Provided further that in emergent cases the persons undertaking such operations
shall first bring the train to stop as stipulated in para 812 and advise the driver of
the train about the need to stop the train through a written memo. The railway
servant shall simultaneously arrange to send a message to the Station Master for
the need to block the track as per para 810 and obtain written confirmation of the
same. The work which may lead to obstruction to the track shall however be done
only during the traffic block, the written confirmation for which shall be obtained
from the concerned Station Master. On completion of the work again the
authorised railway servant shall advise the driver through a written memo to
proceed at the prescribed speed.
(a) Works such as casual renewals of rails and sleepers, adjustment of creep and
lubrication of rail joints which are completed by sunset of the day of
commencement and no restriction of speed thereafter is required, are termed
"works of short duration".
(b) Hand-signal and banner flags and fog-signals shall be used at specified
distances to afford protection to trains.
(a) Works such as relaying, bridge construction, diversions which extend over a
few days, or weeks during which period a continuous restriction of speed is to be
in force, are termed as "works of long duration".
806. Works of short duration - Protection in block section and procedure for
passing of trains - Before commencing any work of such category the Permanent
Way Inspector or authorised Railway servant should issue a notice to the Station
Master/ Block hut in-charge at each end of the Block section and obtain their
acknowledgment. Depending as to whether the train is to be passed through the
work site, after stopping or at a restricted speed, the line should be protected in
the following manner:-
(1) When the train is required to stop at the site of work (in Block section)-
(a) Post a flagman with hand signal at a distance of 30 metres in rear of the place
of obstruction, to show stop hand signals.
(b) Post a flagman with hand signals and place a banner flag across the track at a
distance of 600 metres on Broad Gauge and 400 metres on Metre Gauge and
Narrow Gauge in rear of the work. The flag man will show stop hand signals.
(c) Post a flagman with hand signals and detonators at a distance of 1200 metres
in the case of Broad Gauge and 800 metres in the case of Metre and Narrow
Gauge in rear of the work. The flagman shall fix three detonators on the line 10
metres apart and take stand at a place not less than 45 metres from the three
detonators, from where he can obtain a clear view of the approaching train. He
will show stop hand signals.
Note - In M.G. Sections with trains running at a maximum speed of more than 75
km.p.h. the distances (b) and (c ) shall be as specified under approved special
instructions.
(d) The man at the site of obstruction shall give proceed hand signal to indicate to
the Driver, when he may resume normal speed after the train has been hand
signalled past the obstruction (Annexure 8/1).
(2) When the train can pass over the workspot at restricted speed in Block section
- Keeping in view the provisions in para 1501.1(C) /GR.1976 the following
protections should be adopted in the above cases :-
(a) Post a flagman exhibiting caution hand signals at a distance of 30 metres from
the place of obstruction.
(b) Post a flagman exhibiting caution hand signals at a distance of 1200 metres
for Broad Gauge and 800 metres for Metre Gauge and Narrow Gauge from the
place of obstruction.
(c ) Post a intermediate flagman with hand signals at a distance of 600 metres for
Broad Gauge and 400 metres for Metre Gauge and Narrow Gauge from the place
of obstruction. He will also place a banner flag across the track. The intermediate
banner flag most be kept across the line until the speed of the train has been
reduced, after which the banner flag shall be removed and the train hand signalled
forward.
In Metre Gauge sections with trains running at a maximum speed of more than 75
km.p.h. the distance in (b) & (c) shall be increased as specified under approved
special instructions.
(d) The railway servant at the site of work should give proceed hand signals to
indicate to the Driver, that he may resume normal speed after the train has been
signalled past the site of work -(Annexure 8/2).
(3) The following points should be kept in view, while protecting the track in the
cases mentioned in sub-para (1) and (2) above :-
(a) On single line, the line must be so protected on both sides of the work.
(b) At places where there are curves or falling gradients and at times of poor
visibility the distances laid down in sub-paras (1) and (2) above may be suitably
increased wherever necessary and intermediate flagman posted to relay hand
signals.
(c) The location of the banner flag, detonators and hand signals should be so
selected as to avoid stopping of trains, as far as possible, on continuous steep
rising gradients.
(d) If in an emergency, it becomes necessary to carry out such works at night, the
provisions for protection of line as detailed in sub-pares (1) and (2) must be
complied with except that red light must be exhibited in the direction of
approaching trains in place of red hand signaling flags and banner flags.
(c) Before commencing work on a line which cannot be isolated form other
running lines the Permanent Way Inspector should provide the prescribed hand
signals, detonators and banner flags as detailed on Para 806.
(5) Works in Automatic Territory - In automatic territory, if the distance from the
place of works/obstruction to the automatic signal controlling entry of a train into
the signalling section is less than 1200 metres on Broad Gauge and 800 metres on
Metre Gauge/Narrow Gauge and the automatic signal is secured at 'ON' the
banner flag and three detonators may be provided at 90 and 180 metres
respectively.
