Vous êtes sur la page 1sur 65

APU BASICOS

APU'S CIC SAMPUES


CONCRETO DE 3000 PSI (1:2:3)
UNIDAD.M3
MATERIALES UNIDAD CANT. VR. UNIT.
CEMENTO GRIS. KG 350.00 520.00
ARENA DE ARROYO. M3 0.56 66,000.00
TRITURADO. M3 0.84 108,000.00
AGUA. LTS 210.00 12.00
SUB TOTAL ................
DESPERDICIO 5%
TOTAL MATERIALES
EQUIPOS Vr DA RENDIM. VR. UNIT.
MEZCLADORA MECANICA DIA 10.00 60,000.00

TOTAL EQUIPOS
MANO DE OBRA RENDIM. VR. DA VR. UNITA 87% PREST. SOC.

TOTAL MANO DE OBRA


TOTAL ANALISIS UNIT.

APU'S CIC SAMPUES


MORTERO EN OBRA (1:4)
UNIDAD.M3
MATERIALES UNIDAD CANT. VR. UNIT.
CEMENTO GRIS. KG 362.50 520.00
ARENA DE ARROYO. M3 1.16 66,000.00
AGUA. LTS 243.00 12.00
SUB TOTAL ................
DESPERDICIO 5%
TOTAL MATERIALES
EQUIPOS Vr DA RENDIM. VR. UNIT.
MEZCLADORA MECANICA DIA 8.50 60,000.00

TOTAL EQUIPOS
MANO DE OBRA RENDIM. VR. DA VR. UNITA 87% PREST. SOC.
1 Maestro
1 Oficial
1Ayudante
TOTAL MANO DE OBRA
TOTAL ANALISIS UNIT.
Vr. TOTAL
182,000.00
36,960.00
90,180.00
2,520.00
311,660.00
15,583.00
327,243.00
VR. TOTAL
6,000.00

6,000.00
VR. TOTAL

-
333,243.00

Vr. TOTAL
188,500.00
76,560.00
2,916.00
267,976.00
13,398.80
281,374.80
VR. TOTAL
7,058.82

7,058.82
VR. TOTAL

-
288,433.62
PRESUPUESTO DE OBRA

MUNICIPIO DE SINCELEJO
SECRETARIA DE DESARROLLO Y OBRAS PUBLICAS
CONSTRUCCION DE CENTRO DE INTEGRACION CIUDADANA - CIC MUNICIPIO DE SINCELEJO - SUCRE
LISTADO DE ITEMS Y CANTIDADES

ITEM DESCRIPCION UND. M. CANT VR UNITARIO VR PARCIAL


1 PRELIMINARES

1.1 LOCALIZACION Y REPLANTEO. Localizacin horizontal M2 1258.00 2,287.00 2,877,046.00


y vertical del proyecto
SUBTOTAL ACTIVIDADES PRELIMINARES -
2 EXCAVACIONES CIMENTACION -
2.1 EXCAVACION MANUAL MATERIAL COMUN EN ZAPATA M3 89.00 20,423.00 1,817,647.00

EXCAVACION MANUAL MATERIAL COMUN


2.2 M3 69.00 20,423.00 1,409,187.00
CIMENTACION

2.3 EXCAVACION MANUAL MATERIAL COMUN PARA M3 150.00 20,423.00 3,063,450.00


OFICINA Y BATERIA SANITARIA
2.4 M3 355.00 15,577.00 5,529,835.00
RETIRO DE MATERIAL PROCEDENTE DE EXCAVACION
RELLENO MATERIAL SELECCIONADO, INCLUYE
2.5 M3 264.00 50,615.00 13,362,360.00
COMPACTACION
EXCAVACIONES PARA DESNIVEL DE OFICINAS Y
2.6 M3 327.00 20,423.00 6,678,321.00
BATERIAS SANITARIAS
SUBTOTAL ESTRUCTURA EN CONCRETO -
3 ESTRUCTURA EN CONCRETO -
3.1 CIMENTACION -
3.1.1 SOLADO EN CONCRETO M2 47.00 38,133.00 1,792,251.00
ZAPATA EN CONCRETO 3000 PSI GRADAS Y
3.1.2 M3 10.00 502,937.00 5,029,370.00
CUBIERTA
3.1.3 PEDESTAL EN CONCRETO 3000 PSI M3 6.42 505,567.00 3,245,740.14
3.1.4 VIGA DE CIMENTACION EN CONCRETO 3000PSI M3 38.00 511,004.00 19,418,152.00

PILOTES DE CIMENTACION D:25cm EN CONCRETO DE


3.1.5 3000 PSI INCLUYE EXCAVACION Y ACERO DE ML 216.00 193,167.00 41,724,072.00
REFUERZO
CABEZAL EN CONCRETO 3000 PSI DE TARIMA Y
3.1.6 M3 6.89 458,316.00 3,157,797.24
CUBIERTA
3.2 ESTRUCTURA -
3.2.1 CONCRETO DE 3000 PSI COLUMNAS M3 6.20 521,537.00 3,233,529.40
3.2.2 VIGA EN CONCRETO 3000 PSI GRADAS M3 12.20 568,063.00 6,930,368.60
3.2.3 VIGUETA EN CONCRETO 3000 PSI GRADAS M3 11.70 555,109.00 6,494,775.30

3.2.4 LOSETA EN CONCRETO 3000 PSI GRADAS M2 80.50 111,786.00 8,998,773.00

3.2.5 LOSETA EN CONCRETO 3000 PSI TARIMA E=5cm M2 69.70 78,066.00 5,441,200.20
3.2.6 VIGA EN CONCRETO 3000 PSI TARIMA M3 4.96 612,423.00 3,037,618.08
3.2.7 VIGUETA EN CONCRETO 3000 PSI TARIMA M3 1.98 655,893.00 1,298,668.14

3.2.8 COLUMNA DE CONFINAMIENTO 3000 PSI EN TARIMA ML 122.00 44,735.00 5,457,670.00


SUBTOTAL ESTRUCTURA EN CONCRETO -
4 ACERO DE 60000 PSI -
4.1 ACERO DE 60000 PSI KG 14318.00 3,947.00 56,513,146.00
4.2 MALLA ELECTROSOLDADA KG 3170.89 3,747.00 11,881,324.83
SUBTOTAL ACERO DE REFUERZO -
5 MAMPOSTERIA Y PAETES -
5.1 MAMPOSTERIA EN BLOQUE -
5.1.1 LEVANTE BLOQUE 0.15 2 HILADAS. ML 125.00 19,514.00 2,439,250.00
5.1.2 LEVANTE EN BLOQUE 015 GRADERIA M2 171.00 36,267.00 6,201,657.00
5.1.3 M2 124.00 36,267.00 4,497,108.00
LEVANTE EN BLOQUE CEMENTO 015 TARIMA
5.1.4 M2 197.00 36,267.00 7,144,599.00
LEVANTE EN BLOQUE 0.15 CERRAMIENTO
PRESUPUESTO DE OBRA

5.2 PAETE EN MORTERO -


5.2.1 PAETE EN MORTERO 1:4 M2 297.00 15,732.00 4,672,404.00
SUBTOTAL MAMPOSTERIA Y PAETES -
6 PISOS Y ENCHAPES -
6.1 M2 37,494.00 25,120,980.00
PLANTILLA CONCRETO 3.000 PSI E=0.07 M. 670.00
6.2 PLACA EN CONCRETO PARA CANCHA M2 532.00 47,691.00 25,371,612.00
SUMINISTRO E INSTALACION DE PISO EN CERAMICA
6.3 M2 57,009.00 2,793,441.00
50X50 49.00
6.4 ML 13,903.00 1,014,919.00
SUMINISTRO E INSTALACION DE ZOCALO PISO 73.00
6.5 M2 44,697.00 2,190,153.00
SUMINISTRO E INSTALCION DE PISO DE BAOS 49.00
6.6 M2 44,697.00 3,799,245.00
SUMINISTRO E INSTALACION DE ENCHAPE DE MURO 85.00

6.7 LINEA DE DEMARCACION CON PINTURA DE TRAFICO M2 4,051.00 992,495.00


ACRILICA ANTIDESLIZANTE COLOR AMARRILLO 245.00
SUBTOTAL PISOS Y ENCHAPES -
7 INSTALACIONES SANITARIA E HIDRAULICAS -
7.1 EQUIPOS SANITARIOS -
7.1.1 UND 6.00 274,655.00 1,647,930.00
Suministro e instalacion de sanitario tipo tanque
7.1.2 UND 2.00 379,498.00 758,996.00
Suministro e instalacion de sanitario para discapacitado
7.1.3 UND 9.00 197,596.00 1,778,364.00
Suministro e instalacion de lavamanos empotrado
7.1.4 Suministro e instalacion de orinal UND 3.00 232,954.00 698,862.00
7.1.5 UND 1.00 279,801.00 279,801.00
Suministro e instalacion de tanque elevado de 1000 litros
7.2 -
CONEXIONES HIDRAULICAS Y SANITARIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC 2"
7.2.1 ML 30.00 25,425.00 762,750.00
SANITARIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC 4"
7.2.2 ML 90.00 33,139.00 2,982,510.00
SANITARIAS
7.2.3 PUNTOS SANITARIOS 2`` UND 12.00 29,086.00 349,032.00
PRESUPUESTO DE OBRA

7.2.4 PUNTOS SANITARIOS 4`` UND 8.00 78,747.00 629,976.00


7.2.5 SIFON SANITARIO PVC 2`` UND 12.00 20,962.00 251,544.00
7.2.6 ACCESORIOS SANITARIOS UND 10.00 20,962.00 209,620.00
7.2.7 PUNTO HIDRAULICO DE 1/2`` UND 24.00 27,135.00 651,240.00
SUMINISTRO E INSTALACION DE TUBERIA PVC 1/2"
7.2.8 ML 68.00 14,401.00 979,268.00
RDE 21
SUMINISTRO E INSTALACION DE TUBERIA P.V.C. 3/4``
7.2.9 ML 58.00 21,541.00 1,249,378.00
RDE 21
7.2.10 CAJA DE INSPECCION 0,8X0,8m UND 2.00 210,098.00 420,196.00
7.2.11 CAJA DE INSPECCION 0,6X0,6m UND 1.00 193,730.00 193,730.00
7.2.12 UND 2.00 50,016.00 100,032.00
SUMINISTRO E INSTALACION DE VALVULA 3/4"
SUMINISTRO E INSTALACION DE LLAVE TERMINAL
7.2.13 UND 2.00 11,405.00 22,810.00
1/2"
SUMINISTRO E INSTALACION DE CANAL PVC AGUAS
7.2.14 ML 68.00 33,487.00 2,277,116.00
LLUVIAS
SUMINISTRO E INSTALACION DE TUBERIA EN PVC
7.2.15 UND 190.00 19,510.00 3,706,900.00
AGUAS LLUVIAS 4"
7.2.16 M2 23.00 357,332.00 8,218,636.00
SUMINISTRO E INSTALACION DE DIVISION METALICA
7.12.17 ML 24.00 21,467.00 515,208.00
Suministro e Instalacion de Tuberia PVC ventilacion 2 "
7.2.18 UND 3.00 184,510.00 553,530.00
CAJA INSPECCION AGUAS LLUVIAS 0.40X0.40
7.2.19 REJILLAS PARA DESAGUES UND 14.00 90,648.00 1,269,072.00
SUBTOTAL INSTALACIONES SANITARIAS E HIDRAULICAS -
PRESUPUESTO DE OBRA

8 INSTALACIONES ELECTRICAS -
8.1 Acometida en 3N4 +1N8 Ml 40.00 82,347.00 3,293,880.00
8.2 Tuberia PVC de 2" Ml 50.00 34,798.00 1,739,900.00

Tablero Bifasico de 24 Circuitos con espacio para


totalizador,con puerta y chapa. Incluye 16 breaker
8.3 Un 1.00 627,561.00 627,561.00
monoplares enchufable de 20 A,5 breaker bipolar
enchufable de 20 A y breaker industrial de 60 A.

8.4 Salida iluminacin en Tuberia PVC de 1/2".Incluye Un 32.00 48,338.00 1,546,816.00


alambre 12,plafon de loza y conectores de resorte.

8.5 Salida suiche de cualquier tipo (sencillo,doble,conmutable) Un 18.00 81,436.00 1,465,848.00


en Tuberia PVC de 1/2".Incluye alambre 12,aparato y
conectores de resorte.

8.6 Salida tomas en Tuberia PVC de 1/2".Incluye alambre Un 10.00 61,460.00 614,600.00
12,tomacorriente y conectores de resorte.

8.7 Salida iluminacion en graderias puntos en Tuberia EMT Un 8.00 55,663.00 445,304.00
de 1/2".Incluye alambre 12,caja 12*12*5,prensaestopa y
conectores de resorte.

8.8 Salida iluminacion reflectores en canchas y tarima puntos Un 14.00 61,668.00 863,352.00
en Tuberia EMT de 1/2".Incluye alambre 12,caja
12*12*5,prensaestopa y conectores de resorte.
8.9 Alimentacion de circuitos en alambre 3N12. Ml 420.00 29,137.00 12,237,540.00
PRESUPUESTO DE OBRA

8.10 Tuberia PVC de 1 1/2" para alimentadores. Ml 80.00 22,653.00 1,812,240.00


8.11 Tuberia PVC de 3/4"para alimentadores. Ml 40.00 17,009.00 680,360.00
8.12 Tuberia Emt de 1/2" para alimentadores. Ml 130.00 15,163.00 1,971,190.00
8.13 Herraje para caja de 30*30 cm Un 3.00 16,892.00 50,676.00
Reflector Metal Halide de 400 W Roy Alpha o
8.14 semejante.Incluye cable encauchetado 3*12,elementos de Un 14.00 272,455.00 3,814,370.00
fijacin y anclaje.

8.15 Lampara Hermetica de 2*54 W tipo Roy Alpha o similar. Un 8.00 197,718.00 1,581,744.00
Incluye Cable encauchetado 3*14,elementos de fijacin y
anclajes.

sistema de apantallamiento, incluye suministro e


instalacion de: cable de cobre, cable de aluminio,
8.16 alombrn de aluminio, conector Dehnsnap Ref LH DS Un 1.00 18,197,844.00 18,197,844.00
8H36 IGM6 GR (204 003), Punta captadora Electropol de
60cms con base, grapas de aluminio MV Clamps y cajas
de paso metalica.

8.17 Lampara tipo Bala incandecente o similar. Incluye Cable Un 32.00 65,267.00 2,088,544.00
encauchetado,elementos de fijacin y anclajes.
8.0a VOZ Y DATOS -
8.1a Acometida en cable UTP CAT6 x 3 Ml 75.00 31,342.00 2,350,650.00
8.2a Ml 25.00 33,050.00 826,250.00
suministro en instalacion de cable telefonico de 2 Pares
8.3a Tuberia PVC de 2" para cableado Ml 20.00 34,799.00 695,980.00
8.4a Suministro e instalacion de rack de pared Un 1.00 254,478.00 254,478.00
Suministro e instalacion de cajillas de inspeccion de baja
8.5a Un 1.00 210,099.00 210,099.00
tension 0.80x0.80
suministro e instalacion de Caja de 40 x 60 mm salida de
8.6a Un 3.00 11,283.00 33,849.00
datos y telefono
SUBTOTAL INSTALACIONES ELECTRICA -
-
PRESUPUESTO DE OBRA

9 CUBIERTA -

Suministro, fabricacion, Montaje y pintura DE Estructura


metalica Para La Cubierta , Cercha principal, Correa, y
porticos En Anguloss Estructurales. ESTRUCTURA A LA
9.1 KG 16600.00 8,157.00 135,406,200.00
VISTA, . Incluye Pernos, Riostras, Contravientos, Laminas,
Soldadura E70:18 Y Acabado con anticorrosivo + Esmalte
para estructura a la vista, SEGN DISEO.

9.2 Suministro e instalacion de cubierta teja arquitectonical, M2 1300.00 44,813.00 58,256,900.00


incluye tornillos autoperforante
9.3 caballete de lamina trapezoidal ML 34.00 35,070.00 1,192,380.00
SUBTOTAL CUBIERTA -
-
10 PINTURAS Y ACABADOS -
10.1 pintura en vinilo tipo 1 M2 95.00 6,519.00 619,305.00

10.2 suministro e instalacion de cielo raso en drywall, incluye M2 58.00 40,530.00 2,350,740.00
acabados, perfilerias y tornillos
SUBTOTAL PINTURAS Y ACABADOS -
-
11 CERRAMIENTO -
suministro e instalacion de malla eslabonada en alambre
11.1 galvanizado sin M2 250.00 54,983.00 13,745,750.00
recubrimiento de 21/4x21/4.
11.2 Ml 130.00 38,880.00 5,054,400.00
Machon en concreto de 15cm X20cm , 3000psi
11.3 Ml 310.00 40,377.00 12,516,870.00
viga de corona de confinamiento de 15cmX20cm, 3000psi
SUBTOTAL MURO DE CERRAMIENTO -
PRESUPUESTO DE OBRA

-
12 CARPINTERIA METALICA Y MADERA -

suministro e instalacion de ventana V1 para baterias


12.1 sanitarias y vestier, con marco en perfil de aluminio M2 6.00 144,782.00 868,692.00
sistema 50-20 color natural deslizable con montante y
cerrojo de punzon con vidrio de 4mm, dimensiones
50cmX130cm

suministro e instalacion de puerta P1,P2, P3, P4 , cuerpo


12.2 con marco en cold rolled cal.20. manija en acero UND 4.00 616,183.00 2,464,732.00
inoxidable ref. rimini tipo schlage o similar. cerrojo de
seguridad cilindro/volteador cromado mate,llave-mariposa
con pestillo que permite aplicacin en puertas derechas o
izquierdas ref. b-350 tipo schlage o similar

suministro e instalacion de puerta P6, P7 y P8 , cuerpo


12.3 con marco en cold rolled cal.20. manija en acero UND 3.00 576,928.00 1,730,784.00
inoxidable ref. rimini tipo schlage o similar. cerrojo de
seguridad cilindro/volteador cromado mate,llave-mariposa
con pestillo que permite aplicacin en puertas derechas o
izquierdas ref. b-350 tipo schlage o similar

12.4 suministro e instalacion de porteria en tuberia y tablero de UND 2.00 1,782,863.00 3,565,726.00
baloncesto en
acrilico o vidrio de 1.80m de ancho por 1.05 de largo.
Barandas en tuberia 2" Galvanizada con un metro de
12.5 ML 50.00 121,817.00 6,090,850.00
altura para graderias y tarimas.

