ANALISIS DE PRECIOS
UNITARIOS
. . MATERIAL UNIDAD CANTIDAD

PRELIMINARES

1.1.1 Localizacion y Replanteo m2


22G021 - DURMIENTE ORDINARIO 4 MT ML 0.0200
22G060 - PLANCHON ORDINARIO 3 MT ML 0.0200
22G103 - VARA DE CLAVO ML 0.0200
24C075 - PUNTILLA DE 2" C.C LBR 0.0200
27A844 - HILO POLIPROPILENO ML 0.2000
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
28A800 - EQUIPO DE TOPOGRAFIA MES 0.0003
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA HR 0.05
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

1.2.2 Letrinas en Mamposteria und


01A090 - RECEBO M3 0.10
02A030 - CONCRETO COMUN DE 2500 PSI DI M3 0.10
10B005 - SANITARIO ACUACER BLANCO UND 1.00
14A120 - GANCHO ETERNIT UND 8.00
14A310 - TEJA No.4 A.C. UND 4.00
16B045 - TUBO DE GRES DE 4"X1 MTS AA UND 10.00
17A035 - BISAGRA ACERO DE 3" UND 3.00
17A248 - PORTACANDADO DE 3" UND 1.00
22G093 - TABLA CHAPA ORDINARIO 0.30X3 M ML 14.00
22G100 - VARA BASE PROM.= 7 cm (CLAVO) UND 5.00
24C075 - PUNTILLA DE 2" C.C LBR 1.20
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 0.25%
SUBTOTAL HERRAMIENTAS ...
Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.12%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA HR 6.93
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

1.2.4 Valla de identificacion und


22G020 - DURMIENTE ORDINARIO 3 MT UND 2.0000
30A100 - EXCAVACION MANUAL M.O. M3 0.0240
30A104 - DADOS CONCRETO SIMPLE 2000 M3 0.0300
30A154 - RELLENO EN RECEBO COMPACTADO M3 0.0240
- VALLA LICENCIA DE CONSTRUCCION UND 1.0000
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 0.04%

1 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL HERRAMIENTAS ...


Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.01%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA HR 1.03
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Extendida y Afirmado en Rajon para Via Provisional Acceso


1.2.5 m3
Mixers
01A090 - RAJON M3 1.30
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 0.3%
SUBTOTAL HERRAMIENTAS ...
28A812 - VIBRO-COMPACTADOR DD 0.03
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA HR 0.52
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

1.3.1 Provisional Agua und


08M075 - LLAVE S/CROM.JAR.R:60404 C/R UND 1.5000
08E160 - VALVULA/REGISTRO RW 1/2" UND 1.5000
22G070 - REPISA ORDINARIO 3 MT ML 1.5000
25I060 - CODO 45 PVCP 1/2" UND 7.5000
25I120 - TUBO PVCP RDE 13.5 1/2" (6ML) ML 83.0000
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 1.31%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.60%
SUBTOTAL EQUIPO ...
- (El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB Instalaciones HR 29.91
SUBTOTAL MANO DE OBRA
- ACOMETIDA DE 1" EN PISO UND
MEDIDOR DE 1" (suministro e instlacion) UND
DERECHOS DE CONEXIN
TOTAL UNITARIO

1.3.2 Provisional Telefono glb


13A090 - ALAMBRE TWTF/ATT 2X22 ML 100.0000
13E161 - CAJA GALVANIZADA 5800 RECTAN. UND 5.0000
13P367 - TOMA SOBREPONER TELEFONO UND 5.0000
22G100 - VARA BASE PROM.= 7 cm (CLAVO) UND 2.0000
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 1.31%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.60%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA EE Electricos HR 7.96

2 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

1.3.3 Provisional Energia glb


13A050 - ALAMBRE TW 12 ML 960.00
13A070 - ALAMBRE TW 8 ML 320.00
13A180 - CABLE THW 1/0 ML -
13A185 - CABLE THW 2/0 ML -
13A220 - CABLE AISLADO No. 4 THHN-THWN ML 0.00
13C160 - INTERRUPTOR SENCILLO AVE 400 UND 12.00
13C265 - TOMA SENCILLA AVE 606 UND 12.00
13E126 - CAJA GALVANIZADA 2400 CUADRA. UND 12.00
13E131 - CAJA GALVANIZADA 5800 RECTAN. UND 1.00
13E136 - CAJA GALVANIZADA OCTAGONAL UND 12.00
13G060 - CAJA LUMINEX CTI-4 CIRCUITOS UND 2.00
13G160 - INTER.ENCH.1X30 HQP/QPX -1030 UND 8.00
13P335 - ROSETA PORCELANA UND 12.00
13P369 - TOMA DE 20 AMP. CODELCA UND 8.00
25A030 - TUBO PVC CONDUIT 1/2" (3ML) UND 25.00
25A031 - TUBO PVC CONDUIT 3/4" (3ML) UND 25.00
13M011 - TUBO 3" CONDUIT ML 0.00
13P100 - TRANSOFRMADOR TRIFASICO 45 KVA UND
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 1.37%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.60%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA EE Electricos HR 26.96
SUBTOTAL MANO DE OBRA
DERECHOS DE CONEXIN M2
SUBTOTAL OTROS
TOTAL UNITARIO

Solicitud de Servicio Temporal (TPO) de Acueducto y ejecucin


de la Obra respectiva para conexin en andn (sin importar el
tipo) de 1 1/2" - 2". La tramitologa contempla el diligenciamiento
de formularios, cronograma de actividades, planos actualizados y
georeferenciados, levantamiento de redes en caso de ser
necesario, memorias de clculo, autorizaciones de las entidades
competentes en caso de estar en sectores patrimoniales o
aledaos, especificaciones tcnicas, registros fotogrficos, y
dems documentos relacionados. La ejecucin de Obra
contempla la excavacin, tubera, accesorios, conexin a la red
principal y a red interna, recuperacin del espacio pblico (andn
del mismo tipo intervenido) y retiro y disposicin de escombros, y
porcentaje respectivo de los costos de Revisin de diseos por la
empresa de acueducto y costos de la Interventora por parte de la
empresa de acueducto. Incluye las correcciones de los
documentos y anexos hasta el momento en que el Servicio
Temporal (TPO) sea aprobado por parte de la empresa de
acueducto. NO incluye medidor ni registro de usuario (bola)

1.3.4 und
08M075 - ( No Aplica ) UND

3 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MATERIALES ...


20H700 - ( No Aplica ) % (M+MO)
SUBTOTAL HERRAMIENTAS ...
20H701 - ( No Aplica ) % (M+MO)
SUBTOTAL EQUIPO ...
- ( No Aplica )
SUBTOTAL TRANSPORTE ...
- ( No Aplica ) HR
SUBTOTAL MANO DE OBRA
- DERECHOS DE CONEXIN ACUEDUCTO UND 1.00
DERECHOS DE CONEXIN
TOTAL UNITARIO

Solicitud de Servicio Temporal (TPO) de Alcantarillado (A. Negras


y A. Lluvias) y ejecucin de la Obra respectiva para conexin en
andn (sin importar el tipo) de 6" - 8" en tubera de alcantarillado
corrugada PVC. La tramitologa contempla el diligenciamiento de
formularios, cronograma de actividades, planos actualizados y
georeferenciados, levantamiento de redes en caso de ser
necesario, memorias de clculo, autorizaciones de las entidades
competentes en caso de estar en sectores patrimoniales o
aledaos, especificaciones tcnicas, registros fotogrficos,
plizas respectivas solicitadas por el la empresa de acueductoy
acordes a la ejecucin de la obra, y dems documentos
relacionados. La ejecucin de Obra contempla la excavacin,
tubera, accesorios, conexin a la red principal, recuperacin del
espacio pblico (andn del mismo tipo intervenido) y retiro y
disposicin de escombros, y porcentaje respectivo de los costos
de Revisin de diseos por la la empresa de acueductoy costos
de la Interventora por parte de la EAAB. Incluye las correcciones
de los documentos y anexos hasta el momento en que el Servicio
Temporal (TPO) sea aprobado por parte de la EAAB. NO incluye
cajas de inspeccin

1.3.5 und
08M075 - ( No Aplica ) UND
SUBTOTAL MATERIALES ...
20H700 - ( No Aplica ) % (M+MO)
SUBTOTAL HERRAMIENTAS ...
20H701 - ( No Aplica ) % (M+MO)
SUBTOTAL EQUIPO ...
- ( No Aplica )
SUBTOTAL TRANSPORTE ...
- ( No Aplica ) HR
SUBTOTAL MANO DE OBRA
- DERECHOS DE CONEXIN ALCANTARILLADO UND 1.00
DERECHOS DE CONEXIN
TOTAL UNITARIO

4 de 474
. . MATERIAL UNIDAD CANTIDAD

Solicitud de Provisional de Obra de Energa con cargas menores


a 34 kW y ejecucin de la Obra respectiva. La tramitologa
contempla el diligenciamiento de formularios, cronograma de
actividades, planos actualizados y georeferenciados,
autorizaciones de las entidades competentes en caso de estar en
sectores patrimoniales o aledaos, especificaciones tcnicas,
registros fotogrficos, y dems documentos relacionados. La
ejecucin de Obra contempla el cableado, accesorios, conexin a
la red principal, suministro e instalacin del medidor provisional, y
complementarios. Incluye las adecuacines necesarias en obra y
las correciones de los documentos y anexos hasta el momento
en que la Provisional de Obra sea aprobado por parte de la
enpresa de energa.

1.3.6 und
08M075 - ( No Aplica ) UND
SUBTOTAL MATERIALES ...
20H700 - ( No Aplica ) % (M+MO)
SUBTOTAL HERRAMIENTAS ...
20H701 - ( No Aplica ) % (M+MO)
SUBTOTAL EQUIPO ...
- ( No Aplica )
SUBTOTAL TRANSPORTE ...
- ( No Aplica ) HR
SUBTOTAL MANO DE OBRA
- DERECHOS DE CONEXIN ENERGIA UND 1.00
DERECHOS DE CONEXIN
TOTAL UNITARIO

Solicitud de Lnea Telefnica con servicio de Internet Banda


Ancha y ejecucin de la Obra respectiva. La tramitologa
contempla el diligenciamiento de formularios, planos actualizados
y georeferenciados en caso de ser necesarios, autorizaciones de
las entidades competentes en caso de estar en sectores
patrimoniales o aledaos, y dems documentos relacionados. La
ejecucin de Obra contempla el cableado, accesorios, conexin a
la red principal, y complementarios. Incluye las adecuacines
necesarias en obra y las correciones de los documentos y
anexos hasta el momento en que la Linea Telefnica sea
aprobado e instalada

1.3.7 und
08M075 - ( No Aplica ) UND
SUBTOTAL MATERIALES ...
20H700 - ( No Aplica ) % (M+MO)
SUBTOTAL HERRAMIENTAS ...
20H701 - ( No Aplica ) % (M+MO)
SUBTOTAL EQUIPO ...
- ( No Aplica )
SUBTOTAL TRANSPORTE ...
- ( No Aplica ) HR
SUBTOTAL MANO DE OBRA
- DERECHOS DE CONEXIN TELEFONO UND 1.00
DERECHOS DE CONEXIN
TOTAL UNITARIO

5 de 474
. . MATERIAL UNIDAD CANTIDAD

Demolicin Integral Cerramiento Existente (Inlcuye demolicion


1.5.2 cimieneto, mamposteria, carpinterias, etc.) Incluye cargue, m2
transporte y botada de material.)
(no aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1%
28A800 - COMPRESOR DE 2 MARTILLOS HR 0.50
SUBTOTAL EQUIPO ...
28A802 - VOLQUETA (6M3) VJE 0.049
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA DEMOLICION HR 0.93
MANO DE OBRA CUADRILLA AA CARGUE HR 0.05
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Demolicion Integral Placa de Contrapiso e=10cm en Concreto


1.5.2 M2
Reforzado (incluye cargue y retiro)
(no aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1%
28A800 - COMPRESOR DE 2 MARTILLOS HR 0.44
SUBTOTAL EQUIPO ...
28A802 - VOLQUETA (6M3) VJE 0.022
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA DEMOLICION HR 0.68
- MANO DE OBRA CUADRILLA AA CARGUE HR 0.05
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Demolicion Integral Via en Concreto espesor e<=20 cm


1.5.4 M2
(incluye cargue y retiro)
(no aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1%
28A800 - COMPRESOR DE 2 MARTILLOS HR 0.44
SUBTOTAL EQUIPO ...
28A802 - VOLQUETA (6M3) VJE 0.022
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA DEMOLICION HR 0.68
- MANO DE OBRA CUADRILLA AA CARGUE HR 0.05
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Demoliciones en Concreto Reforzado de Cimientos y Estructuras


1.5.5 M3
Enterradas Aisladas (Incluye cargue y retiro)
(no aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2%

6 de 474
. . MATERIAL UNIDAD CANTIDAD

28A800 - COMPRESOR DE 2 MARTILLOS HR 3.75


SUBTOTAL EQUIPO ...
28A802 - VOLQUETA (6M3) VJE 0.217
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA DEMOLICION HR 7.66
MANO DE OBRA CUADRILLA AA CARGUE HR 0.48
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CIMENTACION

PILOTES PREEXCAVADOS

Pilotes Preexcavados de D=45 cm ( 1136 x 11+1m) Incluye:


Excavacin, Fundida, Localizacin, Prehuecos, Agua de
2.1.1 ml
Carrotanques, Retiro de lodos y Descabece de pilotes de 45 cm
de diametro y L= 1,00 m de longitud
- Bentonita (50kg) dd 0.1824
Suministro Agua m3 1.0000
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 0.0200
SUBTOTAL HERRAMIENTAS ...
- Grua p/excavacin Pinguelly 45Tn. 18m. dd 0.0231
- Cuchara Clamshell Bachy 7.5Tn. dd 0.0231
- Trepano de cruz dd 0.0231
- Bomba de membrana PDM dd 0.0231
- Bomba para agua dd 0.0231
- Tanque para lodo bentonitico 24m3 dd 0.0231
- Mezclador para bentonita dd 0.0231
- Conjunto tuberia para vaciado dd 0.0231
- Vigas E-810 x 12m dd 0.0231
- Motosoldadora Hobarta 400A dd 0.0231
- Sacavueltas E-116 dd 0.0231
- Equipo de laboratorio dd 0.0231
SUBTOTAL EQUIPO ...
- (no aplica)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Palonero HR 0.4880
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Manejo Acero de Refuerzo PDR-60 f'y=4.200


2.1.2 kg
kg/cm2 (420Mpa) Pilotes
04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

7 de 474
. . MATERIAL UNIDAD CANTIDAD

Suministro Concreto para Fundida Pilotes D = 45 cm


2.1.3 m3
f'c=3.500 psi ( 1136 x 11 + 1 ml ) (expansion 25 %)
02A051 - CONCRETO TREMIE 3500 pasi M3 1.00
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
(no aplica)
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
(no aplica)
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

EXCAVACIONES

Excavacion Mecanica a Niv. +2.40 Explanacin ( incluye retiro,


2.2.1 m3
cargue y transporte fuera de la obra )
(no aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
28A202 - RETROEXCAVADORA HR 0.0580
SUBTOTAL EQUIPO ...
28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA 1 Ayudante HR 0.0609
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Mecanica a Niv. +2.40 para Conformacin


2.2.2 m3
Subbase ( incluye retiro, cargue y transporte fuera de la obra )

(no aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
28A202 - RETROEXCAVADORA HR 0.0580
SUBTOTAL EQUIPO ...
28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA 1 Ayudante HR 0.0609
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Mecanica Tanques de Agua ( incluye retiro,


2.2.3 m3
cargue y transporte fuera de la obra )
(no aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
28A202 - RETROEXCAVADORA HR 0.0580

8 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL EQUIPO ...


28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA 1 Ayudante HR 0.0609
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Manual Dados ( incluye retiro, cargue y


2.2.4 m3
transporte fuera de la obra )
(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 1.25
MANO DE OBRA CUADRILLA AA Retiro y Cargue HR 0.45
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Manual Zapata Corrida (Incluye retiro, cargue y


2.2.5 m3
transporte fuera de la obra)
(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 1.25
MANO DE OBRA CUADRILLA AA Retiro y Cargue HR 0.45
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Manual Vigas Cimentacion ( incluye retiro,


2.2.6 m3
cargue y transporte fuera de la obra)
(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 1.25
MANO DE OBRA CUADRILLA AA Retiro y Cargue HR 0.45
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Manual Pozos Eyectores (Incluye retiro, cargue y


2.2.7 m3
transporte fuera de la obra )

9 de 474
. . MATERIAL UNIDAD CANTIDAD

(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 2.40
MANO DE OBRA CUADRILLA AA Retiro y Cargue HR 0.87
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Excavacion Manual Foso Ascensores ( incluye retiro,


2.2.8 m3
cargue y transporte fuera de la obra)
(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
28A200 VOLQUETA VJE 0.1667
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 2.40
MANO DE OBRA CUADRILLA AA Retiro y Cargue HR 0.87
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

PERFILADA y PROTECCION

2.3.1 Perfilada Manual Fondo Excavacion m2


(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 1.8%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
(No aplica)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.23
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.3.2 Perfilada Manual Paredes Dados m2


(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 1.8%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
(No aplica)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.23
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

10 de 474
. . MATERIAL UNIDAD CANTIDAD

2.3.3 Perfilada Manual Paredes Zapata m2


(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 1.8%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
(No aplica)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.23
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.3.4 Perfilada Manual Paredes Vigas Cimentacion m2


(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 1.8%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
(No aplica)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.23
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.3.5 Perfilada Manual Taludes Interiores m2


(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 1.0%
SUBTOTAL EQUIPO ...
(No aplica)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.23
SUBTOTAL MANO DE OBRA

TOTAL UNITARIO

2.3.6 Paete Proteccion Paredes Vigas y Dados m2


01D010 - ARENA DE PENA M3 0.0232
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1450
04I300 - MALLA ELECTROSOLDADA KG 0.71
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.52

11 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

2.3.7 Paete Proteccion Taludes Interiores m2


01D010 - ARENA DE PENA M3 0.0232
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1450
04I300 - MALLA ELECTROSOLDADA KG 0.71
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.52
SUBTOTAL MANO DE OBRA

TOTAL UNITARIO

RELLENOS

2.4.1 Rellenos en Material Local Compactado m3


(No aplica)
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
28A812 - VIBRO-COMPACTADOR Tipo Rana DD 0.05
SUBTOTAL EQUIPO ...
(No aplica)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Excavacion HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Relleno en Material Granular de Subbase INV 320 -7 en


capas de 30 cm para Nivelacion Terreno a Niv. +9.80. Incluye
2.4.2 m3
: Suministro, Extendida, Nivelacion, Humedecimiento y
compactacion
01A090 - BASE GRANULAR B-200 M3 1.30
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 0.0%
SUBTOTAL HERRAMIENTAS ...
28A811 - MOTONIVELADORA DD 0.0823985
28A812 - VIBRO-COMPACTADOR HR 0.0823985
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA HR 0.1045526
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

12 de 474
. . MATERIAL UNIDAD CANTIDAD

Base Granular Recebo B-400. Incluye Suministro, Extendida,


2.4.3 Nivelacin, Humedecimieto y Compatacion, para pisos en m3
concreto, gramoquin, funtes de agua, bordillos, jardines

01A090 - BASE GRANULAR B-400 M3 1.30


SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 0.0%
SUBTOTAL HERRAMIENTAS ...
28A811 - MOTONIVELADORA DD 0.0823985
28A812 - VIBRO-COMPACTADOR HR 0.0823985
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA HR 0.1045526
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CONCRETOS CIMENTACION

2.5.1 Concreto pobre e=5cm f'c=2.500 psi m2


02A010 - BOMBEO D M3 0.0525
02A030 - CONCRETO COMUN DE 2500 PSI M3 0.0525
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % ( MO ) 0.6%
SUBTOTAL HERRAMIENTAS ...
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0001
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Cimentacion HR 0.30
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.5.2 Dados en concreto reforzado f'c=4.000 psi2 m3


02A010 - BOMBEO D M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
22G121 - MADERA ORDINARIA M3 6.30
24C075 - PUNTILLA DE 2" C.C LBR 0.33
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.04
50F120 - ALQUILER TORRE GRUA MES/M3 0.0011
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 10.51
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.5.3 Zapata Corrida en concreto reforzado f'c=4.000 psi m3


02A010 - BOMBEO D M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
22G121 - MADERA ORDINARIA M3 6.30

13 de 474
. . MATERIAL UNIDAD CANTIDAD

24C075 - PUNTILLA DE 2" C.C LBR 0.33


SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.04
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0011
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 10.51
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Vigas Cimentacion en concreto reforzado f'c=4.000 psi


2.5.4 m3
02A010 - BOMBEO D M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
22G121 - MADERA ORDINARIA M3 6.30
24C075 - PUNTILLA DE 2" C.C LBR 0.33
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.04
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0011
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 10.51
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.5.5 Muro de Contencionen concreto reforzado f'c=4.000 psi m3


02A010 - BOMBEO D I M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.0000
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.6822
21B121 - DESENCOFRANTE KGR 0.38
* 21B122 - CURASEL KGR 0.13
* 21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 6.3000
* 24C075 - PUNTILLA DE 2" C.C LBR 0.8000
21B135 Cinta PVC A-15 ML 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
* 28A816 - VIBRADOR A GASOLINA HR 0.4300
50B225 - ANDAMIO TUBULAR SECCION MES 0.2000
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
50D500 - PARAL PLANO CON PASADOR DIA 2.0000
50F100 - FORCLAMPS METALICO C/TORNILLO DIA 0.2000
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0011
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

14 de 474
. . MATERIAL UNIDAD CANTIDAD

Tanques de Agua en concreto reforzado f'c=4.000 psi (son 4 )


2.5.6 m3
02A010 - BOMBEO D I M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.0000
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.6822
21B121 - DESENCOFRANTE KGR 0.38
* 21B122 - CURASEL KGR 0.13
* 21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 6.3000
* 24C075 - PUNTILLA DE 2" C.C LBR 0.8000
21B135 Cinta PVC A-15 ML 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
* 28A816 - VIBRADOR A GASOLINA HR 0.4300
50B225 - ANDAMIO TUBULAR SECCION MES 0.2000
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
50D500 - PARAL PLANO CON PASADOR DIA 2.0000
50F100 - FORCLAMPS METALICO C/TORNILLO DIA 0.2000
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0011
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pozos Eyectores y Trampa de Grasas en concreto reforzado


2.5.8 f'c=3000 psi m3
02A010 - BOMBEO D I M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.0000
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.6822
21B121 - DESENCOFRANTE KGR 0.38
* 21B122 - CURASEL KGR 0.13
* 21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 6.3000
* 24C075 - PUNTILLA DE 2" C.C LBR 0.8000
21B135 Cinta PVC A-15 ML 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
* 28A816 - VIBRADOR A GASOLINA HR 0.4300
50B225 - ANDAMIO TUBULAR SECCION MES 0.2000
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
50D500 - PARAL PLANO CON PASADOR DIA 2.0000
50F100 - FORCLAMPS METALICO C/TORNILLO DIA 0.2000
50F120 - ALQUILER TORRE GRUA MES/M3 0.0011
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

15 de 474
. . MATERIAL UNIDAD CANTIDAD

Fosos Ascensores en concreto reforzado f'c=3000 psi


2.5.9 m3
02A010 - BOMBEO D I M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.0000
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.6822
21B121 - DESENCOFRANTE KGR 0.38
* 21B122 - CURASEL KGR 0.13
* 21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 6.3000
* 24C075 - PUNTILLA DE 2" C.C LBR 0.8000
21B135 Cinta PVC A-15 ML 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
* 28A816 - VIBRADOR A GASOLINA HR 0.4300
50B225 - ANDAMIO TUBULAR SECCION MES 0.2000
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
50D500 - PARAL PLANO CON PASADOR DIA 2.0000
50F100 - FORCLAMPS METALICO C/TORNILLO DIA 0.2000
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0011
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Placa de Contrapiso Maciza e=10 cm en concreto f'c=3000


2.5.10 m2
psi. Niv. -3.20
02A010 - BOMBEO DI M3 0.11
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 0.11
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.11
22G120 - MADERA ORDINARIA M3 0.11
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 0.4147
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0001
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 0.64
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acabado Esmaltado y Endurecido (Solado S-3) sobre placa de


contrapiso en concreto para Areas de Servicio y Cuartos
Tcnicos Niv+2.40 que lo requieren. Incluye : Retardante de
2.5.11 m2
Evaporacion de agua Tipo Sikaflim (0.06 kg/m2) + Curador Tipo
Antisol Blanco para Tortas en Concreto ( 0.3 kg/m2 ) +
Endurecedor Sikaflor - 3 Quarz Top (5 kg/m2)

Esmaltado
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...

16 de 474
. . MATERIAL UNIDAD CANTIDAD

20H601 - ALLANADORA ALLEN DD 0.0234


SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.17
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
KGR
Tipo Sikaflim (0.06 kg/m2)
21B140 - SIKAFLIM KGR 0.06
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.0011
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
KGR
Tortas en Concreto ( 0.3 kg/m2 )
21B140 - ANTISOL BLANCO KGR 0.30
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.006
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
KGR
(5 kg/m2)
21B140 - SIKAFLOR - 3 QUARZ TOP KGR 5.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.10
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

LOSAS DE CONTRAPISO EN CONCRETO HIDRAULICO

Losa de Concreto MR43 e=15 cm para Area de


2.6.1 Estacionamiento Niv. +2.40. Incluye : suministro, formaleteado, m3
colocacion y acabado

02A010 - BOMBEO DI M3 1.00


02A035 - CONCRETO MR43 f'c=4.500 psi (31.5Mpa) M3 1.00

17 de 474
. . MATERIAL UNIDAD CANTIDAD

21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.11


SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A816 - REGLA VIBRAORIA Briss Straton 8HP DIA 0.15
22G120 - TEXTURIZADO PAVIMENTO CONCRETO DIA 2.71
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.00
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 7.18
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Losa de Concreto MR43 e=18 cm para Acceso Vehicular


2.6.2 Niv. +2.40. Incluye : suministro, formaleteado, colocacion y m3
acabado
02A010 - BOMBEO DI M3 1.00
02A035 - CONCRETO MR43 f'c=4.500 psi (31.5Mpa) M3 1.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.11
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A816 - REGLA VIBRAORIA Briss Straton 8HP DIA 0.15
22G120 - TEXTURIZADO PAVIMENTO CONCRETO DIA 2.71
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.00
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 7.18
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Losa de Concreto MR43 e=18 cm para Area de Descarga


2.6.3 y Abastecimiento Niv. +2.40. Incluye : suministro, m3
formaleteado, colocacion y acabado estriado
02A010 - BOMBEO DI M3 1.00
02A035 - CONCRETO MR43 f'c=4.500 psi (31.5Mpa) M3 1.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.11
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A816 - REGLA VIBRAORIA Briss Straton 8HP DIA 0.15
22G120 - TEXTURIZADO PAVIMENTO CONCRETO DIA 2.71
50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.00
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA Cimentacion HR 7.18
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Costo Adicional concreto MR43 por adicion de Fibra Metalica


2.6.4 m3
Re 3 48% (65/60) (20 kg/me) + Microfibra
02A035 - FRIBRA METALICA Re 3 48% M3 1.00
02A035 - MICROFIBRA M3 1.00

18 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MATERIALES ...


20H600 - No Aplica % (M+MO) 0.0%
SUBTOTAL HERRAMIENTAS ...
28A816 - No Aplica DIA 0.00
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- No Aplica HR 0.00
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Dilatacion Cortada con Disco de 25 mm de profundidad y 3 mm


2.6.5 ML
de ancho
( No Aplica )
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
- CORTADORA DE CONCRETO DD 0.05
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.17
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Aplicacin Sello Fondo de Junta con una Capa de


2.6.6 ML
Sika Road 3/8 ( 1 m/m )
21B140 - SIKA ROAD 3/8 ML 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.03
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Aplicacin Sello Junta Dilatacion con Sellante


2.6.7 Epoxico Semirigido Tipo Sikadur - 51 SL (91.7 gr/m junta de ML
25mm x 3 mm),
21B140 - SIKADUR 51 SL KGR 0.18
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.05
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

19 de 474
. . MATERIAL UNIDAD CANTIDAD

REFUERZO CIMENTACION

2.7.1 Acero PDR-60 Dados kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.7.2 Acero PDR-60 Zapatas Corridas kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.7.3 Acero PDR-60 Vigas Cimentacion kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.7.4 Acero PDR-60 Muros de Contencion kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...

20 de 474
. . MATERIAL UNIDAD CANTIDAD

20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%


SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.7.5 Acero PDR-60 Tanques de Agua kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.7.6 Acero PDR-60 Tanque Combustible kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.7.7 Acero PDR-60 Pozos Eyectores kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

2.7.8 Acero PDR-60 Foso Ascensor kg

21 de 474
. . MATERIAL UNIDAD CANTIDAD

04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05


24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Malla Electrosoldada f'y=5.000 kg/cm2 (500 Mpa) M.3.78


2.7.9 kg
Placa Cimentacion
04I300 - MALLA ELECTROSOLDADA KG 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ESTRUCTURA EN CONCRETO

ELEMENTOS VERTICALES EN CONCRETO

Columnas Circulares en concreto reforzado a la vista


3.1.1 m3
f'c=5000 psi
02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50F100 - MORDAZA-PLATINA 3"X1/4X0.75 MT DIA 35.0000
* 50F110 - FORMALETA Metalica para Elementos Circulares M2/M3 1.0000

22 de 474
. . MATERIAL UNIDAD CANTIDAD

* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012


SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Columnas Rectangulares en concreto reforzado a la vista


3.1.2 m3
f'c=5000 psi
02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05
02A047 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A048 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50F100 - MORDAZA-PLATINA 3"X1/4X0.75 MT DIA 35.0000
* 50F110 - FORMALETA Madera Liston Machimbrado M2/M3 1.0000
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 15.11
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pantallas Estructurales Interiores en concreto reforzado a


3.1.3 m3
la vista f'c=5000 psi (Muros HD01, HD02)

02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05


02A047 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A048 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000

23 de 474
. . MATERIAL UNIDAD CANTIDAD

* 50F100 - MORDAZA-PLATINA 3"X1/4X0.75 MT DIA 35.0000


* 50F110 - FORMALETA Madera Liston Machimbrado M2/M3 1.0000
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 15.11
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pantallas Estructurales Fachada en concreto reforzado a


3.1.4 m3
la vista f'c=5000 psi (Muros HD01, HD02)

02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05


02A047 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A048 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50F100 - MORDAZA-PLATINA 3"X1/4X0.75 MT DIA 35.0000
* 50F110 - FORMALETA Madera Liston Machimbrado M2/M3 1.0000
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 15.11
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

VIGAS AEREAS

Vigas Aereas Descolgadas Placa 2o Nivel, en concreto


3.2.1 m3
reforzado a la vista f'c=5000 psi. Niv. +6.10
02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...

24 de 474
. . MATERIAL UNIDAD CANTIDAD

28A816 - VIBRADOR A GASOLINA HR 1.6000


* 50F100 - FORCLAMPS DIA 35.0000
* 50F110 - FORMALETA Madera Liston Machimbrado M2/M3 0.7500
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 6.5127
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 15.72
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Vigas Aereas Descolgadas Placa 3o Piso, en concreto


3.2.2 m3
reforzado a la vista f'c=5000 psi. Niv. +9.85
02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50F100 - FORCLAMPS DIA 35.0000
* 50F110 - FORMALETA Madera Liston Machimbrado M2/M3 0.7500
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 6.5127
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 15.72
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Vigas Aereas Descolgadas Placa Cubierta, en concreto


3.2.3 m3
reforzado a la vista f'c=5000 psi. Niv. +16.20
02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50F100 - FORCLAMPS DIA 35.0000
* 50F110 - FORMALETA Madera Liston Machimbrado M2/M3 0.7500

25 de 474
. . MATERIAL UNIDAD CANTIDAD

* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 6.5127


* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 15.72
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Vigas Aereas Cubierta, en concreto reforzado a la vista


3.2.4 m3
f'c=5000 psi. Niv. +18.60
02A045 - CONCRETO COMUN DE 5000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 30.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50F100 - FORCLAMPS DIA 35.0000
* 50F110 - FORMALETA Madera Liston Machimbrado M2/M3 0.7500
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 6.5127
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0012
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 15.72
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

PLACAS EN CONCRETO

Placa Maciza h=25 cm en concreto reforzado a la vista


3.3.1 m2
f' c=4000 psi. 2o Nivel - Niv. +6.10
02A010 - BOMBEO DI M3 0.2625
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 0.2625
02A035 - SOBRECOSTO GRAVILLA FINA M3 0.2625
02A035 - SOBRECOSTO FLUIDO M3 0.2625
04U010 - DISTANCIADOR P/PLACAS 35mm UND 6.0000
21D120 - DESENCOFRANTE KGR 0.1200
22G010 - BOCEL 1/2 LUNA 15mm C/MACHO ML 0.9000
22G120 - MADERA ORDINARIA M3 2.0000
24C075 - PUNTILLA DE 2" C.C LBR 0.6000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.14%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.0368
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 8.4845
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0005
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)

26 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL TRANSPORTE ...


MANO DE OBRA CUADRILLA AA Estructura HR 2.41
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Placa Maciza h=25 cm en concreto reforzado a la vista f'


3.3.2 c=4000 psi, sobre vigas areas descolgadas, 3o Nivel - Niv. m2
+9.85 para Area Pabellon Ferial
02A010 - BOMBEO DI M3 0.2625
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 0.2625
02A035 - SOBRECOSTO GRAVILLA FINA M3 0.2625
02A035 - SOBRECOSTO FLUIDO M3 0.2625
04U010 - DISTANCIADOR P/PLACAS 35mm UND 6.0000
21D120 - DESENCOFRANTE KGR 0.1200
22G010 - BOCEL 1/2 LUNA 15mm C/MACHO ML 0.9000
22G120 - MADERA ORDINARIA M3 2.0000
24C075 - PUNTILLA DE 2" C.C LBR 0.6000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.14%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.0368
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 8.4845
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0005
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 2.41
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Placa Maciza h=35 cm en concreto reforzado a la vista f'


3.3.3 c=4000 psi, sobre vigas areas descolgadas, 3o Nivel - Niv. m2
+9.85 para Area Calle de Servicio
02A010 - BOMBEO DI M3 0.3675
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 0.3675
02A035 - SOBRECOSTO GRAVILLA FINA M3 0.3675
02A035 - SOBRECOSTO FLUIDO M3 0.3675
04U010 - DISTANCIADOR P/PLACAS 35mm UND 8.4000
21D120 - DESENCOFRANTE KGR 0.1680
22G010 - BOCEL 1/2 LUNA 15mm C/MACHO ML 1.2600
22G120 - MADERA ORDINARIA M3 2.8000
24C075 - PUNTILLA DE 2" C.C LBR 0.8400
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.14%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.4515
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 11.8782
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0007
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 3.3778
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

27 de 474
. . MATERIAL UNIDAD CANTIDAD

Placa Reticular Celulado h=60 cm en concreto reforzado


3.3.4 m2
a la vista f' c=4000 psi, Cubierta Niv. +16.20
02A010 - BOMBEO DI M3 0.29
02A045 - CONCRETO COMUN DE 4000 PSI DI M3 0.29
02A045 - SOBRECOSTO GRAVILLA FINA M3 0.29
02A045 - SOBRECOSTO FLUIDO M3 0.29
04U010 - DISTANCIADOR P/PLACAS 35mm UND 3.0000
21D120 - DESENCOFRANTE KGR 0.06
22G010 - BOCEL 1/2 LUNA 15mm C/MACHO ML 0.4500
22G120 - MADERA ORDINARIA M3 1.0000
24C075 - PUNTILLA DE 2" C.C LBR 0.3000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.14%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 0.6221
28A816 - CASETON DE ICOPOR RECUPERABLE M3/M3 0.2300
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 8.9971
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0003
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 3.73
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Placa Maciza h=25 cm en concreto reforzado a la vista f'


3.3.5 c=4000 psi, sobre vigas areas descolgadas, Cubierta - Niv. m2
+16.20
02A010 - BOMBEO DI M3 0.2625
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 0.2625
02A035 - SOBRECOSTO GRAVILLA FINA M3 0.2625
02A035 - SOBRECOSTO FLUIDO M3 0.2625
04U010 - DISTANCIADOR P/PLACAS 35mm UND 6.0000
21D120 - DESENCOFRANTE KGR 0.1200
22G010 - BOCEL 1/2 LUNA 15mm C/MACHO ML 0.9000
22G120 - MADERA ORDINARIA M3 2.0000
24C075 - PUNTILLA DE 2" C.C LBR 0.6000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.14%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.0368
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 8.4845
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0005
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 2.41
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Acabado Esmaltado y Endurecido (Solado S-3) sobre placas


aereas en concreto para Areas de Servicio y Cuartos
Tcnicos Niv+6.10, Niv.+9.85 y Niv.+1.20 que lo requiere.
3.3.6 Incluye : Retardante de Evaporacion de agua Tipo Sikaflim m2
(0.06 kg/m2) + Curador Tipo Antisol Blanco para Tortas en
Concreto ( 0.3 kg/m2 ) + Endurecedor Sikaflor - 3 Quarz Top (5
kg/m2)

28 de 474
. . MATERIAL UNIDAD CANTIDAD

Esmaltado
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H601 - ALLANADORA ALLEN DD 0.0234
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.17
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
KGR
Tipo Sikaflim (0.06 kg/m2)
21B140 - SIKAFLIM KGR 0.06
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.0011
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
KGR
Tortas en Concreto ( 0.3 kg/m2 )
21B140 - ANTISOL BLANCO KGR 0.30
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.006
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
KGR
(5 kg/m2)
21B140 - SIKAFLOR - 3 QUARZ TOP KGR 5.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.10
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

29 de 474
. . MATERIAL UNIDAD CANTIDAD

Acabado Esmaltado y Endurecido sobre placa en concreto


(Solado S-3) Area Pabellon Ferial Niv.+9.85 que lo requiere.
Incluye : Retardante de Evaporacion de agua Tipo Sikaflim
3.3.7 m2
(0.06 kg/m2) + Curador Tipo Antisol Blanco para Tortas en
Concreto ( 0.3 kg/m2 ) + Endurecedor Sikaflor - 1 Metal Top (7
kg/m2)

Esmaltado
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H601 - ALLANADORA ALLEN DD 0.0234
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.17
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
KGR
Tipo Sikaflim (0.06 kg/m2)
21B140 - SIKAFLIM KGR 0.06
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.0011
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
KGR
Tortas en Concreto ( 0.3 kg/m2 )
21B140 - ANTISOL BLANCO KGR 0.30
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.006
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
KGR
(5 kg/m2)
21B140 - SIKAFLOR - 1 METAL TOP KGR 7.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.14
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

30 de 474
. . MATERIAL UNIDAD CANTIDAD

Acabado Estriado y Endurecido (Solado S-3) sobre placas


aereas en concreto para Area Calle de Servicio y Area de
Descarga, Niv.+9.85 que lo requieren. Incluye : Retardante
3.3.8 m2
de Evaporacion de agua Tipo Sikaflim (0.06 kg/m2) + Curador
Tipo Antisol Blanco para Tortas en Concreto ( 0.3 kg/m2 ) +
Endurecedor Sikaflor - 1 Metal Top (7 kg/m2)

Esmaltado
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H601 - ALLANADORA ALLEN DD 0.0234
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.17
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Retardante de Evaporacion de agua
KGR
Tipo Sikaflim (0.06 kg/m2)
21B140 - SIKAFLIM KGR 0.06
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.0011
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Curador Tipo Antisol Blanco para
KGR
Tortas en Concreto ( 0.3 kg/m2 )
21B140 - ANTISOL BLANCO KGR 0.30
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.006
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
Suministro y Aplicacin Endurecedor Sikaflor - 3 Quarz Top
KGR
(5 kg/m2)
21B140 - SIKAFLOR - 1 METAL TOP KGR 7.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.14

31 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

ELEMENTOS VARIOS EN CONCRETO

Escalera Aerea No.1 Nucleo F1 - N1 en concreto


3.4.1 m3
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.2 Hall Recepcion F1 - P28 Oficinas


3.4.2 Camara de Comercio, en concreto reforzado a la vista f'c=4000 m3
psi Punto Fijo Principal Niv. +2.40 a +6.10

02A010 - BOMBEO DI M3 1.05


02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000

32 de 474
. . MATERIAL UNIDAD CANTIDAD

* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000


* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.3 Hall Recepcion F1-A02 Oficinas


3.4.3 Camara de Comercio en concreto reforzado a la vista m3
f'c=4000 psi. Niv. +2.40 a +6.10
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.4 Nucleo F1 - N6 en concreto


3.4.4 m3
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +16.20
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600

33 de 474
. . MATERIAL UNIDAD CANTIDAD

50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000


* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.5 Nucleo F1 - N7 en concreto


3.4.5 m3
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.6 Nucleo F1 - N5 en concreto


3.4.6 m3
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000

34 de 474
. . MATERIAL UNIDAD CANTIDAD

* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600


50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.7 Nucleo F1 - N3 en concreto


3.4.7 m3
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +16.20
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.8 Nucleo F1 - N2 en concreto


3.4.8 m3
reforzado a la vista f'c=4000 psi. Niv. +2.40 a +9.85
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...

35 de 474
. . MATERIAL UNIDAD CANTIDAD

28A816 - VIBRADOR A GASOLINA HR 1.6000


* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Escalera Aerea No.9 Extrior Paseo Peatonal en concreto


3.4.9 reforzado a la vista f'c=4000 psi Punto Fijo Principal Niv. m3
+2.40 a +9.85
02A010 - BOMBEO DI M3 1.05
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 1.05
02A045 - SOBRECOSTO GRAVILLA FINA M3 1.05
02A045 - SOBRECOSTO FLUIDO M3 1.05
04U010 - DISTANCIADOR P/PLACAS 35mm UND 12.00
21D300 - POLIETILENO C-4(1KG=10.66 M2) KGR 0.68
21B121 - DESENCOFRANTE KGR 0.38
21B122 - CURASEL KGR 0.13
21B1223 - EPOTOC KGR 0.22
22G121 - MADERA ORDINARIA M3 2.94
24C075 - PUNTILLA DE 2" C.C LBR 3.60
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.12%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.6000
* 50B225 - ANDAMIO TUBULAR SECCION MES 0.5600
50D150 - CAMILLA EN MADERA 0.70X1.40 MT SEM 5.0000
* 50D500 - PARAL PLANO CON PASADOR DIA 100.0000
* 50D400 - CERCHA METALICA 3.00 MTS UND 33.0000
* 50F120 - ALQUILER TORRE GRUA MES/M3 0.0010
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 19.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

REFUERZO ESTRUCTURA

3.5.1 Acero PDR-60 Columnas kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...

36 de 474
. . MATERIAL UNIDAD CANTIDAD

MANO DE OBRA CUADRILLA AA Trasiego y Manejo


Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.2 Acero PDR-60 Pantallas kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.3 Acero PDR-60 Vigas Aereas 2o Nivel +6.10 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.4 Acero PDR-60 Vigas Aereas 3o Nivel +9.85 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.5 Acero PDR-60 Vigas Aereas Cubierta +16.20 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)

37 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL HERRAMIENTAS ...


20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.6 Acero PDR-60 Vigas Aereas Cubierta +18.60 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.7 Acero PDR-60 Placa h=25 cm 2o Nivel +6.10 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.8 Acero PDR-60 Placa h=25 cm 3o Nivel +9.85 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

38 de 474
. . MATERIAL UNIDAD CANTIDAD

3.5.9 Acero PDR-60 Placa h=25 cm Cubierta +16.20 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.10 Acero PDR-60 Placa h=60 cm Cubierta +16.20 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

3.5.10 Acero PDR-60 Escaleras kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ESTRUCTURAS METALICAS

Suministro, Fabricacin, Montaje Estructura Metalica Cubierta


4.1.1 kg
en Aluminio Extruido AW7020
04M001 - ALUMINIO EXTRUIDO AW7020 KG 1.0500
04M002 - TORNILLERIA y SOLDADURA KG 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...

39 de 474
. . MATERIAL UNIDAD CANTIDAD

20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 5.0%


SUBTOTAL EQUIPO ...
TRANSPORTE KG 1.0500
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 0.0902
MANO DE OBRA CUADRILLA AA Montaje HR / KG 0.0808
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje Estructura Metalica Cajas 1


4.1.2 y 2 Acceso Principal Pabellon Ferial Niv. +2.40 y Niv.+9.85 kg
en Aluminio Extruido AW7020
04M001 - ALUMINIO EXTRUIDO AW7020 KG 1.0500
04M002 - TORNILLERIA y SOLDADURA KG 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 5.0%
SUBTOTAL EQUIPO ...
TRANSPORTE KG 1.0500
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 0.0902
MANO DE OBRA CUADRILLA AA Montaje HR / KG 0.0808
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje Estructura Metalica Cubierta


4.1.3 kg
Garita Acceso Vehicular Niv. +? en Aluminio Extruido AW7020

04M001 - ALUMINIO EXTRUIDO AW7020 KG 1.0500


04M002 - TORNILLERIA y SOLDADURA KG 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 5.0%
SUBTOTAL EQUIPO ...
TRANSPORTE KG 1.0500
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 0.0902
MANO DE OBRA CUADRILLA AA Montaje HR / KG 0.0808
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje y Pintura Estructura Metalica


Cubierta Niv.+18.60 Zona de Abastecimiento, en perfiles
4.1.4 kg
estructurales IPE 600, en Acero Galvanizado ASTM A-500
Grado C y A572, f'y=3510 (351 Mpa)
04M001 - LAMINA ASTM A-36 KG 1.0463
04M002 - SOLDADURA E-700X KG 0.0314
04M003 - TORNILLERIA SAE G-5 KG 0.0209
04M004 - OCIGENO, ACETILENO, DISCOS KG 1.1824
04M005 - PINTURA KG 1.0463
04M005 - PROCESO GALVANIZADO KG 1.0463
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...