(a) For doing such works the Engineering Department will arrange with the
Operating Department for the issue of the circular notice as per extant
instructions.
(b) The concerned Divisional Engineer will be responsible for obtaining the
sanction of Commissioner of Railway Safety wherever necessary and sending
Safety Certificate on completion of such works.
(d) Caution orders will be issued by the Station Masters concerned as necessary.
(a) In case where stop dead restriction is to be imposed when restriction is to last
for more than a day, the following temporary Engineering indicators should be
exhibited at the appropriate distance :-
(b) In case where the train is not required to stop (non-stop restriction) and the
restriction is likely to last for more than a day the following temporary Engineering
indicators should be exhibited at the appropriate distances:-
(ii) When during the course of the work, on consideration of safety it is not
desirable to pass trains over the site of work for the time being, the track should
be further protected by hand signals and banner flags, by the authorised Railway
servant.
(3) Protection of line in station limits- Special instructions will be issued by the
Divisional Railway Manager (Operating) after consultations with Divisional
Engineer and Divisional Signal and Telecommunication Engineer in regard to the
use of temporary Engineering signals in conjunction with station fixed signals. In
urgent cases these will be issued by the Station Master at the request of
Permanent Way Inspector.
808. Temporary Engineering Fixed Signals-Location and details -
(1) These consists of:
(a) Caution indicator.
(2) (b) The details and position of fixing each indicator are detailed in Annexures
8/4, 8/3 and 8/3 A.
(3) During the hours of night, the lamps of the temporary indicators which are not
reflective type should be lit at sunset and kept burning till sunrise, where trains
run at night. Reflective type temporary indicators need not be lit.
(5) All indicators should be placed on the left hand side as seen by the Drivers
except on CTC sections (single line) where they should be placed on Right hand
side.
(6) Each Permanent Way Inspector should have in his possession at least one
complete set of signals consisting of 2 caution indicators, 2 speed indicators, 2
stop indicators and two sets of termination indicators (2 Nos T/P & T/G
indicators).
(7) One termination indicator bearing letters T/G should be located at a distance
equal to the length of the longest goods trains operating on the section from the
place of work. Another Termination indicator bearing the letters T/P should be
located at a distance equal to the length of the longest passenger train operating
on the section from the place of work which will help the passenger trains to pick
up speed after reaching T/P indicator, without losing time. The Guard of a
passenger train shorter than the longest passenger train will exhibit an "all-clear"
signal to his Driver when the rearmost vehicle has cleared the restricted length
and the Driver will resume normal speed. In the case of light-engines or single
unit rail cars, the Drivers will resume normal speed after clearing the restricted
length.
809. Procedure for Passing Trains at stop dead Restrictions - The flagman
at the stop indicators shall present his restriction book to the Driver who should
stop in the rear of the stop indicator.
. . . .
After the flagman has obtained the signature of the Driver at the indicator, he
should exhibit proceed with caution signal to the Driver. The Driver will then be
authorised to pass the stop indicator and continue at this speed until his train has
cleared the restricted length, after which he will resume normal speed.
(a) Except in very urgent cases arrangements for Blocking the lines between
stations shall be made by the Divisional Engineer in consultation with the
Divisional Operating Manager, sometime before the block is imposed.
(b) The Divisional Operating Manager will issue instructions to the Station Masters
on either side of the section to be blocked and Station Masters/Yard Masters of
train ordering stations concerned about the last train to pass over the section
before the block is imposed, the trains to be cancelled because of the block and
any other particulars and will conclude by stating which official of the Engineering
Department will impose and remove the block. The instructions will be
acknowledged by those to whom issued.
(b) The Station Master receiving the message for transmission will sign for it,
noting the time of receipt and shall transmit the message to the Station Master on
the other side of the block section, which is to be blocked, and to the Controller.
The Station Master on the other side will acknowledge receipt by a message
addressed to Permanent Way Inspector or authorised railway servant and the
Station Master of the transmitting station.
(c ) On receipt of this message the Station Master of the station from which the
message was transmitted will block the line in the manner prescribed and hand
over a signed copy to the Inspector.
(d) Field telephone should be used for liaison with the Control during the block.
(3) Removal of Engineering Block - (a) When removing a block the Inspector or
authorised railway servant responsible will transmit a message to the Station
Master on either side of the block section blocked, copy to the Divisional Engineer,
Assistant Engineer, Loco Foreman, Controller, Divisional Operating Manager etc.,
advising them that the block has been removed and asking for acknowledgement
from Station Masters. Particulars of kilometrage, restriction of speed and position
of Engineering Indicators should be given in the telegram.