12.6 suministro e instalacion de porton metalico en tuberia UND 3.00 1,657,941.09 4,973,823.26
3"x1.5" cal 18. y marco
3"x1.5" cal. 16 acabado en anticorrosivo+esmalte.
12.7 UND 1.00 902,941.70 902,941.70
Logo cic del ministerio para fachada en lamina metalica
SUBTOTAL CARPINTERIA METALICA Y MADERA

SUB TOTAL CAPITULO I 642,279,834.89


PRESUPUESTO DE LA ZONA DE ACCESO
ITEM DESCRIPCIN UND CANTIDAD V. UNITARIO V. TOTAL
1 PRELIMINARES
1.1 DEMOLICION Y RETIRO ESTRUCTURA EXISTENTES
Demolicion Bordillo ml 42.00 $ 6,190.00 $ 259,980.00
Demolicion losa via ml 0.30 $ 7,540.00 $ 2,262.00
Retiro material sobrante de demolicion m2 21.00 $ 15,577.00 $ 327,117.00
TOTAL PRELIMINARES $ -
1.2 OBRAS DE TRAZADO, REPLANTEO Y EXCAVACION 0
Descapote a maquina manual m2 124.10 $ 3,376.00 $ 418,961.60
Cerramiento en malla verde H=2,00m ML 196.00 $ 21,902.00 $ 4,292,792.00
Trazado y replanteo manual m3 427.00 $ 2,287.00 $ 976,549.00
Excavacin manual material comun m3 73.30 $ 20,423.00 $ 1,497,005.90
Relleno en material seleccionado compactado a mquina m3 42.00 $ 50,615.00 $ 2,125,830.00
Traslado y retiro de material de excavacion m3 118.00 $ 15,577.00 $ 1,838,086.00
TOTAL DE TRAZADO, REPLANTEO, EXCA. $ -
2 CIMIENTOS $ -
Concreto pobre 1500 PSI para solado m2 0.60 $ 38,133.00 $ 22,879.80
Concreto 3000 PSI para zapatas m3 4.00 $ 502,937.00 $ 2,011,748.00
Concreto 3000psi para pedestal m3 1.40 $ 505,567.00 $ 707,793.80
Concreto 3000 PSI para vigas de cimientos m3 1.62 $ 511,004.00 $ 827,826.48
Acero de refuerzo armado y figurado para estructura
Kg 2294.00 $ 3,947.00 $ 9,054,418.00
40.000 y 60.000 psi
TOTAL CIMIENTO $ -
3.1 ESTRUCTURA $ -
PRESUPUESTO DE OBRA

Concreto 3000 PSI para columnas m3 4.48 $ 521,537.00 $ 2,336,485.76


Concreto 3000 PSI para vigas dintel ml 20.20 $ 38,059.00 $ 768,791.80
Concreto 3000 PSI para Losa de piso y anden m2 96.90 $ 37,494.00 $ 3,633,168.60
concreto para losa maciza e=15-30cm m3 16.26 $ 696,193.00 $ 11,320,098.18
TOAL ESTRUCTURA $ -
4.1 MAMPOSTERIA Y PAETES $ -
Levante de muros mamposteria 0,9 m2 35.10 $ 34,792.00 $ 1,221,199.20
Paete interior en mortero 1:4 m2 126.58 $ 15,732.00 $ 1,991,356.56
Paete interior en mortero 1:4 lineal ml 52.40 $ 13,927.00 $ 729,774.80
Paete exterior en mortero 1:4 impermeabilizado bajo
m2 20.20 $ 22,267.00 $ 449,793.40
placa
TOTAL MAMPOSTERIA Y PAETE $ -
10 CERRAMIENTO $ -
Cerramineto perimetral en malla eslabonada y tubo
M2 83.00 $ 54,983.00 $ 4,563,589.00
galvanizado
TOTAL CERRAMIENTO $ -
11.3 AGUAS LLUVIA 0
TUBERIA 4" ml 25.00 $ 19,510.00 $ 487,750.00
TOTAL AGUAS LLUVIAS $ -
13 ASEO GENERAL $ -
Aseo general Gl 1.00 $ 1,368,069.00 $ 1,368,069.00
TOTAL ASEO
SUB TOTAL CAPITULO II $ 53,233,325.88

TOTAL COSTO DIRECTO (CAPITULO I + CAPITIULO II) $ 695,513,160.77


ADMINISTRACION 22% $ 153,012,895.37
IMPREVISTOS 1% $ 6,955,131.61
UTILIDAD 7% $ 48,685,921.25
TOTAL COSOTOS INDIRECTOS $ 208,653,948.23
TOTAL OBRA FISICA $ 904,167,109.00
MUNICIPIO DE SINCELEJO

COD DESCRIPCIN TIPO UNIDAD PRECIO


CAL NARE MAT bol $ 5,355.00
PUNTILLA 2" MAT GBL $ 2,520.00
LISTON 3 MTS 2"X3" MAT UN $ 6,500.00
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
Err:509 MAT Err:509 Err:509
BALASTRO MAT m3 $ 24,500.00
RANA EQU dd $ 68,000.00
MEZCLADORA MECANICA EQU DIA $ 50,000.00
VIBRADOR ELECTRICO EQU DIA $ 40,000.00
TRITURADO. MAT M3 $ 100,000.00
CEMENTO GRIS. MAT KG $ 500.00
ARENA DE ARROYO. MAT M3 $ 50,000.00
TABLA BONGA 3Mts MAT un $ 9,000.00
LISTON 2*4*3.5Mts MADERA TECHO MAT un $ 17,000.00
ICOPOR MAT M3 $ 85,000.00
ANTISOL ROJO 1.6kg MAT un $ 18,720.00
LISTON 1``X1``X3MT LARGO MAT un $ 2,246.40
LISTON 2*4*3.5Mts MADERA TECHO MAT ml $ 6,240.00
PUNTILLA 2`` CC MAT paq $ 2,246.40
TABLA 10cm*1``*2mts CARACOLI MAT un $ 16,224.00
VARAS DE MANGLE/TACOS MAT un $ 1,872.00
ACERO DE REFUERZO 60000 PSI MAT KG $ 3,100.00
MALLA ELECTROSOLDADA MAT KG $ 2,900.00
BLOQUE ARENA CEMENTO 4,5MPA 015 MAT UND $ 1,250.00
CERAMICA 50X50 MAT m $ 30,739.20
PEGACOR EXTERIORES 25 KG. MAT un $ 30,294.40
BOQUILLA CONCOLOR PORCELANATO 2 KG MAT un $ 11,544.00
ALICANTE PISO 33.8*33.8 AZUL H MAT m2 $ 27,955.20
PEGACOR INT BLANCO MAT kg $ 1,622.40
AGUA ACUEDUCTO MAT lt $ 12.48
CEMENTO BLANCO NARE 2KL MAT un $ 2,433.60
ENCHAPE ANTARES BLANCO 20.3X30.5 MAT m $ 20,590.40
OXIDO DE ZINC-LIBRA MAT lb $ 3,369.60
PEGACOR INT BLANCO MAT kg $ 1,622.40
SANITARIO DE FLUXOMETRO MAT UND $ 220,000.00
CEMENTO BLANCO MAT KL $ 18,000.00
LAVAMANOS MAT UND $ 146,500.00
ORINAL DE FLUXOMETRO MAT UND $ 160,000.00
TANQUE PLASTICO 1000 LITROS MAT UND $ 200,000.00
ACCESORIOS DE TANQUE MAT UND $ 31,200.00
FLOTADOR TANQUE ELEVADO MAT UND $ 21,300.00
SOLDADURA PVC 1/4 GAL. MAT M2 $ 72,270.00
LIMPIADOR PVC 1/4 GAL. MAT GBL $ 34,870.00
UNION SANITARIO 2`` MAT UN $ 1,980.00
TUBO SANITARIO 6m 2`` MAT UND $ 54,340.00
TUBO SANITARIO 6m 4`` MAT UN $ 85,600.00
UNION SANITARIO 4`` MAT UND $ 5,610.00
CODO SANITARIO 90 CXC 2`` MAT un $ 2,420.00
TEE REDUCIDA SANITARIA 4*2`` MAT un $ 14,520.00
TEE SANITARIO 2`` MAT un $ 4,950.00
TUBO SANITARIO 2`` ECONO MAT un $ 18,700.00
TUBO SANITARIO 6m 4`` MAT un $ 103,500.00
YEE SANITARIO 4`` MAT un $ 19,470.00
CODO SANITARIO 45 CXC 4`` MAT un $ 10,725.00
CODO SANITARIO 90 CXE 4`` MAT un $ 11,748.00
CINTA TEFLON MAT un $ 495.00
UNION PRESION 1/2`` MAT un $ 330.00
ADAPTADOR MACHO PRESION 1`` MAT un $ 880.00
BUJE SOLDADO PRESION 1*3/4`` MAT un $ 935.00
CODO GALVANIZADO 1/2`` MAT un $ 1,320.00
SOLDADURA PVC 1/4 GAL. MAT un $ 72,270.00
TAPON GALVANIZADO MACHO 1/2`` MAT un $ 902.00
TUBO ECONOMICA PRESION 1/2`` R13.5 MAT un $ 7,700.00
CODO PRESION 90 1`` MAT UND $ 1,320.00
TEE PRESION 1`` MAT UND $ 2,090.00
TUBO PRESION RDE 13.5 1`` MAT UND $ 30,250.00
UNION PRESION 1`` MAT UND $ 770.00
ALAMBRE NEGRO MAT KG $ 3,000.00
VARILLA 3/8 MAT UN $ 7,560.00
BLOQUE 009 MAMPOSTERIA MAT UND $ 1,100.00
ADAPTADOR MACHO PVC 3/4" MAT UND $ 1,858.00
RED WHITE ROSCADO 3/4" MAT UND $ 41,758.00
CINTA TEFLON 3/4" MAT UND $ 819.00
PORTERIA MULTIFUNCIONAL MAT UND $ 1,509,041.18
MALLA DE MICROFUTBOL MAT UND $ 124,500.00
MALLA DE BASKET MAT UND $ 22,000.00
SOLDADURA 7018 x 1/8`` MAT kg $ 7,480.00
PLATINA 1/8X1X6 M. MAT un $ 10,747.00
MASILLA PLAST TEC PANEL INTER. EXTER-28kg MAT cu $ 41,250.00
HOJA LIJA AGUA 9*11 # 240 MAT un $ 1,551.00
ANTICORROSIVO WASH-PRIMER MAT gal $ 134,530.00
TUBO GALVANIZADO 1.1/2`` MAT ml $ 24,530.00
MALLA ESLABONADA 2`` #10 MAT m2 $ 13,255.00
TUBO GALVANIZADO 3`` MAT un $ 295,600.00
PORTACANDADO VERA 2.``NEG MAT un $ 1,430.00
BISAGRA CERRAMIENTO/3``X2`` GALVANIZADA MAT un $ 22,390.50
CURVA MEDIA LUNA PASAMANO MAT un $ 8,712.00
FALLEVA MACIZA 5/8`` METALICA MAT un $ 11,132.00
ALUMINIO 3`` MAT un $ 3,850.00
VARILLA LISA DE 1/2" MAT UNIDAD $ 18,000.00
TUBO GALVANIZADO DE 2" MAT ML $ 22,000.00
SOLDADURA ELECTRICA 60 - 11 * 1/8" MAT KG $ 4,000.00
THINERS MAT GALON $ 12,000.00
WHATS PRIME. MAT GL $ 4,000.00
PINTURA ESMALTE ACABADO COLOR. MAT GALON $ 40,000.00
POSTE CERCA 10 X 10 CM 210 KG/CM2 un $ 25,600.00
TELA CERRAMIENTO OBRA (VERDE) ml $ 2,200.00
RELLENO MATERIAL DEL SITIO COMPACTADO RANA m3 $ 17,000.00
APU BASICOS
APU'S CIC
CONCRETO DE 3000 PSI (1:2:3)
UNIDAD.M3
MATERIALES UNIDAD CANT.
CEMENTO GRIS. KG 350.00
ARENA DE ARROYO. M3 0.56
TRITURADO. M3 0.84
AGUA. LTS 210.00
TRANSPORTE GL 1.00

EQUIPOS Vr DA RENDIM.
MEZCLADORA MECANICA DIA 10.00

MANO DE OBRA RENDIM. VR. DA VR. UNITA

APU'S CIC
MORTERO EN OBRA (1:4)
UNIDAD.M3
MATERIALES UNIDAD CANT.
CEMENTO GRIS. KG 362.50
ARENA DE ARROYO. M3 1.16
AGUA. LTS 243.00

EQUIPOS Vr DA RENDIM.
MEZCLADORA MECANICA DIA 8.50

MANO DE OBRA RENDIM. VR. DA VR. UNITA


1 Maestro
1 Oficial
1Ayudante
SICOS
CIC
000 PSI (1:2:3)
.M3
VR. UNIT. Vr. TOTAL
500.00 175,000.00
50,000.00 28,000.00
100,000.00 83,500.00
12.00 2,520.00
20,000.00 20,000.00
SUB TOTAL ................ 309,020.00
DESPERDICIO 5% 15,451.00
TOTAL MATERIALES 324,471.00
VR. UNIT. VR. TOTAL
50,000.00 5,000.00

TOTAL EQUIPOS 5,000.00


87% PREST. SOC. VR. TOTAL

TOTAL MANO DE OBRA -


TOTAL ANALISIS UNIT. 329,471.00

CIC
OBRA (1:4)
.M3
VR. UNIT. Vr. TOTAL
550.00 199,375.00
50,000.00 58,000.00
12.00 2,916.00
SUB TOTAL ................ 260,291.00
DESPERDICIO 5% 13,014.55
TOTAL MATERIALES 273,305.55
VR. UNIT. VR. TOTAL
60,000.00 7,058.82

TOTAL EQUIPOS 7,058.82


87% PREST. SOC. VR. TOTAL
TOTAL MANO DE OBRA -
TOTAL ANALISIS UNIT. 280,364.37
CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
ACTIVIDADES PRELIMINARES
LOCALIZACION Y REPLANTEO. Localizacin horizontal y vertical del proyecto
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL CANTIDAD DURACION
CAL NARE bol 0.02 5,355.00 107.10
PUNTILLA 2" GBL 0.05 2,520.00 126.00
LISTON 3 MTS 2"X3" UN 0.02 6,500.00 130.00
SUB TOTAL ................ 363.10
DESPERDICIO 5% 18.16
TOTALMATERIALES 381.26
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 383.00 383.00
EQUIPO DE TOPOGRAFIA HR 0.07 10,500.00 735.00
TOTAL EQUIPOS 1,118.00
MANO DE OBRA RENDIM. VR. DA VR DIA+PRES 87% PREST. SOC. VR. TOTAL
1 Maestro 300.00 45,962.00 85,948.94 39,986.94 286.50 1258.00 4.1933333333
1 Oficial 300.00 34,471.50 64,461.71 29,990.21 214.87
2 Ayudantes 300.00 45,962.00 85,948.94 39,986.94 286.50
TOTAL MANO DE OBRA 787.87
TOTAL ANALISIS UNIT. 2,287.00

APU'S CIC
EXCAVACIONES Y RELLENOS
EXCAVACION MANUAL MATERIAL COMUN EN ZAPATA
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. % 1.00 469.00 469.00
TOTAL EQUIPOS 469.00
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 1.00 19954.00 19,954.00

TOTAL MANO DE OBRA 19,954.00


TOTAL ANALISIS UNIT. 20,423.0

APU'S CIC
EXCAVACION MANUAL MATERIAL COMUN CIMENTACION
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 469.00 469.00
TOTAL EQUIPOS 469.00
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 1.00 19954.00 19,954.00 69.00 6.9

TOTAL MANO DE OBRA 19,954.00


TOTAL ANALISIS UNIT. 20,423.0

APU'S CIC
EXCAVACION MANUAL MATERIAL COMUN PARA OFICINA Y BATERIA SANITARIA
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 469.00 469.00
TOTAL EQUIPOS 469.00
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 1.00 19954.00 19,954.00

TOTAL MANO DE OBRA 19,954.00


TOTAL ANALISIS UNIT. 20,423.0

APU'S CIC
RETIRO DE MATERIAL PROCEDENTE DE EXCAVACION
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
VOLQUETA 6 M3 hr 0.06 50,400.00 3,024.00
HERRAMIENTAS MENORES. GL 1.00 2,526.00 2,526.00
TOTAL EQUIPOS 5,550.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 15.00 34,471.50 64,461.71 29,990.21 4,297.45 355.00
2 Ayudantes 15.00 45,962.00 85,948.94 39,986.94 5,729.93

