Rp35,000 Rp 10,290,000.00
Rp23,000 Rp 5,980,000.00
Rp150,000 Rp 150,000.00
Rp22,000 Rp 5,720,000.00
Rp43,000 Rp 688,000.00
SUBTOTAL Rp 22,828,000.00
Rp78,500 Rp 105,975.00
Rp78,500 Rp 828,300.60
Rp78,500 Rp 3,963,465.00
Rp78,500 Rp 212,264.00
Rp78,500 Rp 425,470.00
SUBTOTAL Rp 5,535,474.60
Rp40,000 Rp 404,400.00
Rp40,000 Rp 1,378,080.00
Rp40,000 Rp 84,400.00
SUBTOTAL Rp 1,866,880.00
Rp90,000 Rp 756,900.00
Rp90,000 Rp 2,060,100.00
SUBTOTAL Rp 2,817,000.00
Rp265,000 Rp 14,209,300.00
Rp265,000 Rp 8,745,000.00
Rp265,000 Rp 559,150.00
SUBTOTAL Rp 23,513,450.00
Rp47,000 Rp 80,825.90
Rp47,000 Rp 1,192,484.00
SUBTOTAL Rp 1,273,309.90
Rp1,500,000 Rp 172,800,000.00
Rp1,500,000 Rp 11,700,000.00
Rp3,000,000 Rp 28,500,000.00
Rp3,000,000 Rp 139,500,000.00
Rp2,500,000 Rp 39,097,500.00
Rp2,500,000 Rp 6,689,750.00
SUBTOTAL Rp398,287,250.00
Rp2,225,000 Rp 2,225,000.00
Rp2,225,000 Rp 17,800,000.00
Rp700,000 Rp 4,200,000.00
Rp1,140,000 Rp 2,280,000.00
Rp1,140,000 Rp 2,280,000.00
Rp1,140,000 Rp 1,140,000.00
Rp1,140,000 Rp 2,280,000.00
Rp950,000 Rp 5,700,000.00
Rp1,140,000 Rp 2,280,000.00
Rp1,140,000 Rp 1,140,000.00
Rp1,140,000 Rp 1,140,000.00
Rp3,100,000 Rp 2,332,130.00
Rp3,100,000 Rp 935,580.00
Rp200,000 Rp 20,200.00
Rp200,000 Rp 23,200.00
Rp200,000 Rp 23,000.00
Rp200,000 Rp 1,440.00
Rp200,000 Rp 72,036.00
Rp95,000 Rp 25,761,150.00
SUBTOTAL Rp 71,633,736.00
Rp75,000 Rp 187,500.00
Rp75,000 Rp 924,750.00
Rp75,000 Rp 1,570,500.00
Rp75,000 Rp 544,500.00
Rp75,000 Rp 1,984,500.00
Rp75,000 Rp 609,750.00
Rp75,000 Rp 394,500.00
Rp75,000 Rp 187,500.00
Rp75,000 Rp 187,500.00
Rp75,000 Rp 615,000.00
Rp75,000 Rp 187,500.00
Rp75,000 Rp 1,037,250.00
Rp75,000 Rp 812,250.00
Rp75,000 Rp 2,280,000.00
Rp75,000 Rp 534,750.00
Rp75,000 Rp 1,655,250.00
SUBTOTAL Rp 13,713,000.00
Rp65,000 Rp 670,800.00
Rp65,000 Rp 670,800.00
Rp65,000 Rp 670,800.00
Rp65,000 Rp 1,136,200.00
Rp65,000 Rp 390,000.00
Rp65,000 Rp 670,800.00
SUBTOTAL Rp 4,209,400.00
Rp95,000 Rp 524,400.00
Rp70,000 Rp 175,000.00
Rp95,000 Rp 1,282,500.00
Rp95,000 Rp 2,140,350.00
Rp95,000 Rp 1,313,850.00
Rp70,000 Rp 175,000.00
Rp70,000 Rp 175,000.00
Rp95,000 Rp 1,862,000.00
Rp95,000 Rp 752,400.00
Rp95,000 Rp 503,500.00
Rp70,000 Rp 191,100.00
Rp95,000 Rp 807,500.00
Rp70,000 Rp 175,000.00
Rp95,000 Rp 259,350.00
Rp95,000 Rp 1,313,850.00
Rp95,000 Rp 2,793,000.00
Rp95,000 Rp 1,028,850.00
Rp95,000 Rp 1,042,150.00
Rp95,000 Rp 1,042,150.00
Rp95,000 Rp 874,000.00
SUBTOTAL Rp 18,430,950.00
Rp80,000 Rp 825,600.00
Rp80,000 Rp 825,600.00
Rp80,000 Rp 825,600.00
Rp80,000 Rp 825,600.00
Rp80,000 Rp 480,000.00
Rp80,000 Rp 825,600.00
SUBTOTAL Rp 4,608,000.00
Rp45,000 Rp 14,268,636.00
Rp35,000 Rp 21,347,200.00
Rp90,000 Rp 11,245,320.00
Rp35,000 Rp 9,776,287.50
SUBTOTAL Rp 56,637,443.50
Rp35,000 Rp 175,000.00
Rp1,635,000 Rp 4,905,000.00
Rp695,000 Rp 695,000.00
Rp500,000 Rp 1,500,000.00
Rp40,000 Rp 240,000.00
Rp35,000 Rp 140,000.00
Rp40,000 Rp 40,000.00
Rp1,635,000 Rp 1,635,000.00
Rp500,000 Rp 500,000.00
Rp550,000 Rp 618,750.00
SUBTOTAL Rp 10,448,750.00
Rp80,000 Rp 880,000.00
Rp110,000 Rp 1,540,000.00
Rp110,000 Rp 990,000.00
Rp2,500,000 Rp 12,500,000.00
Rp95,000 Rp 95,000.00
Rp95,000 Rp 1,900,000.00
Rp95,000 Rp 1,140,000.00
Rp300,000 Rp 300,000.00
Rp300,000 Rp 600,000.00
Rp70,000 Rp 14,634,900.00
SUBTOTAL Rp 34,579,900.00
Rp750,609,776.40
PEKERJAAN PERSIAPAN Rp22,828,000
PEKERJAAN TANAH Rp8,675,665
PEKERJAAN PONDASI Rp26,330,450
PEKERJAAN STRUKTUR Rp410,277,230
