-2.00 1.5 hr

2-5.00 3 hr
5-6.30 1.5 hr
9-10.00 1 hr

10-12 pm 2 hr

12-1.00 1 hr

2-3.00 1 hr

3-6.30 3.5 hr

Vous aimerez peut-être aussi