Project: Hinkley Jetty Design


Customer: Edgen Murray
Finalisation
Sub-Vendor: Zhejiang Chankong Steel
Vendor: ESC Group
Pipe CO.,LTD
Sub-Vendor Address: Tianning, Jiashan,
Vendor Address: Putuo, Shanghai,China
Zhejiang
Vendor Reference: Sub-Vendor Reference:

GQIS Assignment No: Customer Reference:

Purchase Order No: 3568 Report No: 017

8PM 8th, September


Date of Visit:
-8AM 9th,September,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial No.,
Cast, Heat No.
3568-PS- 1 1778mmX35mmX4m(LSAW)+1778mmX25mmX28.4m
010 (SSAW)
3568-C12- 1 1778mmX25mmX2.7m(SSAW)+1778mmX30mmX5.7m
052 (LSAW) +1778mmX25mmX18.8m(SSAW)

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

1. SMMARY / AREAS OF CONCERN:


1.1 Inspection ancillary installation for pile 3568-C12-051
As per ITP step 15(Production and installation of ancillary) , GQIS inspector checked sub-vendor lineation
and installation of 3NB Grouting pipe with pile, the result found all the dimension in accordance with the
drawing requirement, also the assembly process is correspond with technical specification, the result is
acceptable.

1.2 Confirm the lift padeye dimension again after repaired (pile No.3568-C06-058)
As per ITP step 15(Production and installation of ancillary) , on 6th September,2016 GQIS inspector found
the lift hole on cheekplate was irregular and the minimum dimension was 60mm, that not in line with the
drawing requirement 74mm, today sub-vendor repaired lifting hole according to the drawing and checked
that dimension was75mm, that satisfactory the drawing requirement.

1.3 Witness UT(pipe 3568-PS-026)


As per ITP step 22(welding inspection-UT inspection, 100% of butt welding such as spiral weld, longitudinal
weld and CIRC weld), GQIS inspector witness ultrasonic testing for spiral weld of pipe 3568-PS-026, before
testing, GQIS inspector reviewed the certificates for UT persons, checked the period of validity of UT
equipment, verification the curve graph accuracy by standard block, and satisfactory; also verification the test
condition, procedure, test process, and satisfactory. Found indication at two location of weld seam and
marked, the sub-vendor state they will totally remove the defect and repair according to the specification and
shall be checked again.

1.4 Inspection rolling, dimension and surface quality of pile 3568-DC-039-09


As per ITP step 14(pile forming-visual and dimension inspection) ,GQIS inspector performed visual and
dimension inspection for pile 3568-DC-039-09 about rolling, dimension and surface quality, confirmed all the
dimension satisfactory the drawing and specification and not found any surface defect, also compare with
original inspection data and verified they are correspond.

Picture

checked sub-vendor lineation and installation of ancillary

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Confirm the lift padeye dimension again after repaired

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Witness UT

Found the indication on weld seam and length about 100mm

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Found the indication on weld seam and length about 65mm

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Inspection rolling, dimension and surface quality of pile 3568-DC-039-09

Inspection rolling, dimension and surface quality of pile 3568-DC-039-09

Accepted Not Non-Compliant No


007 (Revision 0) Daily Report Dated: 29nd August 2016
Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Technical Specialist: Su Jinlong Operations Coordinator:

Date: 8PM 8th, September -8AM Date:


9th,September,2016

007 (Revision 0) Daily Report Dated: 29nd August 2016