PEKERJAAN ARSITEKTUR Rp169,232,530
PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp45,028,650
NO URAIAN PEKERJAAN JUMLAH HARGA
1 PEKERJAAN PERSIAPAN Rp 22,828,000
2 PEKERJAAN TANAH Rp 8,675,665
3 PEKERJAAN PONDASI Rp 26,330,450
4 PEKERJAAN STRUKTUR Rp 410,277,230
5 PEKERJAAN ARSITEKTUR Rp 169,232,530
6 PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 45,028,650
HARGA DASAR Rp 682,372,524
PPN 10% Rp 68,237,252
GRAND TOTAL Rp 750,609,776
PEMBULATAN Rp 750,610,000
PERHITUN
NO JENIS PEKERJAAN GAMBAR PENAMPANG
PANJANG
A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN SITE 21
2 PAGAR SEMENTARA 20
4 PEKERJAAN BOWPLANK 20
5 DIREKSI KET 4
D ANSTAMPING
1 ANSTAMPING 1/2 66
1 ANSTAMPING 1/2 66
E PEKERJAAN PONDASI
1 PONDASI 1 107.24
2 PONDASI 1/2 66
2 PONDASI 1/2 66
1 PONDASI 1 107.24
2 PONDASI1/2 66
G PEKERJAAN BETON
1 SLOOF 1 80
teras depan
(5x1,825)
teras belakang
(8,24x4,750)
mushola
(2,8x1,8)
k.tamu
(2,8x3,8)
wc(1,8x1,8)
k.utama
(3,0x3,3)
dapur
5 PLAT LANTAI (2,8x1,95)
k.pembantu
(2,8x1,8)
r.makan
(4,8x3,45)
kamar mandi
(1,8x1,3)
r.tamu
(4,8x3,8)
TOTAL AREA
(A)
TEBAL PLAT
(T)
6 TANGGA
H PEKERJAAN DINDING
- Pekerjaan Dinding lantai 1 (tinggi dinding = 3,5 m dan tebal dinding = 15 cm)
1 Kamar tidur utama
4 Ruang keluarga
5 Kamar tidur 1
6 Tangga
7 Kamar mandi / wc 1
8 Kamar mandi / wc 2
9 Kamar tidur pembantu
10 Ruang makan
11 Dapur
- Pekerjaan Dinding lantai 2 (tinggi dinding = 3,7 m dan tebal dinding = 15 cm)
13 Kamar tidur
14 Kamar mandi / wc
15 Ruang serbaguna
16 Teras belakang
17 Ruang kerja
18 Mushola
19 Perpustakaan
20 Tangga
21 Ruang santai
- Pekerjaan Dinding Luar
I PEKERJAAN KAYU
- Pekerjaan Kusen, Daun Pintu dan Jendela
1 Pintu Utama (P1)
2 Pintu Kamar (P2)
3 Pintu Kamar Mandi (P3)
4 Jendela 1 (JD1)
5 Jendela 2 (JD2)
6 Jendela 3 (JD3)
7 Jendela 4 (JD4)
8 Bouvenlight (BV)
9 Jendela 5 (JD5)
10 Jendela 6 (JD6)
11 Jendela 7 (JD7)
- Pekerjaan Atap
1 Kuda-kuda 1
Batang tarik 10.27
Balok sokong 1.85
Balok apit 1.762
Balok tiang 1.35
Balok sokong 2 2.26
Balok tarik 2 4.45
2 Kuda-kuda 2
Balok sokong 5
Tiang kuda-kuda 3
Kaki kuda-kuda 5.7
6 Kaso 4/6 1
7 Reng 2/3 1
J PEKERJAAN PLAFOND
- Pekerjaan Plafond Lantai 1
1 Kamar mandi / wc utama
3 Ruang tamu
4 Ruang keluarga
6 Kamar tidur 1
7 Kamar tidur pembantu
8 Kamar mandi / wc 1
9 Kamar mandi / wc 2
11 Kamar mandi / wc
12 Ruang kerja
13 Mushola
14 Ruang serbaguna
15 Tangga
K PEKERJAAN WATERPROOFING
- Pekerjaan coating dinding lantai 1
1 Kamar mandi / wc utama
2 Kamar mandi / wc 1
3 Kamar mandi / wc 2
4 Dapur
5 Tempat cuci
1 Kamar mandi / wc
5 Ruang serbaguna
6 Mushola
7 Perpustakaan
8 Ruang Santai
9 Teras depan
2 Kamar mandi / wc 1
3 Kamar mandi / wc 2
4 Dapur
5 Tempat cuci
- Pekerjaan pemasangan keramik dinding lantai 2
1 Kamar mandi / wc
N PEKERJAAN PENGECATAN
- Cat dinding
1 Area luar
2 Area dalam
- Cat kayu
- Cat plafon
O PEKERJAAN SANITASI
- Pekerjaan sanitasi lantai 1
1 Floor drain
2 Kloset duduk
3 Kitchen sink
4 Bak mandi fiber
5 Kran
- Pekerjaan sanitasi lantai 2
1 Floor drain
2 Kran
3 Kloset duduk
4 Bak mandi fiber
P PEKERJAAN INSTALASI LISTRIK
1 Stop Contact
2 Saklar Tunggal
3 saklar Ganda
4 AC
5 Lampu Hias 40W
6 Bola lampu 30W
7 Bola lampu 5W
8 Meteran
9 Sekring
PERHITUNGAN
VOLUME SATUAN
LEBAR TINGGI JUMLAH
14 V=21*14=294 M
13 V=20*13=260 M
2 V=1,5*2=3 M
2 V=1,5*2=3 M
13 V=20*13=260 M
4 V=4*4=16 M
0.9
1 1 V=(0.9+1.8)*1/2*1*1=1,35 M
1.8
1 1 V=(0.9+1.8)*1/2*1*1=1,35 M
1.8
0.9