(b) The Station Master who receives the message for transmission will sign for it,
noting the time of receipt and transmit the message to the Station Master of the
other station. The message must be acknowledged by the latter, addressed to the
Inspector and Station Master of the transmitting station.
On receipt of this acknowledgement the Station Master who originally imposed the
block, will remove it in the manner prescribed. The Control or the Divisional
Operating Manager, will advise the Station Masters on the train ordering stations
when a block is finally removed.
(4) Issue of Caution Orders to Drivers -Caution order to Drivers of all trains will be
issued by the Station Masters for temporary engineering restrictions. Caution
order will indicate the exact kilometrage, speed restrictions, stops, as the case
may be, but will not include permanent restrictions that are notified in the working
time-table.
811. Works at times of poor visibility -In thick foggy or tempestuous weather
impairing visibility, no rail shall be displaced and no other work which is likely to
cause obstruction to the passage of trains shall be performed except in case of
emergency.
When such work has to be undertaken and the site is protected by temporary
engineering fixed signals, 2 detonators on the line 10 metres apart should be fixed
not less than 270 metres in rear of the caution indicator and a caution hand signal
exhibited to approaching trains.
(2) On single line the line must be protected on each side of obstruction.
(3) Where there are adjacent lines and it is necessary to protect such lines, action
should be taken on each such line in a similar manner.
(1) The names of the block stations on either side of the site where the
engineering work will be undertaken in order that caution orders may be issued.
(3) Restricted speed and stop dead restriction to be observed by the Driver.
(a) Permanent speed restrictions in force are notified in working time-tables. The
speed indicators are erected to indicate to the Drivers the speed restrictions to be
observed e.g., between stations, and at stations due to weaker/non standard
track/ bridges, restrictions on curves, grades and points and crossings etc.
(b) The indicators to be used are similar to those used for temporary restrictions,
namely, caution indicator, speed/stop indicators and termination indicators
(T/P&T/G). The details of the indicators and the distance at which they are to be
fixed are the same in both the cases (Annexure 8/3 & 8/4).
(c) The permanent indicators need not be flood lit at night as in the case of
temporary indicators/ signals.
(2) Siding Boards.-When speed restriction has been imposed on account of facing
points of an outlying siding an 'S' marker (a circular board of 1 metre dia. painted
yellow, with 300 mm. letter 'S' painted in black on it) should be fixed at the points
in addition to the speed and caution boards fixed in rear of the points. Where
however, the sanctioned speed of the section does not exceed 50 km.p.h. the
speed indicator and the 'S' board need not be provided except where the speed
over the points is less than sanctioned speed of the section. 'S' marker should be
so fixed that the centre of the board is 2 metres above the rail level.
(3) Board indicating speed over points -Where the speed over the points at a
station is less than the speed sanctioned at other stations on the same section, a
permanent speed indicator should be fixed on the first approach signal of the
station.
(4)The posts of permanent speed indicator marker boards should be painted with
300 mm. high bands in white and black.
815. Indicators (General) - (1) Where indicators are provided under special
instructions to furnish information to Drivers, these should be in black letters or
figures on yellow back ground.
(2) Whistle indicator - (a) Whistle boards should be provided in rear of all places
where the view of the Drivers is obstructed by cuttings or tunnels or curves and
where it is necessary to give audible warnings of the approach of a train to those
working on the track. The whistle boards are fixed at a distance of 600 metres.
(b) Whistle indicator for level crossings -Whistle boards are also provided on the
approach of all unmanned level crossings and in case of manned level crossings,
where a clear view is not obtained. These bear the letters W/L. The details of
these whistle boards are described in Para 916(1)/ Chapter on Level Crossings and
Gateman.
(3) Shunting limit Boards -They are provided at an adequate distance in advance
of the trailing points. This shall consist of 600 mm. x 1000 mm. rectangular board
painted yellow with a black cross on the top and words "shunting limit" written in
black below it. Its height should be 2 metres from the rail level to the underside of
the portion containing the cross and the post on which it is fixed, painted with 300
mm. high bands in white and black. It should be fitted with a lamp showing white
light in both directions.
817. Care and Custody - (1) Detonators should be protected against damp.
They should be stored in tin cases with papers wrapped over them, a layer of
waste cotton must be kept at bottom and top of the tin cases to avoid contact with
the metal.
(2) In one tin case not more than twelve detonators should be kept.
(3) The tin cases should be stored in wooden boxes which should be kept in dry
places and not left in contact with the brick walls, damp wood, chloride of lime or
other disinfectants; these should not be exposed to steam or other vapours.
(4) Unexploded detonators should not be as far as possible sent from place to
place by consignment; they should be conveyed personally or by a messenger.