TOTAL MANO DE OBRA 10,027.38


TOTAL ANALISIS UNIT. 15,577.00

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
RELLENO MATERIAL SELECCIONADO, INCLUYE COMPACTACION
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
AGUA ACUEDUCTO lt 30.00 12.48 374.40
BALASTRO m3 1.30 24,500.00 31,850.00

TOTALMATERIALES 32,224.40
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
RANA dd 0.05 68,000.00 3,400.00
TRANSPORTE MATERIALES M3/KM m3/km 6.50 1,040.00 6,760.00
HERRAMIENTA MENOR GL 1.00 2,011.60 2,011.60
TOTAL EQUIPOS 12,171.60
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 6.00 19954.00 37,313.98 17,359.98 6,219.00

TOTAL MANO DE OBRA 6,219.00


TOTAL ANALISIS UNIT. 50,615 50615 -

APU'S CIC
ESTRUCTURA EN CONCRETO
CIMENTACION
SOLADO EN CONCRETO
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.05 329,471.00 16,473.55
SUB TOTAL ................ 16,473.55
DESPERDICIO 5%
TOTALMATERIALES 16,473.55
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,948.13 1,948.13
TRANSPORTE GL 200.00 20,000.00 100.00
MEZCLADORA MECANICA DIA 10.00 50,000.00 5,000.00

TOTAL EQUIPOS 7,048.13


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 25.00 45,962.00 85,948.94 39,986.94 3,437.96
1 Oficial 25.00 34,471.50 64,461.71 29,990.21 2,578.47
5 Ayudantes 25.00 114,905.00 214,872.35 99,967.35 8,594.89
TOTAL MANO DE OBRA 14,611.32
TOTAL ANALISIS UNIT. 38,133.00 38133 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
ZAPATA EN CONCRETO 3000 PSI GRADAS Y CUBIERTA
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00

SUB TOTAL ................ 329,471.00


DESPERDICIO 5% 16,473.55
TOTALMATERIALES 345,944.55
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 3,502.45 3,502.45
TRANSPORTE GL 100.00 20,000.00 200.00
MEZCLADORA MECANICA DIA 5.00 50,000.00 10,000.00
VIBRADOR ELECTRICO DIA 5.00 40,000.00 8,000.00
TOTAL EQUIPOS 21,702.45
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.70 45,962.00 85,948.94 39,986.94 31,832.94
1 Oficial 2.70 34,471.50 64,461.71 29,990.21 23,874.71
5 Ayudantes 2.70 114,905.00 214,872.35 99,967.35 79,582.35
TOTAL MANO DE OBRA 135,290.00
TOTAL ANALISIS UNIT. 502,937.00

APU'S CIC
PEDESTAL EN CONCRETO 3000 PSI
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
SUB TOTAL ................ 329,471.00
DESPERDICIO 5%
TOTALMATERIALES 329,471.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,139.26 1,139.26
TRANSPORTE GL 100.00 20,000.00 200.00
FORMALETA M3 4.00 50,000.00 12,500.00
MEZCLADORA MECANICA DIA 3.00 60,000.00 20,000.00
VIBRADOR ELECTRICO DIA 3.00 40,000.00 13,333.33
TOTAL EQUIPOS 47,172.59
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.50 45,962.00 85,948.94 39,986.94 34,379.58
1 Oficial 2.50 34,471.50 64,461.71 29,990.21 25,784.68
4 Ayudantes 2.50 91,924.00 171,897.88 79,973.88 68,759.15
TOTAL MANO DE OBRA 128,923.41
TOTAL ANALISIS UNIT. 505,567.00 505567 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
VIGA DE CIMENTACION EN CONCRETO 3000PSI
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
SUB TOTAL ................ 329,471.00
DESPERDICIO 5%
TOTALMATERIALES 329,471.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,086.40 5,086.40
TRANSPORTE GL 1.00 6,000.00 6,000.00
FORMALETA M3 6.00 50,000.00 8,333.33
VIBRADOR ELECTRICO DIA 2.50 40,000.00 16,000.00
TOTAL EQUIPOS 35,419.73
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.50 45,962.00 85,948.94 39,986.94 34,379.58
1 Oficial 2.50 34,471.50 64,461.71 29,990.21 25,784.68
5 Ayudantes 2.50 114,905.00 214,872.35 99,967.35 85,948.94
TOTAL MANO DE OBRA 146,113.20
TOTAL ANALISIS UNIT. 511,004.00 511,004.00 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
ESTRUCTURA EN CONCRETO
CONCRETO DE 3000 PSI COLUMNAS
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
SUB TOTAL ................ 329,471.00
DESPERDICIO 5%
TOTALMATERIALES 329,471.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,742.60 2,742.60
TRANSPORTE GL 1.00 400.00 400.00
FORMALETA M3 2.50 50,000.00 20,000.00
MEZCLADORA MECANICA DIA 2.50 60,000.00 24,000.00
VIBRADOR ELECTRICO DIA 2.50 40,000.00 16,000.00
TOTAL EQUIPOS 63,142.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.50 45,962.00 85,948.94 39,986.94 34,379.58
1 Oficial 2.50 34,471.50 64,461.71 29,990.21 25,784.68
4 Ayudantes 2.50 91,924.00 171,897.88 79,973.88 68,759.15
TOTAL MANO DE OBRA 128,923.41
TOTAL ANALISIS UNIT. 521,537.00 521537 -

APU'S CIC
VIGA EN CONCRETO 3000 PSI GRADAS
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
TABLA BONGA 3Mts un 2.10 9,000.00 18,900.00
LISTON 2*4*3.5Mts MADERA TECHO un 2.15 17,000.00 36,550.00
SUB TOTAL ................ 384,921.00
DESPERDICIO 5%
TOTALMATERIALES 384,921.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,519.00 1,519.00
TRANSPORTE GL 1.00 200.00 200.00
FORMALETA M3 4.00 50,000.00 12,500.00
MEZCLADORA MECANICA DIA 2.50 60,000.00 24,000.00
VIBRADOR ELECTRICO DIA 2.50 40,000.00 16,000.00
TOTAL EQUIPOS 54,219.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.50 45,962.00 85,948.94 39,986.94 34,379.58
1 Oficial 2.50 34,471.50 64,461.71 29,990.21 25,784.68
4 Ayudantes 2.50 91,924.00 171,897.88 79,973.88 68,759.15
TOTAL MANO DE OBRA 128,923.41
TOTAL ANALISIS UNIT. 568,063.00 568063 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
VIGUETA EN CONCRETO 3000 PSI GRADAS
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
TABLA BONGA 3Mts un 2.10 9,000.00 18,900.00
LISTON 2*4*3.5Mts MADERA TECHO un 2.15 17,000.00 36,550.00
SUB TOTAL ................ 384,921.00
DESPERDICIO 5%
TOTALMATERIALES 384,921.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,305.00 1,305.00
TRANSPORTE GL 1.00 100.00 100.00
FORMALETA M3 5.00 50,000.00 10,000.00
MEZCLADORA MECANICA DIA 2.50 60,000.00 24,000.00
VIBRADOR ELECTRICO DIA 3.00 40,000.00 13,333.33
TOTAL EQUIPOS 48,738.33
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.30 45,962.00 85,948.94 39,986.94 37,369.10
1 Oficial 2.30 34,471.50 64,461.71 29,990.21 28,026.83
3 Ayudantes 2.30 68,943.00 128,923.41 59,980.41 56,053.66
TOTAL MANO DE OBRA 121,449.59
TOTAL ANALISIS UNIT. 555,109.00 555109 -

APU'S CIC
LOSETA EN CONCRETO 3000 PSI GRADAS
UNIDAD. M2

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.10 329,471.00 32,947.10
ICOPOR M3 0.20 85,000.00 17,000.00
SUB TOTAL ................ 49,947.10
DESPERDICIO 5%
TOTALMATERIALES 49,947.10
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
FORMALETA LOSA ENTRE PISO POR M2 GL 1.00 10,000.00 10,000.00
MEZCLADORA DIA 9.00 60,000.00 6,666.67
VIBRADOR PARA CONCRETO DIA 9.00 40,000.00 4,444.44
HERRAMIENTA MENOR GL 1.00 4,915.70 4,915.70
TOTAL EQUIPOS 26,026.81
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 9.00 45,962.00 85,948.94 39,986.94 9,549.88
1 Oficial 9.00 34,471.50 64,461.71 29,990.21 7,162.41
4 Ayudantes 9.00 91,924.00 171,897.88 79,973.88 19,099.76
TOTAL MANO DE OBRA 35,812.06
TOTAL ANALISIS UNIT. 111,786.00 111786 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
LOSETA EN CONCRETO 3000 PSI TARIMA E=5cm
UNIDAD. M2

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.05 329,471.00 16,473.55
ANTISOL ROJO 1.6kg un 0.021 18,720.00 393.12
SUB TOTAL ................ 16,866.67

TOTALMATERIALES 16,866.67
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
FORMALETA LOSA ENTRE PISO POR M2 gl 1.00 10,000.00 10,000.00
MEZCLADORA dd 9.00 60,000.00 6,666.67
VIBRADOR PARA CONCRETO dd 9.00 40,000.00 4,444.44
HERRAMIENTA MENOR gl 1.00 4,276.16 4,276.16
TOTAL EQUIPOS 25,387.27
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
1 Maestro 9.00 45,962.00 85,948.94 39,986.94 9,549.88
1 Oficial 9.00 34,471.50 64,461.71 29,990.21 7,162.41
4 Ayudantes 9.00 91,924.00 171,897.88 79,973.88 19,099.76
TOTAL MANO DE OBRA 35,812.06
TOTAL ANALISIS UNIT. 78,066.00 78066 -

APU'S CIC
VIGA EN CONCRETO 3000 PSI TARIMA
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
TABLA BONGA 3Mts un 2.10 9,000.00 18,900.00
LISTON 2*4*3.5Mts MADERA TECHO un 2.10 17,000.00 35,700.00
SUB TOTAL ................ 384,071.00
DESPERDICIO 5%
TOTALMATERIALES 384,071.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 4,397.70 4,397.70
TRANSPORTE GL 1.00 300.00 300.00
FORMALETA M3 4.00 50,000.00 12,500.00
MEZCLADORA MECANICA DIA 2.00 60,000.00 30,000.00
VIBRADOR ELECTRICO DIA 2.00 40,000.00 20,000.00
TOTAL EQUIPOS 67,197.70
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.00 45,962.00 85,948.94 39,986.94 42,974.47
1 Oficial 2.00 34,471.50 64,461.71 29,990.21 32,230.85
4 Ayudantes 2.00 91,924.00 171,897.88 79,973.88 85,948.94
TOTAL MANO DE OBRA 161,154.26
TOTAL ANALISIS UNIT. 612,423.00 612423 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
VIGUETA EN CONCRETO 3000 PSI TARIMA
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


FORMALETA LOSA ENTRE PISO POR M2 dd 1.10 450.00 495.00
LISTON 1``X1``X3MT LARGO un 3.00 2,246.40 6,739.20
LISTON 2*4*3.5Mts MADERA TECHO ml 6.00 6,240.00 37,440.00
PUNTILLA 2`` CC paq 4.00 2,246.40 8,985.60
TABLA 10cm*1``*2mts CARACOLI un 2.00 16,224.00 32,448.00
VARAS DE MANGLE/TACOS un 8.00 1,872.00 14,976.00
CONCRETO 3.000 PSI EN OBRA m3 1.24 329,471.00 408,544.04
TOTALMATERIALES 509,627.84

EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL


HERRAMIENTAS MENORES. gl 1.00 11,829.16 11,829.16
VIBRADOR PARA CONCRETO dd 0.30 60,000.00 18,000.00

TOTAL EQUIPOS 29,829.16


MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA. ALB. TIPO AA 2 AYUDANTES + 1
3.00 27,278.00 81,834.00
OFICIAL
CUADRILLA. ALB. TIPO AA 3 AYUDANTES + 1
1.00 34,602.00 34,602.00
OFICIAL

TOTAL MANO DE OBRA 116,436.00


TOTAL ANALISIS UNIT. 655,893.00 655893 -

APU'S CIC
COLUMNA DE CONFINAMIENTO 3000 PSI EN TARIMA
UNIDAD. ML

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.02 329,471.00 6,589.42
TABLA BONGA 3Mts un 0.60 9,000.00 5,400.00
LISTON 2*4*3.5Mts MADERA TECHO un 0.50 17,000.00 8,500.00
SUB TOTAL ................ 20,489.42
DESPERDICIO 5%
TOTALMATERIALES 20,489.42
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 430.15 430.15
TRANSPORTE GL 1.00 200.00 200.00
FORMALETA M3 20.00 50,000.00 2,500.00
MEZCLADORA MECANICA DIA 20.00 60,000.00 3,000.00
VIBRADOR ELECTRICO DIA 20.00 40,000.00 2,000.00
TOTAL EQUIPOS 8,130.15
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 20.00 45,962.00 85,948.94 39,986.94 4,297.45
1 Oficial 20.00 34,471.50 64,461.71 29,990.21 3,223.09
4 Ayudantes 20.00 91,924.00 171,897.88 79,973.88 8,594.89
TOTAL MANO DE OBRA 16,115.43
TOTAL ANALISIS UNIT. 44,735.00 44735 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
ACERO DE REFUERZO
ACERO DE 60000 PSI
UNIDAD. KG
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ACERO DE REFUERZO 60000 PSI KG 1.00 3,100.00 3,100.00
SUB TOTAL ................ 3,100.00
DESPERDICIO 5%
TOTALMATERIALES 3,100.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 20.60 20.60
TOTAL EQUIPOS 20.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 130 34,471.50 64,461.71 29,990.21 495.86
1 Ayudante 130 22,981.00 42,974.47 19,993.47 330.57
TOTAL MANO DE OBRA 826.43
TOTAL ANALISIS UNIT. 3,947.00 3947 -

APU'S CIC
MALLA ELECTROSOLDADA
UNIDAD. KG
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
MALLA ELECTROSOLDADA KG 1.00 2,900.00 2,900.00
SUB TOTAL ................ 2,900.00
DESPERDICIO 5%
TOTALMATERIALES 2,900.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 20.60 20.60
TOTAL EQUIPOS 20.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 130 34,471.50 64,461.71 29,990.21 495.86
1 Ayudante 130 22,981.00 42,974.47 19,993.47 330.57
TOTAL MANO DE OBRA 826.43
TOTAL ANALISIS UNIT. 3,747.00 3747 -

APU'S CIC
MAMPOSTERIA DE PARQUE
LEVANTE BLOQUE 0.15 2 HILADAS.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
MORTERO 1:4 EN OBRA M3 0.015 280,364.37 4,205.47
BLOQUE ARENA CEMENTO 4,5MPA 015 UND 5.00 1,250.00 6,250.00
SUB TOTAL ................ 10,455.47
DESPERDICIO 5% 522.77
TOTALMATERIALES 10,978.24
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 179.60 179.60
TOTAL EQUIPOS 179.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 18.00 34,471.50 64,461.71 29,990.21 3,581.21
2 Ayudantes 18.00 45,962.00 85,948.94 39,986.94 4,774.94
TOTAL MANO DE OBRA 8,356.15
TOTAL ANALISIS UNIT. 19,514.00 19514 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
LEVANTE EN BLOQUE 015 GRADERIA
UNIDAD. M2
DIRECCIN:CIUDAD DE SINCELEJO.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
BLOQUE ARENA CEMENTO 4,5MPA 015 UND 13.00 1,250.00 16,250.00
MORTERO 1:4 M3 0.033 280,364.37 9,252.02
SUB TOTAL ................ 25,502.02
DESPERDICIO 5% 1,275.10
TOTALMATERIALES 26,777.13
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 536.90 536.90
TOTAL EQUIPOS 536.90
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 12 34,471.50 64,461.71 29,990.21 5,371.81
1 Ayudante 12 22,981.00 42,974.47 19,993.47 3,581.21
TOTAL MANO DE OBRA 8,953.01
TOTAL ANALISIS UNIT. 36,267.00 36267 -

APU'S CIC
LEVANTE EN BLOQUE CEMENTO 015 TARIMA
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
BLOQUE ARENA CEMENTO 4,5MPA 015 UND 13.00 1,250.00 16,250.00
MORTERO 1:4 M3 0.033 280,364.37 9,252.02
SUB TOTAL ................ 25,502.02
DESPERDICIO 5% 1,275.10
TOTALMATERIALES 26,777.13
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 536.90 536.90
TOTAL EQUIPOS 536.90
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 12 34,471.50 64,461.71 29,990.21 5,371.81
1 Ayudante 12 22,981.00 42,974.47 19,993.47 3,581.21
TOTAL MANO DE OBRA 8,953.01
TOTAL ANALISIS UNIT. 36,267.00 36267 -

APU'S CIC
LEVANTE EN BLOQUE CEMENTO 015 CERRAMIENTO
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
BLOQUE ARENA CEMENTO 4,5MPA 015 UND 13.00 1,250.00 16,250.00
MORTERO 1:4 M3 0.033 280,364.37 9,252.02
SUB TOTAL ................ 25,502.02
DESPERDICIO 5% 1,275.10
TOTALMATERIALES 26,777.13
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 536.90 536.90
TOTAL EQUIPOS 536.90
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 12 34,471.50 64,461.71 29,990.21 5,371.81
1 Ayudante 12 22,981.00 42,974.47 19,993.47 3,581.21
TOTAL MANO DE OBRA 8,953.01
TOTAL ANALISIS UNIT. 36,267.00 36267 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
PAETE EN MORTERO
PAETE EN MORTERO 1:4
UNIDAD. M2
DIRECCIN:CIUDAD DE SINCELEJO.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
MORTERO 1:4 EN OBRA M3 0.021 280,364.37 5,887.65