1 V=(0,9+1,8)*1/2*10,74*1=10,5516 M
1.8
0.55
1 V=(0,55+0,98)*1/2*66*1=50,49 M
0.98
1.3 1.6 V=1,3*1,3*1,6=2,704 M
0.9
1 V=(0,9+0,986)*1/2*10,724*1=10,11 M
1 V=(0,9+0,986)*1/2*10,724*1=10,11 M
0.986
0.55
1 V=(0,55+0,494)*1/2*66*1=34,452 M
0.494
0.9
1.5 1 V=(09+1.269)*1/2*1.5*1.3=2.11 M
1.029
0.68
0.2 V =(0,68+0,594)x1/2x0.2x66=8.41 M
0.2 V =(0,68+0,594)x1/2x0.2x66=8.41 M
0.594
0.986
0.2 V =(0.986+1,157)x1/2x2x107,24=22,89 M
1.157
0.3
1 V=(0.3+0.7)X1/2X1X107.24=53.62 M
0.7
0.3
1 V=(0.3+0.7)X1/2x1x66=33 M
0.7
1 V=(0.3+0.7)X1/2x1x66=33 M
0.7
3.5
0.3
1.5 1 ((0.2x1x1.5)+(1x1.5/3x3.5)+(1.5x0.2x0.2))=2.11 M
0.7 1.3 M
1.7197
0.7 0.3 M
25.372
3
0.15 0.25 144.00 M
0.15 2 15 0.68 M
0.15 2 15 0.68 M
9.13
39.14
10.64
10.64
3.24
9.90
5.46 M
5.04
16.56
2.34
18.24
130.33 15.639
0.12
m
Kusen :
= (0,12 x 0,06) x (2,52 + 1,7 + 1,7
+ 2,52) = 0,06 m Daun pintu :
= (1,7 - 0,06
- 0,06) x 2,1 = 3,32 m Kaca
:
= 0,32 x (1,7 - 0,06 - 0,06) = 0,51 m
Engsel = 4
Handle + kunci = 2 set
1
Kusen :
= (0,12 x 0,06) x (2,1 + 0,8 + 2,1)
= 0,04 m Daun pintu :
=
(0,8 - 0,06 - 0,06) x 2,1 = 1,43 m
Engsel = 2
Kusen :
= (0,12 x 0,06) x (1,84 + 1,34
+ 1,34 + 1,84) = 0,05 m
Daun jendela :
=
(1,34 - 0,06 - 0,06) x 1,84 = 2,248 m
2 Engsel = 4
Kunci = 2 set
Kusen :
= (0,12 x 0,06) x (2,2 + 0,7 +
0,7 + 2,2) = 0,042 m Daun jendela :
= (0,7
- 0,06 - 0,06) x 2,2 = 1,276 m
Engsel = 2
Kunci = 1 set
2
Kusen :
= (0,12 x 0,06) x (1,84 + 1,08 +
1,08 + 1,84) = 0,04 m
Daun jendela :
=
(1,08 - 0,06 - 0,06) x 1,84 = 1,76 m
Engsel = 4
1 Kunci = 2 set
Kusen :
= (0,12 x 0,06) x (1,84 + 0,57 +
0,57 + 1,84) = 0,03 m
Daun jendela :
Kusen :
= (0,12 x 0,06) x (0,5 + 0,52 +
0,52 + 0,5) = 0,02 m Daun bouvenlight :
= (0,52 -
6 0,06 - 0,06) x 0,5 = 0,2 m
Engsel = 1
Kusen :
= (0,12 x 0,06) x (2,2 + 3,26 + 3,26
+ 2,2) = 0,08 m Daun jendela :
= (3,26 -
0,06 - 0,06) x 2,2 = 6,91 m
Engsel = 5
Kunci = 5 set
2
Kusen :
= (0,12 x 0,06) x (2,2 + 2,62 + 2,62
+ 2,2) = 0,07 m Daun jendela :
=
(2,62 - 0,06 - 0,06) x 2,2 = 5,5 m
Engsel = 4
1 Kunci = 4 set
Kusen :
= (0,12 x 0,06) x (3 + 1,09 +
1,09 +3) = 0,06 m Daun jendela :
=
(1,09 - 0,06 - 0,06) x 3 = 2,91 m
Engsel = 2
Kunci = 2 set
1
271.17 m
Luas plafond = 1,35 x 1,85 = 2,5 m m
Luas coating = 3 x 2 = 6 m m
317.0808 m
609.92 m
124.948 m
279.3225 m
5 unit
3 unit
1 unit
3 unit
6 unit
4 unit
1 unit
1 unit
1 unit
11 unit
14 unit
9 unit
5 unit
1 unit
20 unit
12 unit
1 unit
2 unit
V=Jumlah(Luas alas x
t)
V
=15((1.2+1.224)x0.1
/2)X1.2=2.18
V
=((0.78+0.83)x0.1/2)
x46.8=3.77
V
=((0.65+0.68)x0.1/2)
x58.5=3.89
V
=((1+1.054)x0.1/2)x
67.4=6.92
21.9375
0.75228
0.3018
1 m2 pekerjaan dinding pasangan 1/2 bata 1:5
koefisien satuan pekerjaan
70.000 bh bata merah
BAHAN 9.680 kg semen
0.045 m3 pasir
0.320 OH pekerja
0.100 OH tukang batu
UPAH
0.010 OH kepala tukang
0.015 OH mandor
PEKERJAAN LANGIT-LANGIT
0.003 OH mandor
PEKERJAAN CAT
1m2 pengecatan kayu (1 lps plamir:1 lps cat dasar:2 lps cat minyak)
koefisien satuan pekerjaan
0.200 kg Cat menie kayu
0.150 kg Plamir
BAHAN
0.170 kg Cat Dasar
0.260 kg Cat Penutup
UPAH 0.070 OH Pekerja
0.090 OH Tukang Cat
0.009 OH kepala tukang
0.0025 OH Mandor
PLUMBING
1m' pas.instalasi pipa air bersih PVC tipe AW D 3/4"
koefisien satuan pekerjaan
1.200 m' pipa D 3/4"
BAHAN
0.350 % perlengkapan
0.036 OH Pekerja
0.060 OH Tukang batu
UPAH
0.006 OH Kepala Tukang
0.002 OH Mandor
UPAH
1.015 OH Tukang batu
UPAH
0.002 OH Kepala Tukang
0.016 OH Mandor
Instalasi Listrik
Rp 16,800.00
Rp 7,880.00
Rp 919.00
Rp 984.00
Rp 92,719.10
Rp 92,719.10
Rp 10,500.00
Rp 11,820.00
Rp 1,378.50
Rp 656.00
Rp 31,523.90
Rp 31,523.90
Rp 10,500.00
Rp 11,820.00
Rp 1,378.50
Rp 656.00
Rp 32,689.61
Rp 32,689.61
jumlah harga upah
Rp 13,125.00
Rp 9,456.00
Rp 1,102.80
Rp 820.00
Rp 333,032.05
Rp 333,032.05
Rp 13,125.00
Rp 9,456.00
Rp 1,102.80
Rp 820.00
Rp 149,136.22
Rp 149,136.22
Rp 13,125.00
Rp 9,456.00
Rp 1,102.80
Rp 820.00
Rp 134,844.55
Rp 134,844.55
Rp 13,125.00
Rp 7,880.00
Rp 919.00
Rp 656.00
Rp 33,580.00
Rp 33,580.00
Rp 5,250.00
Rp 3,940.00
Rp 459.50
Rp 328.00
Rp 40,655.62
Rp 40,655.62
Rp 3,150.00
Rp 4,728.00
Rp 551.40
Rp 196.80
Rp 17,159.70
Rp 17,159.70
Rp 3,675.00
Rp 7,092.00
Rp 827.10
Rp 164.00
Rp 30,187.70
Rp 30,187.70
Rp 1,575.00
Rp 7,092.00
Rp 827.10
Rp 98.40
Rp 15,993.70
Rp 15,993.70
Rp 1,575.00
Rp 7,092.00
Rp 827.10
Rp 98.40
Rp 16,513.70
Rp 16,513.70
Rp 315,000.00
Rp 1,576,000.00
Rp 183,800.00
Rp 19,680.00
Rp 2,120,797.50
Rp 2,120,797.50
Rp 2,257.50
Rp 3,388.40
Rp 395.17
Rp 137.76
Rp 162,658.83
Rp 162,658.83
Rp 52,500.00
Rp 236,400.00
Rp 27,570.00
Rp 3,280.00
Rp 855,845.22
Rp 855,845.22
Rp 31,500.00
Rp 236,400.00
Rp 18,380.00
Rp 1,968.00
Rp 717,242.80
Rp 717,242.80
Rp 813.75
Rp 13,002.00
Rp 1,516.35
Rp 52.48
Rp 175,494.58
Rp 175,494.58
Rp 787.50
Rp 11,820.00
Rp 1,378.50
Rp 49.20
Rp 29,165.20
Rp 29,165.20
Rp 525.00
Rp 7,880.00
Rp 919.00
Rp 32.80
Rp 25,086.80
Rp 25,086.80
Rp 1,050.00
Rp 15,760.00
Rp 1,838.00
Rp 65.60
Rp 45,943.60
Rp 45,943.60
Rp 2,625.00
Rp 39,400.00
Rp 4,595.00
Rp 164.00
Rp 159,794.00
Rp 159,794.00
Rp 1,050.00
Rp 15,760.00
Rp 1,838.00
Rp 65.60
Rp 57,713.60
Rp 57,713.60
Rp 787.50
Rp 11,820.00
Rp 1,378.50
Rp 32.80
Rp 34,018.80
Rp 34,018.80
jumlah harga upah
Rp 2,625.00
Rp 39,400.00
Rp 4,595.00
Rp 164.00
Rp 103,784.00
Rp 103,784.00
Rp 787.50
Rp 11,820.00
Rp 1,378.50
Rp 49.20
Rp 33,155.20
Rp 33,155.20
Rp 2,887.50
Rp 78,800.00
Rp 5,054.50
Rp 328.00
Rp 372,070.00
Rp 372,070.00
Rp 13,125.00
Rp 7,880.00
Rp 919.00
Rp 656.00
Rp 22,580.00
Rp 22,580.00
jumlah harga upah
Rp 173,250.00
Rp 118,200.00
Rp 13,785.00
Rp 10,496.00
Rp 5,721,731.00
Rp 5,721,731.00
Rp 7,875.00
Rp 11,820.00
Rp 4,595.00
Rp 6,560.00
Rp 197,850.00
Rp 197,850.00
Rp 525.00
Rp 7,880.00
Rp 919.00
Rp 328.00
Rp 156,652.00
Rp 156,652.00
Rp 525.00
Rp 7,880.00
Rp 919.00
Rp 328.00
Rp 24,652.00
Rp 24,652.00
jumlah harga upah
21,780.00
Rp 157,500.00
Rp 354,600.00
Rp 82,710.00
Rp 59,040.00
Rp 835,350.00
Rp 835,350.00
Rp 63,000.00
Rp 114,260.00
Rp 13,785.00
Rp 6,560.00
Rp 795,502.00
Rp 795,502.00
Rp 45,000.00
Rp 282,600.00
Rp 282,600.00
Rp 525.00
Rp 7,880.00
Rp 919.00
Rp 328.00
Rp 47,652.00
Rp 47,652.00
jumlah harga upah
Rp 1,890.00
Rp 4,728.00
Rp 551.40
Rp 118.08
Rp 15,812.48
Rp 15,812.48
Rp 4,200.00
Rp 3,152.00
Rp 367.60
Rp 459.20
Rp 54,653.70
Rp 54,653.70
Rp 1,890.00
Rp 4,728.00
Rp 551.40
Rp 118.08
Rp 84,663.48
Rp 84,663.48
Rp 168,000.00
Rp 79,982.00
Rp 137.85
Rp 1,049.60
Rp 277,493.45
Rp 277,493.45
Rp 625.00
Rp 8,125.00
Rp 8,125.00
Rp 625.00
Rp 18,125.00
Rp 18,125.00
Rp 625.00
Rp 18,125.00
Rp 18,125.00
Rp 16,675.00
Rp 16,675.00
Rp 16,675.00
Rp 425.00
Rp 39,425.00
Rp 39,425.00
jumlah harga upah
Rp 425.00
Rp 22,925.00
Rp 22,925.00
Rp 425.00
Rp 27,925.00
Rp 27,925.00
Rp 175.00
Rp 16,675.00
Rp 16,675.00
Rp 105,000.00
Rp 27,580.00
Rp 3,216.50
Rp 65,600.00
Rp 570,966.50
Rp 570,966.50
Rp 525.00
Rp 7,880.00
Rp 919.00
Rp 328.00
Rp 39,316.25
Rp 39,316.25
RENCANA ANGGARAN BIAYA (RA
NO JENIS PEKERJAAN VOLUME