40 de 474
. . MATERIAL UNIDAD CANTIDAD

20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.9%


SUBTOTAL EQUIPO ...
TRANSPORTE KG 1.0000
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 0.0575
MANO DE OBRA CUADRILLA AA Montaje HR / KG 0.0515
MANO DE OBRA CUADRILLA CC Pintura HR / KG 0.0070
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje y Pintura Estructura Metalica


Pasarelas Tecnicas ( son 14 ) Niv.+23.30 , en perfiles
4.2.1 kg
estructurales PT 220x70x4 mm y 40x40x2.5 mm, en Acero
Galvanizado ASTM A-36, f'y=250 Mpa
04M001 - LAMINA ASTM A-36 KG 1.0463
04M002 - SOLDADURA E-700X KG 0.0314
04M003 - TORNILLERIA SAE G-5 KG 0.0209
04M004 - OCIGENO, ACETILENO, DISCOS KG 1.1824
04M005 - PINTURA KG 1.0463
04M005 - PROCESO GALVANIZADO KG 1.0463
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.9%
SUBTOTAL EQUIPO ...
TRANSPORTE KG 1.0000
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 0.0575
MANO DE OBRA CUADRILLA AA Montaje HR / KG 0.0515
MANO DE OBRA CUADRILLA CC Pintura HR / KG 0.0070
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Fabricacin, Montaje y Pintura Estructura Metalica


Soporte Revestimiento Fachada en Chapa de Aluminio , en
4.2.2 kg
perfiles estructurales PT 50x50x2.5 mm, en Acero Galvanizado
ASTM A-36, f'y=250 Mpa
04M001 - LAMINA ASTM A-36 KG 1.0463
04M002 - SOLDADURA E-700X KG 0.0314
04M003 - TORNILLERIA SAE G-5 KG 0.0209
04M004 - OCIGENO, ACETILENO, DISCOS KG 1.1824
04M005 - PINTURA KG 1.0463
04M005 - PROCESO GALVANIZADO KG 1.0463
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.9%
SUBTOTAL EQUIPO ...
TRANSPORTE KG 1.0000
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 0.0575
MANO DE OBRA CUADRILLA AA Montaje HR / KG 0.0515
MANO DE OBRA CUADRILLA CC Pintura HR / KG 0.0070
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

41 de 474
. . MATERIAL UNIDAD CANTIDAD

Suministro, Fabricacin, Montaje Estructura Metalica Cubierta


4.3.1 kg
Pergola Paseo Peatonal en Aluminio Extruido AW7020

04M001 - ALUMINIO EXTRUIDO AW7020 KG 1.0500


04M002 - TORNILLERIA y SOLDADURA KG 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 5.0%
SUBTOTAL EQUIPO ...
TRANSPORTE KG 1.0500
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 0.0902
MANO DE OBRA CUADRILLA AA Montaje HR / KG 0.0808
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

TABIQUERIA y MAMPOSTERIA

TABIQUES EN PLACA CEMENTICIA

Muro D01 en Doble Placa Cementicia Azul : Superboard de


dos ( 2 ) cara vista en lamina de fibrocemento de 10mm con
9.1.1 M2
estructura galvanizada base 9 cal.24 con paral cada 40 cm
encintada y rematada
- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL UND 0.71
- PERFILERIA PARAL/CANAL c/60cm ML 1.75
- TORNILLO AUTOPERFORANTE UND 6.00
- CORDON SELLANTE ELASTOMERICO ML 2.00
- VINILICO PREPARADO GLN 0.14
- FRESCASA 3.1/2" m2 1.00
SUBTOTAL MATERIALES ...
- HERRAMIENTAS MENORES % 5%
SUBTOTAL HERRAMIENTAS ...
MANO DE OBRA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Muro D02 en Doble Placa Cementicia Verde : Superboard


de dos ( 2 ) cara vista en lamina de fibrocemento de 10mm con
9.1.2 M2
estructura galvanizada base 9 cal.24 con paral cada 40 cm
encintada y rematada

- LAMINA SUPERBOAR 1.22x2.44 10 mm VERDE UND 0.71


- PERFILERIA PARAL/CANAL c/60cm ML 1.75
- TORNILLO AUTOPERFORANTE UND 6.00
- CORDON SELLANTE ELASTOMERICO ML 2.00
- VINILICO PREPARADO GLN 0.14
- FRESCASA 3.1/2" m2 1.00
SUBTOTAL MATERIALES ...
- HERRAMIENTAS MENORES % 5%
SUBTOTAL HERRAMIENTAS ...

42 de 474
. . MATERIAL UNIDAD CANTIDAD

MANO DE OBRA ...


SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Muro D03 en Doble Placa Cementicia Mixto : Superboard


de dos ( 2 ) cara vista en lamina de fibrocemento de 10mm con
9.1.3 M2
estructura galvanizada base 9 cal.24 con paral cada 40 cm
encintada y rematada

- LAMINA SUPERBOAR 1.22x2.44 10 mm VERDE UND 0.35


- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL UND 0.35
- PERFILERIA PARAL/CANAL c/60cm ML 1.75
- TORNILLO AUTOPERFORANTE UND 6.00
- CORDON SELLANTE ELASTOMERICO ML 2.00
- VINILICO PREPARADO GLN 0.14
- FRESCASA 3.1/2" m2 1.00
SUBTOTAL MATERIALES ...
- HERRAMIENTAS MENORES % 5%
SUBTOTAL HERRAMIENTAS ...
MANO DE OBRA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Muro D04, D05 en Doble Placa Cementicia Mixta y Doble


Estructura esp. 22 o 36 cm : Superboard de dos ( 2 ) cara
9.1.4 vista en lamina de fibrocemento de 10mm con estructura M2
galvanizada base 9 cal.24 con paral cada 40 cm encintada y
rematada

- LAMINA SUPERBOAR 1.22x2.44 10 mm VERDE UND 0.35


- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL UND 0.35
- PERFILERIA PARAL/CANAL c/60cm ML 3.51
- TORNILLO AUTOPERFORANTE UND 6.00
- CORDON SELLANTE ELASTOMERICO ML 2.00
- VINILICO PREPARADO GLN 0.14
- FRESCASA 3.1/2" m2 1.00
SUBTOTAL MATERIALES ...
- HERRAMIENTAS MENORES % 4%
SUBTOTAL HERRAMIENTAS ...
MANO DE OBRA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Muro HD-01 en Placa Sencilla Cementicia Azul :


Superboard una ( 1 ) cara vista en lamina de fibrocemento de
9.1.5 M2
10mm con estructura galvanizada base 9 cal.24 con paral cada
40 cm encintada y rematada

- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL UND 0.35


- PERFILERIA PARAL/CANAL c/60cm ML 1.75
- TORNILLO AUTOPERFORANTE UND 3.00
- CORDON SELLANTE ELASTOMERICO ML 1.00
- VINILICO PREPARADO GLN 0.07
- FRESCASA 3.1/2" m2 1.00
SUBTOTAL MATERIALES ...

43 de 474
. . MATERIAL UNIDAD CANTIDAD

- HERRAMIENTAS MENORES % 5%
SUBTOTAL MATERIALES ...
MANO DE OBRA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Muro HD-01 en Placa Sencilla Cementicia Azul :


Superboard una ( 1 ) cara vista en lamina de fibrocemento de
9.1.6 12 mm con estructura galvanizada base 9 cal.24 con paral cada M2
40 cm encintada, masillada y rematada, con acabado en pintura
de vinilo blanco.

- LAMINA SUPERBOAR 1.22x2.44 10 mm AZUL UND 0.35


- PERFILERIA PARAL/CANAL c/60cm ML 1.75
- TORNILLO AUTOPERFORANTE UND 3.00
- CORDON SELLANTE ELASTOMERICO ML 1.00
- VINILICO PREPARADO GLN 0.07
- FRESCASA 3.1/2" m2 1.00
SUBTOTAL MATERIALES ...
- HERRAMIENTAS MENORES % 5%
SUBTOTAL MATERIALES ...
MANO DE OBRA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

9.1.7 Dilatacion Plastica en Z ML


- Dilatacion Plastica en Z ml 1.00
SUBTOTAL MATERIALES ...
- NO APLICA % 0%
SUBTOTAL MATERIALES ...
NOP APLICA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

MUROS EN BLOQUE DE CONCRETO

Muros en Bloque de Concreto de 19 cm de espesor, Tipo


9.2.1 m2
Bloque de KREATO o INDURAL o equivalente, Color Gris liso

01D010 - ARENA DE PENA M3 0.03


03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.25
03C001 - CAL (10 kls) BTO 0.02
06M070 - BLOQUE CONCRETO 20 x 20 x 40 COLOR GRIS UND 12.50
21B160 - TOXEMENT POLVO KGR 0.25
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A840 - CORTADORA DE LADRILLO DD 0.02
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.84
SUBTOTAL MANO DE OBRA

44 de 474
. . MATERIAL UNIDAD CANTIDAD

TOTAL UNITARIO

Muros en Bloque de Concreto de 12 cm de espesor, Tipo


9.2.2 m2
Bloque de KREATO o INDURAL o equivalente, Color Gris liso

01D010 - ARENA DE PENA M3 0.03


03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.25
03C001 - CAL (10 kls) BTO 0.02
06M070 - BLOQUE CONCRETO 15 x 2 0 x 40 COLOR GRIS UND 12.50
21B160 - TOXEMENT POLVO KGR 0.25
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.2%
SUBTOTAL HERRAMIENTAS ...
28A840 - CORTADORA DE LADRILLO DD 0.02
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.84
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

REFUERZO CONFINAMIENTO

9.3.1 Grafil 5mm kg


04C011 - Grafil 5mm KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

9.3.2 Acero PDR-60 kg


04C010 - HIERRO FIGURADO DE 60000 PSI KGR 1.05
24A060 - ALAMBRE NEGRO #18 (KG=111.11M) KGR 0.03
SUBTOTAL MATERIALES ...
(no aplica)
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.02
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CONFINAMIENTO y BORDILLOS

45 de 474
. . MATERIAL UNIDAD CANTIDAD

Bordillos para Apoyo Ventaneria de 15 x 20 cm en concreto


9.4.5 ml
reforzado a la vista f'c=3000 psi Niv.+2.40 / + 6.10 / + 9.85

02A035 - CONCRETO COMUN DE 3000 PSI DI M3 0.0315


04U005 - DISTANCIADOR P/COLUMNA 35mm UND 0.0315
04U010 - DISTANCIADOR P/PLACAS 35mm UND 0.0315
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
22G120 - FORMALETA DE MADERA M2/M3 0.0341
28A816 - VIBRADOR A GASOLINA HR 0.0148
50D500 - PARAL PLANO CON PASADOR DIA 2.0000
50B225 - ANDAMIO TUBULAR SECCION MES 0.0133
50F030 - FORCLAMPS METALICO C/TORNILLO DD 0.1190
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.29
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Bordillos para Arranque Mamposteria de 15 x 20 cm en


9.4.2 ml
concreto reforzado a la vista f'c=3000 psi
02A035 - CONCRETO COMUN DE 3000 PSI DI M3 0.0315
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 0.0315
04U010 - DISTANCIADOR P/PLACAS 35mm UND 0.0315
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
22G120 - FORMALETA DE MADERA M2/M3 0.0341
28A816 - VIBRADOR A GASOLINA HR 0.0148
50D500 - PARAL PLANO CON PASADOR DIA 2.0000
50B225 - ANDAMIO TUBULAR SECCION MES 0.0133
50F030 - FORCLAMPS METALICO C/TORNILLO DD 0.1190
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.29
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Viga sobre Muro o Dientel de 15 x 20 cm en concreto


9.4.3 ml
reforzado a la vista f'c=3000 psi
02A035 - CONCRETO COMUN DE 3000 PSI DI M3 0.0315
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 0.0315
04U010 - DISTANCIADOR P/PLACAS 35mm UND 0.0315
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
22G120 - FORMALETA DE MADERA M2/M3 0.0341
28A816 - VIBRADOR A GASOLINA HR 0.0148
50D500 - PARAL PLANO CON PASADOR DIA 2.0000
50B225 - ANDAMIO TUBULAR SECCION MES 0.0133
50F030 - FORCLAMPS METALICO C/TORNILLO DD 0.1190
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...

46 de 474
. . MATERIAL UNIDAD CANTIDAD

MANO DE OBRA CUADRILLA AA Albaileria HR 1.29


SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Bordillos Cubierta de seccion <= 45 x 15 cm en concreto


9.4.4 ml
reforzado f'c=3500 psi
02A035 - CONCRETO COMUN DE 3000 PSI DI M3 0.0675
04U005 - DISTANCIADOR P/COLUMNA 35mm UND 0.0675
04U010 - DISTANCIADOR P/PLACAS 35mm UND 0.0675
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
22G120 - FORMALETA DE MADERA M2/M3 0.0730
28A816 - VIBRADOR A GASOLINA HR 0.0317
50D500 - PARAL PLANO CON PASADOR DIA 4.2857
50B225 - ANDAMIO TUBULAR SECCION MES 0.0285
50F030 - FORCLAMPS METALICO C/TORNILLO DD 0.2550
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 2.77
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Tapas Macizas Ductos Cubierta de 25 cm de espesor en


9.4.5 m2
concreto reforzado f'c=3.000 psi
02A010 - BOMBEO DI M3 0.2625
02A035 - CONCRETO COMUN DE 4000 PSI DI M3 0.2625
02A035 - SOBRECOSTO GRAVILLA FINA M3 0.2625
02A035 - SOBRECOSTO FLUIDO M3 0.2625
04U010 - DISTANCIADOR P/PLACAS 35mm UND 6.0000
21D120 - DESENCOFRANTE KGR 0.1200
22G010 - BOCEL 1/2 LUNA 15mm C/MACHO ML 0.9000
22G120 - MADERA ORDINARIA M3 2.0000
24C075 - PUNTILLA DE 2" C.C LBR 0.6000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.14%
SUBTOTAL HERRAMIENTAS ...
28A816 - VIBRADOR A GASOLINA HR 1.0368
* 50F110 - FORMALETA Entrepiso (Camilla+Cercha+Parales) M2/MES 8.7987
* 50F120 - ALQUILER TORRE GRUA ( 2 unidades ) MES/M3 0.0005
SUBTOTAL FORMALETA y EQUIPOS ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Estructura HR 2.41
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

9.4.6 Dovelas en grouting ml


02A110 - GROUTING 3000 PSI M3 0.0095
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
(no aplica)
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)

47 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL TRANSPORTE ...


MANO DE OBRA CUADRILLA AA Albaileria HR 0.11
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

9.4.7 Refuerzo horizontal muros ml


01D010 - ARENA DE PENA M3 0.0033
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.0209
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.7%
SUBTOTAL HERRAMIENTAS ...
(no aplica)
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.07
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

9.4.8 Anclaje : Perforacion + Inyeccin epoxico 3/8" L = 14.29 cm und

ANCLAJE HILTI HI HY 150 ( 1car = 330 mml) Car 0.0255


SUBTOTAL MATERIALES ...
50F120 - DISPENSADOR Und 0.0006
SUBTOTAL HERRAMIENTAS ...
- TALADO PERCUTOR DIA 0.04
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.16
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CUBIERTAS

BASES PARA IMPERMEABILIZACIONES

Pendientado y Afinado con Mortero Impermeabilizado,


10.1.1 espesor promedio e=6 cm, llenado con mortero y/o material m2
aliviandado, sobre Cubiertas Niv. +9.85
01D030 - ARENA LAVADA DE PEA M3 0.0464
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.2900
20H600 - TOXEMENT POLVO KGR 0.2900
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.72
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

48 de 474
. . MATERIAL UNIDAD CANTIDAD

Pendientado y Afinado con Mortero Impermeabilizado,


10.1.2 espesor promedio e=6 cm, llenado con mortero y/o material m2
aliviandado, sobre Cubiertas Niv.+16.20

01D030 - ARENA LAVADA DE PEA M3 0.0464


03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.2900
20H600 - TOXEMENT POLVO KGR 0.2900
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.72
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

10.1.4 Mediacaa con Mortero Impermeabilizado Cubiertas ml


01D030 - ARENA LAVADA DE PEA M3 0.0140
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.0870
20H600 - TOXEMENT POLVO KGR 0.0870
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.41
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CUBIERTA LIVIANA

Panel Metalico para Cubierta , tipo sandwich, inyectado en linea


continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
10.2.1 m2
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno o equivalente. para Cubierta Principal Niv.+23.85

Panel Metalico para Cubierta , tipo sandwich, inyectado en linea


continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
M2 1.00
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno
-
- Tornillos Traxxx 3 UND 3.00
- Tornillo Graxx 1 UND 2.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)

49 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL TRANSPORTE ...


MANO DE OBRA CUADRILLA AA Albaileria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Panel Metalico para Cubierta , tipo sandwich, inyectado en linea


continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
10.2.2 flexible de poliolefina termoplastica TPO y cara interna en lamina m2
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno o equivalente. para Cubierta Zona de Abastecimiento
Niv.+18.60

Panel Metalico para Cubierta , tipo sandwich, inyectado en linea


continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
M2 1.00
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno
-
- Tornillos Traxxx 3 UND 3.00
- Tornillo Graxx 1 UND 2.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Panel Metalico para Cubierta ,tipo sandwich, inyectado en linea


continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
10.2.3 flexible de poliolefina termoplastica TPO y cara interna en lamina m2
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno o equivalente. para Cubierta Garita Acceso Vehicular
Niv.+?

Panel Metalico para Cubierta , tipo sandwich, inyectado en linea


continua con poliuretano expandido de alta densidad (38
kg/m3) , cara externa preimpermeabilizada con una membrana
M2 1.00
flexible de poliolefina termoplastica TPO y cara interna en lamina
de acero galvanizada prepintada, Tipo TECHMET DRY de
Metecno
-
- Tornillos Traxxx 3 UND 3.00
- Tornillo Graxx 1 UND 2.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.62

50 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Remate Cubierta en Aluminio 0.6mm cal. 24 desarrollo 610


10.2.4 ml
mm pintada color Citrus SW 6906
Remate Cubierta en Aluminio 0.6mm cal. 24 desarrollo 610
ml 1.00
- mm pintada color Citrus SW 6906
- Tornillos Traxxx 3 UND 1.00
- Tornillo Graxx 1 UND 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.44
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Remate Borde Cubierta en Aluminio 0.6mm cal. 24 desarrollo


10.2.5 ml
1.25 m pintada color Citrus SW 6906
Remate Cubierta en Aluminio 0.6mm cal. 24 desarrollo 610
ml 1.00
- mm pintada color Citrus SW 6906
- Tornillos Traxxx 3 UND 2.00
- Tornillo Graxx 1 UND 2.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.78
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Panel de Aluminio Liso Software 50 de Hunter Douglas o


10.2.6 equivalente, Color Verde Limon HD 7044, para Cubierta m2
Paseo Peatonal
Panel de Aluminio Liso Software 50 de Hunter Douglas o
M2 1.00
- equivalente, Color Verde Limon HD 7044
- Tornillos Traxxx 3 UND 3.00
- Tornillo Graxx 1 UND 2.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

51 de 474
. . MATERIAL UNIDAD CANTIDAD

Panel de Aluminio Perforado Software 50 de Hunter Douglas o


10.2.7 equivalente, Color Verde Limon HD 7044, para Cubierta m2
Paseo Peatonal
Panel de Aluminio Liso Software 50 de Hunter Douglas o
M2 1.00
- equivalente, Color Verde Limon HD 7044
- Tornillos Traxxx 3 UND 3.00
- Tornillo Graxx 1 UND 2.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Canal en Aluminio 0.6mm cal. 24 desarrollo 100 cm pintada


10.2.8 ml
color Verde, para Cubierta Paseo Peatonal
Canal en Aluminio 0.6mm cal. 24 desarrollo 100 cm pintada
ml 1.00
- color Verde,
- Tornillos Traxxx 3 UND 2.00
- Tornillo Graxx 1 UND 2.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (MO) 2.3%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.73
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CUBIERTA LIVIANA

Subtrato Liviano de Base Mineral (800 kg/m3 en seco), Volumen


de Aire minimo : 10%, P.H. 6 a 8, Conducitvidad electrica maxima
: 2 microsiemens, Capacidad de retencion de agua : entre 35 6
10.3.1 m3
65%, Contenido maximo de materia organica : 15%, Espesor de3
Subtato : de 3 a 8 cm, para Cubiertas Verdes Niv. +18.67, Niv.
+20.53, Niv.+22.42 y Niv.+24.28

Subtrato Liviano de Base Mineral (800 kg/m3 en seco), Volumen


de Aire minimo : 10%, P.H. 6 a 8, Conducitvidad electrica maxima
- m3 1.00
: 2 microsiemens, Capacidad de retencion de agua : entre 35 6
65%, Contenido maximo de materia organica : 15%

SUBTOTAL MATERIALES ...


20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.65

52 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura


10.3.2 Vegetal en AE Aeonium (Aedonium spp), 8 plantulas por m2, m2
para Cubiertas Verdes Niv.+16.20
- AE Aeonium (Aedonium spp), 8 plantulas por m2 und 8.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.84
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura


10.3.3 Vegetal en MF Mani Forrajero (Arachis), 12 plantulas por m2, m2
para Cubiertas Verdes Niv.+16.20
- MF Mani Forrajero (Arachis), 12 plantulas por m2 und 12.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.84
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura


10.3.9 Vegetal en FIL Filodendros (Phylodendrum spp), 5 plantulas m2
por m2, para Cubiertas Verdes Niv.+9.85
- FIL Filodendros (Phylodendrum spp), 5 plantulas por m2 und 5.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.84
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU2 : Cubierta Verde Extensiva con Cobertura vegetal


10.3.13 m2
Tipo CES Cesped, para Cubierta Verde Niv.+16.20

- Grama m2 1.05
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...

53 de 474
. . MATERIAL UNIDAD CANTIDAD

20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%


SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.21
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cubierta CU1 : Gravilla Lavada suelta y/o compactada de


colores claros, rojos y amarillos combinada con triturados de
marmol, triturados de madera y materiales vegetales,
10.3.14 m2
extendidada sobre la superficie de la cubierta conformando
figuras precolombinas de colores, segun diseo paisajistico.
Incluye Suministro, Extendida y Conformacion.

- Gravilla Lavada de 3/4" m3 0.04


- Triturado de marmol m3 0.03
- ARENA LAVADA DE PEA M3 0.0112
- CEMENTO GRIS PORTLAND (50 kls) BTO 0.0695
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.08
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol CLE Clemon (Thespesia


10.3.15 m2
populnea) de h=1.50 m
- Arbol CLE Clemon (Thespesia populnea) de h=1.50 m und 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.24
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol OV Olivo (Capparis


10.3.16 m2
adoratissima) de h=1.50 m
- Arbol OV Olivo (Capparis adoratissima) de h=1.50 m und 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.24
SUBTOTAL MANO DE OBRA

54 de 474
. . MATERIAL UNIDAD CANTIDAD

TOTAL UNITARIO

Suministro y Siembra de Arbol UVP Uva de Playa (Coccoloba


10.3.17 m2
uvifera) de h=1.50 m

- Arbol UVP Uva de Playa (Coccoloba uvifera) de h=1.50 m und 1.00

SUBTOTAL MATERIALES ...


20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.24
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol TR Trupillo (Prosoposis


10.3.18 m2
juliflora) de h=1.50 m
- Arbol TR Trupillo (Prosoposis juliflora) de h=1.50 m und 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.24
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol GM Gomo (Cordia dentata)


10.3.19 m2
de h=1.50 m
- Arbol GM Gomo (Cordia dentata) de h=1.50 m und 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.24
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro y Siembra de Arbol PAV Palo Verde (Parkisonaria


10.3.20 m2
acueta) de h=1.50 m

- Arbol PAV Palo Verde (Parkisonaria acueta) de h=1.50 m und 1.00

SUBTOTAL MATERIALES ...


20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)

55 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL TRANSPORTE ...