SUB TOTAL ................ 5,887.65


DESPERDICIO 5% 294.38
TOTALMATERIALES 6,182.03
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 149.00 149.00
TOTAL EQUIPOS 149.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 16.00 34,471.50 64,461.71 29,990.21 4,028.86
2 Ayudantes 16.00 45,962.00 85,948.94 39,986.94 5,371.81
TOTAL MANO DE OBRA 9,400.67
TOTAL ANALISIS UNIT. 15,732.00 15732 -

APU'S CIC
PISOS Y ENCHAPES
PLANTILLA CONCRETO 3.000 PSI E=0.07 M.
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000 PSI M3 0.07 329,471.00 24,380.85

SUB TOTAL ................ 24,380.85

TOTALMATERIALES 24,380.85
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. gl 1.0 1,141.00 1,141.00

TOTAL EQUIPOS 1,141.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.6 19,954.0 11,972.40

TOTAL MANO DE OBRA 11,972.40


TOTAL ANALISIS UNIT. 37,494.00 37494 -

APU'S CIC
PLACA EN CONCRETO PARA CANCHA
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000 PSI M3 0.10 329,471.00 34,593.80

SUB TOTAL ................ 34,593.80

TOTALMATERIALES 34,593.80
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. gl 1.0 1,124.80 1,124.80

TOTAL EQUIPOS 1,124.80


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.6 19,954.0 11,972.40

TOTAL MANO DE OBRA 11,972.40


TOTAL ANALISIS UNIT. 47,691.00 47691 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
SUMINISTRO E INSTALACION DE PISO EN CERAMICA 50X50
UNIDAD. M2
DIRECCIN:CIUDAD DE MORROA.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CERAMICA 50X50 m 1.05 30,739.20 32,276.16
PEGACOR EXTERIORES 25 KG. un 0.252 30,294.40 7,633.79
BOQUILLA CONCOLOR PORCELANATO 2 KG un 0.175 11,544.00 2,020.20
SUB TOTAL ................ 41,930.15
TOTALMATERIALES 41,930.15
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. gl 1.0 1,111.00 1,111.00
TOTAL EQUIPOS 1,111.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.7 19954 13,967.80

TOTAL MANO DE OBRA 13,967.80


TOTAL ANALISIS UNIT. 57,009 57009 -

APU'S CIC
SUMINISTRO E INSTALACION DE ZOCALO PISO
UNIDAD. ML
DIRECCIN:CIUDAD DE MORROA.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALICANTE PISO 33.8*33.8 AZUL H m2 0.13 27,955.20 3,522.36
PEGACOR INT BLANCO kg 1.00 1,622.40 1,622.40
SUB TOTAL ................ 5,144.76

TOTALMATERIALES 5,144.76
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. gl 1.0 776.60 776.60
TOTAL EQUIPOS 776.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.4 19954 7,981.60

TOTAL MANO DE OBRA 7,981.60


TOTAL ANALISIS UNIT. 13,903.00 13903 -

APU'S CIC
SUMINISTRO E INSTALCION DE PISO DE BAOS
UNIDAD. M2
DIRECCIN:CIUDAD DE MORROA.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
AGUA ACUEDUCTO lt 10.50 12.48 131.04
CEMENTO BLANCO NARE 2KL un 0.21 2,433.60 511.06
ENCHAPE ANTARES BLANCO 20.3X30.5 m 1.00 20,590.40 20,590.40
OXIDO DE ZINC-LIBRA lb 0.04 3,369.60 141.22
PEGACOR INT BLANCO kg 6.30 1,622.40 10,221.12
SUB TOTAL ................ 31,594.84
TOTALMATERIALES 31,594.84
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. gl 1.0 1,129.76 1,129.76
TOTAL EQUIPOS 1,129.76
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.6 19,954.00 11,972.40

TOTAL MANO DE OBRA 11,972.40


TOTAL ANALISIS UNIT. 44,697.00 44697 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
SUMINISTRO E INSTALACION DE ENCHAPE DE MURO
UNIDAD. M2
DIRECCIN:CIUDAD DE MORROA.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
AGUA ACUEDUCTO lt 10.50 12.48 131.04
CEMENTO BLANCO NARE 2KL un 0.21 2,433.60 511.06
ENCHAPE ANTARES BLANCO 20.3X30.5 m 1.00 20,590.40 20,590.40
OXIDO DE ZINC-LIBRA lb 0.04 3,369.60 141.22
PEGACOR INT BLANCO kg 6.30 1,622.40 10,221.12
SUB TOTAL ................ 31,594.84

TOTALMATERIALES 31,594.84
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. gl 1.0 1,129.76 1,129.76
TOTAL EQUIPOS 1,129.76
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.6 19,954.00 11,972.40

TOTAL MANO DE OBRA 11,972.40


TOTAL ANALISIS UNIT. 44,697.00 44697 -

APU'S CIC
INSTALACIONES SANITARIAS E HIDRAULICAS
EQUIPOS SANITARIOS
SUMINISTRO E INSTALACION DE SANITARIO
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SANITARIO DE FLUXOMETRO UND 1.000 220,000.00 220,000.00
CEMENTO BLANCO KL 0.011 18,000.00 189.00

SUB TOTAL ................ 220,189.00


DESPERDICIO 5% 11,009.45
TOTALMATERIALES 231,198.45
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,853.90 5,853.90
TOTAL EQUIPOS 5,853.90
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 4.00 34,471.50 64,461.71 29,990.21 16,115.43
2 Ayudantes 4.00 45,962.00 85,948.94 39,986.94 21,487.24
TOTAL MANO DE OBRA 37,602.66
TOTAL ANALISIS UNIT. 274,655.00 274655 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
SUMINISTRO E INSTALACION DE SANITARIO DISCAPACITADOS
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SANITARIO PARA DISCAPACITADO Y
UND 1.000 320,000.00 320,000.00
ELEMENTOS NECESARIOS
CEMENTO BLANCO KL 0.011 18,000.00 189.00

SUB TOTAL ................ 320,189.00


DESPERDICIO 5% 16,009.45
TOTALMATERIALES 336,198.45
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,696.90 5,696.90
TOTAL EQUIPOS 5,696.90
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 4.00 34,471.50 64,461.71 29,990.21 16,115.43
2 Ayudantes 4.00 45,962.00 85,948.94 39,986.94 21,487.24
TOTAL MANO DE OBRA 37,602.66
TOTAL ANALISIS UNIT. 379,498.00 379498 -

APU'S CIC
SUMINISTRO E INSTALACION DE LAVAMANOS
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
LAVAMANOS UND 1.000 146,500.00 146,500.00
CEMENTO BLANCO KL 0.011 18,000.00 189.00

SUB TOTAL ................ 146,689.00


DESPERDICIO 5% 7,334.45
TOTALMATERIALES 154,023.45
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,969.89 5,969.89
TOTAL EQUIPOS 5,969.89
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 4.00 34,471.50 64,461.71 29,990.21 16,115.43
2 Ayudantes 4.00 45,962.00 85,948.94 39,986.94 21,487.24
TOTAL MANO DE OBRA 37,602.66
TOTAL ANALISIS UNIT. 197,596.00 197596 -

APU'S CIC
SUMINISTRO E INSTALACION ORINAL
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ORINAL DE FLUXOMETRO UND 1.000 160,000.00 160,000.00
CEMENTO BLANCO KL 0.500 18,000.00 9,000.00

SUB TOTAL ................ 169,000.00


DESPERDICIO 5% 8,450.00
TOTALMATERIALES 177,450.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,367.10 5,367.10
TOTAL EQUIPOS 5,367.10
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 3.00 34,471.50 64,461.71 29,990.21 21,487.24
2 Ayudantes 3.00 45,962.00 85,948.94 39,986.94 28,649.65
TOTAL MANO DE OBRA 50,136.88
TOTAL ANALISIS UNIT. 232,954.00 232954 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Suministro e instalacion de tanque elevado de 1000 litros
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
TANQUE PLASTICO 1000 LITROS UND 1.000 200,000.00 200,000.00
ACCESORIOS DE TANQUE UND 1.000 31,200.00 31,200.00
FLOTADOR TANQUE ELEVADO UND 1.000 21,300.00 21,300.00
SUB TOTAL ................ 252,500.00
DESPERDICIO 5%
TOTALMATERIALES 252,500.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,232.56 2,232.56
TOTAL EQUIPOS 2,232.56
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 6.00 34,471.50 64,461.71 29,990.21 10,743.62
2 Ayudantes 6.00 45,962.00 85,948.94 39,986.94 14,324.82
TOTAL MANO DE OBRA 25,068.44
TOTAL ANALISIS UNIT. 279,801.00 279801 -

APU'S CIC
CONEXIONES HIDRAULICAS Y SANITARIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC 2" SANITARIAS
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA PVC 1/4 GAL. M2 0.011 72,270.00 758.84
LIMPIADOR PVC 1/4 GAL. GBL 0.011 34,870.00 366.14
UNION SANITARIO 2`` UN 0.210 1,980.00 415.80
TUBO SANITARIO 6m 2`` UND 0.175 54,340.00 9,509.50
SUB TOTAL ................ 11,050.27
DESPERDICIO 5% 552.51
TOTALMATERIALES 11,602.78
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,288.00 1,288.00
TOTAL EQUIPOS 1,288.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 12.00 34,471.50 64,461.71 29,990.21 5,371.81
2 Ayudantes 12.00 45,962.00 85,948.94 39,986.94 7,162.41
TOTAL MANO DE OBRA 12,534.22
TOTAL ANALISIS UNIT. 25,425.00 25425 -

APU'S CIC
SUMINISTRO E INSTALACION DE TUBERIA PVC 4" SANITARIAS
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA PVC 1/4 GAL. M2 0.02 72,270.00 1,517.67
LIMPIADOR PVC 1/4 GAL. GBL 0.02 34,870.00 732.27
TUBO SANITARIO 6m 4`` UN 0.18 85,600.00 14,980.00
UNION SANITARIO 4`` UND 0.21 5,610.00 1,178.10
SUB TOTAL ................ 18,408.04
DESPERDICIO 5% 920.40
TOTALMATERIALES 19,328.44
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 136.80 136.80
TOTAL EQUIPOS 136.80
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 11.00 34,471.50 64,461.71 29,990.21 5,860.16
2 Ayudantes 11.00 45,962.00 85,948.94 39,986.94 7,813.54
TOTAL MANO DE OBRA 13,673.70
TOTAL ANALISIS UNIT. 33,139.00 33139 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
PUNTOS SANITARIOS 2``
UNIDAD. UND

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


SOLDADURA PVC 1/4 GAL. un 0.04 72,270.00 3,035.34
CODO SANITARIO 90 CXC 2`` un 1.00 2,420.00 2,420.00
TEE REDUCIDA SANITARIA 4*2`` un 0.36 14,520.00 5,183.64
TEE SANITARIO 2`` un 0.53 4,950.00 2,598.75
TUBO SANITARIO 2`` ECONO un 0.25 18,700.00 4,675.00

SUB TOTAL ................ 17,912.73


DESPERDICIO 5%
TOTALMATERIALES 17,912.73
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 429.65 429.65

TOTAL EQUIPOS 429.65


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 14.00 34,471.50 64,461.71 29,990.21 4,604.41
2 Ayudantes 14.00 45,962.00 85,948.94 39,986.94 6,139.21
TOTAL MANO DE OBRA 10,743.62
TOTAL ANALISIS UNIT. 29,086.00 29086 -

APU'S CIC
PUNTOS SANITARIOS 4``
UNIDAD. UND

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


SOLDADURA PVC 1/4 GAL. un 0.08 72,270.00 6,070.68
TUBO SANITARIO 6m 4`` un 0.30 103,500.00 31,050.00
YEE SANITARIO 4`` un 0.53 19,470.00 10,221.75
CODO SANITARIO 45 CXC 4`` un 0.53 10,725.00 5,630.63
CODO SANITARIO 90 CXE 4`` un 0.50 11,748.00 5,874.00

SUB TOTAL ................ 58,847.06


DESPERDICIO 5% 2,942.35
TOTALMATERIALES 61,789.41
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 245.20 245.20

TOTAL EQUIPOS 245.20


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 9.00 34,471.50 64,461.71 29,990.21 7,162.41
2 Ayudantes 9.00 45,962.00 85,948.94 39,986.94 9,549.88
TOTAL MANO DE OBRA 16,712.29
TOTAL ANALISIS UNIT. 78,747.00 78747 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
SIFON SANITARIO PVC 2``
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA PVC 1/4 GAL. un 0.004 72,270.00 289.08
LIMPIADOR PVC 1/4 GAL. un 0.004 34,870.00 139.48
HERRAMIENTA MENOR gl 0.300 1,100.00 330.00
SIFON SANITARIO 2`` un 1.000 6,490.00 6,490.00
SUB TOTAL ................ 7,248.56
DESPERDICIO 5% 324.50
TOTALMATERIALES 14,063.06
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 62.00 62.00

TOTAL EQUIPOS 62.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 22.00 34,471.50 64,461.71 29,990.21 2,930.08
2 Ayudantes 22.00 45,962.00 85,948.94 39,986.94 3,906.77
TOTAL MANO DE OBRA 6,836.85
TOTAL ANALISIS UNIT. 20,962.00 20962 -

APU'S CIC
ACCESORIOS SANITARIOS
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA PVC 1/4 GAL. un 0.004 72,270.00 289.08
LIMPIADOR PVC 1/4 GAL. un 0.004 34,870.00 139.48
HERRAMIENTA MENOR gl 0.300 1,100.00 330.00
SIFON SANITARIO 2`` un 1.000 6,490.00 6,490.00
SUB TOTAL ................ 7,248.56
DESPERDICIO 5% 324.50
TOTALMATERIALES 14,063.06
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 62.00 62.00

TOTAL EQUIPOS 62.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 22.00 34,471.50 64,461.71 29,990.21 2,930.08
2 Ayudantes 22.00 45,962.00 85,948.94 39,986.94 3,906.77
TOTAL MANO DE OBRA 6,836.85
TOTAL ANALISIS UNIT. 20,962.00 20962 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
PUNTO HIDRAULICO DE 1/2``
UNIDAD. UND

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CINTA TEFLON un 0.53 495.00 259.88
UNION PRESION 1/2`` un 1.05 330.00 346.50
ADAPTADOR MACHO PRESION 1`` un 1.05 880.00 924.00
BUJE SOLDADO PRESION 1*3/4`` un 1.05 935.00 981.75
CODO GALVANIZADO 1/2`` un 1.05 1,320.00 1,386.00
SOLDADURA PVC 1/4 GAL. un 0.05 72,270.00 3,794.18
TAPON GALVANIZADO MACHO 1/2`` un 1.05 902.00 947.10
TUBO ECONOMICA PRESION 1/2`` R13.5 un 0.53 7,700.00 4,042.50
SUB TOTAL ................ 12,681.90
DESPERDICIO 5% 634.10
TOTALMATERIALES 13,316.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,284.70 1,284.70

TOTAL EQUIPOS 1,284.70


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 12.00 34,471.50 64,461.71 29,990.21 5,371.81
2 Ayudantes 12.00 45,962.00 85,948.94 39,986.94 7,162.41
TOTAL MANO DE OBRA 12,534.22
TOTAL ANALISIS UNIT. 27,135.00 27135 -

APU'S CIC
SUMINISTRO E INSTALACION DE TUBERIA PVC 1/2" RDE 21
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
UNION PRESION 1/2`` UND 0.175 330.00 57.75
SOLDADURA PVC 1/4 GAL. UND 0.01 72,270.00 383.03
LIMPIADOR PVC 1/4 GAL. UND 0.01 34,870.00 184.81
CODO PRESION 90 1/2`` UND 0.36 440.00 157.08
TEE PRESION 1/2`` UND 0.36 660.00 235.62
TUBO PRESION RDE 21 1/2`` 6mt UND 0.175 8,910.00 1,559.25
-
SUB TOTAL ................ 2,577.54
DESPERDICIO 5% 128.88
TOTALMATERIALES 2,706.42
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 124.50 124.50
TOTAL EQUIPOS 124.50
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 13.00 34,471.50 64,461.71 29,990.21 4,958.59
2 Ayudantes 13.00 45,962.00 85,948.94 39,986.94 6,611.46
TOTAL MANO DE OBRA 11,570.05
TOTAL ANALISIS UNIT. 14,401.00 14401 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
SUMINISTRO E INSTALACION DE TUBERIA P.V.C. 3/4`` RDE 21
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA PVC 1/4 GAL. UND 0.01 72,270.00 469.76
LIMPIADOR PVC 1/4 GAL. UND 0.01 34,870.00 226.66
CODO PRESION 90 1`` UND 0.36 1,320.00 471.24
TEE PRESION 1`` UND 0.36 2,090.00 746.13
TUBO PRESION RDE 13.5 1`` UND 0.18 30,250.00 5,293.75
UNION PRESION 1`` UND 0.18 770.00 137.45
-
SUB TOTAL ................ 7,344.98
DESPERDICIO 5% 367.25
TOTALMATERIALES 7,712.22
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 155.08 155.08
TOTAL EQUIPOS 155.08
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 11.00 34,471.50 64,461.71 29,990.21 5,860.16
2 Ayudantes 11.00 45,962.00 85,948.94 39,986.94 7,813.54
TOTAL MANO DE OBRA 13,673.70
TOTAL ANALISIS UNIT. 21,541.00 21541 -