A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN SITE 294.00
2 PAGAR SEMENTARA 260.00
3 PAPAN NAMA PROYEK 1.00
4 PEKERJAAN BOWPLANK 260.00
5 DIREKSI KEET 16.00
D ANSTAMPING
1 ANSTAMPING 1/2 8.41
2 ANSTAMPING POND. I 22.89
E PEKERJAAN PONDASI
1 PONDASI 1 53.62
2 PONDASI 1/2 33.00
3 PONDASI SETEMPAT 2.11
G PEKERJAAN BETON
1 SLOOF 1 115.20
2 SLOOF PAGAR KELILING 7.80
3 KOLOM STRUKTUR 9.50
4 KOLOM PAGAR KELILING (15x15) 46.50
5 PLAT LANTAI 15.64
6 TANGGA 2.68
H PEKERJAAN DINDING
1 Pekerjaan Dinding 1/2 bata tebal 15 cm 666.11
2 Pekerjaan plesteran dinding 1:5 15 mm 1332.22
3 Pekerjaan plesteran dinding 1:0.5:3 15 mm 1332.22
I PEKERJAAN KAYU
- Pekerjaan Kusen, Daun Pintu dan Jendela
1 Pintu Utama (P1) 1.00
2 Pintu Kamar (P2) 8.00
3 Pintu Kamar Mandi (P3) 6.00
4 Jendela 1 (JD1) 2.00
5 Jendela 2 (JD2) 2.00
6 Jendela 3 (JD3) 1.00
7 Jendela 4 (JD4) 2.00
8 Bouvenlight (BV) 6.00
9 Jendela 5 (JD5) 2.00
10 Jendela 6 (JD6) 1.00
11 Jendela 7 (JD7) 1.00
- Pekerjaan Atap
1 Kuda-kuda 1 0.75
2 Kuda-kuda 2 0.30
3 Balok tembok 0.10
4 Jurai luar 8/12 0.12
5 Jurai dalam 8/12 0.12
6 Kaso 4/6 0.01
7 Reng 2/3 0.36
8 Luas genteng atap 271.17
J PEKERJAAN PLAFOND
- Pekerjaan Plafond Lantai 1
1 Kamar mandi / wc utama 2.50
2 Kamar tidur utama 12.33
3 Ruang tamu 20.94
4 Ruang keluarga 7.26
5 Ruang makan + dapur 26.46
6 Kamar tidur 1 8.13
7 Kamar tidur pembantu 5.26
8 Kamar mandi / wc 1 2.50
9 Kamar mandi / wc 2 2.50
- Pekerjaan Plafond Lantai 2
10 Kamar tidur 8.20
11 Kamar mandi / wc 2.50
12 Ruang kerja 13.83
13 Mushola 10.83
14 Ruang serbaguna 30.40
15 Tangga 7.13
16 Ruang santai + perpustakaan 22.07
K PEKERJAAN WATERPROOFING
- Pekerjaan coating dinding lantai 1
1 Kamar mandi / wc utama 10.32
2 Kamar mandi / wc 1 10.32
3 Kamar mandi / wc 2 10.32
4 Dapur 17.48
5 Tempat cuci 6.00
- Pekerjaan coating dinding lantai 2
1 Kamar mandi / wc 10.32
N PEKERJAAN PENGECATAN
1 Cat dinding area luar 317.08
2 Cat dinding area dalam 609.92
- Cat kayu 124.95
- Cat plafon 279.32
O PEKERJAAN SANITASI
1 Floor drain 9.00
2 Kloset duduk Toto CW 914 j 4.00
3 Kitchen sink 1.00
4 Bak mandi fiber 4.00
Kran cuci piring 1/2 " 1.00
5 Kran 7.00
- Pekerjaan Septic Tank 1.13
TOTAL
GARAN BIAYA (RAB)
SATUAN HARGA SATUAN HARGA
m Rp 35,000.00 Rp 10,290,000.00
m' Rp 23,000.00 Rp 5,980,000.00
unit Rp 150,000.00 Rp 150,000.00
m' Rp 22,000.00 Rp 5,720,000.00
m Rp 43,000.00 Rp 688,000.00
SUBTOTAL Rp 22,828,000.00
m Rp 78,500.00 Rp 105,975.00
m Rp 78,500.00 Rp 828,300.60
m Rp 78,500.00 Rp 3,963,465.00
m Rp 78,500.00 Rp 212,264.00
m Rp 78,500.00 Rp 425,470.00
SUBTOTAL Rp 5,535,474.60
m Rp 40,000.00 Rp 404,400.00
m Rp 40,000.00 Rp 1,378,080.00
m Rp 40,000.00 Rp 84,400.00
SUBTOTAL Rp 1,866,880.00
m Rp 90,000.00 Rp 756,900.00
m Rp 90,000.00 Rp 2,060,100.00
SUBTOTAL Rp 2,817,000.00
m Rp 265,000.00 Rp 14,209,300.00
m Rp 265,000.00 Rp 8,745,000.00
m Rp 265,000.00 Rp 559,150.00
SUBTOTAL Rp 23,513,450.00
m Rp 47,000.00 Rp 80,825.90
m Rp 47,000.00 Rp 1,192,484.00
SUBTOTAL Rp 1,273,309.90
m Rp 1,500,000.00 Rp 172,800,000.00
m Rp 1,500,000.00 Rp 11,700,000.00
m Rp 3,000,000.00 Rp 28,500,000.00
m Rp 3,000,000.00 Rp 139,500,000.00
m Rp 2,500,000.00 Rp 39,097,500.00
m Rp 2,500,000.00 Rp 6,689,750.00
SUBTOTAL Rp398,287,250.00
m Rp 3,100,000.00 Rp 2,332,130.00
m Rp 3,100,000.00 Rp 935,580.00
m Rp 200,000.00 Rp 20,200.00
m Rp 200,000.00 Rp 23,200.00
m Rp 200,000.00 Rp 23,000.00
m Rp 200,000.00 Rp 1,440.00
m Rp 200,000.00 Rp 72,036.00
