Académique Documents
Professionnel Documents
Culture Documents
Figure 21
The big question remained: How do you obtain the money to live with and
to acquire the materials and tools with which to work?
The answer was "precession." What precession is, and why it was the an-
swer, requires some explaining.
When we pull away from one another the opposite rigid-disc ends of a
flexible, water-filled rubber cylinder, the middle part of the overall cylinder
contracts in a concentric series of circular planes of diminishing radius per-
pendicular (at right angles) to the line of our pulling.
When we push toward one another on the two opposite ends of the same
flexible, water-filled, rubber, rigid-disk-ended cylinder, the center of the cyl-
inder swells maximally outward in a circular plane perpendicular (at right
angles) to the line of our pushing together.
When we drop a stone in the water, a circular wave is generated that
moves outwardly in a plane perpendicular (at right angles) to the line of
FlGURE 22.
of bodies in motion on other bodies in motion. The Sun and Earth are both
in motion. Despite the 180-degree gravitational pull of the in-motion Sun
upon the in-motion Earth, precession makes Earth orbit around the Sun in
ear axis and flight path), whereafter the bees' further bumbling entries into
other flowers inadvertently dusts off, pollenizes, and cross-fertilizes those
flowers at right angles (precessionally) to the bees' operational axis so, too,
do all the mobile creatures of Earth cross-fertilize all the different rooted
botanicals in one or another precessional (right-angled), inadvertent way.
Humans, as honey-money-seeking bees, do many of nature's required
tasks only inadvertently. They initially produce swords with metal-forging-
developed capability, which capability is later used to make steel into farm
plows. Humans in politically organized, group-fear-mandated acquisition
of weaponry have inadvertently developed so-much-more-performance-
with-so-much-less material, effort, and time investment per each technologi-
cal task accomplished as now inadvertently to have established a level of
technological capability which, if applied exclusively to peaceful purposes,
>
Figure 23.
Self-Disciplines of Buckminster Fuller 143
V, ( f *
~*
( Sun I < O Eartn
Figure 24.
can provide a sustainable high standard of living for all humanity, which
accomplished fact makes war and all weaponry obsolete. Furthermore, all
of this potential has happened only because of the at-ninety-degrees-realized
generalized technology and science "side effects" or "fall-out" inadvertently
discovered as special case manifest of the scientifically generalized principle
of precession.
At the 1927 outset of project "Guinea Pig B" I assumed that humanity
was designed to perform an important function in Universe, a function it
my prime objective.
So preoccupied with its honey-money bumbling has society been that the
ninety-degree side effects of the century-old science of ecology remained
long unnoticed by the populace. Ecology is the world-around complex in-
tercomplementation of all the biological species' regenerative intercyclings
with nature's geological and meteorological transformation recyclings. So-
ciety discovered ecology only when its economically sidewise discards of un-
profitable substances became so prodigious as to pollutingly frustrate
nature's regenerative mainstream intersupport. Society's surprise "discov-
ery" of ecology in the 1960s constituted its as-yet-realistically-unresponded-
to discovery of nature's main effects ergo, of precession. It is a safe guess
144 Critical Path
that not more than one human in 10 million is conceptually familiar with
and sensorially comprehending of the principle of "precession."
In 1927 I reasoned that if humans' experiences gave them insights into
what nature's main objectives might be, and if humans committed them-
selves, their lifetimes, and even their dependents and all their assets toward
direct, efficient, and expeditious realization of any of nature's comprehen-
sive evolutionary objectives, nature might realistically support such a main
precessional commitment and all the ramifications of the individual's devel-
opmental needs, provided that no one else was trying to do what the pre-
cessionally committed saw needed to be done. Precession cannot be
accomplished competitively. Precession cannot respond to angularly redun-
dant forces. It can, however, respond to several angularly nonredundant
forces at a given time.
Since nature was clearly intent on making humans successful in support
of the integrity of eternally regenerative Universe, it seemed clear that if I
tary ecological regenerative tasks ergo, I must so commit myself and must
depend upon nature providing the physical means of realization of my in-
axies within supergalaxies and all the stars, moons, comets, asteroids, star-
dust particles, unattached molecules, atoms, and the electrons within the
Self-Disciplines of Buckminster Fuller 145
was doing what nature wanted done, and if I was doing it in promising
ways, permitted by nature's principles, I would find my work being econom-
ically sustained and vice versa, in which latter negative case I must quick-
ly cease doing what I had been doing and seek logically alternative courses
until I found the new course that nature signified her approval of by pro-
viding for its physical support.
Wherefore, I concluded that I would be informed by nature if I proceeded
in the following manner:
(A) committed myself, my wife, and our infant daughter directly to the de-
sign, production, and demonstration of artifact accommodation of the
most evident but as-yet-unattended-to human-environment-advantag-
ing physical evolutionary tasks, and
(B) paid no attention to "earning a living" in humanity's established eco-
nomic system, yet
(C) found my family's and my own life's needs being unsolicitedly provid-
ed for by seemingly pure happenstance and always only "in the nick
of time," and
(D) being provided for "only coincidentally," yet found
(E) that this only "coincidentally," unbudgetable, yet realistic support per-
sisted, and did so
(F) only so long as I continued spontaneously to commit myself unreserv-
edly to the task of developing relevant artifacts, and if I
(G) never tried to persuade humanity to alter its customs and viewpoints
and never asked anyone to listen to me and spoke informatively to oth-
ers only when they asked me so to do, and if I
(1) that nature might economically sustain human activity that served
ficient ways that, without thinking about it, the undesirable ways would be
abandoned by society. (I liked the popular 1944 song, "Accentuate the Pos-
itive, Eliminate the Negative.")
All the foregoing was, then, the precessional course I deliberately adopted
in 1927. I had only the remaining days of my life to invest. It involved swift
lowing reasons:
Having no academically earned scientific degrees I could not qualify for
membership in any scientific societies and could therefore not publish my