Level (msl)
EG Tie beam C from to
P46 L1 a 1.09 -0.16 -11.63 -12.63
P46 L1 b 1.09 -0.16 -12.63 -20.35
P46 L2 a 1.09 -0.16 -10.57 -16.90
P47 L1 a 1.12 -0.13 -11.96 -15.96
P48 L2 a 1.1 -0.15 -7.30 -13.30
P48 L2 b 1.1 -0.15 -13.30 -20.30
P48 L2 c 1.1 -0.15 -20.30 -28.30
P48 L2 d 1.1 -0.15 -20.30 -28.30
Cover
required shear link
P46 L1 a 100 12
P46 L1 b 100 12
P46 L2 a 100 12
P47 L1 a 100 12
P48 L2 a 100 12
P48 L2 b 100 12
P48 L2 c 100 12
P48 L2 d 100 12
EG Existing ground
actual
Pile cover to Reinforcement
diameter main RF Nos Dia *
P46 L1 a 1652 38 36 20
P46 L1 b 1596 10 36 20
P46 L2 a 1596 10 36 20
P47 L1 a 1693 59 36 20
P48 L2 a 1652 38 36 20
P48 L2 b 1514 -31 36 20
P48 L2 c 1529 -24 36 20
P48 L2 d 1529 -24 36 16
For type 01 Reinforcement are withing the good concrete and It is possible to
develop P-M curve (Refer Annex A1) based on actual reinforcement configeration
and then follow the design capacity checking procedure given in BS 5400 Part 4
P48 L2 b
P48 L2 c
P48 L2 d
For type 01 Reinforcement are outside of the good concrete it is and It is possible
to develop P-M (Refer Annex A2) curve based on actual reinforcement
configeration and then follow the design capacity checking procedure given in BS
5400 Part 4
Sample calculation for Pile P46 L1 a is given in C-1 of the report and for other
Piles result summary is given in Annex A3