m Rp 95,000.00 Rp 25,761,150.00
SUBTOTAL Rp 71,633,736.00
m Rp 75,000.00 Rp 187,500.00
m Rp 75,000.00 Rp 924,750.00
m Rp 75,000.00 Rp 1,570,500.00
m Rp 75,000.00 Rp 544,500.00
m Rp 75,000.00 Rp 1,984,500.00
m Rp 75,000.00 Rp 609,750.00
m Rp 75,000.00 Rp 394,500.00
m Rp 75,000.00 Rp 187,500.00
m Rp 75,000.00 Rp 187,500.00
m Rp 75,000.00 Rp 615,000.00
m Rp 75,000.00 Rp 187,500.00
m Rp 75,000.00 Rp 1,037,250.00
m Rp 75,000.00 Rp 812,250.00
m Rp 75,000.00 Rp 2,280,000.00
m Rp 75,000.00 Rp 534,750.00
m Rp 75,000.00 Rp 1,655,250.00
SUBTOTAL Rp 13,713,000.00
m Rp 65,000.00 Rp 670,800.00
m Rp 65,000.00 Rp 670,800.00
m Rp 65,000.00 Rp 670,800.00
m Rp 65,000.00 Rp 1,136,200.00
m Rp 65,000.00 Rp 390,000.00
m Rp 65,000.00 Rp 670,800.00
SUBTOTAL Rp 4,209,400.00
6.468 43.12
NO
NO
Rp22,828,000
Rp8,675,665
Rp26,330,450
Rp545,594,892
Rp188,286,116
Rp46,564,860
RENCANA ANGGARAN BIAYA (RAB)
A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN SITE 294.00
2 PAGAR SEMENTARA 260.00
3 PAPAN NAMA PROYEK 1.00
4 PEKERJAAN BOWPLANK 260.00
5 DIREKSI KEET 16.00
SUBTOTAL
B PEKERJAAN GALIAN TANAH
1 GALIAN PONDASI TELAPAK 1.35
2 GALIAN PONDASI 1 10.55
3 GALIAN PONDASI 1/2 50.49
4 GALIAN RESAPAN 2.70
5 GALIAN SEPTICTANK 5.42
SUBTOTAL
C PEKERJAAN URUGAN PASIR
1 A.URUGAN PONDASI 1 10.11
2 B.URUGAN PASIR PONDASI 1/2 34.45
3 URUGAN PASIR PONDASI SETAPAK 2.11
SUBTOTAL
D ANSTAMPING
1 ANSTAMPING 1/2 8.41
2 ANSTAMPING POND. I 22.89
SUBTOTAL
E PEKERJAAN PONDASI
1 PONDASI 1 53.62
2 PONDASI 1/2 33.00
3 PONDASI SETEMPAT 2.11
SUBTOTAL
F URUGAN TANAH KEMBALI
1 PONDASI 1 1.72
2 PONDASI1/2 25.37
SUBTOTAL
G PEKERJAAN BETON
1 SLOOF 1 115.20
2 SLOOF PAGAR KELILING 7.80
3 KOLOM STRUKTUR 9.50
4 KOLOM PAGAR KELILING (15x15) 46.50
5 PLAT LANTAI 15.64
6 TANGGA 2.68
H PEKERJAAN DINDING
1 Pekerjaan Dinding 1/2 bata tebal 15 cm 666.11
Pekerja
Tukang Batu
Kepala Tukang
Mandor
2 Pekerjaan plesteran dinding 1:5 15 mm 1332.22
I PEKERJAAN KAYU
- Pekerjaan Kusen, Daun Pintu dan Jendela
1 Pintu Utama (P1) 1.00
2 Pintu Kamar (P2) 8.00
3 Pintu Kamar Mandi (P3) 6.00
4 Jendela 1 (JD1) 2.00
5 Jendela 2 (JD2) 2.00
6 Jendela 3 (JD3) 1.00
7 Jendela 4 (JD4) 2.00
8 Bouvenlight (BV) 6.00
9 Jendela 5 (JD5) 2.00
10 Jendela 6 (JD6) 1.00
11 Jendela 7 (JD7) 1.00
- Pekerjaan Atap
1 Kuda-kuda 1 0.75
2 Kuda-kuda 2 0.30
3 Balok tembok 0.10
4 Jurai luar 8/12 0.12
5 Jurai dalam 8/12 0.12
6 Kaso 4/6 0.01
7 Reng 2/3 0.36
8 Luas genteng atap 271.17
SUBTOTAL
J PEKERJAAN PLAFOND
- Pekerjaan Plafond Lantai 1
1 Kamar mandi / wc utama 2.50
2 Kamar tidur utama 12.33
3 Ruang tamu 20.94
4 Ruang keluarga 7.26
5 Ruang makan + dapur 26.46
6 Kamar tidur 1 8.13
7 Kamar tidur pembantu 5.26
8 Kamar mandi / wc 1 2.50
9 Kamar mandi / wc 2 2.50
- Pekerjaan Plafond Lantai 2
10 Kamar tidur 8.20
11 Kamar mandi / wc 2.50
12 Ruang kerja 13.83
13 Mushola 10.83
14 Ruang serbaguna 30.40
15 Tangga 7.13
16 Ruang santai + perpustakaan 22.07
SUBTOTAL
K PEKERJAAN WATERPROOFING
- Pekerjaan coating dinding lantai 1
1 Kamar mandi / wc utama 10.32
2 Kamar mandi / wc 1 10.32
3 Kamar mandi / wc 2 10.32
4 Dapur 17.48
5 Tempat cuci 6.00
- Pekerjaan coating dinding lantai 2
1 Kamar mandi / wc 10.32
SUBTOTAL
L PEKERJAAN PENUTUP LANTAI
1 Pekerjaan penutup lantai keramik Granito 40x40 179.33
SUBTOTAL
M PEKERJAAN PEMASANGAN KERAMIK DINDING
1 Pekerjaan pemasangan keramik dinding Roman 40X40 16.32
SUBTOTAL
N PEKERJAAN PENGECATAN
1 Cat dinding area luar 317.08
SUBTOTAL
O PEKERJAAN SANITASI