MANO DE OBRA CUADRILLA AA Albaileria HR 0.24
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

PAETE

Paete P-1 : Paete Corriente sobre Muros Interiores con


11.1.1 mortero M.1:4 y espesor e=2 cm m2
01D010 - ARENA DE PENA M3 0.0239
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1494
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.47
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Paete P-3 : Paete Impermeabilizado sobre Muros


Exteriores con mortero impermeabilizado M.1:4 y espesor e=2
11.1.2 cm m2
01D010 - ARENA DE PENA M3 0.0239
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1494
21B160 - TOXEMENT POLVO KGR 0.1124
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.47
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Paete Impermeabilizado Tanques de Agua M.1:4 e= 2 cm


11.1.3 m2
01D010 - ARENA DE PENA M3 0.0239
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1494
21B160 - TOXEMENT POLVO KGR 0.1124
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.47
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

56 de 474
. . MATERIAL UNIDAD CANTIDAD

Paete Vanos Ventanas y Puertas con mortero


11.1.4 ml
impermeabilizado M:1:4 y espesor e=2 cm
01D010 - ARENA DE PENA M3 0.00
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.01
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 3.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.27
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Panete Filos y Dilataciones con mortero M.1:4 y espesor


11.1.5 e=2cm ml
01D010 - ARENA DE PENA M3 0.00
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.01
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.12
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

REVESTIMIENTOS

Revestimiento T - 9 : Enchape en Porcelanato color Gris de


45 x 90 cm para Muros Baos Publicos, Baos
12.1.1 Discapacitados, Baos VIP, Baos Oficinas y Cambiaderos. m2
(Incluye pega, biselada, win de remate en aluminio y
emboquillada)
12C100 - PORCELANATO GRIS 45 x 90 cm M2 1.0500
21D235 - STONMIX LATEX KGR 2.0000
03B001 - STONMIX BOQUILLA BTO 0.0300
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.64
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

57 de 474
. . MATERIAL UNIDAD CANTIDAD

Revestimiento T - 10 : Enchape en Ceramica Blanca de 30 x


12.1.2 30 cm para Muros Baos de Servicio y Vestieres. (Incluye ml
pega, biselada, win de remate en aluminio y emboquillada)

03B001 - CEMENTO BLANCO (40kg) BTO 0.0200


12G053 - PARED CORONA ARITICA BLANCA 30x30 cm M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 10 : Enchape en Ceramica Blanca de 30 x


12.1.3 30 cm para Muros Cocina y Cuartos de Aseo. (Incluye pega, ml
biselada, win de remate en aluminio y emboquillada)

03B001 - CEMENTO BLANCO (40kg) BTO 0.0200


12G053 - PARED CORONA ARITICA BLANCA 30x30 cm M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 7 : Revestimiento en Corian , color Sun de


12.2.1 12 mm, sobre estructura de aluminio oculta, Muros Baos ML
Publicos, Baos VIP, Baos Oficinas, Cambiaderos y Foyer

12C150 - CORIAN Ref. SUN M2 1.0500


21D460 - LITOFLEX K-80 (pegante) KG 2.0000
21D470 - LITOSTUCK X-24 (emboquille) KG 0.0300
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.64
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

58 de 474
. . MATERIAL UNIDAD CANTIDAD

Revestimiento T - 8 : Revestimiento en Corian , color Gris


12.2.2 Sun de 12 mm, sobre estructura de aluminio oculta, Muros ML
Foyer
12C150 - CORIAN Ref. SUN M2 1.0500
21D460 - LITOFLEX K-80 (pegante) KG 2.0000
21D470 - LITOSTUCK X-24 (emboquille) KG 0.0300
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.64
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 7 Mesones : Superficie de Acabado en


Corian color Sun de 12 mm, ancho a=60 cm con estructura de
12.2.3 ML
soporte en aluminio, Mesones Lavamanos Baos Publicos,
Baos VIP, Baos Oficias y Cambiaderos
12C150 - CORIAN Ref. SUN M2 0.7350
04R10 - ANGULO ALUMINIO de 2" kg 2.0000
21D460 - LITOFLEX K-80 (pegante) KG 2.0000
21D470 - LITOSTUCK X-24 (emboquille) KG 0.0300
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 4.4047
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 7 Mesones : Superficie de Acabado en


12.2.4 Corian color Sun de 12 mm, ancho a=60 cm con estructura de ML
soporte en aluminio, Mesones Caf Oficinas

12C150 - CORIAN Ref. SUN M2 0.7350


04R10 - ANGULO ALUMINIO de 2" kg 2.0000
21D460 - LITOFLEX K-80 (pegante) KG 2.0000
21D470 - LITOSTUCK X-24 (emboquille) KG 0.0300
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 4.4047
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

59 de 474
. . MATERIAL UNIDAD CANTIDAD

Revestimiento T - 1 : Revestimiento en Cristal Doble 6 mm +


12.3.1 6mm color Tangerrine colocado sobre estructura de aluminio m2
oculta, Muros Fachada
04R111 - VIDRIO LAMINADO 6 + 6 mm color Tangerine M2 1.05
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
21B125 - SILICONA ESTRUCTURAL M2 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 2 : Revestimiento en Bandeja de Madera


Aglomerado enchapada en madera natural Abedul o Maio
12.3.2 m2
Tropical, colocado sobre estructura de aluminio oculta, Muros
Foyer
Bandeja de Madera Aglomerado enchapada en madera
04R111 - natural Abedul o Maio Tropical M2 1.05
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 5 : Revestimiento en Bandeja Metalwall


Hounter Douglas o equivalente , terminacin 7262 color Gris
12.3.3 Mineral Brillo 15%, junta abierta 6 mm, colocado sobre m2
estructura de aluminio oculta, Muros Pabellon de
Exposiciones

Bandeja Metalwall Hounter Douglas terminacin 7262 color


04R111 - Gris Mineral Brillo 15%, junta abierta 6 mm M2 1.05
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

60 de 474
. . MATERIAL UNIDAD CANTIDAD

Revestimiento T - 13 : Revestimiento Exterior en Chapa de


12.3.4 Aluminio de 3000 x 1500 x 3 mm perforada, colocado sobre m2
estructura de aluminio oculta, Muros Fachada Exterior

04R111 - Chapa de Aluminio de 3000 x 1500 x 3 mm perforada, M2 1.05


04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 13 : Revestimiento Exterior en Chapa de


12.3.4 Aluminio de 3000 x 1500 x 3 mm perforada, colocado sobre m2
estructura de aluminio oculta, Muros Fachada Exterior

04R111 - Chapa de Aluminio de 3000 x 1500 x 3 mm perforada, M2 1.05


04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 14 : Revestimiento Acrilico sobre Muros


12.3.5 m2
Exteriores, en Graniacryl o equivalente.
21D087 - GRANYACRIL GLN 0.0700
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
28A840 - EQUIPO MENOR % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA 1 Oficial HR 0.31
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - 16 : Revestimiento Bandejas de Aluminio


Exterior esp. 2.5 mm Tipo Hounter Douglas o equivalente ,
12.3.6 color 7320 Yema, pintura PDVF --2xl plus, colocado sobre m2
estructura de aluminio oculta, Caja de Acceso 1 y 2 Pabellon
Ferial

61 de 474
. . MATERIAL UNIDAD CANTIDAD

Bandejas de Aluminio Exterior esp. 2.5 mm Tipo Hounter


Douglas o equivalente , color 7320 Yema, pintura PDVF --2xl
04R111 - plus, M2 1.05
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - ? : Revestimiento Curvo en Bandeja


Metalwall Hounter Douglas o equivalente , terminacin 7262
12.3.7 color Gris Mineral Brillo 15%, junta abierta 6 mm, colocado m2
sobre estructura de aluminio oculta, Tapaductos Columnas
Pabellon Exposiciones

Bandeja Metalwall Hounter Douglas terminacin 7262 color


04R111 - Gris Mineral Brillo 15%, junta abierta 6 mm M2 1.05
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Revestimiento T - ? : Revestimiento Zocalo Columnas Pabellon


12.3.8 Exposiciones Niv.+2.40 en Chapa Metalica de 1/8" color m2
Software SW7074 con aros de planchuela 3/6"x2" cada 20 cm.

04R111 - Chapa Metalica de 1/8" M2 1.05


04R111 - Aros de planchuela 3/6"x2" UND 5.00
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 1.8%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.62
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

62 de 474
. . MATERIAL UNIDAD CANTIDAD

SOLADOS

BASES

13.1.1 Afinado pisos con mortero M.1:3 e = 2 cm m2


01D030 - ARENA LAVADA DE PEA M3 0.0209
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1307
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.49
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

13.1.2 Pendientado Duchas con mortero impermeabilizado e=4 cm m2


01D030 - ARENA LAVADA DE PEA M3 0.0294
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1835
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.6933
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

13.1.4 Bordillo Duchas h=10 cm ml


01D010 - ARENA DE PENA M3 0.02
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.09
06M015 - LADRILLO TOLETE MACIZO NATURAL 20x10x6 UND 6.00
21B160 - TOXEMENT POLVO KGR 0.08
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES GLB 1.00
SUBTOTAL HERRAMIENTAS ...
28A840 - CORTADORA DE LADRILLO DD 0.01
SUBTOTAL EQUIPO ...
MANO DE OBRA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Bordillo Pocetas de Aseo h=37 cm (maposteria+paete)


13.1.4 ml
01D010 - ARENA DE PENA M3 0.04
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.21
06M015 - LADRILLO TOLETE MACIZO NATURAL 20x10x6 UND 14.07
21B160 - TOXEMENT POLVO KGR 0.19
SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES GLB 2.35
SUBTOTAL HERRAMIENTAS ...

63 de 474
. . MATERIAL UNIDAD CANTIDAD

28A840 - CORTADORA DE LADRILLO DD 0.01


SUBTOTAL EQUIPO ...
MANO DE OBRA ...
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

SOLADOS

Solado S - 1 : Piso en Baldosa Matiz PHB fondo crema 60


12.2.1 x 60 Alfa. Incluye mortero 1:3, boquilla blanca, destronque (#36), m2
3 pulidas (#60,120,220) , para Foyer y Circulaciones Publico

01D030 - ARENA LAVADA DE PEA M3 0.0200


03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1254
03B001 - STONMIX BOQUILLA KG 0.2000
06M104 - BALDOSA MATIZ PHB fondo crema 60x60 Alfa M2 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
PULIDA PISO M2 1.0000
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.13
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 2 : Piso en Baldosa Matiz PHB fondo crema 60


12.2.2 x 60 Alfa Antideslizante. Incluye mortero 1:3, boquilla blanca, m2
destronque (#36), 3 pulidas (#60,120,220), para Accesos Foyer

01D030 - ARENA LAVADA DE PEA M3 0.0200


03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.1254
03B001 - STONMIX BOQUILLA KG 0.2000

BALDOSA MATIZ PHB fondo crema 60x60 Alfa Antideslizante


06M104 - M2 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
PULIDA PISO M2 1.0000
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.13
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 5 : Piso en Madera Natural Multilaminada, Trafico


13.2.5 m2
Pesado, terminado Abedul , para Auditorio
Piso en Madera Natural Multilaminada, Trafico Pesado,
12C120 terminado Abedul , m2 1.050
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%

64 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL EQUIPO ...


(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.42
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 8 : Piso en Alfombra de Rollo, Trafico Pesado,


13.2.6 m2
para Oficinas Camara de Comercio
12C120 Alfombra de Rollo, Trafico Pesado m2 1.050
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.42
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 9 : Piso en Porcelanato color Gris de 45 x 90 cm


13.2.7 para Baos Publicos, Baos Discapacitados, Baos VIP, Baos m2
Oficinas y Cambiaderos. (Incluye pega y emboquillada)

12C100 - PORCELANATO GRIS 45 x 90 cm para piso M2 1.0500


21D235 - STONMIX LATEX KGR 2.0000
03B001 - STONMIX BOQUILLA BTO 0.0300
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 1.64
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 10 : Piso en Tableta de Gres Liso Tradicional


13.2.8 Sahara 22500377 30 x 30 Alfa o equivlaente Incluye pega y ml
emboquillada)
03B001 - STONMIX BOQUILLA BTO 0.2000
12G053 - TABLETA GRIS LISA SAHARA 30 x 30 ALFA M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

65 de 474
. . MATERIAL UNIDAD CANTIDAD

Solado S - 11 : Piso en Tablon Porcelagres de 30 x 30 Alfa o


13.2.9 equivalente, para Duchas Vestieres. Incluye pega y ml
emboquillada
03B001 - STONMIX BOQUILLA BTO 0.2000
12G053 - TABLON PORCELAGRES 30 x 30 ALFA M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 12 : Piso en Loseta Liston en concreto Prepulida


13.2.10 40 x 40 Alfa o equivalente, para Espacio Publico Interior ml
Accesos y Paseo Peatonal. Incluye pega y emboquillada

03B001 - STONMIX BOQUILLA BTO 0.2000


12G053 - LOSETA LISTON PREPULID 40 x 40 M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 13 : Piso en Loseta Prefabricada en concreto


color AZUL sin Textura 40 x 40 Alfa o equivalente, para
13.2.11 ml
Espacio Publico Interior Paseo Peatonal. Incluye pega y
emboquillada
03B001 - STONMIX BOQUILLA BTO 0.2000
12G053 - LOSETA PREFABRICADA CONCRETO AZUL 40 x 40 M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

66 de 474
. . MATERIAL UNIDAD CANTIDAD

Solado S - 14 : Piso en Loseta Prefabricada en concreto sin


Textura 40 x 40 Alfa o equivalente, para Espacio Publico
13.2.12 ml
Interior Accesos y Paseo Peatonal. Incluye pega y
emboquillada
03B001 - STONMIX BOQUILLA BTO 0.2000
12G053 - LOSETA PREFABRICADA CONCRETO 40x40 M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 15 : Piso Tecnico Elevado , conformado por un


sistema de soporte de altura regulable en aluminio y baldosas
13.2.13 m2
removibles con un revestimiento antiesttico, para Oficinas
Camara de Comercio

Piso Tecnico Elevado , Incluye sistema de soporte de altura


12C120 regulable en aluminio y baldosas removibles con un revestimiento m2 1.000
antiesttico
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 6.30
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 16 : Capa de Rodadura para Estacionamientos :


13.2.14 Mezcla Densa en Caliente MDC-3 Asfalto 80-100, espesor e=6 m2
cm. Iincluye Suministro, Extendida, Nivelacin y Compactacion

Imprimacion con Asfalto Liquido MC-30. Incluye Suministro,


m2 1.0000
02A010 - Barrido de Superficie y Riego
Riego de Liga con Emulsion Modificada con Polimero CRR-1m.
m2 1.0000
02A035 - Incluye Suministro, Barrido de Superficie y Riego
Mezcla Densa en Caliente MDC-3 Asfalto 80-100, para Capa de
Rodadura. Iincluye Suministro, Extendida, Nivelacin y m3 0.0600
02A045 - Compactacion
TOTAL UNITARIO

Solado S - 17 : Piso en Adoqun de concreto coloreado de


13.2.15 ml
10 x 20 Alfa o equivalente. Incluye pega y emboquillada

03B001 - STONMIX BOQUILLA BTO 0.2000


12G053 - TABLETA GRIS LISA SAHARA 30 x 30 ALFA M2 1.0500
21D235 - PEGACOR BLANCO/PEGALIT KGR 4.0000
SUBTOTAL MATERIALES ...

67 de 474
. . MATERIAL UNIDAD CANTIDAD

20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%


SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.86
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Solado S - 18 : Piso en Sika Floor 21 Purcem 6mm sin


13.2.16 m2
areando. Color Azul RAL 5015 o equivalente7
21B140 - Sika Floor 21 KGR 13.45
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.5%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.28
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Guardaescoba Z4 : en tableta de gres de altura h=7


13.2.21 ml
cm
03B001 - STONMIX BOQUILLA BTO 0.1353
12G053 - LOCETA ETRUSCA ALFA 7 x 25 cm UND 4.0000
21D235 - PEGACOR BLANCO/PEGALIT KGR 0.2800
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.64
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Guardaescoba Z6 : en granito idem Baldosa Matiz , de


13.2.22 ml
altura h=10 cm
01D030 - ARENA LAVADA DE PEA M3 0.0040
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.0251
03B001 - STONMIX BOQUILLA KG 0.0400
GUARDAESCOBA 1/2 CAABALDOSA MATIZ PHB
06M104 - fondo crema 30x30 Alfa ML 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
PULIDA PISO ML 0.2000

68 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL TRANSPORTE ...


MANO DE OBRA CUADRILLA AA Albaileria HR 0.85
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Carcamo con Tapa en Concreto f'c=3.000 psi, de Seccion


13.4.1 0.94 x 0.45 m, segn detalles especificos DE-800 D-020,D-021, ML
D-022 Laboratorios Niv. -5.65 Sotano
02A010 - BOMBEO DI M3 0.1470
02A035 - CONCRETO COMUN DE 3000 PSI DI M3 0.1470
22G120 - MADERA ORDINARIA M3 0.1470
21B140 - SIKAFLOR - 1 METAL TOP KGR 0.7000
21B140 - ANTISOL BLANCO KGR 0.7000
01D010 - ARENA DE PENA M3 0.0149
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.0777
06K042 - LADRILLO TOLETE MACIZO NATURAL 26x12.5x6 UND 18.5500
04M001 - ANGULO 3"x5/16" KG 6.3560
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.3%
28A816 - VIBRADOR A GASOLINA HR 1.2192
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 2.21
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Topellantas Prefabricados en concreto fc=3.000 psi de 15 x


13.4.2 ML
23 x 50 cm
21B101 ANCLAJE HILTI HI HY 150 ( 1car = 330 mml) Car 0.0510
21B102 DISPENSADOR Und 0.0020
06V128 - TOPELLANTAS 15x23x50cm UND 1.00
20H600 - HERRAMIENTAS MENORES GLB 5.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
28A816 - VIBRADOR A GASOLINA HR 0.14
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.75
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sobrepiso para conformacion de andenes y separadores


interiores Niv.+2.40 y Niv.9.85. Incluye : Bloque No.5 acostado
13.4.3 m2
+ Malla Electrosoldada M.1.31 + Torta de Concreto e=5 cm
f'c=3.000 psi.
01D010 - ARENA DE PENA M3 0.01

69 de 474
. . MATERIAL UNIDAD CANTIDAD

03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.06


06K042 - BLOQUE No. 5 STA.FE UND 9.51
02A010 - BOMBEO DI M3 0.0525
02A035 - CONCRETO COMUN DE 3000 PSI DI M3 0.0525
22G120 - MADERA ORDINARIA M3 0.0525
04I300 - MALLA ELECTROSOLDADA KG 2.42
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
20H601 - ALLANADORA ALLEN DD 0.0234
28A816 - VIBRADOR A GASOLINA HR 0.0000
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.84
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sardinel Prefabricado A-10 (800x200x500mm) - Incluye


13.4.4 ML
Suministro, Instalacion y Mortero 3 cm de 2000 PSI
01D030 - ARENA LAVADA DE PEA M3 0.0078
03A015 - CEMENTO GRIS PORTLAND (50 kls) BTO 0.0522
06V111 - SARDINEL PREFABRIADO A-10 (800x20x500mm) UND 1.25
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Trasiego y Manejo
Refuerzo HR 0.66
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

IMPERMEABILIZACION

Impermeabilizacin Muro de Contencin con Cemento marino


14.1.1 m2
liquido, tipo toxement o similar.
21B100 - CEMENTO MARINO DENSO KGR 1.1000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.41
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

70 de 474
. . MATERIAL UNIDAD CANTIDAD

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


14.2.1 PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil m2
SIKA PP 2500, para Cubierta Niv. +9.85

- GEOTEXTIL SIKA PP 2500 1.80 x 100 Rollo 0.0111


- SIKAPLAN 12 R MEMBRANA 1.55 x 20 Rollo 0.0323
- SIKPLAN PERFIL DE FONDO ML/M2 0.2874
- SIKAPLAN PERFIL DE BORDE ML/M2 0.2874
- ARANDELA FIJACION SIKAPLAN UND/M2 1.0000
- KIT SOLDADURA SIKAPLAN UND/M2 0.0003
- HERRAMIENTAS MENORES GLB/M2 4.42
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.73
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


14.2.2 PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil m2
SIKA PP 2500, para Cubierta Transitable Niv.+16.20

- GEOTEXTIL SIKA PP 2500 1.80 x 100 Rollo 0.0111


- SIKAPLAN 12 R MEMBRANA 1.55 x 20 Rollo 0.0323
- SIKPLAN PERFIL DE FONDO ML/M2 0.2874
- SIKAPLAN PERFIL DE BORDE ML/M2 0.2874
- ARANDELA FIJACION SIKAPLAN UND/M2 1.0000
- KIT SOLDADURA SIKAPLAN UND/M2 0.0003
- HERRAMIENTAS MENORES GLB/M2 4.42
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.73
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


14.2.3 PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil m2
SIKA PP 2500, para Cubierta Niv. +18.60

- GEOTEXTIL SIKA PP 2500 1.80 x 100 Rollo 0.0111


- SIKAPLAN 12 R MEMBRANA 1.55 x 20 Rollo 0.0323
- SIKPLAN PERFIL DE FONDO ML/M2 0.2874
- SIKAPLAN PERFIL DE BORDE ML/M2 0.2874
- ARANDELA FIJACION SIKAPLAN UND/M2 1.0000
- KIT SOLDADURA SIKAPLAN UND/M2 0.0003
- HERRAMIENTAS MENORES GLB/M2 4.42
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%

71 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL HERRAMIENTAS ...