APU'S CIC
CAJA DE INSPECCION 0,8X0,8m
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000PSI M3 0.03 329,471.00 10,543.07
MORTERO 1:4 M3 0.08 280,364.37 22,429.15
ALAMBRE NEGRO KG 1.37 3,000.00 4,124.10
VARILLA 3/8 UN 3.00 7,560.00 22,680.00
BLOQUE 009 MAMPOSTERIA UND 40.00 1,100.00 44,000.00

-
SUB TOTAL ................ 103,776.32
DESPERDICIO 5% 5,188.82
TOTALMATERIALES 108,965.14
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,927.50 5,927.50
TRANSPORTE UND 1.00 20,000.00 20,000.00
TOTAL EQUIPOS 25,927.50
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 2.00 34,471.50 64,461.71 29,990.21 32,230.85
2 Ayudantes 2.00 45,962.00 85,948.94 39,986.94 42,974.47
TOTAL MANO DE OBRA 75,205.32
TOTAL ANALISIS UNIT. 210,098.00 210098 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
CAJA DE INSPECCION 0,6X0,6m
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000PSI M3 0.02 329,471.00 5,930.48
MORTERO 1:4 M3 0.08 280,364.37 22,429.15
ALAMBRE NEGRO KG 1.37 3,000.00 4,124.10
VARILLA 3/8 UN 3.00 7,560.00 22,680.00
BLOQUE 009 MAMPOSTERIA UND 30.00 1,100.00 33,000.00

-
SUB TOTAL ................ 88,163.73
DESPERDICIO 5% 4,408.19
TOTALMATERIALES 92,571.91
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,952.70 5,952.70
TRANSPORTE UND 1.00 20,000.00 20,000.00
TOTAL EQUIPOS 25,952.70
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 2.00 34,471.50 64,461.71 29,990.21 32,230.85
2 Ayudantes 2.00 45,962.00 85,948.94 39,986.94 42,974.47
TOTAL MANO DE OBRA 75,205.32
TOTAL ANALISIS UNIT. 193,730.00 193730 -

APU'S CIC
SUMINISTRO E INSTALACION DE TUBERIA PVC VENTILACION 2"
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
TUBO VENTILACION 2" X 6 m UND 0.18 46,231.00 8,090.43
UNION SANITARIA 2" UND 1.00 1,648.00 1,648.00
LIMPIADOR PVC KG 0.01 29,715.00 297.15
SOLDADURA PVC UN 0.01 61,582.00 615.82

-
SUB TOTAL ................ 10,651.40
DESPERDICIO 5% 532.57
TOTALMATERIALES 11,183.96
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 126.60 126.60
TRANSPORTE UND 155.00 20,000.00 129.03
TOTAL EQUIPOS 255.63
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 15.00 34,471.50 64,461.71 29,990.21 4,297.45
2 Ayudantes 15.00 45,962.00 85,948.94 39,986.94 5,729.93
TOTAL MANO DE OBRA 10,027.38
TOTAL ANALISIS UNIT. 21,467.00 21467 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
SUMINISTRO E INSTALACION DE VALVULA 3/4"
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ADAPTADOR MACHO PVC 3/4" UND 2.00 1,858.00 3,716.00
RED WHITE ROSCADO 3/4" UND 1.00 41,758.00 41,758.00
CINTA TEFLON 3/4" UND 0.19 819.00 158.89

-
SUB TOTAL ................ 45,632.89
DESPERDICIO 5%
TOTALMATERIALES 45,632.89
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 45.60 45.60
TRANSPORTE UND 500.00 20,000.00 40.00
TOTAL EQUIPOS 85.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 35.00 34,471.50 64,461.71 29,990.21 1,841.76
2 Ayudantes 35.00 45,962.00 85,948.94 39,986.94 2,455.68
TOTAL MANO DE OBRA 4,297.45
TOTAL ANALISIS UNIT. 50,016.00 50016 -

APU'S CIC
SUMINISTRO E INSTALACION DE LLAVE TERMINAL 1/2"
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
LLAVE TERMINA 1/2" UND 1.00 6,510.00 6,510.00
-

SUB TOTAL ................ 6,510.00


DESPERDICIO 5% 325.50
TOTALMATERIALES 6,835.50
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 145.60 145.60

TOTAL EQUIPOS 145.60


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 34.00 34,471.50 64,461.71 29,990.21 1,895.93
2 Ayudantes 34.00 45,962.00 85,948.94 39,986.94 2,527.91
TOTAL MANO DE OBRA 4,423.84
TOTAL ANALISIS UNIT. 11,405.00 11405 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
SUMINISTRO E INSTALACION DE CANAL PVC AGUAS LLUVIAS
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CANAL PVC AGUAS LLUVIAS ML 1.00 21,000.00 21,000.00
LIMPIADOR PVC KG 0.01 29,715.00 297.15
SOLDADURA PVC UN 0.01 61,582.00 615.82
SOPORTE DE CANAL PVC UN 2.74 2,000.00 5,480.00

SUB TOTAL ................ 27,392.97


DESPERDICIO 5%
TOTALMATERIALES 27,392.97
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 77.60 77.60

TOTAL EQUIPOS 77.60


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 25.00 34,471.50 64,461.71 29,990.21 2,578.47
2 Ayudantes 25.00 45,962.00 85,948.94 39,986.94 3,437.96
TOTAL MANO DE OBRA 6,016.43
TOTAL ANALISIS UNIT. 33,487.00 33487 -

APU'S CIC
SUMINISTRO E INSTALACION DE TUBERIA EN PVC AGUAS LLUVIAS 4"
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
TUBO PVC AGUAS LLUVIAS 4" UND 0.18 9,950.00 1,791.00
UNION SANITARIA 3" UN 0.37 3,650.00 1,343.20
LIMPIADOR PVC KG 0.01 29,715.00 297.15
SOLDADURA PVC UN 0.01 61,582.00 615.82
SUB TOTAL ................ 4,047.17
DESPERDICIO 5% 202.36
TOTALMATERIALES 4,249.53
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 219.40 219.40

TOTAL EQUIPOS 219.40


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 10.00 34,471.50 64,461.71 29,990.21 6,446.17
2 Ayudantes 10.00 45,962.00 85,948.94 39,986.94 8,594.89
TOTAL MANO DE OBRA 15,041.06
TOTAL ANALISIS UNIT. 19,510.00 19510 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
CAJA DE INSPECCION 0,4X0,4m
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000PSI M3 0.01 329,471.00 2,635.77
MORTERO 1:4 M3 0.08 280,364.37 22,429.15
ALAMBRE NEGRO KG 1.37 3,000.00 4,124.10
VARILLA 3/8 UN 3.00 7,560.00 22,680.00
BLOQUE 009 MAMPOSTERIA UND 25.00 1,100.00 27,500.00
SUB TOTAL ................ 79,369.02
DESPERDICIO 5% 3,968.45
TOTALMATERIALES 83,337.47
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,009.00 2,009.00
TRANSPORTE UND 1.00 20,000.00 20,000.00
TOTAL EQUIPOS 22,009.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 1.90 34,471.50 64,461.71 29,990.21 33,927.21
2 Ayudantes 1.90 45,962.00 85,948.94 39,986.94 45,236.28
TOTAL MANO DE OBRA 79,163.50
TOTAL ANALISIS UNIT. 184,510.00 184510 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
REJILLAS PARA DESAGUES
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000PSI M3 0.02 329,471.00 4,942.07
TAPA PREFABRICADA UND 1.00 35,000.00 48,114.50
ALAMBRE NEGRO KG 1.37 3,000.00 4,124.10
VARILLA 3/8 UN 3.00 7,560.00 22,680.00
-
SUB TOTAL ................ 79,860.67
DESPERDICIO 5% 3,993.03
TOTALMATERIALES 83,853.70
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 327.00 327.00
TRANSPORTE UND 1.00 200.00 200.00
TOTAL EQUIPOS 527.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 24.00 34,471.50 64,461.71 29,990.21 2,685.90
2 Ayudantes 24.00 45,962.00 85,948.94 39,986.94 3,581.21
TOTAL MANO DE OBRA 6,267.11
TOTAL ANALISIS UNIT. 90,648.00 90648 -

APU'S CIC
INSTALACIONES ELECTRICAS
Acometida en 3N4 +1N8
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CABLE COBRE THW 8 AWG ML 1.00 4,050.00 4,050.00
CABLE COBRE THW 4 AWG ML 3.00 12,400.00 37,200.00
TUBO CONDUIT LIVIANO 1 1/2 UN 1.00 14,500.00 14,500.00
SUB TOTAL ................ 55,750.00
DESPERDICIO 5%
TOTALMATERIALES 55,750.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,528.50 1,528.50

TOTAL EQUIPOS 1,528.50


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 6.00 34,471.50 64,461.71 29,990.21 10,743.62
2 Ayudantes 6.00 45,962.00 85,948.94 39,986.94 14,324.82
TOTAL MANO DE OBRA 25,068.44
TOTAL ANALISIS UNIT. 82,347.00 82347 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Tuberia PVC de 2"
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
TUBO CONDUIT LIVIANO 2" UND 1.00 21,300.00 21,300.00
SOLDADURA PVC UND 0.01 78,840.00 788.40
LIMPIADOR UND 0.01 28,600.00 286.00
JUEGO BOQUILLA PVC 2 UND 0.33 2,300.00 759.00
SUB TOTAL ................ 23,133.40
DESPERDICIO 5%
TOTALMATERIALES 23,133.40
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 94.50 94.50

TOTAL EQUIPOS 94.50


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 13.00 34,471.50 64,461.71 29,990.21 4,958.59
2 Ayudantes 13.00 45,962.00 85,948.94 39,986.94 6,611.46
TOTAL MANO DE OBRA 11,570.05
TOTAL ANALISIS UNIT. 34,798.00 34798 -

APU'S CIC
Tablero Bifasico de 24 Circuitos con espacio para totalizador,con puerta y chapa. Incluye 16 breaker monoplares enchufable
de 20 A,5 breaker bipolar enchufable de 20 A y breaker industrial de 60 A.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
TABLERO 24 CIRC. BIF/ PUERTA UND 1.00 200,000.00 200,000.00
BREAKER 20AMPERIOS UND 20.00 14,300.00 286,000.00
BREAKER BIPOLAR 20AMPERIOS UND 4.00 19,300.00 77,200.00
SUB TOTAL ................ 563,200.00
DESPERDICIO 5%
TOTALMATERIALES 563,200.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 10,642.90 10,642.90

TOTAL EQUIPOS 10,642.90


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 2.00 34,471.50 64,461.71 29,990.21 32,230.85
1 Ayudante 2.00 22,981.00 42,974.47 19,993.47 21,487.24
TOTAL MANO DE OBRA 53,718.09
TOTAL ANALISIS UNIT. 627,561.00 627561 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Salida iluminacin en Tuberia PVC de 1/2".Incluye alambre 12,plafon de loza y conectores de resorte.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALAMBRE COBRE O RIGIDO No12 ml 9.00 1,560.00 14,040.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 2.00 300.00 600.00
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
ALAMBRE COBRE THW 14 AWG THHN/NN ml 4.50 889.20 4,001.40
TUBO CONDUIT PVC 1/2 ml 4.50 1,550.40 6,976.80
ROSETA (PLAFON) un 1.00 1,372.80 1,372.80
TORNILLO LMINA DIAM. 3/8 un 1.00 15.60 15.60
CONECTOR RESORTE ROJO un 2.00 816.00 1,632.00
CAJA OCTAGONAL CONDUIT un 1.00 1,622.40 1,622.40
SUB TOTAL ................ 31,335.30
DESPERDICIO 5%
TOTALMATERIALES 31,335.30
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,654.60 1,654.60
TOTAL EQUIPOS 1,654.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 7.00 34,471.50 64,461.71 29,990.21 9,208.82
1 Ayudante 7.00 22,981.00 42,974.47 19,993.47 6,139.21
TOTAL MANO DE OBRA 15,348.03
TOTAL ANALISIS UNIT. 48,338.00 48338 -

APU'S CIC
Salida suiche de cualquier tipo (sencillo,doble,conmutable) en Tuberia PVC de 1/2".Incluye alambre 12,aparato y conectores
de resorte.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALAMBRE COBRE O RIGIDO No12 ml 9.00 1,560.00 14,040.00
TUBO CONDUIT GRIS 1/2 ml 4.50 7,500.00 33,750.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 2.00 300.00 600.00
CAJA RECTANGULAR 2X4 PLASTICA RETIE un 1.00 960.00 960.00
INTER. DOBLE DECORA 15A 120V un 1.00 13,500.00 13,500.00
CONECTOR RESORTE ROJO un 2.00 816.00 1,632.00
SUB TOTAL ................ 64,482.00
DESPERDICIO 5%
TOTALMATERIALES 64,482.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 241.70 241.70
TOTAL EQUIPOS 241.70
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 9.00 34,471.50 64,461.71 29,990.21 7,162.41
2 Ayudantes 9.00 45,962.00 85,948.94 39,986.94 9,549.88
TOTAL MANO DE OBRA 16,712.29
TOTAL ANALISIS UNIT. 81,436.00 81436 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Salida tomas en Tuberia PVC de 1/2".Incluye alambre 12,tomacorriente y conectores de resorte.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CAJA RECTANGULAR 4X4 PLASTICA RETIE un 1.00 1,440.00 1,440.00
ALAMBRE COBRE O RIGIDO No12 ml 9.00 1,560.00 14,040.00
TUBO CONDUIT GRIS 1/2 ml 3.00 8,700.00 26,100.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 2.00 300.00 600.00
SUB TOTAL ................ 42,180.00
DESPERDICIO 5%
TOTALMATERIALES 42,180.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 478.60 478.60

TOTAL EQUIPOS 478.60


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 8.00 34,471.50 64,461.71 29,990.21 8,057.71
2 Ayudantes 8.00 45,962.00 85,948.94 39,986.94 10,743.62
TOTAL MANO DE OBRA 18,801.33
TOTAL ANALISIS UNIT. 61,460.00 61460 -

APU'S CIC
Salida iluminacion en graderias puntos en Tuberia EMT de 1/2".Incluye alambre 12,caja 12*12*5,prensaestopa y conectores
de resorte.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALAMBRE COBRE O RIGIDO No12 ml 9.00 1,560.00 14,040.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 2.00 300.00 600.00
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
ALAMBRE COBRE THW 14 AWG THHN/NN ml 4.50 889.20 4,001.40
TUBO CONDUIT PVC 1/2 ml 4.50 1,550.40 6,976.80
ROSETA (PLAFON) un 1.00 1,372.80 1,372.80
TORNILLO LMINA DIAM. 3/8 un 1.00 15.60 15.60
CONECTOR RESORTE ROJO un 2.00 816.00 1,632.00
CAJA OCTAGONAL CONDUIT un 1.00 3,600.00 3,600.00
SUB TOTAL ................ 33,312.90
DESPERDICIO 5%
TOTALMATERIALES 33,312.90
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 862.80 862.80
TOTAL EQUIPOS 862.80
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 7.00 34,471.50 64,461.71 29,990.21 9,208.82
2 Ayudantes 7.00 45,962.00 85,948.94 39,986.94 12,278.42
TOTAL MANO DE OBRA 21,487.24
TOTAL ANALISIS UNIT. 55,663.00 55663 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Salida iluminacion reflectores en canchas y tarima puntos en Tuberia EMT de 1/2".Incluye alambre 12,caja
12*12*5,prensaestopa y conectores de resorte.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALAMBRE COBRE O RIGIDO No12 ml 12.00 1,560.00 18,720.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 2.00 300.00 600.00
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
ALAMBRE COBRE THW 14 AWG THHN/NN ml 6.00 889.20 5,335.20
TUBO CONDUIT PVC 1/2 ml 4.50 1,550.40 6,976.80
ROSETA (PLAFON) un 1.00 1,372.80 1,372.80
TORNILLO LMINA DIAM. 3/8 un 1.00 15.60 15.60
CONECTOR RESORTE ROJO un 2.00 816.00 1,632.00
CAJA OCTAGONAL CONDUIT un 1.00 3,600.00 3,600.00
SUB TOTAL ................ 39,326.70
DESPERDICIO 5%
TOTALMATERIALES 39,326.70
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 854.06 854.06

TOTAL EQUIPOS 854.06


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 7.00 34,471.50 64,461.71 29,990.21 9,208.82
2 Ayudantes 7.00 45,962.00 85,948.94 39,986.94 12,278.42
TOTAL MANO DE OBRA 21,487.24
TOTAL ANALISIS UNIT. 61,668.00 61668 -

APU'S CIC
Alimentacion de circuitos en alambre 3N12.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALAMBRE COBRE O RIGIDO No12 ml 3.00 1,560.00 4,680.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 2.00 300.00 600.00
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
ALAMBRE COBRE THW 14 AWG THHN/NN ml 3.00 889.20 2,667.60
TUBO CONDUIT PVC 1/2 ml 3.00 1,550.40 4,651.20
TORNILLO LMINA DIAM. 3/8 un 1.00 15.60 15.60
CONECTOR RESORTE ROJO un 2.00 816.00 1,632.00
SUB TOTAL ................ 15,320.70
DESPERDICIO 5%
TOTALMATERIALES 15,320.70
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 142.60 142.60

TOTAL EQUIPOS 142.60


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 11.00 34,471.50 64,461.71 29,990.21 5,860.16
2 Ayudantes 11.00 45,962.00 85,948.94 39,986.94 7,813.54
TOTAL MANO DE OBRA 13,673.70
TOTAL ANALISIS UNIT. 29,137.00 29137 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Tuberia PVC de 1 1/2" para alimentadores.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA PVC LIQUIDA 1/4 ml 0.01 78,840.00 788.40
BOQUILLAS JUEGO 1 1/2 un 2.00 1,104.00 2,208.00
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
TUBO CONDUIT PVC 1 1/2 un 1.00 5,544.00 5,544.00
SUB TOTAL ................ 8,826.30
DESPERDICIO 5%
TOTALMATERIALES 8,826.30
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 153.00 153.00