1 Floor drain 9.00
4 AC 5.00
8 Meteran 1.00
9 Sekring 2.00
m
m' 0.015 0.00
unit 0.022 0.00
m' 0.13 0.00
m 0.022 0.00
SUBTOTAL 0.005 0.00
m 0.06 0.00
m 0.01
m 0.09 0
m 0.0015 0
m
SUBTOTAL 0.028 0
0.042 0
m 0.004 0
m 0.0025 0
m
SUBTOTAL
m
m
SUBTOTAL
m
m
m
SUBTOTAL
m
m
SUBTOTAL
m
m
m
m
m
m
m
m
unit
unit
unit
unit
unit
unit
unit
unit
unit 3.3 0
unit 1.5 0
unit 0.15 0
0.16 0
m
m 0.15 0
m 0.15 0
m 0.05 0
m 0.1 0
m
m 0.001 0
m 0.1 0
SUBTOTAL 0.01 0
0.005 0
m 0.01 0
m 0.1 0
m 0.01 0
m 0.005 0
m
m 1.2 0
m 1.45 0
m 0.15 0
m 0.1 0
m
m
m
m
m
m
m
SUBTOTAL 0.036
0.06
0.006
m 0.002
m
m 0.08
m 0.04
m 0.004
0.007
m
SUBTOTAL
SUBTOTAL 0.036 0
0.06 0
m 0.006 0
m 0.002 0
SUBTOTAL
m
SUBTOTAL 3.2 0
1.015 0
unit 0.002 0
unit 0.016 0
unit
unit
unit
unit
m
SUBTOTAL
titik
titik 0.017 0
titik
unit
titik
titik
titik
titik
titik
m'
SUBTOTAL
2.000 0
0.350 0
0.035 0
1.0000 0
0.030 0
0.300 0
0.030 0
0.0015 0
0.270 0
0.130 0
0.013 0
0.014 0
0.010 0
0.100 0
0.010 0
0.005 0
Hari Pekerja Total pekerja
28 0 1
21 0 1
5 0 2
5 0 1
7 0 1
7 0 2
5 0 15
5 0 1
2 0 5
2 0 7
2 0 1
2 0 1
2 0 8
2 0 4
2 0 1
2 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
2 0 4
2 0 4
2 0 1
2 0 1
1
1
1
1
1
1
1
1
1 0 1
1 0 1
1 0 1
1 0 1
5 0 3
5 0 1
5 0 1
5 0 1
1 1.7 2
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
1 0 1
3 0 3
3 0 1
3 0 1
3 0 1
1 0 1
1 0 1
1 0 1
1 0 1
RENCANA ANGGARAN BIAYA (RAB)
A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN SITE 294.00
2 PAGAR SEMENTARA 260.00
3 PAPAN NAMA PROYEK 1.00
4 PEKERJAAN BOWPLANK 260.00
5 DIREKSI KEET 16.00
SUBTOTAL
B PEKERJAAN GALIAN TANAH
1 GALIAN PONDASI TELAPAK 1.35
2 GALIAN PONDASI 1 10.55
3 GALIAN PONDASI 1/2 50.49
4 GALIAN RESAPAN 2.70
5 GALIAN SEPTICTANK 5.42
SUBTOTAL
C PEKERJAAN URUGAN PASIR
1 A.URUGAN PONDASI 1 10.11
2 B.URUGAN PASIR PONDASI 1/2 34.45
3 URUGAN PASIR PONDASI SETAPAK 2.11
SUBTOTAL
D ANSTAMPING
1 ANSTAMPING 1/2 8.41
2 ANSTAMPING POND. I 22.89
SUBTOTAL
E PEKERJAAN PONDASI
1 PONDASI 1 53.62
2 PONDASI 1/2 33.00
3 PONDASI SETEMPAT 2.11
SUBTOTAL
F URUGAN TANAH KEMBALI
1 PONDASI 1 1.72
2 PONDASI1/2 25.37
SUBTOTAL
G PEKERJAAN BETON
1 SLOOF 1 115.20
2 SLOOF PAGAR KELILING 7.80
3 KOLOM STRUKTUR 9.50
4 KOLOM PAGAR KELILING (15x15) 46.50
5 PLAT LANTAI 15.64
6 TANGGA 2.68
H PEKERJAAN DINDING
1 Pekerjaan Dinding 1/2 bata tebal 15 cm 666.11
2 Pekerjaan plesteran dinding 1:5 15 mm 1332.22
3 Pekerjaan plesteran dinding 1:0.5:3 15 mm 1332.22
SUBTOTAL
I PEKERJAAN KAYU
- Pekerjaan Kusen, Daun Pintu dan Jendela
1 Pintu Utama (P1) 1.00
2 Pintu Kamar (P2) 8.00
3 Pintu Kamar Mandi (P3) 6.00
4 Jendela 1 (JD1) 2.00
5 Jendela 2 (JD2) 2.00
6 Jendela 3 (JD3) 1.00
7 Jendela 4 (JD4) 2.00
8 Bouvenlight (BV) 6.00
9 Jendela 5 (JD5) 2.00
10 Jendela 6 (JD6) 1.00
11 Jendela 7 (JD7) 1.00
- Pekerjaan Atap
1 Kuda-kuda 1 0.75
2 Kuda-kuda 2 0.30
3 Balok tembok 0.10
4 Jurai luar 8/12 0.12
5 Jurai dalam 8/12 0.12
6 Kaso 4/6 0.01
7 Reng 2/3 0.36
8 Luas genteng atap 271.17
SUBTOTAL
J PEKERJAAN PLAFOND
- Pekerjaan Plafond Lantai 1
1 Kamar mandi / wc utama 2.50
2 Kamar tidur utama 12.33
3 Ruang tamu 20.94
4 Ruang keluarga 7.26
5 Ruang makan + dapur 26.46
6 Kamar tidur 1 8.13
7 Kamar tidur pembantu 5.26
8 Kamar mandi / wc 1 2.50
9 Kamar mandi / wc 2 2.50
- Pekerjaan Plafond Lantai 2
10 Kamar tidur 8.20
11 Kamar mandi / wc 2.50
12 Ruang kerja 13.83
13 Mushola 10.83
14 Ruang serbaguna 30.40
15 Tangga 7.13
16 Ruang santai + perpustakaan 22.07
SUBTOTAL
K PEKERJAAN WATERPROOFING