20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.73
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


14.2.4 PP - 2500 + Membrana SIKAPLAN 12 R + 2a capa Geotextil m2
SIKA PP 2500, sobre Cubierta Metalica Principal Niv. +23.85

- GEOTEXTIL SIKA PP 2500 1.80 x 100 Rollo 0.0111


- SIKAPLAN 12 R MEMBRANA 1.55 x 20 Rollo 0.0323
- SIKPLAN PERFIL DE FONDO ML/M2 0.2874
- SIKAPLAN PERFIL DE BORDE ML/M2 0.2874
- ARANDELA FIJACION SIKAPLAN UND/M2 1.0000
- KIT SOLDADURA SIKAPLAN UND/M2 0.0003
- HERRAMIENTAS MENORES GLB/M2 4.42
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.73
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


14.3.1 PP - 1800 + Membrana SIKAPLAN 12 NTR + LAMINA SIKA m2
DRENAJE 32 t, para Cubierta Verde Niv. +16.20

- GEOTEXTIL SIKA PP 1800 1.80 x 100 Rollo 0.0056


- SIKAPLAN 12 NTR MEMBRANA 1.55 x 20 Rollo 0.0323
- SIKA DRENAJE 32t LAMINA M2 1.0000
- SIKPLAN PERFIL DE FONDO ML/M2 0.2874
- SIKAPLAN PERFIL DE BORDE ML/M2 0.2874
- ARANDELA FIJACION SIKAPLAN UND/M2 1.0000
- KIT SOLDADURA SIKAPLAN UND/M2 0.0003
- HERRAMIENTAS MENORES GLB/M2 4.42
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.71
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

72 de 474
. . MATERIAL UNIDAD CANTIDAD

Sistema de Impermeabilizacion Compuesto por : Geotextil SIKA


14.4.1 PP - 1800 + Membrana SIKAPLAN 12 NTR + SIKAPLAN m2
12NT, para Tanques de Agua
- GEOTEXTIL SIKA PP 1800 1.80 x 100 Rollo 0.0056
- SIKAPLAN 12 NTR MEMBRANA 1.55 x 20 Rollo 0.0323
- SIKAPLAN 12 NT MEMBRANA 1.55 x 1 Rollo 0.6452
- SIKPLAN PERFIL DE FONDO ML/M2 0.2874
- SIKAPLAN PERFIL DE BORDE ML/M2 0.2874
- ARANDELA FIJACION SIKAPLAN UND/M2 1.0000
- KIT SOLDADURA SIKAPLAN UND/M2 0.0003
- HERRAMIENTAS MENORES GLB/M2 4.41
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.67
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Sistema de Impermeabilizacion Compuesto por Geotextil SIKA


14.4.2 PP - 1800 + Membrana SIKAPLAN 15 PR , para Fosos y m2
Pozos
- GEOTEXTIL SIKA PP 1800 1.80 x 100 Rollo 0.0056
- SIKAPLAN 15 NTR MEMBRANA 1.55 x 20 Rollo 0.0323
- SIKAPLAN 15 NT MEMBRANA 1.55 x 1 Rollo 0.6452
- SIKPLAN PERFIL DE FONDO ML/M2 0.2874
- SIKAPLAN PERFIL DE BORDE ML/M2 0.2874
- ARANDELA FIJACION SIKAPLAN UND/M2 1.0000
- KIT SOLDADURA SIKAPLAN UND/M2 0.0003
- HERRAMIENTAS MENORES GLB/M2 4.41
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.4%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA Albaileria HR 0.67
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CIELORRASOS

Cielorraso Falso CR - 1 : en Placa Plana Cementicia


17.1.1 Simple, Tipo Superboard o equivalente, espesor e=6 mm, con m2
acabado en Estuco Plastico + Pintura Latex color blanco

- LAMINA SUPERBOARD 1.22x2.44 6 mm UND 0.39


- PERFILERIA PARAL/CANAL c/60cm ML 1.72
- TORNILLO AUTOPERFORANTE UND 6.00
- CORDON SELLANTE ELASTOMERICO ML 2.00
- ESTUCO PLASTICO M2 1.0500
- VINILO BLANCO GLN 0.0700

73 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MATERIALES ...


20H600 - HERRAMIENTAS MENORES % (M+MO) 1.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.6801
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cielorraso Falso CR - 2 : en Placa Plana Cementicia


17.1.2 Doble, Tipo Superboard o equivalente, espesor e=12 mm, con m2
acabado en Estuco Plastico + Pintura Latex color blanco

LAMINA SUPERBOARD 1.22x2.44 12 mm


- UND 0.39
PERFILERIA PARAL/CANAL c/60cm
- ML 2.58
TORNILLO AUTOPERFORANTE
- UND 9.00
CORDON SELLANTE ELASTOMERICO
- ML 2.00
- ESTUCO PLASTICO M2 1.0500
- VINILO BLANCO GLN 0.0700
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 1.11
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cielorraso Falso CR - 16 : en Placa Plana Cementicia


Simple, Tipo Superboard o equivalente, espesor e=6 mm, con
17.1.3 acabado en Estuco Plastico + Pintura Latex color blanco, con m2
aislamiento acustico en fibra de vidrio con velo negro esp.3",
para cuarto grupo electrogeno

- LAMINA SUPERBOARD 1.22x2.44 6 mm UND 0.39


- PERFILERIA PARAL/CANAL c/60cm ML 1.72
- TORNILLO AUTOPERFORANTE UND 6.00
- CORDON SELLANTE ELASTOMERICO ML 2.00
- ESTUCO PLASTICO M2 1.0500
- VINILO BLANCO GLN 0.0700
- AISLANTE ACUSTIVO BACK THEATHER 1" M2 1.0500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.6%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.6801
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

74 de 474
. . MATERIAL UNIDAD CANTIDAD

Cielorraso Falso CR - 7 : en Panel Curvo de Lamina de


Aluminio Microperforada , color Goldfinch SW 6905,
17.1.4 m2
suspendido con sistema de perfileria oculta tipo Hunter Douglas
o equivalente. Pabellon de Exposiciones
Panel Curvo de Lamina de Aluminio Microperforada , color
04R111 - Goldfinch SW 6905 M2 1.05
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.7%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 0.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 1.11
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Cielorraso Falso CR - 8 : en Panel custico de Aluminio colort


17.1.5 Software SW7074, suspendido con sistema de perfileria oculta. m2
Recinto Ampliacion Ferial
04R111 - Panel custico de Aluminio colort Software SW7074 M2 1.05
04R111 - Angulo de aluminio de 1.1/2" x 1/8" con pintura kg 3.8430
04R111 - Buje de Teflon squas Tipo VEA Ref. P1Q und 2.0000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.8%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 0.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 0.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 1.11
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

VENTANERIA

VENTANAS EXTERIORES

Ventana AE01a - V1 + V5 1.62 x 15.20 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.1 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 3/16" o equivalente. Fachada Paseo Peatonal. (Son 4 Und)

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...

75 de 474
. . MATERIAL UNIDAD CANTIDAD

20H701 - EQUIPO FABRICACION % (M+MO) 3.0%


SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE01b - V1 + V5 1.62 x 12.78 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.2 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 3/16" o equivalente. Fachada Paseo Peatonal (Son 8 Und)

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE01c - V1 + V5 1.62 x 15.20 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.3 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 3/16" o equivalente. Fachada Paseo Peatonal (Son 2 Und)

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

76 de 474
. . MATERIAL UNIDAD CANTIDAD

Ventana AE01d - V1 + V5 1.62 x 12.78 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.4 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 + Ch
3/16" o equivalente. Fachada Via 40 (Son 2 Und)

Perfileria Sistema NS254 + Ch 3/16" Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 12b - V1 3.24 x 14.15 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.5 m2
mm + Incoloro 6mm HS. Sistema NS25-5 + Ch 1/16" o
equivalente. Fachada Via 40 (Son 1 Und)
Perfileria Sistema NS25-5 + Ch 1/16" Aluminio Duranar Arcadia
- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- M2 1.0000
Separador 12 mm + Incoloro 6mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 12b - V1 2.44 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.6 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Via 40 (Son 1 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS


- M2 5.9780
+ Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%

77 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL TRANSPORTE ...


MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 13b - V1 + V5 4.86 x 7.75 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.7 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS.Sistema NS25-6 + Ch
1/8" o equivalente. Fachada Paseo Peatonal (Son 2 Und)

Perfileria Sistema NS25-6 + Ch 1/8" Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 14b - V1 + V5 3.24 x 7.75 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.8 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8" o equivalente. Fachada Paseo Peatonal (Son 2 Und)

Perfileria Sistema NS25-6 + Ch 1/8" Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

78 de 474
. . MATERIAL UNIDAD CANTIDAD

Ventana AE 15a - V1 + V5 0.76 x 15.20 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.9 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 +
Ch 1/16" o equivalente. Fachada Via 40 (Son 3 Und)

Perfileria Sistema NS25-4 + Ch 1/16"Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 15b - V1 + V5 0.50 x 7.50 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.10 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-4 o
equivalente. Fachada Via 40 (Son 1 Und)

- Perfileria Sistema NS25-4 Aluminio Duranar Arcadia Silver M2 1.0000

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS


- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 17a - V1 14.60 x 4.74 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.11 m2
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/16" o
equivalente. Acceso (Son 2 Und)
Perfileria Sistema NS25-6 + Ch 1/16" Aluminio Duranar Arcadia
- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- M2 1.0000
+ Separador 12 mm + Incoloro 6mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%

79 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL EQUIPO ...


TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 17a - V1 2.44 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.12 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 4 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS


- M2 5.9780
+ Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 17b - V1 14.60 x 6.99 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.13 m2
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/4" o
equivalente. Acceso (Son 1 Und)
Perfileria Sistema NS25-6 + Ch 1/16" Aluminio Duranar Arcadia
- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- M2 1.0000
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 17b - V1 2.40 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.14 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 4 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

80 de 474
. . MATERIAL UNIDAD CANTIDAD

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 5.9780
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 18 - V1 + V5 15.12 x 2.88 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.15 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 o
equivalente. Fachada Paseo Peatonal (Son 2 Und)

- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver M2 1.0000

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 19a - V1 + V5 1.62 x 7.75 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.16 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 o
equivalente. Fachada Paseo Peatonal (Son 1 Und)

- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver M2 1.0000

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA

81 de 474
. . MATERIAL UNIDAD CANTIDAD

TOTAL UNITARIO

Ventana AE 19b - V1 + V5 1.62 x 7.75 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.17 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 o
equivalente. Fachada Paseo (Son 1 Und)

- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver M2 1.0000

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 19b - V1 1.20 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.18 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 1 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 2.9400

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 2.9400
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 0.0000
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 21b - V1 1.70 x 6.70 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.19 m2
mm + Incoloro 6mm HS. Sistema NS25-6 o equivalente. Paseo
Peatonal (Son 1 Und)

- Perfileria Sistema NS25-6 Aluminio Duranar Arcadia Silver M2 1.0000

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 1.0000
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...

82 de 474
. . MATERIAL UNIDAD CANTIDAD

20H701 - EQUIPO FABRICACION % (M+MO) 3.0%


SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 22b - V1 7.49 x 6.70 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.20 m2
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/4" Plaza
Comidas (Son 1 Und)
Perfileria Sistema NS25-6 + Ch 1/4" Aluminio Duranar Arcadia
- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- M2 1.0000
Separador 12 mm + Incoloro 6mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 22b - V1 2.40 x 2.15 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.21 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Peatonal (Son 1 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 5.9780
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 26 - V6 0.81 x 2.70 m Vidrio Solarban 60VT


II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12 mm +
18.1.22 m2
Traslucido 6mm HS. Sistema NS25-2 o equivalente. Plaza
Comidas (Son 15 Und)

- Perfileria Sistema NS25-2 Aluminio Duranar Arcadia Silver M2 1.0000

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS


- M2 1.0000
+ Separador 12 mm + Traslucido 6mm HS

83 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL SUMINISTRO y FABRICACION ...


20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 27b - V4 + V1 17.41 x 6.70 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS +
18.1.23 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expancion (Son 1Und)

Perfileria Sistema NS25-6 + Ch 1/8" Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
- HS + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban M2 1.0000
60VT II 6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 30d - V1 + V4 9.04 x 6.70 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.26 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expansin (Son 1 Und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

84 de 474
. . MATERIAL UNIDAD CANTIDAD

Ventana AE 30d - V1 + V4 9.04 x 6.70 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.26 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expansin (Son 1 Und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 30d - V1 2.40 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.27 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Patio Expansion (Son 2 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 5.9780
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 30e - V1 + V4 9.04 x 6.70 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.28 Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II m2
6mm HS#2 + PVB Opaco + Gris 4mm HS. Sistema NS25-6 +
Ch 1/8". Patio Expansion (Son 1 Und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS
- + Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448

85 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Ventana AE 31 - V1 + V5 3.24 x 7.75 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.29 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II 6mm HS#2 + m2
PVB Opaco + Gris 4mm HS. Sistema NS25-6 + Ch 1/8".
Fachada Paseo (Son 1 Und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AE 31 - V1 1.62 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.1.30 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Fachada Paseo Pdeatonal (Son 1 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 3.9690

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 3.9690
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 14.4663
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 32 - V1 4.86 x 6.60 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.31 m2
mm + Incoloro 6mm HS. Sistema NS25-6 + Ch 1/8". (Son
1 Und)
Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia
- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- M2 1.0000
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%

86 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL HERRAMIENTAS ...


20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AE 33 - V1 + V5 6.48 x 7.75 m Vidrio Solarban


60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS + Separador 12
18.1.32 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II 6mm HS#2 + m2
PVB Opaco + Gris 4mm HS. Sistema NS25-6 + Ch 1/8".
Fachada Paseo (Son 1 Und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
- Separador 12 mm + Incoloro 6mm HS + Vidrio Solarban 60VT II M2 1.0000
6mm HS#2 + PVB Opaco + Gris 4mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

REJILLAS en ALUMINIO

Rejilla AE 60 7.20 x 0.90 Marco y Premarco en Perfiles


de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
18.2.1 und
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-
325. Servicios

- Perfileria Sistema 3x1.1/2 + ES-ALN-325 M2 6.29


- Malla Mosquietero en Aluminio M2 6.29
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 9.61

87 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Rejilla AE 61 3.24 x 1.00 Marco y Premarco en Perfiles


de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
18.2.2 und
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas

- Perfileria Sistema 3x1.1/2 + ES-ALN-325 M2 3.05


- Malla Mosquietero en Aluminio M2 3.05
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 4.65
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 62b 6.51 x 2.05 Marco y Premarco en Perfiles


de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
18.2.3 und
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas

- Perfileria Sistema 3x1.1/2 + ES-ALN-325 M2 12.16


- Malla Mosquietero en Aluminio M2 12.16
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 18.56
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 63b 6.52 x 2.05 Marco y Premarco en Perfiles


de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
18.2.4 und
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas

- Perfileria Sistema 3x1.1/2 + ES-ALN-325 M2 12.16


- Malla Mosquietero en Aluminio M2 12.16
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...

88 de 474
. . MATERIAL UNIDAD CANTIDAD

MANO DE OBRA CUADRILLA DD Carpinteria HR 18.57


SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 64b 31.62 x 2.05 Marco y Premarco en Perfiles


de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
18.2.5 und
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Sala Maquinas

- Perfileria Sistema 3x1.1/2 + ES-ALN-325 M2 53.49


- Malla Mosquietero en Aluminio M2 53.49
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 81.68
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 66 4.05 x 1.81 Marco y Premarco en Perfiles


de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
18.2.6 und
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Grupo electrogeno

- Perfileria Sistema 3x1.1/2 + ES-ALN-325 M2 6.43


- Malla Mosquietero en Aluminio M2 6.43
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 9.82
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Rejilla AE 72 17.40 x 1.03 Marco y Premarco en Perfiles


de alenacion de aluminio. Pao Fijo de Ventilacion de celosia a
45 con perfiles de aleneacion de aluminio, terminacion
18.2.7 und
anodizado natural. En el interior de las rejas se colocara un
mosquito de malla de aluminio. Sistema 3x1.1/2 + ES-ALN-325.
Ventilacion Baos Interiores

- Perfileria Sistema 3x1.1/2 + ES-ALN-325 M2 16.71


- Malla Mosquietero en Aluminio M2 16.71
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 2.0%

89 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL EQUIPO ...


TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 25.51
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

VENTANAS INTERIORES

Ventana AI 1a - V3 14.60 x 4.67 m Vidrio Solarban


18.3.1 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador m2
12 mm + Incoloro 6mm HS. Acceso Foyer Nivel 3 (Son 2 Und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
- M2 1.0000
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AI 1a - V3 2.40 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.3.2 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Acceso Foyer Nivel 3. (Son 4 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 5.9780
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AI 1b - V3 14.60 x 6.70 m Vidrio Solarban


18.3.3 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador m2
12 mm + Incoloro 6mm HS. Acceso Foyer Nivel 1 (Son 1 und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
- M2 1.0000
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...

90 de 474
. . MATERIAL UNIDAD CANTIDAD

20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%


SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AI 1b - V3 2.40 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.3.4 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Acceso Foyer Nivel 1. (Son 4 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 5.9780
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AI 10 - V3 3.24 x 1.00 m Vidrio Solarban 60VT


18.3.5 II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador 12 mm m2
+ Incoloro 6mm HS. Cabina de Cobro Nivel 1 (Son 1 und)

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
- M2 1.0000
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ventana AI 11 - V3 16.40 x 6.00 m Vidrio Solarban


18.3.6 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm HS + Separador m2
12 mm + Incoloro 6mm HS. Acceso Bar Nivel 3 (Son 1 und)

91 de 474
. . MATERIAL UNIDAD CANTIDAD

Perfileria Sistema NS25-6 + Ch 1/8".Aluminio Duranar Arcadia


- M2 1.0000
Silver
Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Incoloro 4mm
- M2 1.0000
HS + Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.6448
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Pivotante AI 11 - V3 2.40 x 2.45 m Vidrio


Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +
18.3.7 und
Separador 12 mm + Incoloro 6mm HS. Sistema ES-9000 o
equivalente. Acceso Bar Nivel 3. (Son 2 Und)

- Perfileria Sistema ES-9000Aluminio Duranar Arcadia Silver M2 5.9780

Vidrio Solarban 60VT II 6mm HS#2 + PVB 0.03 + Gris 4mm HS +


- M2 5.9780
Separador 12 mm + Incoloro 6mm HS.
SUBTOTAL SUMINISTRO y FABRICACION ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 21.7887
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

CARPINTERIA METALICA

PUERTAS EXTERIORES CORTAFUEGO RF60


Marco y Premarco en
Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Las uniones
con pared deberan ser selladas con sellador a base de silicona
transparente. Hoja Batiente de chapa galvanizada BWG No.22
electrosoldada. Panel sandwich 40mm de espesor. Doble
19.1.1 a 19.1.7 M2
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.
Rejilla de Ventilacion Superior minimo 1.20m . Bisagras : 3 piezas
galvanizadas ajustables por jamba. Superficie mate croamdo.
Terminacion 1 : imprimacion electrostatica (ambos lados). Burlete
de Neopreno en todo el perimetro.

92 de 474
. . MATERIAL UNIDAD CANTIDAD

04R050 - LAMINA COLD ROLLED Cal.14 1x2m UND 2.02


04R052 - BISAGRA PLANA 1" UND 1.17
04R053 - SOLDADURA 1/8 Ref.6013 KG 0.73
23A001 - ANTICORROSIVO GLN 0.07
- AISLANTE T TERMICO M2 1.00
- SELLO HERMETICO ML 1.00
- SELLO CONTRA HUMOS ML 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 12.59
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta CE 01 1.26 x 2.45 m Marco y Premarco en


Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60 de chapa galvanizada BWG No.22
19.1.1 M2
electrosoldada. Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado

- Puerta CE 01 1.26 x 2.45 m M2 3.09


TOTAL UNITARIO

Puerta CE 03a 1.62 x 2.45 m Marco y Premarco en


Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60 de chapa galvanizada BWG No.22
19.1.3 electrosoldada. Panel sandwich 40mm de espesor. Doble M2
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.
Rejilla de Ventilacion

- Puerta CE 03a 1.62 x 2.45 m M2 3.97


TOTAL UNITARIO

Puerta CE 03b 1.62 x 2.45 m Marco y Premarco en


Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60 de chapa galvanizada BWG No.22
19.1.4 electrosoldada. Panel sandwich 40mm de espesor. Doble M2
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.
Rejilla de Ventilacion

93 de 474
. . MATERIAL UNIDAD CANTIDAD

- Puerta CE 03b 1.62 x 2.45 m M2 3.97


TOTAL UNITARIO

Puerta CE 04 1.86 x 2.45 m Marco y Premarco en


Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60 de chapa galvanizada BWG No.22
19.1.5 M2
electrosoldada. Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado

- Puerta CE 04 1.86 x 2.45 m M2 4.56


TOTAL UNITARIO

Puerta CE 06 2.06 x 2.45 m PORTON ENROLLABLE


RF60 en 1 hoja en lamas metalicas de chaoa galvanizada a 2
caras de 1mm de epesor. Relleno ignifugo segn ensayo y 63
mm de espesor total. Guias metalicas en "U" con sitema de
19.1.8 anclaje a pared. Cartelas laterales metalicas con rodamientos M2
para sujetar ehe de hoja sin muelles dimensionados. Activacion
mediante motor segun proveedor. La puerta abre y cierra
electricamente, al saltar la seal de incendio, cierra
automaticamente con velocidad constante

- Puerta CE 06 2.06 x 2.45 m M2 5.05


TOTAL UNITARIO

Puerta CE 07 1.86 x 2.10 m Marco y Premarco en


Chapa Galvanizada BWG No.22 galvanizado en caliente po
imersion. Terminacion imprimacion electrostatica. Hoja Batiente
categoria RF60 de chapa galvanizada BWG No.22
19.1.9 M2
electrosoldada. Panel sandwich 40mm de espesor. Doble
contacto. Relleno : aislante termico homologado segun ensayo.
Chapa de acero mas chapa de zinc en ambos lado de la chapa.
Guardapie de aluminio fijado con tornillo de acero galvanizado.

- Puerta CE 07 1.86 x 2.10 m M2 3.91


TOTAL UNITARIO

94 de 474
. . MATERIAL UNIDAD CANTIDAD

19.2.1 a

PUERTAS INTERIORES
Marco y Premarco en Chapa Galvanizada BWG
No.22 galvanizado en caliente po imersion. Terminacion
imprimacion electrostatica. Las uniones con pared deberan ser
selladas con sellador a base de silicona transparente. Hoja
Batiente de chapa galvanizada BWG No.22 electrosoldada.
Panel sandwich 40mm de espesor. Doble contacto. Relleno :
M2
aislante termico homologado segun ensayo. Chapa de acero mas
chapa de zinc en ambos lado de la chapa. Guardapie de
aluminio fijado con tornillo de acero galvanizado. Rejilla de
Ventilacion Superior minimo 1.20m . Bisagras : 3 piezas
galvanizadas ajustables por jamba. Superficie mate croamdo.
Terminacion 1 : imprimacion electrostatica (ambos lados). Burlete
de Neopreno en todo el perimetro.

19.2.24
04R050 - LAMINA COLD ROLLED Cal.18 1x2m UND 2.45
04R052 - BISAGRA PLANA 1" UND 1.43
04R053 - SOLDADURA 1/8 Ref.6013 KG 0.88
23A001 - PROCESO GALVANIZADO UND 2.45
23A001 - ANTICORROSIVO GLN 0.07
23A001 - PINTURA ELECTROSTATICA M2 1.90
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 2.74
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

19.2.1 Puerta C 01 1.86 x 2.10 Pasillos de Escape M2

- Puerta C 01 1.86 x 2.10 M2 3.91


TOTAL UNITARIO

Puerta C 02a 1.86 x 2.10 Depositos, UTA, AA,


19.2.2 M2
Manten.
- Puerta C 02a 1.86 x 2.10 M2 3.91
TOTAL UNITARIO

19.2.3 Puerta C 03a 1.86 x 2.10 Nivel 1 M2

- Puerta C 03a 1.86 x 2.10 M2 3.91


TOTAL UNITARIO

19.2.4 Puerta C 03b 1.86 x 2.10 Nivel 1 M2

- Puerta C 03b 1.86 x 2.10 M2 3.91


TOTAL UNITARIO

19.2.5 Puerta C 03c 0.96 x 2.10 Nivel 1 M2

95 de 474
. . MATERIAL UNIDAD CANTIDAD

- Puerta C 03c 0.96 x 2.10 M2 2.02


TOTAL UNITARIO

Puerta C 04 1.41 x 2.10 Cuarto electrico, Salas


19.2.6 M2
de Rack
- Puerta C 04 1.41 x 2.10 M2 2.96
TOTAL UNITARIO

19.2.7 Puerta C 05 1.86 x 2.10 Acceso Cocina M2

- Puerta C 05 1.86 x 2.10 M2 3.91


TOTAL UNITARIO

19.2.8 Puerta C 06 1.86 x 2.10 Cocina M2

- Puerta C 06 1.86 x 2.10 M2 3.91


TOTAL UNITARIO

19.2.9 Puerta C 07 0.96 x 2.10 Cocina M2

- Puerta C 07 0.96 x 2.10 M2 2.02


TOTAL UNITARIO

Puerta C 08 0.96 x 2.10 Lavado, Vajillas, Deposito


19.2.10 M2
Cocina
- Puerta C 08 0.96 x 2.10 M2 2.02
TOTAL UNITARIO

19.2.11 Puerta C 10 1.26 x 2.10 Salia Nucleo Escalera M2

- Puerta C 10 1.26 x 2.10 M2 2.65


TOTAL UNITARIO

Puerta C 13 0.76 x 2.10 Deposito, Bao


19.2.12 M2
Camerinos, Control
- Puerta C 13 0.76 x 2.10 M2 1.60
TOTAL UNITARIO

Puerta C 14 0.96 x 2.10 Baos Discapacitados,


19.2.13 M2
Servicio
- Puerta C 14 0.96 x 2.10 M2 2.02
TOTAL UNITARIO

96 de 474
. . MATERIAL UNIDAD CANTIDAD

19.3.1 a
CORTINAS ENRROLLABLES
Marco y Premarco en Perfiles de alenacion de aluminio. Hoja
Batiente bastidor de perfiles de aleacion de aluminio, terminado
anodizado natural, con tablero ciego compuesto por dos chapas
de aluminio espe. 1.25 mm CORTINA ENROLLABLE con perfiles
M2
de aluminio de extrusion . Guas metalicas de seguridad de
80x60 cm. Perfil de aleacion de aluminio. Accionamiento : moor
semiblindado con alimentacion trifasica. Acople al eje de la
cortina mediant enganaje y contramarcha. Freno magnetico.
Eventual accionamiento manual.
19.3.8
04M001 - LAMINA ASTM A-36 KG 36.559
04M002 - SOLDADURA E-700X KG 1.097
04M003 - TORNILLERIA SAE G-5 KG 0.731
04M004 - OCIGENO, ACETILENO, DISCOS KG 41.312
23A001 - PROCESO GALVANIZADO KG 36.559
04M005 - PINTURA KG 36.687
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.1%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.9%
SUBTOTAL EQUIPO ...
TRANSPORTE KG 34.940
SUBTOTAL TRANSPORTE ...
Sistema Automatico Apertura Puertas Industriales Saheco SF-
m2 1.0000
1000
MANO DE OBRA CUADRILLA AA Fabricacion HR / KG 2.116
MANO DE OBRA CUADRILLA AA Montaje HR / KG 1.895
MANO DE OBRA CUADRILLA AA Pintura HR / KG 0.259
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

19.3.1 Puerta C 25a 4.95 x 4.20 m CORTINA ENROLLABLE M2

- Puerta C 25a 4.95 x 4.20 m M2 20.79


TOTAL UNITARIO

19.3.2 Puerta C 25b 6.21 x 4.20 m CORTINA ENROLLABLE M2

- Puerta C 25b 6.21 x 4.20 m M2 26.08


TOTAL UNITARIO

19.3.3 Puerta C 25c 3.53 x 3.95 m CORTINA ENROLLABLE M2

- Puerta C 25c 3.53 x 3.95 m Estacionamiento VIP M2 13.94


TOTAL UNITARIO

Baranda B I1 Vacio Foyer y Oficinas , de altura h=1.05 m, en


en cristal templado de 8mm rrecto, anclado a viga metlica con
bujes en acero inoxidable y con pasamanos en acero inoxidable
19.5.4 ML
mate de 1.1/2 y 3mm de espesor, anclado al vidrio mediante
cuello en varilla maciza de 5/8 y escudo de fijacin circular de
1.1/2x1.5 en acero inoxidable, segun detalles especificos

97 de 474
. . MATERIAL UNIDAD CANTIDAD

04R200 - Perfil tubular en acero inoxidable 1.1/2" ml 1.50


04R200 - Platina 1.1/2" x 1/4" acero inoxidable ml 1.50
04R200 - Vidrio Templado de 8 mm m2 1.05
20H700 - Anclajes y Herrajes % 5%
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 4.94
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Baranda B 2 , para Escaleras Nucleos, de altura h=1.05 m,


con parales y tensores en platina de acero de 1.1/2" x 3/8" y
pasamanos en tuberia metalica de 1.1/2", pintado al horno
19.5.4 color mate RAL ?, con acabado de poliuretano catalizado con ML
propiedades ignfugas, Incluye Anclaje en lamina Calibre 10
doblada, embedida en placa y fijada con tornillos bristol de 1/4",
04R200 - segun detalles
Perfil tubular enespecificos
acero inoxidable 1.1/2" ml 1.00
04R200 - Guaya en Acero ml 2.91
04R200 - Platina 1.1/2" x 1/4" acero inoxidable ml 1.00
20H700 - Anclajes y Herrajes % 5%
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 2.75
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Baranda B 2 , para Vacios Espacio Publico, de altura h=1.05


m, con parales y tensores en platina de acero de 1.1/2" x 3/8"
y pasamanos en tuberia metalica de 1.1/2", pintado al horno
19.5.5 color mate RAL ?, con acabado de poliuretano catalizado con ML
propiedades ignfugas, Incluye Anclaje en lamina Calibre 10
doblada, embedida en placa y fijada con tornillos bristol de 1/4",
04R200 - segun detalles
Perfil tubular enespecificos
acero inoxidable 1.1/2" ml 1.00
04R200 - Guaya en Acero ml 2.91
04R200 - Platina 1.1/2" x 1/4" acero inoxidable ml 1.00
20H700 - Anclajes y Herrajes % 5%
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 2.75
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

98 de 474
. . MATERIAL UNIDAD CANTIDAD

Baranda B E1 , para Zona Abastecimiento, de altura h=1.05 m,


con parales en platina de acero de 1.1/2" x 3/8" y pasamanos
en tuberia metalica de 1.1/2", pintado al horno color mate
19.5.4 RAL ?, con acabado de poliuretano catalizado con propiedades ML
ignfugas, Incluye Anclaje en lamina Calibre 10 doblada,
embedida en placa y fijada con tornillos bristol de 1/4", segun
- detalles especificos
Perfil tubular en acero inoxidable 1.1/2" ml 1.00
- Platina 1.1/2" x 1/4" acero inoxidable ml 3.00
- SOLDADURA 1/8 Ref.6013 KG 0.45
- ANTICORROSIVO GLN 0.03
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 2.75
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta Sanitario de acero inoxidable, linea institucional sokoda o


19.6.1 M2
similar, de 0.57x1.60 m, con cerrojo y gancho de ropa

LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18 UND 0.55


ANCLAJES, SOLDADURA, ACETILENO, ETC. GLB 2.41
HERRAJES GLN 0.48
Espuma Roff Insulation 1.20x0.60x3/4 GLN 1.02
Frescasa 2.5" GLN 0.02
SUBTOTAL MATERIALES
Porcentaje Contrato % 45%

Tabique Mayor de acero inoxidable anclado a pared, linea


19.6.2 institucional sokoda o similar, de 1.40x1.60 m, instalado con M2
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18 UND 1.70
ANCLAJES, SOLDADURA, ACETILENO, ETC. GLB 7.49
HERRAJES GLN 1.50
Espuma Roff Insulation 1.20x0.60x3/4 GLN 3.18
Frescasa 2.5" GLN 0.08
SUBTOTAL MATERIALES
Porcentaje Contrato % 45%

Tabique Lateral de acero inoxidable anclado a pared, linea


19.6.3 institucional sokoda o similar, de 0.86x1.60 m, instalado con M2
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18 UND 0.99
ANCLAJES, SOLDADURA, ACETILENO, ETC. GLB 4.38
HERRAJES GLN 0.88
Espuma Roff Insulation 1.20x0.60x3/4 GLN 1.86
Frescasa 2.5" GLN 0.04
SUBTOTAL MATERIALES
Porcentaje Contrato % 45%

99 de 474
. . MATERIAL UNIDAD CANTIDAD

Tabique Central de acero inoxidable con apoyo a piso, linea


19.6.4 institucional sokoda o similar, de 0.26x1.80 m, instalado con M2
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18 UND 0.57
ANCLAJES, SOLDADURA, ACETILENO, ETC. GLB 2.52
HERRAJES GLN 0.50
Espuma Roff Insulation 1.20x0.60x3/4 GLN 1.07
Frescasa 2.5" GLN 0.03

Porcentaje Contrato % 45%

Tabique Extremo de acero inoxidable anclado a muro, linea


19.6.5 institucional sokoda o similar, de 0.125x1.60 m, instalado con M2
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18 UND 0.33
ANCLAJES, SOLDADURA, ACETILENO, ETC. GLB 1.46
HERRAJES GLN 0.29
Espuma Roff Insulation 1.20x0.60x3/4 GLN 0.62
Frescasa 2.5" GLN 0.01

Porcentaje Contrato % 45%

Division Orinal de acero inoxidable anclado a muro, linea


19.6.6 institucional sokoda o similar, de 0.46x1.48 m, instalado con M2
anclajes tipo sokoda
LAMINA ACERO INOXIDABLE 1.22x2.44 cal. 18 UND 0.43
ANCLAJES, SOLDADURA, ACETILENO, ETC. GLB 1.90
HERRAJES GLN 0.38
Espuma Roff Insulation 1.20x0.60x3/4 GLN 0.81
Frescasa 2.5" GLN 0.02

Porcentaje Contrato % 45%

Divisones DUCHAS BAOS


Divisones y Puertas en Vidrio Templado 3 mm o Vidrio
19.6.7 a
Laminado (3+3 mm), con chapetas en acero inoxidable para m2
19.6.9
divisiones y con bisagra para puerta de vaiven en aluminio
anodizado negro, tipo Casma Ref. 51000/620 o equivalente

04R111 - VIDRIO TEMPLADO 6 mm INCOLORO M2 1.05


04R112 - CHAPETAS SOPORTE DE VIDRIO UND 4.00
21B125 - SILICONA ESTRUCTURAL M2 1.00
21B130 - SAND BLASTING M2 1.00
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.40
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

100 de 474
. . MATERIAL UNIDAD CANTIDAD

Puerta Ducha de 0.90x2.00 m, sujetada a muro con bisagras


19.6.7 sencillas en acero inoxidable,, Tipo P5P1 de VEA y Cia., o M2
equivalente

- Puerta Ducha de 0.90x2.00 m, M2 1.80


TOTAL UNITARIO

Puerta Ducha en Vidrio Laminado Blanco de 3+3 mm, de


19.6.8 0.70x2.00 m, sujetada a muro con bisagras sencillas en acero M2
inoxidable,, Tipo P5P1 de VEA y Cia., o equivalente

- Puerta Ducha de 0.70x2.00 m, M2 1.40


TOTAL UNITARIO

Tabique Central Divisones Duchas en Vidrio Laminado Blanco


19.6.9 de 3+3 mm, de (1..20+0.20) x 2.00 m, adherida a miro con M2
silicona estructural, Tipo VEA y Cia, o equivalente

- Puerta Ducha de (1.20 + 0.20) x 2.00 m, M2 2.80


TOTAL UNITARIO

CARPINTERIA MADERA

PUERTAS EN MADERA
Hojas en madera entamborada con alma de tablex, 2 laminas de
20.1.1 a 20.1. 9mm, mas refuerzo de 18mm, con acabado en lamina de alta M2
presion e=0.7 mm Tipo 2163 MT de Formica o equivalente, y con
bisagra de pivote, segun detalle especifico

- Lamina Tablex 1.53x2.44x9mm und 0.6911


- Lamina Formica Tangelo 1.22x2.44 und 0.8667
- PIEZA CEDRO CAQUETA UND 0.3931
- PEGANTE COLBON MADERA GN 0.1912
- BIZAGRA DE PIVOTE UND 0.3333
- TORNILLO PARA MADERA 8x2 UND 7.5751
- PUNTILLA 1" SIN CABEZA LIB 0.2580
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 3.03
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

101 de 474
. . MATERIAL UNIDAD CANTIDAD

Suministro, Instalacion y Acabado de Columnas Tipo 1


Fachada en Madera Laminada de seccion 0,25 x 0.60 x 15.80
m, con acabado en Majestic Plus resistente a rayos UV. La
20.2.1 Und
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte

- COLUMNAS MADERA LAMINADA 0.25x.0.60x15.80 m M3 2.3700


- MAGESTIC PLUD Gln/M3 2.3700
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 96.96
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Instalacion y Acabado de Columnas Tipo 2


Fachada en Madera Laminada de seccion 0,20 x 0.60 x 6.33
m, con acabado en Majestic Plus resistente a rayos UV. La
20.2.2 Und
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte

- COLUMNAS MADERA LAMINADA 0.25x.0.60x6.33 m M3 0.9495


- MAGESTIC PLUD Gln/M3 0.9495
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 38.85
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Suministro, Instalacion y Acabado de Columnas Tipo 3


Fachada en Madera Laminada de seccion 0,20 x 0.60 x 11.92
m, con acabado en Majestic Plus resistente a rayos UV. La
20.2.3 Und
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte

- COLUMNAS MADERA LAMINADA 0.25x.0.60x11.92 m M3 1.7880


- MAGESTIC PLUD Gln/M3 1.7880
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 73.15

102 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL MANO DE OBRA


TOTAL UNITARIO

Suministro, Instalacion y Acabado de Columnas Tipo 4


Fachada en Madera Laminada de seccion 0,20 x 0.60 x 11.92
m, con acabado en Majestic Plus resistente a rayos UV. La
20.2.4 Und
madera sera : inmunizada al vacio, a la vista, sin beta blanca
(albura), sin medula, con nudos vivos y muertos sanos, fisuras <5
mm. Inlcuye Mano de Obra, Tornilleria, Herrajes y Transporte

- COLUMNAS MADERA LAMINADA 0.25x.0.60x11.92 m M3 1.7880


- MAGESTIC PLUD Gln/M3 1.7880
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 73.15
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
20.3.1
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 01 L = 6.75 Recepcion Niv. -5.65 und
- TRIPLEX PERILLO 2.44x1.22 4mm UND 18.74
- LAMINA TABLEX 1.53x2.44x9mm UND 14.94
- PIEZA CEDRO CAQUETA UND 8.50
- PEGANTE COLBON MADERA GN 4.13
- BIZAGRA COBRIZADA 3" UND 42.51
- TORNILLO PARA MADERA 8x2 UND 163.81
- PUNTILLA 1" SIN CABEZA LIB 5.58
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 61.10
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
20.3.2
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 02 L = 4.90 Recepcion Niv. +0.00 und
- TRIPLEX PERILLO 2.44x1.22 4mm UND 13.60
- LAMINA TABLEX 1.53x2.44x9mm UND 10.85
- PIEZA CEDRO CAQUETA UND 6.17
- PEGANTE COLBON MADERA GN 3.00
- BIZAGRA COBRIZADA 3" UND 30.86

103 de 474
. . MATERIAL UNIDAD CANTIDAD

- TORNILLO PARA MADERA 8x2 UND 118.91


- PUNTILLA 1" SIN CABEZA LIB 4.05
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 44.35
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
20.3.3
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural

Mueble M - 03 L = 7.12 Recepcion Niv. +14.00 und


TRIPLEX PERILLO 2.44x1.22 4mm
- UND 19.77
LAMINA TABLEX 1.53x2.44x9mm
- UND 15.76
PIEZA CEDRO CAQUETA
- UND 8.97
PEGANTE COLBON MADERA
- GN 4.36
BIZAGRA COBRIZADA 3"
- UND 44.84
TORNILLO PARA MADERA 8x2
- UND 172.79
PUNTILLA 1" SIN CABEZA
- LIB 5.88
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 64.45
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
20.3.4
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 04 L = 2.64 Piso+Gabinete Cocineta Niv.
und
+14.00
- TRIPLEX PERILLO 2.44x1.22 4mm UND 9.07
- LAMINA TABLEX 1.53x2.44x9mm UND 7.23
- PIEZA CEDRO CAQUETA UND 4.11
- PEGANTE COLBON MADERA GN 2.00
- BIZAGRA COBRIZADA 3" UND 20.57
- TORNILLO PARA MADERA 8x2 UND 79.27
- PUNTILLA 1" SIN CABEZA LIB 2.70
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...

104 de 474
. . MATERIAL UNIDAD CANTIDAD

MANO DE OBRA CUADRILLA DD Carpinteria HR 29.57


SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

MUEBLES DE MADERA
Muebles de Piso, en madera de aglomerado
20.3.5
tipo MDF de 2mm y listones de cedro, con acabado en triplex de
madera roble mallado natural
Mueble M - 05 L = 4.68 Piso+Gabinete Cocineta Niv.
und
+19.25
- TRIPLEX PERILLO 2.44x1.22 4mm UND 16.08
- LAMINA TABLEX 1.53x2.44x9mm UND 12.82
- PIEZA CEDRO CAQUETA UND 7.29
- PEGANTE COLBON MADERA GN 3.55
- BIZAGRA COBRIZADA 3" UND 36.46
- TORNILLO PARA MADERA 8x2 UND 140.52
- PUNTILLA 1" SIN CABEZA LIB 4.79
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 52.41
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Puerta - Ventana LPV - 43 de 25.31 x 2.62 m Graderia


20.4.1 Cubierta : Estructura Metalica Soporte + Listones de Madera Und
segn detalle especifico
- Listones de Madera Teka de 0.04x0.04x1.50 m UND 21.00
- MAGESTIC PLUD GLN 0.0674
- Estructura Metalica de Soporte kg 19.8947
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...
TRANSPORTE % (M+MO) 1.0%
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 2.64
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Banca Ducha Vestieres : Estructura Metalica Soporte +


20.4.2 Und
Listones de Madera segn detalle especifico
- Listones de Madera Teka de 0.04x0.04x1.50 m UND 8.40
- MAGESTIC PLUD GLN 0.0270
- Estructura Metalica de Soporte kg 7.9579
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - EQUIPO FABRICACION % (M+MO) 3.0%
SUBTOTAL EQUIPO ...

105 de 474
. . MATERIAL UNIDAD CANTIDAD

TRANSPORTE % (M+MO) 1.0%


SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA DD Carpinteria HR 1.06
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

PORCELANA SANITARIA

Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior


21.1.1 und
Ref.030111001
Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior
12A101 - UND 1.0000
Ref.030111001
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.3) HR 1.06
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior


21.1.2 und
para Minusvalidos
Taza de Colgar a Muro CORONA ERIE 1.28 Entrada Posterior
21.1.2 - UND 1.0000
para Minusvalidos
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.3) HR 1.06
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

21.1.3 Orinal CORONA GOTTA Entrada Posterior Ref. 043101001 m2

12A103 - Orinal CORONA GOTTA Entrada Posterior Ref. 043101001 UND 1.0000

MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.2) ...
TOTAL UNITARIO

21.1.4 Orinal CORONA GOTTA Ref. 042111001 m2

106 de 474
. . MATERIAL UNIDAD CANTIDAD

12A103 - Orinal CORONA GOTTA Ref. 042111001 UND 1.0000


MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.2) ...
TOTAL UNITARIO

Lavamanos de Sobreponer CORONA MANANTIAL DUO Ref.


21.1.5 m2
74110031
Suministro e Instalacion de Lavamanos de Sobreponer
12A104 - CORONA MANANTIAL DUO Ref. 74110031, CON DESAGUE UND 1.0000
Ref.931100001 y SIFON Ref. 93130001
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.6) ...
TOTAL UNITARIO

Lavamanos de Sobreponer en Acero Inoxidable


21.1.6 m2
TRAMONTINA Ref. 43-AA-94108
LAVAPLATOS DE EMPOTRAR DE 60x40 cm EN ACERO
12A106 - INOXIDABLE MARCA SOCODA CON DESAGUE y SIFON UND 1.0000
PARA LAVAPLATOS Ref.
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.5) ...
TOTAL UNITARIO

Lavamanos para Minusvalidos de colgar color blanco, marca ?


21.1.7 m2
Ref. Aquajet A&A o equivalente, con desague y sifon.

LAVAMANOS PARA MINUSVALDIOS DE COLGAR COLOR


12A105 - BLANCO MARCA HANDICAP Ref. Gr-01291 A&A CON UND 1.0000
DESAGUE Ref.931100001 y SIFON Ref. 93130001
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.5) ...
TOTAL UNITARIO

107 de 474
. . MATERIAL UNIDAD CANTIDAD

GRIFERIAS

Valvula de Sensor para Sanitario marca TOTO Ref. 5AA-TET


21.2.1 und
2LN-32-22 o equivalente, de igual calidad o superior
Fluxometro de Sensor para Sanitario marca Toto Ref. 5AA-
12A118 und 1.0000
TET2LN-32 o equivalente, de igual calidad o superior
MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

Griferia Kit Valvula Descarga Alta Presion para Sanitario con


21.2.2 juego accesorios de conexin y boton de accionamiento und
antivandalico, marca DOCOL Ref. 4-AA-1701510B

Griferia Kit Valvula Descarga Alta Presion para Sanitario con


12A117 juego accesorios de conexin y boton de accionamiento und 1.0000
antivandalico, marca DOCOL Ref. 4-AA-1701510B

MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

Griferia Kit Valvula Descarga Alta Presion para Sanitario


Minusvalidos, con juego de accesorios de conexin, boton de
21.2.3 und
accionamiento tipo palanca, marca ? Ref. PRESMMATIC
BENEFIT CHROME

Grifera para Sanitario Discapacitados, compuesta por:


Vlvula Antivandlica para sanitario, alta presin, Ref.
01021500, tipo Docol o equivalente, de igual calidad o superior.
Boton de accionamiento con palanca para discapacitados, para
12A119 vlvula de alta descarga, antivandlico, metlico cromado, Ref. und 1.0000
00184906, tipo Docol o equivalente, de igual calidad o superior.
Accesorios para sanitario de conexin posterior, Ref. 4-AA-
TCDIC, tipo Docol o equivalente, de igual calidad o superior.

MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...

108 de 474
. . MATERIAL UNIDAD CANTIDAD

NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU


21.2.4 und
2LN-SS o equivalente, de igual calidad o superior
Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU
12A115 und 1.0000
2LN-SS
MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.2)
TOTAL UNITARIO

Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU


21.2.5 und
2LN-SS o equivalente, de igual calidad o superior
Valvula de Sensor para Orinal marca TOTO Ref. 5AA TEU
12A115 und 1.0000
2LN-SS
MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.2)
TOTAL UNITARIO

Griferia Kit Valvula para Orinal, con juego de accesorios de


21.2.6 conexin y boton de accionamiento antivandalico, marca DOCOL und
Ref. 4-AA-17015106 o equivalente
Griferia Kit Valvula para Orinal, con juego de accesorios de
12A117 conexin y boton de accionamiento antivandalico, marca DOCOL und 1.0000
Ref. 4-AA-17015106
MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.3)
TOTAL UNITARIO

Griferia de Sensor para Lavamanos marca TOTO Ref. 5AA-


21.2.7 und
TEL 5 CC10-CP o equivalente, de igual calidad o superior

Griferia de Sensor para Lavamanos marca TOTO Ref. 5AA-


12A116 und 1.0000
TEL 5 CC10-CP
MATERIALES

109 de 474
. . MATERIAL UNIDAD CANTIDAD

NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

Griferia Antivandalica de Meson para Lavamanos Tipo Push


21.2.8 und
Cromada Metalica Ref. 91-AA-D02
Grifera para lavamanos, push antivandlica de mesa, en acero
inoxidable, Ref. 00108304, tipo Docol o equivalente, de igual
12A122 und 1.0000
calidad o superior.

MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

Griferia de Sensor para Lavamanos Minusvalidos marca


21.2.9 TOTO Ref. 5AA-TEL 5 CC10-CP o equivalente, de igual calidad und
o superior
Griferia de Sensor para Lavamanos Minusvalidos marca
12A116 und 1.0000
TOTO Ref. 5AA-TEL 5 CC10-CP
MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

Griferia Antivandalica para Ducha Tipo Push Cromada Metalica


21.2.10 und
Ref. DOCOL 171256406 con Poma Ref. DOCOL 171201106

Griferia Antivandalica para Ducha Tipo Push Cromada Metalica


12A116 und 1.0000
Ref. DOCOL 171256406 con Poma Ref. DOCOL 171201106

MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.6)
TOTAL UNITARIO

110 de 474
. . MATERIAL UNIDAD CANTIDAD

Llave Terminales manguera para pocetas de aseo, Ref. BL-


21.2.11 9977-11, color Cromo-Blister , tipo Gricol o equivalente, de igual und
calidad o superior

Llave Terminales manguera para pocetas de aseo y


12A121 vertederos de laboratorio, Ref. BL-9977-11, color Cromo-Blister , und 1.0000
tipo Gricol o equivalente, de igual calidad o superior

MATERIALES
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA (se paga por el item 6.18.8)
TOTAL UNITARIO

ACCESORIOS

Dispensador para Papel Higienico, de sobreponer en la pared,


21.3.1 en acero inoxidable satinado 304, para rollo 200/400 m, und
importado Ref. AA-8AA-845 o equivalente.
Dispensador para Papel Higienico, de sobreponer en la pared,
12A107 - en acero inoxidable satinado 304, para rollo 200/400 m, UND 1.0000
importado Ref. AA-8AA-845
CHAZO PLASTICO 1/4" ESTRIADO UND 2.0000
TORNILLO 1.1/2"X11/4 UND 2.0000
HERRAMIENTAS MENORES GLB 1.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32
TOTAL UNITARIO

Dispensador de Jabon , para montar sobre la pared, Tipo Manos


Libres, carcasa en acero inoxidable satindo 304, capacidad de
21.3.2 und
0.8 lit., alimentado por 6 pilas alcalinas de 1.5V, importado Ref.
AA-1-AA-RSD

Dispensador de Jabon , para montar sobre la pared, Tipo Manos


Libres, carcasa en acero inoxidable satindo 304, capacidad de
12A109 - UND 1.0000
0.8 lit., alimentado por 6 pilas alcalinas de 1.5V, importado Ref.
AA-1-AA-RSD
CHAZO PLASTICO 1/4" ESTRIADO UND 2.0000
TORNILLO 1.1/2"X11/4 UND 2.0000
HERRAMIENTAS MENORES GLB 1.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32

111 de 474
. . MATERIAL UNIDAD CANTIDAD

TOTAL UNITARIO

Caneca de sobreponer en la pared o divisin metlica, en acero


21.3.3 inoxidable satindo 304, con soportes para bolsa plastica, m2
capacidad de 14.5 lit., Nacional, Ref. 9-AA-330
Caneca de sobreponer en la pared o divisin metlica, en acero
12A108 - inoxidable satindo 304, con soportes para bolsa plastica, UND 1.0000
capacidad de 14.5 lit., Nacional, Ref. 9-AA-330
CHAZO PLASTICO 1/4" ESTRIADO UND 2.0000
TORNILLO 1.1/2"X11/4 UND 2.0000
HERRAMIENTAS MENORES GLB 1.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32
TOTAL UNITARIO

Gabinete para Toallas de papel, de sobreponer en la pared, en


acero inoxidable satinado 304, capacidad de 300 toalal toallas o
21.3.4 m2
2 paquetes, con llave, importado Ref. Bobrick 3-AA-210B o
equivalente

Dispensador de Toallas de papel, en acero inoxidable, para


12A108 - montar sobre la pared, Tipo Bobrick Classic B-262 o UND 1.0000
equivalente
CHAZO PLASTICO 1/4" ESTRIADO UND 2.0000
TORNILLO 1.1/2"X11/4 UND 2.0000
HERRAMIENTAS MENORES GLB 1.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32
TOTAL UNITARIO

21.3.5 Percha en acero inoxidable Bobrick m2


12A108 - Percha en acero inoxidable Bobrick UND 1.0000
CHAZO PLASTICO 1/4" ESTRIADO UND 1.0000
TORNILLO 1.1/2"X11/4 UND 1.0000
HERRAMIENTAS MENORES GLB 1.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32
TOTAL UNITARIO

112 de 474
. . MATERIAL UNIDAD CANTIDAD

Barra de Seguridad Abatible para Discapacitados en acero


21.3.6 Jgo
inoxidable Ref. ?
Barra de Seguridad Abatible para Discapacitados en acero
12A110 - Jgo 1.0000
inoxidable Ref. ?
CHAZO PLASTICO 1/4" ESTRIADO UND 4.0000
TORNILLO 1.1/2"X11/4 UND 4.0000
HERRAMIENTAS MENORES GLB 2.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32
TOTAL UNITARIO

Barra de Seguridad Fija 60 cm para discapacitados en


21.3.7 Jgo
acero inoxidable Ref. ?
Barra de Seguridad Fija 60 cm para discapacitados en
12A110 - Jgo 1.0000
acero inoxidable Ref. ?
CHAZO PLASTICO 1/4" ESTRIADO UND 4.0000
TORNILLO 1.1/2"X11/4 UND 4.0000
HERRAMIENTAS MENORES GLB 2.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32
TOTAL UNITARIO

Secador de Manos, carcasa en acero inoxidable satinado 304,


calibre 1.2mm, motor sin escobillas, sensor ajustable de 10 a 30
21.3.8 Jgo
cm, indicador led de color, de salida de aie, importado, Ref. AA-
1-AA-1800SRA o equivlaente

Secador de Manos, carcasa en acero inoxidable satinado 304,


calibre 1.2mm, motor sin escobillas, sensor ajustable de 10 a 30
12A112 - Jgo 1.0000
cm, indicador led de color, de salida de aie, importado, Ref. AA-
1-AA-1800SRA
CHAZO PLASTICO 1/4" ESTRIADO UND 4.0000
TORNILLO 1.1/2"X11/4 UND 4.0000
HERRAMIENTAS MENORES GLB 2.0000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.32
TOTAL UNITARIO

113 de 474
. . MATERIAL UNIDAD CANTIDAD

Espejo Cristal Biselado de 5 mm colocado sobre marco de


21.4.1 und
madera , para baos Wc. h=1.00
Espejo Cristal Biselado de 5 mm colocado sobre marco de
12A111 - M2 1.0000
madera , para baos Wc. h=1.00
- CINTA DOBLE FAZ ROLL 0.1333
- SILICONA CART 0.1500
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 1.00
TOTAL UNITARIO

REJILLAS

Rejillas para Desague en aluminio de 8 x 16", Tipo TA-


21.5.1 und
8x16cmx2", de Colrejillas o equivalente
03B001 - CEMENTO BLANCO (40kg) BTO 0.0025
17B600 - REJILLA ALUMINIO 3x2" UND 1.0000
21D235 - PEGACOR BLANCO/PEGALIT KGR 0.2000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.35
TOTAL UNITARIO

21.5.2 Taparegistro plastico und


03B001 - CEMENTO BLANCO (40kg) BTO 0.0025
17B610 - Taparregistro en Acero Inoxidable con cerradura UND 1.0000
21D235 - PEGACOR BLANCO/PEGALIT KGR 0.2000
MATERIALES ...
NO APLICA % (M+MO)
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.35
TOTAL UNITARIO

CERRADUIRAS

Cerraduras Cilndricas de Manija, para puertas Baos privados,


22.1.1 und
color cromado mate, Ref. Jupiter A40S, tipo Schlage o similar

19C230 - Cerraduras P-0? Schlage Jupiter A40S de oficina UND 1.00


27A650 - CINTA DE ENMASCARAR 1" (CREPE RLL 0.10
MATERIALES ...

114 de 474
. . MATERIAL UNIDAD CANTIDAD

HERRAMIENTAS MENORES % (M+MO) 2%


SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 1.02
TOTAL UNITARIO

Cerraduras Cilndricas de Manija, para puertas Oficinas, color


22.1.2 und
cromado mate, Ref. Jupiter A50PD, tipo Schlage o similar

19C230 - Cerraduras P-0? Schlage Jupiter A50PD de oficina UND 1.00


27A650 - CINTA DE ENMASCARAR 1" (CREPE RLL 0.10
MATERIALES ...
NO APLICA % (M+MO) 2%
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 1.02
TOTAL UNITARIO

Cerraduras Cilndricas de Manija, de Paso, color cromado


22.1.3 und
mate, Ref. Jupiter A10S, tipo Schlage o similar
19C230 - Cerraduras P-0? Schlage Jupiter A10S de Paso UND 1.00
27A650 - CINTA DE ENMASCARAR 1" (CREPE RLL 0.10
MATERIALES ...
NO APLICA % (M+MO) 2%
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 1.02
TOTAL UNITARIO

Cerrojos de seguridad dobless, para puertas Cuartos tecnicos y


22.1.4 depositos, color cromado mate, Ref. B262PX, tipo Schlage o und
similar
19C230 - CERROJO SCHALAGE B262 PX DORA UND 1.0000
27A650 - CINTA DE ENMASCARAR 1" (CREPE RLL 0.1000
MATERIALES ...
NO APLICA % (M+MO) 2%
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 1.02
TOTAL UNITARIO

Cerradura Antipnico Horizontal, color cromado mate, Ref. 7300,


22.1.5 und
tipo Schlage o similar
19C010 - MANIJA ANTIPANICO UND 1.00

115 de 474
. . MATERIAL UNIDAD CANTIDAD

27A650 - CERRADURA EXT.ANTIP. 0707718 UND 1.00


MATERIALES ...
NO APLICA % (M+MO) 2%
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 6.75
TOTAL UNITARIO

22.2.1 Topes para puertas und


17A278 - TOPE DE RESORTE UND 1.0000
MATERIALES
NO APLICA % (M+MO) 2%
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 0.31
TOTAL UNITARIO

22.2.2 Bisagra de piso Puerta de Vaiven und

19C230 - Bisagra de piso Puerta de Vaiven UND 1.0000


27A650 - CINTA DE ENMASCARAR 1" (CREPE RLL 0.1000
MATERIALES ...
NO APLICA % (M+MO) 2%
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 1.02
TOTAL UNITARIO

22.2.3 Cierrapuerta Horizontal No.2 Tipo Dorma o equivalente und


19C230 - Cierrapuerta Horizontal No.2 Tipo Dorma o equivalente UND 1.0000
27A650 - CINTA DE ENMASCARAR 1" (CREPE RLL 0.1000
MATERIALES ...
NO APLICA % (M+MO) 0%
SUBTOTAL HERRAMIENTAS ...
NO APLICA % (M+MO)
SUBTOTAL EQUIPO ...
NO APLICA % (M+MO)
SUBTOTAL TRANSPORTE ...
Cuadrilla AA (Albaileria) 1 Oficial HR 1.02
TOTAL UNITARIO

PINTURA

116 de 474
. . MATERIAL UNIDAD CANTIDAD

Pintura P -1 : Latex (Vinilo) sobre superficie de Tabiqueria


23.1.1 m2
Interior, Z10 Satinado, colores segn planos de detalle

23A135 - VINILICO PREPARADO GLN 0.0700


27A650 - CINTA DE ENMASCARAR 1" (CREPE) RLL 0.0200
27A805 - LIJA PARA AGUA # 80 PLG 0.0200
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 3.8%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.1405
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura P - 2 : Latex (Vinilo) sobre superficie de Tabiqueria


23.1.2 m2
Interior, Z10 Mate, colores segn planos de detalle

23A135 - VINILICO PREPARADO GLN 0.0700


27A650 - CINTA DE ENMASCARAR 1" (CREPE) RLL 0.0200
27A805 - LIJA PARA AGUA # 80 PLG 0.0200
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 3.8%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 2.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.1405
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura P - 3 : Latex (Vinilo) bajo superficie de Cielorraso


23.1.3 m2
Cementicio, color blanco
23A135 - VINILICO PREPARADO GLN 0.0700
27A650 - CINTA DE ENMASCARAR 1" (CREPE) RLL 0.0200
27A805 - LIJA PARA AGUA # 80 PLG 0.0200
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 2.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 1.9%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.1405
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura P - 6 : Base de Recinas Epoxicas Acrilicas (Epoxico)


23.1.4 sobre supereficie de muros en bloque paetados, colores segn m2
planos de dedetalle
23A135 - PINTURA EPOXICA ICO GLN 0.0700
23A136 - CATALIZADOR EPOXICO GLN 0.0420
27A650 - CINTA DE ENMASCARAR 1" (CREPE) RLL 0.0200

117 de 474
. . MATERIAL UNIDAD CANTIDAD

27A805 - LIJA PARA AGUA # 80 PLG 0.0200


SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.5%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 1.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.1405
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura Puertas Metalicas, rejillas y cerramiento con limpieza


23.2.1 mecanica SSPCP-SP3, base epoxica atoxica, con acabadado en m2
pintura epoxica Pintucoat color negro mate RAL 9005

23A009 - BASE CREMA SOLAC 6071360 GLN 0.07


23A076 - LACA ACRILICA ESPECIAL GLN 0.06
23A084 - MASILLA ACRILICA SOLAC 6072311 GLN 0.02
23G050 - THINNER 2103 GLN 0.03
27A805 - LIJA PARA AGUA # 80 PLG 0.11
MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.3949
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura P - 4 : Pintura Barandas Metalicas Tubulares, con Ml


limpieza mecanica SSPCP-SP3, base epoxica atoxica, con
23.2.2
acabadado en pintura epoxica Pintucoat en colores RAL 6905
y 7074
23A009 - BASE CREMA SOLAC 6071360 GLN 0.04
23A076 - LACA ACRILICA ESPECIAL GLN 0.03
23A084 - MASILLA ACRILICA SOLAC 6072311 GLN 0.01
23G050 - THINNER 2103 GLN 0.02
27A805 - LIJA PARA AGUA # 80 PLG 0.06
MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.3%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.2259
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

23.3.1 Pintura P - 5 : Pintura Trafico demarcacion Columnas m2


23C110 - TRAFICO AMARILLO 659/13712 GLN 0.0511
23C112 - TRAFICO BLANCO 653/13713 GLN 0.0511
23G050 - THINNER 2103 GLN 0.1206

118 de 474
. . MATERIAL UNIDAD CANTIDAD

27A650 - CINTA DE ENMASCARAR 1" (CREPE) RLL 0.0511


SUBTOTAL HERRAMIENTAS ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.1144
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

23.3.2 Pintura P - 5 : Pintura Trafico demarcacion Parqueaderos m2


23C110 - TRAFICO AMARILLO 659/13712 GLN 0.0089
23C112 - TRAFICO BLANCO 653/13713 GLN 0.0089
23G050 - THINNER 2103 GLN 0.0210
27A650 - CINTA DE ENMASCARAR 1" (CREPE) RLL 0.0089
SUBTOTAL HERRAMIENTAS ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.0564
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Pintura P - 5 : Pintura Trafico numeracion Parqueos y


23.3.3 m2
Columnas
23C110 - TRAFICO AMARILLO 659/13712 GLN 0.0089
23C112 - TRAFICO BLANCO 653/13713 GLN 0.0089
23G050 - THINNER 2103 GLN 0.0210
27A650 - CINTA DE ENMASCARAR 1" (CREPE) RLL 0.0089
SUBTOTAL HERRAMIENTAS ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.0%
SUBTOTAL HERRAMIENTAS ...
20H701 - Equipo Traciego y Transporte Vertical/Horizontal Obra % (M+MO) 0.0%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA CC Pintura HR 0.0564
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

EQUIPOS ESPECIALES

Escaleras Mecanicas, capacidad 9000 pasajeros/hora,


inclinacion 35, velociad 30m/m, altura 4.04 m, tipo Mitsubishi o
25.1.1 equivalente und
Escaleras Mecanicas, capacidad 9000 pasajeros/hora,
inclinacion 35, velociad 30m/m, altura 4.04 m, tipo Mitsubishi o
08M075 - equivalente UND 1.0000
SUBTOTAL MATERIALES TODO COSTO ...
20H700 - ( No Aplica ) % (M+MO)

119 de 474
. . MATERIAL UNIDAD CANTIDAD

SUBTOTAL HERRAMIENTAS ...


20H701 - ( No Aplica ) % (M+MO)
SUBTOTAL EQUIPO ...
- ( No Aplica )
SUBTOTAL TRANSPORTE ...
- ( No Aplica ) HR
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Ascensor Panoramico : 2 Paradas, Capacidad para 750 kg :


11 personas, Velocidad 60 m/m, Tipo Mitsubishi o equivalente
25.1.2 und

Ascensor Panoramico : 2 Paradas, Capacidad para 750 kg :


11 personas, Velocidad 60 m/m, Tipo Mitsubishi o equivalente
08M075 - UND 1.0000
SUBTOTAL MATERIALES TODO COSTO ...
20H700 - ( No Aplica ) % (M+MO)
SUBTOTAL HERRAMIENTAS ...
20H701 - ( No Aplica ) % (M+MO)
SUBTOTAL EQUIPO ...
- ( No Aplica )
SUBTOTAL TRANSPORTE ...
- ( No Aplica ) HR
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Montacarga Capacidad 5,000kg : 4 Paradas, Velocidad


25.1.3 0,20m/seg, Tipo Mitusibishi o equivalente und
Montacarga Capacidad 5,000kg : 4 Paradas, Velocidad
08M075 - 0,20m/seg, Tipo Mitusibishi o equivalente UND 1.0000
SUBTOTAL MATERIALES TODO COSTO ...
20H700 - ( No Aplica ) % (M+MO)
SUBTOTAL HERRAMIENTAS ...
20H701 - ( No Aplica ) % (M+MO)
SUBTOTAL EQUIPO ...
- ( No Aplica )
SUBTOTAL TRANSPORTE ...
- ( No Aplica ) HR
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

ASEO y LIMPIEZA

Limpieza Superficies en Concreto : Columnas, Pantallas, Muros


26.1.1 m2
y Elementos Arquitectonicos
20H600 - HERRAMIENTAS MENORES GLB 0.5000
21D100 - ACIDO MURIATICO (CLORHIDRICO) KGR 0.5000
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.9%
SUBTOTAL HERRAMIENTAS ...
28A840 - EQUIPO MENOR % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...

120 de 474
. . MATERIAL UNIDAD CANTIDAD

MANO DE OBRA CUADRILLA AA 1 Oficial HR 0.24


SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

Proteccion Concretos Fachada con Hidrofugo adicionado con


26.1.2 Pigmetos de Tonalidad Verde tipo "Concretal" de la Industria m2
KEIM o equivlaente
21D087 - HIDROFUGO-R P/FACHADAS KG 0.1500
- PIGMENTO COLORANTE TIPO KEIM KG 0.1500
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 1.0%
SUBTOTAL HERRAMIENTAS ...
28A840 - EQUIPO MENOR % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA 1 Oficial HR 0.24
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

26.2.1 Aseo Final para Entrega Edificio m2


20H600 - HERRAMIENTAS MENORES GLB 1.0000
21D100 - ACIDO MURIATICO (CLORHIDRICO) KGR 1.0000
27A711 - ESCOBA NYLON UND 0.0150
27A725 - ESTOPA KGR 0.0150
SUBTOTAL MATERIALES ...
20H600 - HERRAMIENTAS MENORES % (M+MO) 0.9%
SUBTOTAL HERRAMIENTAS ...
28A840 - EQUIPO MENOR % (M+MO) 0.6%
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA 1 Oficial HR 0.34
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO

121 de 474
UNITARIO TOTAL

1,205.15
790.00 15.80
1,500.00 30.00
966.00 19.32
1,286.50 25.73
2.64 0.53
91.38 *
950.00 28.50
28.50 *
1,500,000.00 450.00
450.00 *

0.00 *
12,705.37 635.27
635.27 *
1,205.15 *

493,698.26
30,000.00 3,000.00
255,472.60 25,547.26
161,000.00 161,000.00
388.00 3,104.00
24,897.00 99,588.00
6,252.00 62,520.00
237.51 712.53
889.37 889.37
1,450.00 20,300.00
4,634.00 23,170.00
3,357.00 4,028.40
403,859.56 *
483,871.47 1,209.68
1,209.68 *
483,871.47 590.32
590.32 *

0.00 *
12,705.37 88,038.70
88,038.70 *
493,698.26 *

250,059.15
1,404.00 2,808.00
12,203.70 292.89
418,871.18 12,566.14
49,286.00 1,182.86
220,000.00 220,000.00
236,849.89 *
248,745.76 87.06

122 de 474
UNITARIO TOTAL

87.06 *
248,745.76 32.94
32.94 *

0.00 *
12,705.37 13,089.27
13,089.27 *
250,059.15 *

42,087.92
24,000.00 31,200.00
31,200.00 *
37,200.00 110.00
110.00 *
139,200.00 4,176.00
4,176.00 *

0.00 *
12,705.37 6,601.92
6,601.92 *
42,087.92 *

533,612.02
11,500.00 17,250.00
19,836.00 29,754.00
966.00 1,449.00
270.51 2,028.83
664.37 55,142.71
105,624.54 *
523,598.32 6,872.11
6,872.11 *
523,598.32 3,141.59
3,141.59 *

0.00 *
13,975.91 417,973.78
417,973.78 *
281,164.00 0.00
353,028.00 0.00
0.00 *
533,612.02 *

283,114.13
290.00 29,000.00
345.00 1,725.00
2,595.00 12,975.00
4,634.00 9,268.00
52,968.00 *
277,804.55 3,642.75
3,642.75 *
277,804.55 1,666.83
1,666.83 *

0.00 *
28,242.52 224,836.55

123 de 474
UNITARIO TOTAL

224,836.55 *
283,114.13 *

2,472,684.27
705.00 676,800.00
1,867.00 597,440.00
15,942.00 0.00
23,545.00 0.00
7,231.00 0.00
3,600.00 43,200.00
557.20 6,686.40
750.00 9,000.00
345.00 345.00
410.00 4,920.00
13,815.00 27,630.00
6,751.00 54,008.00
1,102.00 13,224.00
2,088.00 16,704.00
2,277.66 56,941.50
6,264.00 156,600.00
7,528.84 0.00
8,000,000.00 0.00
1,663,498.90 *
2,425,018.83 33,115.33
33,115.33 *
2,425,018.83 14,550.11
14,550.11 *

0.00 *
28,242.52 761,519.93
761,519.93 *
16,067,674.37 0.00
0.00 *
2,472,684.27 *

1,718,534.00
0.00

124 de 474
UNITARIO TOTAL

0.00 *
0.00
0.00 *
0.00
0.00 *

0.00 *
0.00
0.00 *
1,718,534.00 1,718,534.00
1,718,534.00 *
1,718,534.00 *

1,531,552.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

0.00 *
0.00
0.00 *
1,531,552.00 1,531,552.00
1,531,552.00 *
1,531,552.00 *

125 de 474
UNITARIO TOTAL

1,038,896.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

0.00 *
0.00
0.00 *
1,038,896.00 1,038,896.00
1,038,896.00 *
1,038,896.00 *

90,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

0.00 *
0.00
0.00 *
90,000.00 90,000.00
90,000.00 *
90,000.00 *

126 de 474
UNITARIO TOTAL

23,649.60

0.00 *
12,389.60 371.69
371.69 *
12,389.60 156.47
10,150.00 5,075.00
5,231.47 *
116,000.00 5,656.85
5,656.85 *
12,705.37 11,769.02
12,705.37 620.58
12,389.60 *
23,649.60 *