TOTAL EQUIPOS 153.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 11.00 34,471.50 64,461.71 29,990.21 5,860.16
2 Ayudantes 11.00 45,962.00 85,948.94 39,986.94 7,813.54
TOTAL MANO DE OBRA 13,673.70
TOTAL ANALISIS UNIT. 22,653.00 22653 -

APU'S CIC
Tuberia PVC de 3/4"para alimentadores.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
TUBO CONDUIT PVC 3/4 ml 1.00 1,020.00 1,020.00
ADAPTADOR TERMINAL CONDUIT 3/4 un 2.00 540.00 1,080.00
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90

SUB TOTAL ................ 3,174.30


DESPERDICIO 5%
TOTALMATERIALES 3,174.30
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 161.00 161.00

TOTAL EQUIPOS 161.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 11.00 34,471.50 64,461.71 29,990.21 5,860.16
2 Ayudantes 11.00 45,962.00 85,948.94 39,986.94 7,813.54
TOTAL MANO DE OBRA 13,673.70
TOTAL ANALISIS UNIT. 17,009.00 17009 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Tuberia Emt de 1/2" para alimentadores.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA PVC LIQUIDA 1/4 ml 0.01 78,840.00 788.40
BOQUILLAS JUEGO 1 1/2 un 2.00 300.00 600.00
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
TUBO CONDUIT PVC 11/2 un 1.00 820.00 820.00
SUB TOTAL ................ 2,494.30
DESPERDICIO 5%
TOTALMATERIALES 2,494.30
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 134.40 134.40
TOTAL EQUIPOS 134.40
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 12.00 34,471.50 64,461.71 29,990.21 5,371.81
2 Ayudantes 12.00 45,962.00 85,948.94 39,986.94 7,162.41
TOTAL MANO DE OBRA 12,534.22
TOTAL ANALISIS UNIT. 15,163.00 15163 -

APU'S CIC
Herraje para caja de 30*30 cm
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
HERRAJE PARA CAJA UND 1.00 5,200.00 5,200.00
SUB TOTAL ................ 5,200.00
DESPERDICIO 5%
TOTALMATERIALES 5,200.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 121.95 121.95
TOTAL EQUIPOS 121.95
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 13.00 34,471.50 64,461.71 29,990.21 4,958.59
2 Ayudantes 13.00 45,962.00 85,948.94 39,986.94 6,611.46
TOTAL MANO DE OBRA 11,570.05
TOTAL ANALISIS UNIT. 16,892.00 16892 -

APU'S CIC
Reflector Metal Halide de 400 W Roy Alpha o semejante.Incluye cable encauchetado 3*12,elementos de fijacin y anclaje.
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
REFLECTOR METAL HALIDE und 1.00 230,000.00 230,000.00
ALAMBRE COBRE O RIGIDO No12 ml 6.00 1,560.00 9,360.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 0.01 78,840.00 788.40
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
ALAMBRE COBRE THW 14 AWG THHN/NN ml 6.00 820.00 4,920.00
SUB TOTAL ................ 246,142.70
DESPERDICIO 5%
TOTALMATERIALES 246,142.70
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,243.80 1,243.80
TOTAL EQUIPOS 1,243.80
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 6.00 34,471.50 64,461.71 29,990.21 10,743.62
2 Ayudantes 6.00 45,962.00 85,948.94 39,986.94 14,324.82
TOTAL MANO DE OBRA 25,068.44
TOTAL ANALISIS UNIT. 272,455.00 272455 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Lampara Hermetica de 2*54 W tipo Roy Alpha o similar. Incluye Cable encauchetado 3*14,elementos de fijacin y anclajes.
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
LAMPARA HERMETICA und 1.00 162,500.00 162,500.00
ALAMBRE COBRE O RIGIDO No12 ml 6.00 1,560.00 9,360.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 0.01 78,840.00 788.40
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
ALAMBRE COBRE THW 14 AWG THHN/NN ml 6.00 820.00 4,920.00
SUB TOTAL ................ 178,642.70
DESPERDICIO 5%
TOTALMATERIALES 178,642.70
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 273.90 273.90

TOTAL EQUIPOS 273.90


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 8.00 34,471.50 64,461.71 29,990.21 8,057.71
2 Ayudantes 8.00 45,962.00 85,948.94 39,986.94 10,743.62
TOTAL MANO DE OBRA 18,801.33
TOTAL ANALISIS UNIT. 197,718.00 197718 -

APU'S CIC
CUBIERTA
Suministro, fabricacion, Montaje y pintura DE Estructura metalica Para La Cubierta , Cercha principal, Correa, y porticos En
Anguloss Estructurales. ESTRUCTURA A LA VISTA, . Incluye Pernos, Riostras, Contravientos, Laminas, Soldadura E70:18 Y
Acabado con anticorrosivo
UNIDAD. KG + Esmalte para estructura a la vista, SEGN DISEO.

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


ACERO PERFILERIA 60000 PSI KG 1.00 3,300.00 3,300.00
PINTURA ANTICORROSIVA GL 1.00 700.00 700.00
SUB TOTAL ................ 4,000.00
DESPERDICIO 5% 199.83
TOTALMATERIALES 4,199.83
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 808.60 808.60
TRANSPORTE DIA 50.00 100,000.00 2,000.00
COMPRESOR DIA 70.00 15,000.00 214.29
TOTAL EQUIPOS 3,022.89
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 115.00 34,471.50 64,461.71 29,990.21 560.54
1 Ayudante 115.00 22,981.00 42,974.47 19,993.47 373.69
TOTAL MANO DE OBRA 934.23
TOTAL ANALISIS UNIT. 8,157.00 8157 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Suministro e instalacion de cubierta teja arquitectonical, incluye tornillos autoperforante
UNIDAD. M2

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


TZA TERMOACUSTUSTICA UNIDAD 0.57 42,207.00 24,057.99
AMARRE O TORNILLO AUTOPERFORANTE UNIDAD 4.20 622.00 2,612.40
SUB TOTAL ................ 26,670.39
DESPERDICIO 5% 1,333.52
TOTALMATERIALES 28,003.91
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 3,229.50 3,229.50
cuerpo de andamio DIA 100.00 15,000.00 150.00
TOTAL EQUIPOS 3,379.50
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 8.00 34,471.50 64,461.71 29,990.21 8,057.71
1 Ayudante 8.00 22,981.00 42,974.47 19,993.47 5,371.81
TOTAL MANO DE OBRA 13,429.52
TOTAL ANALISIS UNIT. 44,813.00 44813 -

APU'S CIC
CABALLETE DE LAMINA TRAPEZOIDAL
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CABALLETE PARA LAMINA TERMO ACUS UND 0.50 32,500.00 16,250.00
TORNILLO FIJADOR UND 5.00 800.00 4,000.00

SUB TOTAL ................ 20,250.00


DESPERDICIO 5% 1,012.50
TOTALMATERIALES 21,262.50
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 3,063.80 3,063.80
TOTAL EQUIPOS 3,063.80
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 10.00 34,471.50 64,461.71 29,990.21 6,446.17
1 Ayudante 10.00 22,981.00 42,974.47 19,993.47 4,297.45
TOTAL MANO DE OBRA 10,743.62
TOTAL ANALISIS UNIT. 35,070.00 35070 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
pintura en vinilo tipo 1
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
PINTURA INTERIOR CUETE 0.020 120,000.00 2,400.00

SUB TOTAL ................ 2,400.00


DESPERDICIO 5% 120.00
TOTALMATERIALES 2,520.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,611.50 1,611.50
TOTAL EQUIPOS 1,611.50
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 45 34,471.50 64,461.71 29,990.21 1,432.48
1 Ayudante 45 22,981.00 42,974.47 19,993.47 954.99
TOTAL MANO DE OBRA 2,387.47
TOTAL ANALISIS UNIT. 6,519.00 6519 -

APU'S CIC
suministro e instalacion de cielo raso en drywall, incluye acabados, perfilerias y tornillos
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
PERFIL PARAL B-9 LAM ACE GALV C.26 L=2.44m un 0.250 9,600.00 2,400.00
LAMINA SUPERBOARD 6MM 2.44X2.44 (FIBR
un 0.336 32,400.00 10,886.40
LIBRE ASB)

PERFIL ANG LAM ACERO GALV C. 26 L=2.44 M. un 0.450 3,600.00 1,620.00

TORNILLO 6X1`` PARA LAM ESTRUC LIVIANA un 12.000 24.00 288.00


PERFIL OMEGA 2.44 un 1.320 6,600.00 8,712.00
TORNILLO 8X3/4`` AUT-AVELL-PUNTA FINA un 4.000 60.00 240.00
SUPERMASTICO x 28kg. gal 0.200 12,000.00 2,400.00
SUB TOTAL ................ 26,546.40
DESPERDICIO 5% 1,327.32
TOTALMATERIALES 27,873.72
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,938.80 1,938.80
TOTAL EQUIPOS 1,938.80
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 12.00 34,471.50 64,461.71 29,990.21 5,371.81
2 Ayudantes 12.00 45,962.00 85,948.94 39,986.94 7,162.41
TOTAL MANO DE OBRA 10,717.44
TOTAL ANALISIS UNIT. 40,530.00 40530 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
Cerramineto perimetral en malla eslabonada y tubo galvanizado
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALAMBRE PUAS C14 X ROLLOS 350M un 0.0045 181,000.00 814.50
VARILLA 3/8 LEG 9.5 DDCO un 0.09 8,041.00 759.87
SOLDADURA ELECTRICA 1/8 kg 0.21 5,775.00 1,212.75
ANTICORROSIVO C.Z VERD 1/4 un 0.02 17,864.00 375.14
ESMALTE COMPACT VERDE un 0.02 92,300.00 1,938.30
MALLA ESLABONADA 2.00Mt ml 0.53 22,500.00 11,812.50
LIJA DE AGUA ABRACOL # 220 un 0.53 1,276.00 669.90
ANGULO (25*3) 1*1/8 LEGITIMO un 0.53 15,520.00 8,148.00
TUBO GALVANIZADO 2`` 6mt un 0.12 110,000.00 13,200.00
-
SUB TOTAL ................ 38,930.97
DESPERDICIO 2%
TOTALMATERIALES 38,930.97
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 79.50 79.50
EQUIPO DE SOLDADURA HR 50.00 60,000.00 1,200.00
TOTAL EQUIPOS 1,279.50
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 16.00 45,962.00 85,948.94 39,986.94 5,371.81
1 Oficial 16.00 34,471.50 64,461.71 29,990.21 4,028.86
2 Ayudantes 16.00 45,962.00 85,948.94 39,986.94 5,371.81
TOTAL MANO DE OBRA 14,772.47
TOTAL ANALISIS UNIT. 54,983.00 54983 -

APU'S CIC
suministro e instalacion de porton metalico en tuberia 3"x1.5" cal 18. y marco
3"x1.5" cal. 16 acabado en anticorrosivo+esmalte.
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
SOLDADURA 7018 x 1/8`` kg 4.00 7,480.00 29,920.00
PLATINA 1/8X1X6 M. un 5.00 10,747.00 53,735.00
MASILLA PLAST TEC PANEL INTER. EXTER-28kg cu 0.20 41,250.00 8,250.00
HOJA LIJA AGUA 9*11 # 240 un 6.00 1,551.00 9,306.00
ANTICORROSIVO WASH-PRIMER gal 0.20 134,530.00 26,906.00
TUBO GALVANIZADO 1.1/2`` ml 15.00 24,530.00 367,950.00
MALLA ESLABONADA 2`` #10 m2 6.00 13,255.00 79,530.00
TUBO GALVANIZADO 3`` un 3.00 295,600.00 886,800.00
PORTACANDADO VERA 2.``NEG un 1.00 1,430.00 1,430.00
BISAGRA CERRAMIENTO/3``X2`` GALVANIZADA un 4.00 22,390.50 89,562.00
CURVA MEDIA LUNA PASAMANO un 1.00 8,712.00 8,712.00
FALLEVA MACIZA 5/8`` METALICA un 1.00 11,132.00 11,132.00
ALUMINIO 3`` un 1.00 3,850.00 3,850.00
SUB TOTAL ................ 1,577,083.00
DESPERDICIO 5%
TOTALMATERIALES 1,577,083.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 9,768.19 9,768.19
EQUIPO DE SOLDADURA HR 5.00 60,000.00 12,000.00
TOTAL EQUIPOS 21,768.19
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 4.00 45,962.00 85,948.94 39,986.94 21,487.24
1 Oficial 4.00 34,471.50 64,461.71 29,990.21 16,115.43
2 Ayudantes 4.00 45,962.00 85,948.94 39,986.94 21,487.24
TOTAL MANO DE OBRA 59,089.90
TOTAL ANALISIS UNIT. 1,657,941.09 1657941.09 0.00

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
suministro e instalacion de porteria en tuberia y tablero de baloncesto en
acrilico o vidrio de 1.80m de ancho por 1.05 de largo.
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
PORTERIA MULTIFUNCIONAL UND 1.00 1,509,041.18 1,509,041.18
MALLA DE MICROFUTBOL UND 1.00 124,500.00 124,500.00
MALLA DE BASKET UND 1.00 22,000.00 22,000.00
SUB TOTAL ................ 1,655,541.18
DESPERDICIO 5%
TOTALMATERIALES 1,655,541.18
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 30,629.20 30,629.20

TOTAL EQUIPOS 30,629.20


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 2.00 34,471.50 64,461.71 29,990.21 32,230.85
3 Ayudantes 2.00 68,943.00 128,923.41 59,980.41 64,461.71
TOTAL MANO DE OBRA 96,692.56
TOTAL ANALISIS UNIT. 1,782,863.00 1782863 -

APU'S CIC
SUMINISTRO E INSTALACION DE DIVISION METALICA
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
DIVISION METALICA EN ACERO INOXIDABLE M2 1.00 300,000.00 300,000.00
SUB TOTAL ................ 300,000.00
DESPERDICIO 5%
TOTALMATERIALES 300,000.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 7,195.10 7,195.10

TOTAL EQUIPOS 7,195.10


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 3.00 34,471.50 64,461.71 29,990.21 21,487.24
2 Ayudantes 3.00 45,962.00 85,948.94 39,986.94 28,649.65
TOTAL MANO DE OBRA 50,136.88
TOTAL ANALISIS UNIT. 357,332.00 357332 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
EXCAVACIONES PARA DESNIVEL DE OFICINAS Y BATERIAS SANITARIAS
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
BULDOZER D6 hr 0.03 135,000.00 4,050.00
VOLQUETA 6 M3 hr 0.20 50,400.00 10,080.00
HERRAMIENTAS MENORES. GL 1.00 2,302.2 2,302.20
TOTAL EQUIPOS 16,432.20
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.20 19954.00 3,990.80

TOTAL MANO DE OBRA 3,990.80


TOTAL ANALISIS UNIT. 20,423.0 20,423.00 -

APU'S CIC
LINEA DE DEMARCACION CON PINTURA DE TRAFICO ACRILICA ANTIDESLIZANTE COLOR AMARRILLO
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
PINTURA TRAFICO BLANC. 659 GAL un 0.0200 81,244.80 1,624.90
THINNER Lts 4L=G gal 0.020 4,867.20 97.34
SUB TOTAL ................ 1,722.24
DESPERDICIO 5% 86.11
TOTALMATERIALES 1,808.35
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 775.00 775.00
EQUIPO DE PINTURA COMPRESOR dd 0.02 11,970.00 239.40
TOTAL EQUIPOS 1,014.40
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Ayudante 35 22,981.00 42,974.47 19,993.47 1,227.84
TOTAL MANO DE OBRA 1,227.84
TOTAL ANALISIS UNIT. 4,051.00 4051 -

APU'S CIC
Lampara tipo Bala incandecente o similar. Incluye Cable encauchetado,elementos de fijacin y anclajes.
UNIDAD. UND
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
BALA INCANDESCENTE 2.9213D=11.5CM und 1.00 22,500.00 22,500.00
ALAMBRE COBRE O RIGIDO No12 ml 6.00 1,560.00 9,360.00
ADAPTADOR TERMINAL CONDUIT 1/2 un 0.01 78,840.00 788.40
SOLDADURA PVC LIQUIDA 1/4 un 0.01 78,840.00 788.40
LIMPIADOR REM.PVC 760 GR. un 0.01 28,590.00 285.90
ALAMBRE COBRE THW 14 AWG THHN/NN ml 6.00 820.00 4,920.00
SUB TOTAL ................ 38,642.70
DESPERDICIO 5%
TOTALMATERIALES 38,642.70
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,556.00 1,556.00

