Daily Report

www.GQIS.co.uk

Project: Hinkley Jetty Design


Customer: Egden Murray
Finalisation
Sub-Vendor: Zhejiang Chankong Steel
Vendor: ESC Group
Pipe CO.,LTD
Sub-Vendor Address: Tianning, Jiashan,
Vendor Address: Putuo, Shanghai,China
Zhejiang
Vendor Reference: Sub-Vendor Reference:

GQIS Assignment No: Customer Reference:

Purchase Order No: 3568 Report No: 008

8PM 30th,August-8AM
Date of Visit:
31th,August,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial No., Cast,
Heat No.
1# 1 Raw material inspection Detail as below table

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

1. SMMARY / AREAS OF CONCERN:


1.1 Raw material inspection.
GQIS inspector performed raw material inspection according to ITP and specification, the detail inspection
content as below table, all inspection data conformity with ITP & specification and traceability, the surface
hasnt found any indication of damage. The result satisfactory.
Serial No. Material Grade Size Heat No. Delivering Specification
Condition
1630598106 S355J2 35X3000X 16305981 Hot Rolled EN 10025-2 2004: S355J2
0101 10955

1.2 Witness hydrostatic testing for flexible hose


As per ITP, GQIS inspector witness hydrostatic testing for flexible hose; Before testing, GQIS inspector
reviewed flexible hoses certificates, verified its satisfactory the drawing and specification requirement,
checked calibration certificate for hydrostatic testing equipment and valuable time and confirmed that are
satisfactory. Not any indication of leakage was found after past 15 second when testing pressure was 20 Bar,
that satisfactory the drawing and specification.

1.3 Visual and dimension inspection for supports of pile 3568-C04-065 and 3568-C04-066
GQIS inspector performed visual and dimension inspection for supports of pipe No.3568-C04-065 and 3568-
C04-066 according to drawing and project specification, not found any dimension out of tolerance, but found
some scratches which was produced by flame cut when open the 95mm hole, already marked on supports
and factory stated they would repair that and then will inspection again.

1.4 Visual and dimension inspection for pile of 3568-C12-052-C


According to ITP, GQIS inspector random executed visual and dimension inspection in-process, checked pile
of 3568-C12-052-C the length about 27240mm, outside diameter about1772mm~1784, the roundness
about 12mm, that satifactory the drawing and specification, not found any surface defect or damage, the
result can acceptable.

Picture 5

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Raw material inspection

Raw material inspection

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Witness hydrostatic testing for flexible hose

Witness hydrostatic testing for flexible hose

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Visual and dimension inspection for supports

Visual and dimension inspection for supports

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

found some scratches which was produced by flame cut

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Visual and dimension inspection for pile

Accepted Yes Non-Compliant Yes / No

Technical Specialist: Su Jinlong Operations Coordinator:

Date: 8PM 30th,August-8AM 31th,August,2016 Date: