SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review of Procedure for Ultrasonic Testing SAIC-UT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements

UT procedure is applicable to specific requirement of the project Schedule Q,


(Identified & traceable to Project Quality Plan & updated document list) Para. 3 &
A1
& was approved by the Contractor & Prime Contractor ASNT certified Att. VI
Level III Inspector. Tables

All UT Procedures (Manual/Automatic, ToFD, Phased Array, Guided Schedule Q,


wave, Corrosion mapping, Pipe line girth weld scanning & other Para. 3 &
A2
Computerized imaging techniques) for In-Kingdom application has Att. VI
been reviewed and approved for use by SA OID/NDT Unit Dhahran. Tables

All UT personnel shall be qualified as per SAEP 1142 & SAEP 1140 SAEP-1142 &
A3
and as required by referencing code section (See SAIC-UT-2002) SAEP-1140

OID/NDTU Document Review Sheet is attached to the procedure &


list Revision Specific approval Status & Procedure Comments.
Note: Document Review Sheet & specific OID/NDTU comments Schedule Q,
regarding procedure shall be permanently attached to all Controlled Para. 3 &
A4
Field Copies of NDT procedures for use on the project. Technicians Att. VI
shall be trained and aware of their responsibilities regarding the use of Tables
controlled field copy (procedure) containing Document Review Sheet
Comments and understands of any Comments.

B Written procedure requirements

The written procedure shall adress all essential variables as noted in T-421,
B1
Table T-421, ASME Sec. V (See Attachment 1) ASME Sec V

Only Pulse-echo type instrument shall be used. The instrument shall


be capable of operation at frequency range of atleast 1 MHz to 5MHz T-431,
B2
and shall be equipped with a stepped gain control in units of 2 dB or ASME Sec V
less.

Couplant: The couplant, including additives, shall not be detrimental to


the material being examined. The couplants used on nickel base alloys
T-433,
B3 shall not contain more than 250 ppm of sulfur and for austenitic
ASME Sec V
stainless steel or titanium the couplant shall not contain more than 250
ppm of halides (chlorides plus fluorides).

Page 1 of 6
Calibration Blocks _ Reflectors: Specified reflectors (i.e., side-drilled
T-434.1.1,
B4 holes, flat bottom holes, notches, etc.) shall be used to establish
ASME Sec V
primary reference responses of the equipment.

Page 2 of 6
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review of Procedure for Ultrasonic Testing SAIC-UT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Calibration Blocks _ Material: The block material shall be of the same


product form and material specification or equivalent P-Number
grouping as one of the materials being examined. For dissimilar metal
welds the material selection shall be based on the material on the side T-434.1.2,
B5
of the weld from which the examination will be conducted. If the ASME Sec V
examination will be conducted from both sides, calibration reflectors
shall be provided in both materials. The block shall receive the same
heatreatment as that of the weld.

Calibration Blocks _ Surface finish: The finish on the scanning


T-434.1.6,
B6 surfaces of the block shall be representative of the scanning surface
ASME Sec V
finishes on the component to be examined.

The calibration block shall be made as per Fig T-434.2.1: Non piping T-434,
B7
calibration block and Fig T-434.3: Calibration block for pipe ASME Sec V

Technique: Straight and angle beam examination techniques should


T-450,
B8 be used. (Other special techniques may be used after approval from
ASME Sec V
SA OID/NDT Unit Dhahran

Instrument Screen height linearity and Amplitude control linearity shall


T-461,
B9 be verified at intervals not to exceed 3 months for analog type
ASME Sec V
instruments and 1 year for digital instruments .

Temperature. For contact examination, the temperature differential


between the calibration block and examination surfaces shall be within
T-462.6,
B10 25F (14C). For immersion examination, the couplant temperature for
ASME Sec V
calibration shall be within 25F (14C) of the couplant temperature for
examination.

Examination: After equipment calibration, the volume to be scanned


T-471.3,
B11 shall be examined with minimum overlap of 10% of the transducer
ASME Sec V
dimension. The rate of search unit movement shall not exceed 6 in/s.

Evaluation: a)
Distance Amplitude Techniques: All indications greater than 20% of
the reference level shall be investigated to the extent that they can be
evaluated in terms of the acceptance criteria of the referencing Code
T-482,
B12 Section. b) Non-
ASME Sec V
Distance Amplitude Techniques: All indications longer than 40% of the
rejectable flaw size shall be investigated to the extent that they can be
evaluated in terms of the acceptance criteria of the referencing Code
Section.

Documentation: All Rejectable indications shall be recorded. As a


minimum, the type of indication (i.e., crack, non-fusion, slag, etc.), T-491,
B13
location, and extent (i.e., length) shall be recorded. (See attachment 1 ASME Sec V
for the exam information that to be recorded)

REMARKS:

Attachment 1: Requirements for UT procedure & Documentation requirements

REFERENCE DOCUMENTS:
1. Schedule Q, Contractor's Quality Requirements, (November 2003)

Page 3 of 6
2. ASME Section V, Non destructive examination (Ed 2007)
3. SAEP-1142, Qualification of Non saudi aramco NDT personnel (29 February 2004)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
N/A
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date: N/A
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 4 of 6
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review of Procedure for Ultrasonic Testing SAIC-UT-2001 NDE-


Attachment 1. Requirements of an UT procedure & Documentation requirements as per ASME Sec V

Vous aimerez peut-être aussi