- Pekerjaan coating dinding lantai 1
1 Kamar mandi / wc utama 10.32
2 Kamar mandi / wc 1 10.32
3 Kamar mandi / wc 2 10.32
4 Dapur 17.48
5 Tempat cuci 6.00
- Pekerjaan coating dinding lantai 2
1 Kamar mandi / wc 10.32
SUBTOTAL
L PEKERJAAN PENUTUP LANTAI
Pekerjaan penutup lantai keramik Granito 40x40 179.33
Pekerjaan penutup lantai keramik Roman 40x40 7.8
Pekerjaan penutup lantai keramik Roman 20x20 10.23
SUBTOTAL
M PEKERJAAN PEMASANGAN KERAMIK DINDING
- Pekerjaan pemasangan keramik dinding Roman 40X40 16.32
Pekerjaan pemasangan keramik dinding Essensa 40X40 41.28
SUBTOTAL
N PEKERJAAN PENGECATAN
1 Cat dinding area luar 317.08
2 Cat dinding area dalam 609.92
3 Cat kayu 124.95
4 Cat plafon 279.32
SUBTOTAL
O PEKERJAAN SANITASI
1 Floor drain 9.00
2 Kloset duduk Toto CW 914 j 4.00
3 Bak cuci piring 1.00
4 Bak mandi fiber 4.00
5 Kran cuci piring 1/2 " 1.00
6 Kran dinding 7.00
- Pekerjaan Septic Tank 1.13
SUBTOTAL
P PEKERJAAN INSTALASI LISTRIK
1 Stop Contact 11.00
2 Saklar Tunggal 14.00
3 saklar Ganda 9.00
4 AC 5.00
5 Lampu Hias 40W 1.00
6 Bola lampu neon tl 20.00
7 Bola lampu downlight 12.00
8 Meteran 1.00
9 Sekring 2.00
10 Kabel listrik 209.07
SUBTOTAL
TOTAL
SATUAN Batu-bata (bh) PC (kg) Pasir urug (m2)
m
m'
unit
m'
m
SUBTOTAL
m
m
m
m
m
SUBTOTAL
m
m
m
SUBTOTAL
m
m
SUBTOTAL
m
m
m
SUBTOTAL
m
m
SUBTOTAL
m
m
m
m
m
m
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
m
m
m
m
m
m
m
m
SUBTOTAL
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
SUBTOTAL
m
m
m
m
m
m
SUBTOTAL
m 1578.104
m 68.64
m 90.024
SUBTOTAL
m 143.616
m 363.264
SUBTOTAL
m
m
m
m
SUBTOTAL
unit
unit
unit
unit
unit
unit
m
SUBTOTAL
titik
titik
titik
unit
titik
titik
titik
titik
titik
m' NO
SUBTOTAL NO
Semen warna Kapur Padam Pasir Pasang
Besi Beton (kg) Kerikil (m3)
(kg) (m3) (m3)
3.99666 17.319
233.129 3.94526
10.14 0.1716
13.299 0.22506
21.216 0.35904
53.664 0.90816
Keramik Granito Keramik Roman Keramik Roman Keramik Essenza
Hollow (bh)
40x40 cm (bh) 40x40 cm (bh) 20x20 cm (bh) 40x40 cm (bh)
1120.8125
48.75
255.75
102
258
Gypsum board
List Gypsum Tepung Gypsum
120x240x6 mm Paku Sekrup (kg) Cat dasar (kg)
Profil (m) (kg)
(lbr)
38.049696
73.1904
14.99376
50.27805 33.5187
Cat Menil Kayu Pipa besi 2,5"
Cat Penutup (kg) Plamir (kg) Baut (kg)
(kg) (m)
82.441008
158.5792
32.48648 24.9896 18.7422
Kloset Toto CW Hand shower Kran dinding Kran cuci piring
Seal tape (bh)
914 J (bh) (bh) (bh) 1/2" (bh)
4
1 0.025
1 0.025
Wastafel LW 812 Perlengkapan Perlengkapan
Floor drain (bh) Cermin (m2)
CJR (bh) toilet (%) Watafel (%)
1
0.06
Tissue Pipa PVC AW D Pipa PVC D 20 Pipa PVC D 4"
List Kayu (m)
Holder(bh) 3/4" (m) cm (m) (m)
Water Drain Bak mandi
Perlengkapan Kitchen zinc 2 Perlengkapan
accessories fiberglass 1m3
Pipa (%) lubang (unit) bak mandi (%)
(unit) (unit)
1 1
4 0.12
Saklar tunggal Saklar ganda Kabel 3x2,55
Stop kontak (bh) Pipa PVC 5/8"
(bh) (bh) (m2)
1
1
1
1 1
Meteran Lampu hias 40 w Lampu neon tl lampu downlight
1
1
1
1
1 m2 pekerjaan dinding pasangan 1/2 bata 1:5
koefisien satuan pekerjaan
70.000 bh bata merah
BAHAN 9.680 kg semen
0.045 m3 pasir
0.320 OH pekerja
0.100 OH tukang batu
UPAH
0.010 OH kepala tukang
0.015 OH mandor
harga satuan bahan harga satuan upah jumlah harga bahan
Rp 720.00 Rp 50,400.00
Rp 1,270.00 Rp 12,293.60
Rp 76,500.00 Rp 3,442.50
Rp52,500.00
Rp78,800.00
Rp91,900.00
Rp65,600.00
jumlah
harga satuan
jumlah harga upah
Rp 16,800.00
Rp 7,880.00
Rp 919.00
Rp 984.00
Rp 92,719.10
Rp 92,719.10