TOTAL EQUIPOS 1,556.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 6.00 34,471.50 64,461.71 29,990.21 10,743.62
2 Ayudantes 6.00 45,962.00 85,948.94 39,986.94 14,324.82
TOTAL MANO DE OBRA 25,068.44
TOTAL ANALISIS UNIT. 65,267.00 65267 -

suministro e instalacion de malla eslabonada en alambre galvanizado sin


recubrimiento de 21/4x21/4.
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ALAMBRE PUAS C14 X ROLLOS 350M un 0.0045 181,000.00 814.50
VARILLA 3/8 LEG 9.5 DDCO un 0.09 8,041.00 759.87
SOLDADURA ELECTRICA 1/8 kg 0.21 5,775.00 1,212.75
ANTICORROSIVO C.Z VERD 1/4 un 0.02 17,864.00 375.14
ESMALTE COMPACT VERDE un 0.02 92,300.00 1,938.30
MALLA ESLABONADA 2.00Mt ml 0.53 22,500.00 11,812.50
LIJA DE AGUA ABRACOL # 220 un 0.53 1,276.00 669.90
ANGULO (25*3) 1*1/8 LEGITIMO un 0.53 15,520.00 8,148.00
TUBO GALVANIZADO 2`` 6mt un 0.12 110,000.00 13,200.00
-
SUB TOTAL ................ 38,930.97
DESPERDICIO 2%
TOTALMATERIALES 38,930.97
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 79.50 79.50
EQUIPO DE SOLDADURA HR 50.00 60,000.00 1,200.00
TOTAL EQUIPOS 1,279.50
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 16.00 45,962.00 85,948.94 39,986.94 5,371.81
1 Oficial 16.00 34,471.50 64,461.71 29,990.21 4,028.86
2 Ayudantes 16.00 45,962.00 85,948.94 39,986.94 5,371.81
TOTAL MANO DE OBRA 14,772.47
TOTAL ANALISIS UNIT. 54,983.00 54983 -
APU'S CIC
Machon en concreto de 15cm X20cm , 3000psi
UNIDAD. ML
DIRECCIN
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000 PSI M3 0.03 - -
TABLA BONGA 3Mts un 0.60 9,000.00 5,400.00
LISTON 2*4*3.5Mts MADERA TECHO un 0.50 17,000.00 8,500.00
SUB TOTAL ................ 13,900.00
DESPERDICIO 5% 695.00
TOTALMATERIALES 14,595.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 445.60 445.60

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

TRANSPORTE GL 200.00 20,000.00 100.00


FORMALETA M3 20.00 50,000.00 2,500.00
MEZCLADORA MECANICA DIA 30.00 60,000.00 2,000.00
VIBRADOR ELECTRICO DIA 30.00 40,000.00 1,333.33
TOTAL EQUIPOS 6,378.93
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 18.00 45,962.00 85,948.94 39,986.94 4,774.94
1 Oficial 18.00 34,471.50 64,461.71 29,990.21 3,581.21
4 Ayudantes 18.00 91,924.00 171,897.88 79,973.88 9,549.88
TOTAL MANO DE OBRA 17,906.03
TOTAL ANALISIS UNIT. 38,880.00 38880 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
viga de corona de confinamiento de 15cmX20cm, 3000psi
UNIDAD. ML
DIRECCIN
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CONCRETO 3000 PSI M3 0.03 - -
TABLA BONGA 3Mts un 0.60 9,000.00 5,400.00
LISTON 2*4*3.5Mts MADERA TECHO un 0.50 17,000.00 8,500.00
SUB TOTAL ................ 13,900.00
DESPERDICIO 5% 695.00
TOTALMATERIALES 14,595.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 442.60 442.60
TRANSPORTE GL 200.00 20,000.00 100.00
FORMALETA M3 15.00 50,000.00 3,333.33
MEZCLADORA MECANICA DIA 25.00 60,000.00 2,400.00
VIBRADOR ELECTRICO DIA 25.00 40,000.00 1,600.00
TOTAL EQUIPOS 7,875.93
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 18.00 45,962.00 85,948.94 39,986.94 4,774.94
1 Oficial 18.00 34,471.50 64,461.71 29,990.21 3,581.21
4 Ayudantes 18.00 91,924.00 171,897.88 79,973.88 9,549.88
TOTAL MANO DE OBRA 17,906.03
TOTAL ANALISIS UNIT. 40,377.00 40377 -

APU'S CIC
suministro e instalacion de ventana V1 para baterias sanitarias y vestier, con marco en perfil de aluminio sistema 50-20 color
natural deslizable con montante y cerrojo de punzon con vidrio de 4mm, dimensiones 50cmX130cm

UNIDAD. UN
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
1.00 85,000.00 85,000.00

SUB TOTAL ................ 85,000.00


DESPERDICIO 5%
TOTALMATERIALES 85,000.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 12,510.00 12,510.00

TOTAL EQUIPOS 12,510.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 5.00 34,471.50 64,461.71 29,990.21 12,892.34
4 Ayudantes 5.00 91,924.00 171,897.88 79,973.88 34,379.58
TOTAL MANO DE OBRA 47,271.92
TOTAL ANALISIS UNIT. 144,782.00 144782 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
suministro e instalacion de puerta P1,P2, P3, P4 , cuerpo con marco en cold rolled cal.20. manija en acero
inoxidable ref. rimini tipo schlage o similar. cerrojo de seguridad cilindro/volteador cromado mate,llave-mariposa
con pestillo que permite aplicacin en puertas derechas o izquierdas ref. b-350 tipo schlage o similar
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

suministro e instalacion de puerta P1,P2, P3, P4 ,


cuerpo con marco en cold rolled cal.20. manija en
acero inoxidable ref. rimini tipo schlage o similar.
cerrojo de seguridad cilindro/volteador cromado 1.00 458,500.00 458,500.00
mate,llave-mariposa con pestillo que permite
aplicacin en puertas derechas o izquierdas ref. b-
350 tipo schlage o similar

SUB TOTAL ................ 458,500.00


DESPERDICIO 5%
TOTALMATERIALES 458,500.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 7,272.30 7,272.30

TOTAL EQUIPOS 7,272.30


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 1.00 34,471.50 64,461.71 29,990.21 64,461.71
2 Ayudantes 1.00 45,962.00 85,948.94 39,986.94 85,948.94
TOTAL MANO DE OBRA 150,410.65
TOTAL ANALISIS UNIT. 616,183.00 616183 -

APU'S CIC
suministro e instalacion de puerta P6, P7 y P8 , cuerpo con marco en cold rolled cal.20. manija en acero inoxidable
ref. rimini tipo schlage o similar. cerrojo de seguridad cilindro/volteador cromado mate,llave-mariposa con pestillo
que permite aplicacin en puertas derechas o izquierdas ref. b-350 tipo schlage o similar

UNIDAD. UN
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

suministro e instalacion de puerta P6, P7 y P8 ,


cuerpo con marco en cold rolled cal.20. manija en
acero inoxidable ref. rimini tipo schlage o similar.
cerrojo de seguridad cilindro/volteador cromado 1.00 410,000.00 410,000.00
mate,llave-mariposa con pestillo que permite
aplicacin en puertas derechas o izquierdas ref. b-
350 tipo schlage o similar

SUB TOTAL ................ 410,000.00


DESPERDICIO 5%
TOTALMATERIALES 410,000.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 27,260.90 27,260.90

TOTAL EQUIPOS 27,260.90


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 2.00 34,471.50 64,461.71 29,990.21 32,230.85
5 Ayudantes 2.00 114,905.00 214,872.35 99,967.35 107,436.18
TOTAL MANO DE OBRA 139,667.03
TOTAL ANALISIS UNIT. 576,928.00 576928 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

APU'S CIC
CABEZAL EN CONCRETO 3000 PSI GRADAS Y CUBIERTA
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00

SUB TOTAL ................ 329,471.00


DESPERDICIO 5% 16,473.55
TOTALMATERIALES 345,944.55
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 743.50 743.50
TRANSPORTE GL 1.00 200.00 200.00
MEZCLADORA MECANICA DIA 4.40 50,000.00 11,363.64
VIBRADOR ELECTRICO DIA 4.40 40,000.00 9,090.91
FORMALETERIA DIA 4.40 35,000.00 7,954.55
TOTAL EQUIPOS 29,352.59
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 4.40 45,962.00 85,948.94 39,986.94 19,533.85
1 Oficial 4.40 34,471.50 64,461.71 29,990.21 14,650.39
5 Ayudantes 4.40 114,905.00 214,872.35 99,967.35 48,834.63
TOTAL MANO DE OBRA 83,018.86
TOTAL ANALISIS UNIT. 458,316.00 458316 -

APU'S CIC
PILOTES DE CIMENTACION D:25cm EN CONCRETO DE 3000 PSI INCLUYE EXCAVACION Y ACERO DE REFUERZO
UNIDAD. ML

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.05 329,471.00 16,473.55
ACERO DE REFUERZO 60.000 PSI KG 4.55 3,954.00 17,990.70

SUB TOTAL ................ 34,464.25


DESPERDICIO 5% 1,723.21
TOTALMATERIALES 36,187.46
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 710.03 710.03
TRANSPORTE GL 1.00 500.00 500.00
FORMALETA M3 6.00 50,000.00 8,333.33
MEZCLADORA MECANICA DIA 2.50 60,000.00 24,000.00
VIBRADOR ELECTRICO DIA 2.50 40,000.00 16,000.00
TOTAL EQUIPOS 49,543.36
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 3.00 45,962.00 85,948.94 39,986.94 28,649.65
1 Oficial 3.00 34,471.50 64,461.71 29,990.21 21,487.24
4 Ayudantes 3.00 91,924.00 171,897.88 79,973.88 57,299.29
TOTAL MANO DE OBRA 107,436.18
TOTAL ANALISIS UNIT. 193,167.00 193167 -
APU'S CIC
sistema de apantallamiento, incluye suministro e instalacion de: cable de cobre, cable de aluminio, alombrn de aluminio,
conector Dehnsnap Ref LH DS 8H36 IGM6 GR (204 003), Punta captadora Electropol de 60cms con base, grapas de
aluminio MV Clamps y cajas de paso metalica.

UNIDAD. UN

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

sistema de apantallamiento, incluye suministro e


instalacion de: cable de cobre, cable de aluminio,
alombrn de aluminio, conector Dehnsnap Ref LH
UN 1.00 16,576,301.00 16,576,301.00
DS 8H36 IGM6 GR (204 003), Punta captadora
Electropol de 60cms con base, grapas de aluminio
MV Clamps y cajas de paso metalica.

SUB TOTAL ................ 16,576,301.00


DESPERDICIO 5%
TOTALMATERIALES 16,576,301.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 10,000.00 10,000.00
TOTAL EQUIPOS 10,000.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 0.20 45,962.00 85,948.94 39,986.94 429,744.70
1 Oficial 0.20 34,471.50 64,461.71 29,990.21 322,308.53
4 Ayudantes 0.20 91,924.00 171,897.88 79,973.88 859,489.40
TOTAL MANO DE OBRA 1,611,542.63
TOTAL ANALISIS UNIT. 18,197,844.00 18197844 -

APU'S CIC
Acometida en cable UTP CAT6 x 3
UNIDAD. Ml

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


Acometida en cable UTP CAT6 x 3 Ml 1.00 21,821.00 21,821.00

SUB TOTAL ................ 21,821.00


DESPERDICIO 5%
TOTALMATERIALES 21,821.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,000.00 2,000.00
TOTAL EQUIPOS 2,000.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 20.00 34,471.50 64,461.71 29,990.21 3,223.09
2 Ayudantes 20.00 45,962.00 85,948.94 39,986.94 4,297.45
TOTAL MANO DE OBRA 7,520.53
TOTAL ANALISIS UNIT. 31,342.00 31342 -

APU'S CIC

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

suministro en instalacion de cable telefonico de 2 Pares


UNIDAD. Ml

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


suministro en instalacion de cable telefonico de 2
Ml 1.00 23,529.00 23,529.00
Pares

SUB TOTAL ................ 23,529.00


DESPERDICIO 5%
TOTALMATERIALES 23,529.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,000.00 2,000.00
TOTAL EQUIPOS 2,000.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 20.00 34,471.50 64,461.71 29,990.21 3,223.09
2 Ayudantes 20.00 45,962.00 85,948.94 39,986.94 4,297.45
TOTAL MANO DE OBRA 7,520.53
TOTAL ANALISIS UNIT. 33,050.00 33050 -

APU'S CIC
Tuberia PVC de 2" para cableado
UNIDAD. Ml

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


Tuberia PVC de 2" para cableado Ml 1.00 25,278.00 25,278.00

SUB TOTAL ................ 25,278.00


DESPERDICIO 5%
TOTALMATERIALES 25,278.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,000.00 2,000.00
TOTAL EQUIPOS 2,000.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 20.00 34,471.50 64,461.71 29,990.21 3,223.09
2 Ayudantes 20.00 45,962.00 85,948.94 39,986.94 4,297.45
TOTAL MANO DE OBRA 7,520.53
TOTAL ANALISIS UNIT. 34,799.00 34799 -

APU'S CIC
Suministro e instalacion de rack de pared
UNIDAD. Un

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


Suministro e instalacion de rack de pared Un 1.00 242,734.00 242,734.00

SUB TOTAL ................ 242,734.00


DESPERDICIO 5%
TOTALMATERIALES 242,734.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,000.00 1,000.00
TOTAL EQUIPOS 1,000.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 10.00 34,471.50 64,461.71 29,990.21 6,446.17
1 Ayudantes 10.00 22,981.00 42,974.47 19,993.47 4,297.45
TOTAL MANO DE OBRA 10,743.62
TOTAL ANALISIS UNIT. 254,478.00 254478 -

APU'S CIC
Suministro e instalacion de cajillas de inspeccion de baja tension 0.80x0.80
UNIDAD. Un

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


Suministro e instalacion de cajillas de inspeccion de
Un 1.00 198,355.00 198,355.00
baja tension 0.80x0.80

SUB TOTAL ................ 198,355.00


DESPERDICIO 5%
TOTALMATERIALES 198,355.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,000.00 1,000.00
TOTAL EQUIPOS 1,000.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 10.00 34,471.50 64,461.71 29,990.21 6,446.17
1 Ayudantes 10.00 22,981.00 42,974.47 19,993.47 4,297.45
TOTAL MANO DE OBRA 10,743.62
TOTAL ANALISIS UNIT. 210,099.00 210099 -

APU'S CIC
suministro e instalacion de Caja de 40 x 60 mm salida de datos y telefono
UNIDAD. Un

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

Suministro e instalacion de cajillas de inspeccion de


Un 1.00 7,502.00 7,502.00
baja tension 0.80x0.80

SUB TOTAL ................ 7,502.00


DESPERDICIO 5%
TOTALMATERIALES 7,502.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 200.00 200.00
TOTAL EQUIPOS 200.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 30.00 34,471.50 64,461.71 29,990.21 2,148.72
1 Ayudantes 30.00 22,981.00 42,974.47 19,993.47 1,432.48
TOTAL MANO DE OBRA 3,581.21
TOTAL ANALISIS UNIT. 11,283.00 11283 -

APU'S CIC

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

Barandas en tuberia 2" Galvanizada con un metro de altura para graderias y tarimas.
UNIDAD. Un

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


VARILLA LISA DE 1/2" UNIDAD 1.00 1 18,000.00 18,000.00
TUBO GALVANIZADO DE 2" ML 3.10 3.1 22,000.00 68,200.00
SOLDADURA ELECTRICA 60 - 11 * 1/8" KG 0.80 0.8 4,000.00 3,200.00
THINERS GALON 0.30 0.3 12,000.00 3,600.00
WHATS PRIME. GL 1.00 1 4,000.00 4,000.00
PINTURA ESMALTE ACABADO COLOR. GALON 0.15 0.15 40,000.00 6,000.00
MORTERO 1:4 M3 0.02 0.015 280,364.37 4,205.47
SUB TOTAL ................ 107,205.47
DESPERDICIO 5%
TOTALMATERIALES 107,205.47
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,982.00 1,982.00
CORTE Y FIGURACION GL 15.00 2,000.00 133.33
EQUIPO DE SOLDADURA DIA 15.00 40,000.00 2,666.67
PULIDORA ELECTRICA DIA 15.00 40,000.00 2,666.67
TOTAL EQUIPOS 7,448.67
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 SOLDADOR 15.00 34,471.50 64,461.71 29,990.21 4,297.45
1 Ayudantes 15.00 22,981.00 42,974.47 19,993.47 2,864.96
TOTAL MANO DE OBRA 7,162.41
TOTAL ANALISIS UNIT. 121,817.00 121817 -

APU'S CIC
Logo cic del ministerio para fachada en lamina metalica
UNIDAD. Un

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


Logo cic del ministerio para fachada en lamina
Un 1.00 842,804.82 842,804.82
metalica

SUB TOTAL ................ 842,804.82


DESPERDICIO 5%
TOTALMATERIALES 842,804.82
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 10,000.00 10,000.00
TOTAL EQUIPOS 10,000.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 3.00 34,471.50 64,461.71 29,990.21 21,487.24
2 Ayudantes 3.00 45,962.00 85,948.94 39,986.94 28,649.65
TOTAL MANO DE OBRA 50,136.88
TOTAL ANALISIS UNIT. 902,941.70 902941.7 -

APU'S CIC
CERRAMIENTO EN MALLA VERDE H = 2,00 mts
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
un 0.35
POSTE CERCA 10 X 10 CM 210 KG/CM2 25,600.00 8,960.00
ml 1.00
TELA CERRAMIENTO OBRA (VERDE) 2,200.00 2,200.00
RELLENO MATERIAL DEL SITIO COMPACTADO
m3 0.02
RANA 17,000.00 340.00

TOTALMATERIALES 11,500.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,420.40 2,420.40
TOTAL EQUIPOS 2,420.40
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 0.40 19954.00 7,981.60

TOTAL MANO DE OBRA 7,981.60


TOTAL ANALISIS UNIT. 21,902 21902 -

APU'S CIC
RETIRO DE MATERIAL PROCEDENTE DE DESCAPOTE
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
VOLQUETA 6 M3 hr 0.06 50,400.00 3,024.00 RARO
HERRAMIENTAS MENORES. GL 1.00 2,526.00 2,526.00
TOTAL EQUIPOS 5,550.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 15.00 34,471.50 64,461.71 29,990.21 4,297.45
2 Ayudantes 15.00 45,962.00 85,948.94 39,986.94 5,729.93

