Flush Pointing with CM(1:3) to Brick / CRS Masonry including cost & conveyanc

materials to site, Seignorage charges, sales & other taxes on all materials, opera
incidental, cost and conveyance of cement, wire mesh, water to work site, , lift ch
complete for finished items of work but excluding cost of steel & its fabrication ch
finished item of work
1
Unit = 10 sqm
A. MATERIALS:
Cement kg 14.4
sand (included 5% wastage) cum 0.03
B. LABOUR:
Mason 1st class day 0.5
Mazdoor (unskilled) day 0.74
area allowances on labour 25.00%
COST per 10 SQM

BASIC COST per 1 SQM


ng cost & conveyance of all
n all materials, operational &
r to work site, , lift charges etc.,
el & its fabrication charges, for

5.7 82.08
936.29 28.0887
0
385 192.5
295 218.3
410.8 102.7
623.6687

62.3