818. Stock with Engineering Staff - (1) Each way, Works and Bridge Inspector
shall have a stock of detonators sufficient to recoup the number annually tested
and any which may be exploded for works and emergency. The Permanent Way
Inspector shall ensure that all Gangs, Gatemen, Keymen, Patrolmen and
Watchmen are equipped with the specified number of detonators.
(3) The month and year of manufacture are shown on the label outside each case
and also stamped on each detonator. Detonators should be used in the order of
the dates stamped on them, the oldest being used first. To facilitate ready
withdrawal in this sequence, they should be stored also accordingly.
819. Use of Detonators - (1) The staff in possession of detonators shall not
make any improper use of them. Engineers and Inspectors are responsible to
ensure that the staff working under them know how and when to use detonators.
(2) A detonator when required to be used shall be placed on the rail with the label
or brand facing upwards and shall be fixed to the rail by bending the clasps
around the head of the rail.
(3) In the case of a mixed gauge, detonators shall be placed on the common rail
or on the rail of each gauge.
820.Testing - (1) Once a year, one detonator shall be taken by the Permanent
Way Inspector from his own stock and from Gangmate, Keyman, Gateman,
Patrolman and Watchman for testing, one also from each of the lots in the
personal custody of Divisional Engineer, Bridge Engineer, Assistant Engineer, works
and relieving Permanent Way Inspector where the headquarters of these officials
falls within the P.W.I.'s jurisdiction. The oldest detonators should be selected for
the test.
(3) The P.W.I, shall submit by the end of the year (31st December) a certificate in
duplicate to the Assistant Engineer to the effect. "I certify that I have tested the
detonators from stocks mentioned below in accordance with standing orders for
the year ending.....and append a list of those that failed to explode." The Assistant
Engineer shall countersign and forward one copy of the certificate to the Divisional
Engineer with remarks, if any. Orders regarding the return or destruction of those
lots, the samples from which failed to explode, shall be issued by the Divisional
Engineer.
821. Life of detonators - The normal life of detonators is seven years. The life of
the detonators can be extended to ten years on an yearly basis subject to the
condition that two detonators from each lot of over 7 year old ones are tested for
the explosive content and the results being found satisfactory. Such time extended
detonators can be used on all sections after satisfactory testing. In case the
results are not satisfactory, they should be destroyed as envisaged in Para 822.
In any case no detonator should be kept in use after ten years.
823. Safety Range - When detonators are being tested, no person should be
allowed within a radius of 50 metres from the detonators to be exploded; the
engine crew shall remain well within the cab. In practice, splinters from detonators
when exploded seldom fly in a direction to the rear of the wheel which detonates
them. Staff should therefore, when observing the safety radius, place themselves,
as far as possible on the rear side.
824. Flare Signals- Descriptions - A flare signal which includes a fusee emits a
bright red flame, when lighted and is used for warning the Driver of an
approaching train of any obstruction. The fusee normally used burns for about
seven minutes.
(i) The contractor shall not start any work without the presence of railway
supervisor at site.
(ii) Wherever the road vehicles and/or machinery are required to work in the close
vicinity of railway line, the work shall be so carried out that there is no
infringement to the railway's schedule of dimensions. For this purpose the area
where road vehicles and/or machinery are required to ply, shall be demarcated
and acknowledged by the contractor. Special care shall be taken for
turning/reversal of road vehicles/machinery without infringing the running track.
Barricading shall be provided wherever justified and feasible as per site conditions.
(iii) The look out and whistle caution orders shall be issued to the trains and speed
restrictions imposed where considered necessary. Suitable flagmen/detonators
shall be provided where necessary for protection of trains.
NOTE:
IN THE CASE OF M.G. SECTIONS WHERE THE TRAINS RUN AT A SPEED MORE
THAN 75 Km. P.H. THE DISTANCES OF HAND - SIGNALS AND DETONATORS SHALL
BE INCREASED SUITABLY AS PER APPROVED SPECIAL INSTRUCTIONS.
NOTE:
(1) INTERMEDIATE FLAGMAN WILL KEEP BANNER FLAG UNTIL THE SPEED OF THE
TRAIN HAS BEEN REDUCED, AFTER WHICH THE BANNER FLAG WILL BE REMOVED
AND TRAIN HAND - SIGNALLED FORWARD.
(2) IN CASE OF M.G. SECTIONS WHERE THE TRAINS RUN AT A SPEED MORE
THAN 75 Km. P.H. THE DISTANCE OF HAND SIGNALS AND DETONATORS SHALL
BE INCREASED SUITABLY AS PER APPROVED SPECIAL INSTRUCTIONS.
COMPETENCY CERTIFICATE
Certified that
shri..........................................................................................P. way
supervisor of M/s.
...............................................................................................has been
examined regarding P. P. Way
working on.......................................work. His knowledge has been found
satisfactory and he is capable of
supervising the work safely.