TOTAL MANO DE OBRA 10,027.38


TOTAL ANALISIS UNIT. 15,577.00 15577 -

APU'S CIC
Demolicion Bordillo
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,176.31 1,176.31

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

TOTAL EQUIPOS 1,176.31


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 30.00 34,471.50 64,461.71 29,990.21 2,148.72
2 Ayudantes 30.00 45,962.00 85,948.94 39,986.94 2,864.96

TOTAL MANO DE OBRA 5,013.69


TOTAL ANALISIS UNIT. 6,190.0 6190 -

APU'S CIC
Demolicion losa via
UNIDAD. ML
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,523.50 1,523.50

TOTAL EQUIPOS 1,523.50


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 25.00 34,471.50 64,461.71 29,990.21 2,578.47
2 Ayudantes 25.00 45,962.00 85,948.94 39,986.94 3,437.96

TOTAL MANO DE OBRA 6,016.43


TOTAL ANALISIS UNIT. 7,540.0 7540 -

APU'S CIC
Descapote a maquina manual
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 368.00 368.00

TOTAL EQUIPOS 368.00


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 50.00 34,471.50 64,461.71 29,990.21 1,289.23
2 Ayudantes 50.00 45,962.00 85,948.94 39,986.94 1,718.98

TOTAL MANO DE OBRA 3,008.21


TOTAL ANALISIS UNIT. 3,376.0 3376 -

Trazado y replanteo manual


UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
CAL NARE bol 0.02 5,355.00 107.10
PUNTILLA 2" GBL 0.05 2,520.00 126.00
LISTON 3 MTS 2"X3" UN 0.02 6,500.00 130.00
SUB TOTAL ................ 363.10
DESPERDICIO 5% 18.16
TOTALMATERIALES 381.26
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 383.00 383.00
EQUIPO DE TOPOGRAFIA HR 0.07 10,500.00 735.00
TOTAL EQUIPOS 1,118.00
MANO DE OBRA RENDIM. VR. DA VR DIA+PRES 87% PREST. SOC. VR. TOTAL
1 Maestro 300.00 45,962.00 85,948.94 39,986.94 286.50
1 Oficial 300.00 34,471.50 64,461.71 29,990.21 214.87
2 Ayudantes 300.00 45,962.00 85,948.94 39,986.94 286.50
TOTAL MANO DE OBRA 787.87
TOTAL ANALISIS UNIT. 2,287.00 2287 -

Excavacin manual material comun


UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. % 1.00 469.00 469.00
TOTAL EQUIPOS 469.00
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 1.00 19954.00 19,954.00

TOTAL MANO DE OBRA 19,954.00


TOTAL ANALISIS UNIT. 20,423.0 20423 -

APU'S CIC
Traslado y retiro de material de excavacion
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
VOLQUETA 6 M3 hr 0.06 50,400.00 3,024.00
HERRAMIENTAS MENORES. GL 1.00 2,526.00 2,526.00
TOTAL EQUIPOS 5,550.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 15.00 34,471.50 64,461.71 29,990.21 4,297.45

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

2 Ayudantes 15.00 45,962.00 85,948.94 39,986.94 5,729.93

TOTAL MANO DE OBRA 10,027.38


TOTAL ANALISIS UNIT. 15,577.00 15577 -

APU'S CIC
Relleno en material seleccionado compactado a mquina
UNIDAD. M3
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
AGUA ACUEDUCTO lt 30.00 12.48 374.40
BALASTRO m3 1.30 24,500.00 31,850.00

TOTALMATERIALES 32,224.40
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
RANA dd 0.05 68,000.00 3,400.00
TRANSPORTE MATERIALES M3/KM m3/km 6.50 1,040.00 6,760.00
HERRAMIENTA MENOR GL 1.00 2,011.60 2,011.60
TOTAL EQUIPOS 12,171.60
MANO DE OBRA RENDIM. VR. Hora 87% PREST. SOC. VR. TOTAL
CUADRILLA ALBAILERIA TIPO AA 6.00 19954.00 37,313.98 17,359.98 6,219.00

TOTAL MANO DE OBRA 6,219.00


TOTAL ANALISIS UNIT. 50,615 50615 -

Concreto pobre 1500 PSI para solado


UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.05 329,471.00 16,473.55
SUB TOTAL ................ 16,473.55
DESPERDICIO 5%
TOTALMATERIALES 16,473.55
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,948.13 1,948.13
TRANSPORTE GL 200.00 20,000.00 100.00
MEZCLADORA MECANICA DIA 10.00 50,000.00 5,000.00

TOTAL EQUIPOS 7,048.13


MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 25.00 45,962.00 85,948.94 39,986.94 3,437.96
1 Oficial 25.00 34,471.50 64,461.71 29,990.21 2,578.47
5 Ayudantes 25.00 114,905.00 214,872.35 99,967.35 8,594.89
TOTAL MANO DE OBRA 14,611.32
TOTAL ANALISIS UNIT. 38,133.00 38133 -

APU'S CIC
Concreto 3000 PSI para zapatas
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00

SUB TOTAL ................ 329,471.00


DESPERDICIO 5% 16,473.55
TOTALMATERIALES 345,944.55
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 3,502.45 3,502.45
TRANSPORTE GL 100.00 20,000.00 200.00
MEZCLADORA MECANICA DIA 5.00 50,000.00 10,000.00
VIBRADOR ELECTRICO DIA 5.00 40,000.00 8,000.00
TOTAL EQUIPOS 21,702.45
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.70 45,962.00 85,948.94 39,986.94 31,832.94
1 Oficial 2.70 34,471.50 64,461.71 29,990.21 23,874.71
5 Ayudantes 2.70 114,905.00 214,872.35 99,967.35 79,582.35
TOTAL MANO DE OBRA 135,290.00
TOTAL ANALISIS UNIT. 502,937.00 502937 -

APU'S CIC
Concreto 3000psi para pedestal
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
SUB TOTAL ................ 329,471.00
DESPERDICIO 5%
TOTALMATERIALES 329,471.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,139.26 1,139.26
TRANSPORTE GL 100.00 20,000.00 200.00
FORMALETA M3 4.00 50,000.00 12,500.00
MEZCLADORA MECANICA DIA 3.00 60,000.00 20,000.00
VIBRADOR ELECTRICO DIA 3.00 40,000.00 13,333.33
TOTAL EQUIPOS 47,172.59
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.50 45,962.00 85,948.94 39,986.94 34,379.58
1 Oficial 2.50 34,471.50 64,461.71 29,990.21 25,784.68
4 Ayudantes 2.50 91,924.00 171,897.88 79,973.88 68,759.15
TOTAL MANO DE OBRA 128,923.41
TOTAL ANALISIS UNIT. 505,567.00 505567 -

APU'S CIC
Concreto 3000 PSI para vigas de cimientos
UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
SUB TOTAL ................ 329,471.00

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

DESPERDICIO 5%
TOTALMATERIALES 329,471.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 5,086.40 5,086.40
TRANSPORTE GL 1.00 6,000.00 6,000.00
FORMALETA M3 6.00 50,000.00 8,333.33
VIBRADOR ELECTRICO DIA 2.50 40,000.00 16,000.00
TOTAL EQUIPOS 35,419.73
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.50 45,962.00 85,948.94 39,986.94 34,379.58
1 Oficial 2.50 34,471.50 64,461.71 29,990.21 25,784.68
5 Ayudantes 2.50 114,905.00 214,872.35 99,967.35 85,948.94
TOTAL MANO DE OBRA 146,113.20
TOTAL ANALISIS UNIT. 511,004.00 511,004.00 -

Acero de refuerzo armado y figurado para estructura 40.000 y 60.000 psi


UNIDAD. KG
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
ACERO DE REFUERZO 60000 PSI KG 1.00 3,100.00 3,100.00
SUB TOTAL ................ 3,100.00
DESPERDICIO 5%
TOTALMATERIALES 3,100.00
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 20.60 20.60
TOTAL EQUIPOS 20.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 130 34,471.50 64,461.71 29,990.21 495.86
1 Ayudante 130 22,981.00 42,974.47 19,993.47 330.57
TOTAL MANO DE OBRA 826.43
TOTAL ANALISIS UNIT. 3,947.00 3947 -

Concreto 3000 PSI para columnas


UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.00 329,471.00 329,471.00
SUB TOTAL ................ 329,471.00
DESPERDICIO 5%
TOTALMATERIALES 329,471.00
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,742.60 2,742.60
TRANSPORTE GL 1.00 400.00 400.00
FORMALETA M3 2.50 50,000.00 20,000.00
MEZCLADORA MECANICA DIA 2.50 60,000.00 24,000.00
VIBRADOR ELECTRICO DIA 2.50 40,000.00 16,000.00
TOTAL EQUIPOS 63,142.60
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.50 45,962.00 85,948.94 39,986.94 34,379.58
1 Oficial 2.50 34,471.50 64,461.71 29,990.21 25,784.68
4 Ayudantes 2.50 91,924.00 171,897.88 79,973.88 68,759.15
TOTAL MANO DE OBRA 128,923.41
TOTAL ANALISIS UNIT. 521,537.00 521537 -

Concreto 3000 PSI para vigas dintel


UNIDAD. Ml

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.0160 329,471.00 5,271.54
ALAMBRE NEGRO N18 kg 0.15 4,817.50 722.63
VARILLA 3/8 LEG 8.5 DDCO un 0.63 7,492.75 4,720.43
SUB TOTAL ................ 10,714.59
DESPERDICIO 5%
TOTALMATERIALES 10,714.59
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 3,257.00 3,257.00
TRANSPORTE GL 1.00 1,000.00 1,000.00
FORMALETA M3 2.50 4,000.00 1,600.00
TOTAL EQUIPOS 5,857.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 15.00 45,962.00 85,948.94 39,986.94 5,729.93
1 Oficial 15.00 34,471.50 64,461.71 29,990.21 4,297.45
4 Ayudantes 15.00 91,924.00 171,897.88 79,973.88 11,459.86
TOTAL MANO DE OBRA 21,487.24
TOTAL ANALISIS UNIT. 38,059.00 38059 -

Concreto 3000 PSI para Losa de piso y anden


UNIDAD. M2

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 0.0160 329,471.00 5,271.54
ALAMBRE NEGRO N18 kg 0.15 4,817.50 722.63
VARILLA 3/8 LEG 8.5 DDCO un 0.63 7,492.75 4,720.43
SUB TOTAL ................ 10,714.59
DESPERDICIO 5%
TOTALMATERIALES 10,714.59
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 2,819.00 2,819.00
MEZCLADORA A GASOLINA m3 12.00 60,000.00 5,000.00
VIBRADOR DE CONCRETO m3 12.00 40,000.00 3,333.33
ASPERSOR MANUAL (BOMBA DE ESPALDA) dia 5.00 5,000.00 1,000.00
RIEL METALICO 4.00M ANDEN dia 0.47 1,152.00 2,451.06
TOTAL EQUIPOS 14,603.40
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 30.00 45,962.00 85,948.94 39,986.94 2,864.96
1 Oficial 30.00 34,471.50 64,461.71 29,990.21 2,148.72
5 Ayudantes 30.00 114,905.00 214,872.35 99,967.35 7,162.41
TOTAL MANO DE OBRA 12,176.10
TOTAL ANALISIS UNIT. 37,494.00 37494 -

concreto para losa maciza e=15-30cm


UNIDAD. M3

MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL


CONCRETO 3000 PSI M3 1.0000 329,471.00 329,471.00

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

TABLA CARACOLI 0.30X4.00 CEPILLADA un 4.00 22,000.00 88,000.00

PUNTILLA DE HIERRO 2 1/2 CC X 500 GR un 0.60 4,000.00 2,400.00


SUB TOTAL ................ 419,871.00
DESPERDICIO 5% 20,993.55
TOTALMATERIALES 440,864.55
EQUIPOS UNIDAD RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 14,187.00 14,187.00
MEZCLADORA A GASOLINA m3 2.00 60,000.00 30,000.00
VIBRADOR DE CONCRETO m3 2.00 40,000.00 20,000.00
TABLERO DE MADERA 0.70X1.40 HORA 0.01 40.00 4,000.00
GATO METALICO HASTA 3.00M HORA 0.01 30.00 3,000.00
CERCHA METALICA 3.00M HORA 0.02 30.00 1,500.00
TOTAL EQUIPOS 72,687.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Maestro 2.00 45,962.00 85,948.94 39,986.94 42,974.47
1 Oficial 2.00 34,471.50 64,461.71 29,990.21 32,230.85
5 Ayudantes 2.00 114,905.00 214,872.35 99,967.35 107,436.18
TOTAL MANO DE OBRA 182,641.50
TOTAL ANALISIS UNIT. 696,193.00 696193 -

APU'S CIC
Levante de muros mamposteria 0,9
UNIDAD. M2
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
BLOQUE 0,9 UND 13.00 1,250.00 16,250.00
MORTERO 1:4 M3 0.033 - -
SUB TOTAL ................ 16,250.00
DESPERDICIO 5% 812.50
TOTALMATERIALES 17,062.50
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 4,300.00 4,300.00
TOTAL EQUIPOS 4,300.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 8 34,471.50 64,461.71 29,990.21 8,057.71
1 Ayudante 8 22,981.00 42,974.47 19,993.47 5,371.81
TOTAL MANO DE OBRA 13,429.52
TOTAL ANALISIS UNIT. 34,792.00 34792 -

APU'S CIC
Paete interior en mortero 1:4
UNIDAD. M2
DIRECCIN:CIUDAD DE SINCELEJO.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
MORTERO 1:4 EN OBRA M3 0.021 280,364.37 5,887.65

SUB TOTAL ................ 5,887.65


DESPERDICIO 5% 294.38
TOTALMATERIALES 6,182.03
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 149.00 149.00
TOTAL EQUIPOS 149.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 16.00 34,471.50 64,461.71 29,990.21 4,028.86
2 Ayudantes 16.00 45,962.00 85,948.94 39,986.94 5,371.81
TOTAL MANO DE OBRA 9,400.67
TOTAL ANALISIS UNIT. 15,732.00 15732 -

APU'S CIC
Paete interior en mortero 1:4 lineal
UNIDAD. Ml
DIRECCIN:CIUDAD DE SINCELEJO.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
MORTERO 1:4 EN OBRA M3 0.021 280,364.37 5,887.65

SUB TOTAL ................ 5,887.65


DESPERDICIO 5% 294.38
TOTALMATERIALES 6,182.03
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 908.00 908.00
TOTAL EQUIPOS 908.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 22.00 34,471.50 64,461.71 29,990.21 2,930.08
2 Ayudantes 22.00 45,962.00 85,948.94 39,986.94 3,906.77
TOTAL MANO DE OBRA 6,836.85
TOTAL ANALISIS UNIT. 13,927.00 13927 -

APU'S CIC
Paete exterior en mortero 1:4 impermeabilizado bajo placa
UNIDAD. M2
DIRECCIN:CIUDAD DE SINCELEJO.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL
MORTERO 1:4 EN OBRA M3 0.021 280,364.37 5,887.65

SUB TOTAL ................ 5,887.65


DESPERDICIO 5% 294.38
TOTALMATERIALES 6,182.03
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 1,044.00 1,044.00
TOTAL EQUIPOS 1,044.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 10.00 34,471.50 64,461.71 29,990.21 6,446.17
2 Ayudantes 10.00 45,962.00 85,948.94 39,986.94 8,594.89
TOTAL MANO DE OBRA 15,041.06
TOTAL ANALISIS UNIT. 22,267.00 22267 -

APU'S CIC
TUBERIA 4"
UNIDAD. Ml
DIRECCIN:CIUDAD DE SINCELEJO.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre


CIC CENTRO DE INTEGRACION CIUDADANA

SOLDADURA PVC 1/4 GAL. un 0.005 72,270.00 383.03


LIMPIADOR PVC 1/4 GAL. un 0.005 32,492.50 172.21
UNION SANITARIA 4`` ECONOMICA un 0.210 3,075.00 645.75
TUBO ECONOMICA VENTILACION 4`` un 0.175 49,610.00 8,681.75

SUB TOTAL ................ 9,882.74


DESPERDICIO 5% 494.14
TOTALMATERIALES 10,376.88
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 285.00 285.00
TOTAL EQUIPOS 285.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 17.00 34,471.50 64,461.71 29,990.21 3,791.87
2 Ayudantes 17.00 45,962.00 85,948.94 39,986.94 5,055.82
TOTAL MANO DE OBRA 8,847.69
TOTAL ANALISIS UNIT. 19,510.00 19510 -

APU'S CIC
Aseo general
UNIDAD. Gl
DIRECCIN:CIUDAD DE SINCELEJO.
MATERIALES UNIDAD CANT. VR. UNIT. Vr. TOTAL

SUB TOTAL ................ -


DESPERDICIO 5% -
TOTALMATERIALES -
EQUIPOS Vr DA RENDIM. VR. UNIT. VR. TOTAL
HERRAMIENTAS MENORES. GL 1.00 60,150.00 60,150.00
TOTAL EQUIPOS 60,150.00
MANO DE OBRA RENDIM. VR. DA 87% PREST. SOC. VR. TOTAL
1 Oficial 0.115 34,471.50 64,461.71 29,990.21 560,536.57
2 Ayudantes 0.115 45,962.00 85,948.94 39,986.94 747,382.09
TOTAL MANO DE OBRA 1,307,918.65
TOTAL ANALISIS UNIT. 1,368,069.00 1368069 -

CEL: 2764800 CALLE 26 #16A 95, CALLE SABANAS DE NARIOSincelejo Sucre