16,714.80

0.00 *
9,311.26 279.34
279.34 *
9,311.26 116.78
10,150.00 4,494.09
4,610.87 *
116,000.00 2,513.33
2,513.33 *
12,705.37 8,699.86
12,705.37 611.39
9,311.26 *
16,714.80 *

16,714.80

0.00 *
9,311.26 279.34
279.34 *
9,311.26 116.78
10,150.00 4,494.09
4,610.87 *
116,000.00 2,513.33
2,513.33 *
12,705.37 8,699.86
12,705.37 611.39
9,311.26 *
16,714.80 *

170,611.98

0.00 *
103,469.15 2,069.38
2,069.38 *
103,469.15 1,891.77

127 de 474
UNITARIO TOTAL

10,150.00 38,048.35
39,940.12 *
116,000.00 25,133.33
25,133.33 *
12,705.37 97,355.21
12,705.37 6,113.94
103,469.15 *
170,611.98 *

94,745.98
19,778.90 3,608.21
25,000.00 25,000.00 *
28,608.21
34,808.43 696.17 *
696.17
1,039,240.29 24,019.85
1,039,240.29 24,019.85
48,466.20 1,120.19
48,466.20 1,120.19
48,466.20 1,120.19
48,466.20 1,120.19
48,466.20 1,120.19
48,466.20 1,120.19
48,466.20 1,120.19
48,466.20 1,120.19
48,466.20 1,120.19
48,454.84 1,119.93 *
59,241.39
*
0.00
12,705.37 6,200.22 *
6,200.22 *
94,745.98

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

128 de 474
UNITARIO TOTAL

357,744.00
357,744.00 357,744.00
357,744.00 *

0.00 *

0.00 *

0.00 *
0.00
0.00 *
357,744.00 *

23,771.02

0.00 *
306.81 6.14
6.14 *
104,400.00 6,058.25
6,058.25 *
104,400.00 17,399.83
17,399.83 *
5,036.07 306.81
306.81 *
23,771.02 *

23,771.02

0.00 *
306.81 6.14
6.14 *
104,400.00 6,058.25
6,058.25 *
104,400.00 17,399.83
17,399.83 *
5,036.07 306.81
306.81 *
23,771.02 *

23,771.02

0.00 *
306.81 6.14
6.14 *
104,400.00 6,058.25

129 de 474
UNITARIO TOTAL

6,058.25 *
104,400.00 17,399.83
17,399.83 *
5,036.07 306.81
306.81 *
23,771.02 *

39,678.90

0.00 *
21,630.00 432.60
432.60 *
21,630.00 216.30
216.30 *
104,400.00 17,400.00
17,400.00 *
12,705.37 15,894.04
12,705.37 5,735.95
21,630.00 *
39,678.90 *

39,678.90

0.00 *
21,630.00 432.60
432.60 *
21,630.00 216.30
216.30 *
104,400.00 17,400.00
17,400.00 *
12,705.37 15,894.04
12,705.37 5,735.95
21,630.00 *
39,678.90 *

39,678.90

0.00 *
21,630.00 432.60
432.60 *
21,630.00 216.30
216.30 *
104,400.00 17,400.00
17,400.00 *
12,705.37 15,894.04
12,705.37 5,735.95
21,630.00 *
39,678.90 *

60,230.69

130 de 474
UNITARIO TOTAL

0.00 *
41,583.19 831.66
831.66 *
41,583.19 415.83
415.83 *
104,400.00 17,400.00
17,400.00 *
12,705.37 30,555.95
12,705.37 11,027.24
41,583.19 *
60,230.69 *

60,230.69

0.00 *
41,583.19 831.66
831.66 *
41,583.19 415.83
415.83 *
104,400.00 17,400.00
17,400.00 *
12,705.37 30,555.95
12,705.37 11,027.24
41,583.19 *
60,230.69 *

2,957.06

0.00 *
2,875.52 52.78
52.78 *
2,875.52 28.76
28.76 *

0.00 *
12,705.37 2,875.52
2,875.52 *
2,957.06 *

2,957.06

0.00 *
2,875.52 52.78
52.78 *
2,875.52 28.76
28.76 *

0.00 *
12,705.37 2,875.52
2,875.52 *
2,957.06 *

131 de 474
UNITARIO TOTAL

2,957.06

0.00 *
2,875.52 52.78
52.78 *
2,875.52 28.76
28.76 *

0.00 *
12,705.37 2,875.52
2,875.52 *
2,957.06 *

2,957.06

0.00 *
2,875.52 52.78
52.78 *
2,875.52 28.76
28.76 *

0.00 *
12,705.37 2,875.52
2,875.52 *
2,957.06 *

2,961.79

0.00 *
2,875.52 57.51
57.51 *
2,875.52 28.76
28.76 *

0.00 *
12,705.37 2,875.52
2,875.52 *

2,961.79 *

12,219.65
41,667.00 966.67
20,500.00 2,972.50
2,088.00 1,476.22
5,415.39 *
11,987.11 160.61
160.61 *
11,987.11 71.92
71.92 *

0.00 *
12,705.37 6,571.72

132 de 474
UNITARIO TOTAL

6,571.72 *
12,219.65 *

12,219.65
41,667.00 966.67
20,500.00 2,972.50
2,088.00 1,476.22
5,415.39 *
11,987.11 160.61
160.61 *
11,987.11 71.92
71.92 *

0.00 *
12,705.37 6,571.72
6,571.72 *

12,219.65 *

12,623.50

0.00 *
10,954.41 219.09
219.09 *
29,000.00 1,450.00
1,450.00 *

0.00 *
12,705.37 10,954.41
10,954.41 *
12,623.50 *

43,184.00
18,328.46 23,827.00
23,827.00 *
1,277.29 0.00
0.00 *
128,774.00 10,610.78
90,644.00 7,468.93
18,079.71 *

0.00 *
12,216.70 1,277.29
1,277.29 *
43,184.00 *

133 de 474
UNITARIO TOTAL

46,084.00
20,559.23 26,727.00
26,727.00 *
1,277.29 0.00
0.00 *
128,774.00 10,610.78
90,644.00 7,468.93
18,079.71 *

0.00 *
12,216.70 1,277.29
1,277.29 *
46,084.00 *

21,001.95
35,372.77 1,857.07
270,500.40 14,201.27
16,058.34 *
19,807.04 112.95
112.95 *
18,451,499.72 1,081.96
1,081.96 *

0.00 *
12,705.37 3,748.70
3,748.70 *
21,001.95 *

531,881.36
35,372.77 37,141.41
312,886.80 328,531.14
1,000.00 6,300.00
3,357.00 1,107.81
373,080.36 *
506,625.51 848.94
848.94 *
3,915.00 4,071.60
18,451,499.72 20,335.30
24,406.90 *

0.00 *
12,705.37 133,545.15
133,545.15 *
531,881.36 *

531,881.36
35,372.77 37,141.41
312,886.80 328,531.14
1,000.00 6,300.00

134 de 474
UNITARIO TOTAL

3,357.00 1,107.81
373,080.36 *
506,625.51 848.94
848.94 *
3,915.00 4,071.60
18,451,499.72 20,335.30
24,406.90 *

0.00 *
12,705.37 133,545.15
133,545.15 *
531,881.36 *

531,881.36
35,372.77 37,141.41
312,886.80 328,531.14
1,000.00 6,300.00
3,357.00 1,107.81
373,080.36 *
506,625.51 848.94
848.94 *
3,915.00 4,071.60
18,451,499.72 20,335.30
24,406.90 *

0.00 *
12,705.37 133,545.15
133,545.15 *
531,881.36 *

698,938.82
35,372.77 37,141.41
312,886.80 328,531.14
290.00 8,700.00
3,942.00 2,689.39
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
1,000.00 6,300.00
3,357.00 2,685.60
18,792.00 19,731.60
421,018.36 *
670,633.70 853.19
853.19 *
3,915.00 1,683.45
17,400.00 3,480.00
365.00 1,825.00
140.00 280.00
87.00 17.40
18,451,499.72 20,166.09
27,451.94 *

0.00 *
12,705.37 249,615.33
249,615.33 *
698,938.82 *

135 de 474
UNITARIO TOTAL

698,938.82
35,372.77 37,141.41
312,886.80 328,531.14
290.00 8,700.00
3,942.00 2,689.39
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
1,000.00 6,300.00
3,357.00 2,685.60
18,792.00 19,731.60
421,018.36 *
670,633.70 853.19
853.19 *
3,915.00 1,683.45
17,400.00 3,480.00
365.00 1,825.00
140.00 280.00
87.00 17.40
18,451,499.72 20,166.09
27,451.94 *

0.00 *
12,705.37 249,615.33
249,615.33 *
698,938.82 *

698,938.82
35,372.77 37,141.41
312,886.80 328,531.14
290.00 8,700.00
3,942.00 2,689.39
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
1,000.00 6,300.00
3,357.00 2,685.60
18,792.00 19,731.60
421,018.36 *
670,633.70 853.19
853.19 *
3,915.00 1,683.45
17,400.00 3,480.00
365.00 1,825.00
140.00 280.00
87.00 17.40
18,451,499.72 20,166.09
27,451.94 *

0.00 *
12,705.37 249,615.33
249,615.33 *
698,938.82 *

136 de 474
UNITARIO TOTAL

698,938.82
35,372.77 37,141.41
312,886.80 328,531.14
290.00 8,700.00
3,942.00 2,689.39
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
1,000.00 6,300.00
3,357.00 2,685.60
18,792.00 19,731.60
421,018.36 *
670,633.70 853.19
853.19 *
3,915.00 1,683.45
17,400.00 3,480.00
365.00 1,825.00
140.00 280.00
87.00 17.40
18,451,499.72 20,166.09
27,451.94 *

0.00 *
12,705.37 249,615.33
249,615.33 *
698,938.82 *

49,337.42
35,372.77 3,714.14
312,886.80 32,853.11
3,942.00 413.91
3,583.00 376.22
37,357.38 *
45,467.37 82.59
82.59 *
3,915.00 1,623.55
18,451,499.72 2,163.91
3,787.46 *

0.00 *
12,705.37 8,109.99
8,109.99 *
49,337.42 *

19,373.20

2,053.20 28.74
28.74 *

137 de 474
UNITARIO TOTAL

61,000.00 1,424.80
1,424.80 *

0.00 *
12,008.85 2,053.20###
2,053.20 *
3,506.75 *

287.97

4,524.00 271.44
271.44 *
285.12 1.43
1.43 *
285.12 1.43
1.43 *

0.00 *
12,008.85 13.68
13.68 *
287.97 *

1,147.07

3,538.00 1,061.40
1,061.40 *
1,135.71 5.68
5.68 *
1,135.71 5.68
5.68 *

0.00 *
12,008.85 74.31
74.31 *
1,147.07 *

14,431.41

2,610.00 13,050.00
13,050.00 *
14,288.53 71.44
71.44 *
14,288.53 71.44
71.44 *

0.00 *
12,008.85 1,238.53
1,238.53 *
14,431.41 *

430,051.00

463,755.24

35,372.77 35,372.77
325,832.40 325,832.40

138 de 474
UNITARIO TOTAL

3,942.00 413.91
361,619.08 *
452,821.28 822.52
822.52 *
30,360.00 4,554.00
2,052.00 5,557.44
18,451,499.72 0.00
10,111.44 *

0.00 *
12,705.37 91,202.20
91,202.20 *
463,755.24 *

463,755.24

35,372.77 35,372.77
325,832.40 325,832.40
3,942.00 413.91
361,619.08 *
452,821.28 822.52
822.52 *
30,360.00 4,554.00
2,052.00 5,557.44
18,451,499.72 0.00
10,111.44 *

0.00 *
12,705.37 91,202.20
91,202.20 *
463,755.24 *

463,755.24

35,372.77 35,372.77
325,832.40 325,832.40
3,942.00 413.91
361,619.08 *
452,821.28 822.52
822.52 *
30,360.00 4,554.00
2,052.00 5,557.44
18,451,499.72 0.00
10,111.44 *

0.00 *
12,705.37 91,202.20
91,202.20 *
463,755.24 *

47,908.00

21,344.00 21,344.00
26,564.00 26,564.00

139 de 474
UNITARIO TOTAL

47,908.00 *
0.00 0.00
0.00 *
0.00 0.00
0.00 *

0.00 *
12,705.37 0.00
0.00 *
47,908.00 *

4,212.00
0.00
0.00 *
2,138.22 42.76
42.76 *
44,746.05 2,031.02
2,031.02 *

0.00 *
12,705.37 2,138.22
2,138.22 *
4,212.00 *

924.82
522.00 522.00
522.00 *
915.66 4.58
4.58 *
915.66 4.58
4.58 *

0.00 *
12,705.37 393.66
393.66 *
924.82 *

7,012.00
34,271.23 6,285.34
6,285.34 *
6,942.57 34.71
34.71 *
6,942.57 34.71
34.71 *

0.00 *
12,705.37 657.23
657.23 *
7,012.00 *

140 de 474
UNITARIO TOTAL

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *

141 de 474
UNITARIO TOTAL

2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62

142 de 474
UNITARIO TOTAL

2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,548.74
2,088.00 2,192.40
2,204.00 66.12
2,258.52

0.00 *
2,498.76 49.98
49.98 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,548.74 *

830,296.21

343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
696,474.69 764.02
764.02 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
87.00 3,045.00
75,930.38 75,930.38

143 de 474
UNITARIO TOTAL

18,451,499.72 21,639.12
133,057.50 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
830,296.21 *

765,960.59
343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
638,871.06 755.17
755.17 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
87.00 3,045.00
69,207.23 69,207.23
18,451,499.72 21,639.12
126,334.35 *
0.00
0.00 *
12,705.37 192,012.12
192,012.12
765,960.59 *

765,960.59
343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
638,871.06 755.17
755.17 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00

144 de 474
UNITARIO TOTAL

87.00 3,045.00
69,207.23 69,207.23
18,451,499.72 21,639.12
126,334.35 *
0.00
0.00 *
12,705.37 192,012.12
192,012.12
765,960.59 *

765,960.59
343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
638,871.06 755.17
755.17 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
87.00 3,045.00
69,207.23 69,207.23
18,451,499.72 21,639.12
126,334.35 *
0.00
0.00 *
12,705.37 192,012.12
192,012.12
765,960.59 *

775,724.08
343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
646,551.54 730.09
730.09 *

145 de 474
UNITARIO TOTAL

3,915.00 6,264.00
87.00 3,045.00
69,207.23 51,905.43
7,000.00 45,588.90
18,451,499.72 21,639.12
128,442.44 *
0.00
0.00 *
12,705.37 199,692.60
199,692.60
775,724.08 *

775,724.08
343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
646,551.54 730.09
730.09 *
3,915.00 6,264.00
87.00 3,045.00
69,207.23 51,905.43
7,000.00 45,588.90
18,451,499.72 21,639.12
128,442.44 *
0.00
0.00 *
12,705.37 199,692.60
199,692.60
775,724.08 *

775,724.08
343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
646,551.54 730.09
730.09 *
3,915.00 6,264.00
87.00 3,045.00
69,207.23 51,905.43

146 de 474
UNITARIO TOTAL

7,000.00 45,588.90
18,451,499.72 21,639.12
128,442.44 *
0.00
0.00 *
12,705.37 199,692.60
199,692.60
775,724.08 *

775,724.08
343,998.00 361,197.90
11,252.00 11,814.60
24,012.00 25,212.60
290.00 8,700.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,858.94 *
646,551.54 730.09
730.09 *
3,915.00 6,264.00
87.00 3,045.00
69,207.23 51,905.43
7,000.00 45,588.90
18,451,499.72 21,639.12
128,442.44 *
0.00
0.00 *
12,705.37 199,692.60
199,692.60
775,724.08 *

218,205.15

35,372.77 9,285.35
312,886.80 82,132.79
11,252.00 2,953.65
24,012.00 6,303.15
360.00 2,160.00
12,604.00 1,512.48
1,500.00 1,350.00
3,583.00 7,166.00
3,357.00 2,014.20
114,877.62 *
145,531.87 206.91
206.91 *
3,915.00 4,058.88
7,000.00 59,391.19
18,451,499.72 9,016.30
72,466.37 *
0.00

147 de 474
UNITARIO TOTAL

0.00 *
12,705.37 30,654.25
30,654.25
218,205.15 *

218,205.15

35,372.77 9,285.35
312,886.80 82,132.79
11,252.00 2,953.65
24,012.00 6,303.15
360.00 2,160.00
12,604.00 1,512.48
1,500.00 1,350.00
3,583.00 7,166.00
3,357.00 2,014.20
114,877.62 *
145,531.87 206.91
206.91 *
3,915.00 4,058.88
7,000.00 59,391.19
18,451,499.72 9,016.30
72,466.37 *
0.00
0.00 *
12,705.37 30,654.25
30,654.25
218,205.15 *

305,487.20

35,372.77 12,999.49
312,886.80 114,985.90
11,252.00 4,135.11
24,012.00 8,824.41
360.00 3,024.00
12,604.00 2,117.47
1,500.00 1,890.00
3,583.00 10,032.40
3,357.00 2,819.88
160,828.66 *
203,744.61 289.68
289.68 *
3,915.00 5,682.43
7,000.00 83,147.67
18,451,499.72 12,622.82
101,452.91 *
0.00
0.00 *
12,705.37 42,915.95
42,915.95
305,487.20 *

148 de 474
UNITARIO TOTAL

283,864.64
35,372.77 10,399.60
347,652.00 102,209.69
11,252.00 3,308.09
24,012.00 7,059.53
360.00 1,080.00
12,604.00 756.24
1,500.00 675.00
3,583.00 3,583.00
3,357.00 1,007.10
130,078.24 *
177,467.35 241.79
241.79 *
3,915.00 2,435.33
150,000.00 34,500.00
7,000.00 62,979.39
18,451,499.72 6,240.79
106,155.51 *
0.00
0.00 *
12,705.37 47,389.11
47,389.11
283,864.64 *

218,205.15

35,372.77 9,285.35
312,886.80 82,132.79
11,252.00 2,953.65
24,012.00 6,303.15
360.00 2,160.00
12,604.00 1,512.48
1,500.00 1,350.00
3,583.00 7,166.00
3,357.00 2,014.20
114,877.62 *
145,531.87 206.91
206.91 *
3,915.00 4,058.88
7,000.00 59,391.19
18,451,499.72 9,016.30
72,466.37 *
0.00
0.00 *
12,705.37 30,654.25
30,654.25
218,205.15 *

19,373.20

149 de 474
UNITARIO TOTAL

2,053.20 28.74
28.74 *
61,000.00 1,424.80
1,424.80 *

0.00 *
12,008.85 2,053.20###
2,053.20 *
3,506.75 *

287.97

4,524.00 271.44
271.44 *
285.12 1.43
1.43 *
285.12 1.43
1.43 *

0.00 *
12,008.85 13.68
13.68 *
287.97 *

1,147.07

3,538.00 1,061.40
1,061.40 *
1,135.71 5.68
5.68 *
1,135.71 5.68
5.68 *

0.00 *
12,008.85 74.31
74.31 *
1,147.07 *

14,431.41

2,610.00 13,050.00
13,050.00 *
14,288.53 71.44
71.44 *
14,288.53 71.44
71.44 *

0.00 *
12,008.85 1,238.53
1,238.53 *
14,431.41 *

150 de 474
UNITARIO TOTAL

29,492.40

2,053.20 28.74
28.74 *
61,000.00 1,424.80
1,424.80 *

0.00 *
12,008.85 2,053.20###
2,053.20 *
3,506.75 *

287.97

4,524.00 271.44
271.44 *
285.12 1.43
1.43 *
285.12 1.43
1.43 *

0.00 *
12,008.85 13.68
13.68 *
287.97 *

1,147.07

3,538.00 1,061.40
1,061.40 *
1,135.71 5.68
5.68 *
1,135.71 5.68
5.68 *

0.00 *
12,008.85 74.31
74.31 *
1,147.07 *

24,550.61

3,224.80 22,573.60
22,573.60 *
24,307.54 121.54
121.54 *
24,307.54 121.54
121.54 *

0.00 *
12,008.85 1,733.94
1,733.94 *
24,550.61 *

151 de 474
UNITARIO TOTAL

29,492.40

2,053.20 28.74
28.74 *
61,000.00 1,424.80
1,424.80 *

0.00 *
12,008.85 2,053.20###
2,053.20 *
3,506.75 *

287.97

4,524.00 271.44
271.44 *
285.12 1.43
1.43 *
285.12 1.43
1.43 *

0.00 *
12,008.85 13.68
13.68 *
287.97 *

1,147.07

3,538.00 1,061.40
1,061.40 *
1,135.71 5.68
5.68 *
1,135.71 5.68
5.68 *

0.00 *
12,008.85 74.31
74.31 *
1,147.07 *

24,550.61

3,224.80 22,573.60
22,573.60 *
24,307.54 121.54
121.54 *
24,307.54 121.54
121.54 *

0.00 *
12,008.85 1,733.94

152 de 474
UNITARIO TOTAL

1,733.94 *
24,550.61 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00

153 de 474
UNITARIO TOTAL

140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00
17,400.00 9,744.00

154 de 474
UNITARIO TOTAL

487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00

155 de 474
UNITARIO TOTAL

17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *

156 de 474
UNITARIO TOTAL

3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

753,117.19
35,372.77 37,141.41
312,886.80 328,531.14
11,252.00 11,814.60
24,012.00 25,212.60
360.00 4,320.00
3,033.00 2,069.23
12,604.00 4,789.52
5,462.00 691.49
44,660.00 9,758.21
3,583.00 10,540.19
3,357.00 12,085.20
446,953.59 *
696,569.35 806.71
806.71 *
3,915.00 6,264.00
17,400.00 9,744.00
487.00 2,435.00
140.00 14,000.00
140.00 4,620.00
18,451,499.72 18,678.13
55,741.13 *
0.00
0.00 *
12,705.37 249,615.75
249,615.75
753,117.19 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

157 de 474
UNITARIO TOTAL

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

158 de 474
UNITARIO TOTAL

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

159 de 474
UNITARIO TOTAL

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

14,250.00
7,600.00 7,980.00
2,791.54 2,931.11
10,911.00
13,105.00 262.10
262.00 *

160 de 474
UNITARIO TOTAL

13,105.00 655.25
655.00 *
216.91 227.75
228.00 *
12,827.54 1,157.23
12,827.54 1,036.30
2,194.00 *
14,250.00 *

14,250.00
7,600.00 7,980.00
2,791.54 2,931.11
10,911.00
13,105.00 262.10
262.00 *
13,105.00 655.25
655.00 *
216.91 227.75
228.00 *
12,827.54 1,157.23
12,827.54 1,036.30
2,194.00 *
14,250.00 *

14,250.00
7,600.00 7,980.00
2,791.54 2,931.11
10,911.00
13,105.00 262.10
262.00 *
13,105.00 655.25
655.00 *
216.91 227.75
228.00 *
12,827.54 1,157.23
12,827.54 1,036.30
2,194.00 *
14,250.00 *

8,241.00
4,255.54 4,452.77
4,952.03 155.45
5,627.31 117.76
181.81 214.96
422.75 442.34
950.00 994.03
6,377.00
7,941.00 8.67
9.00 *

161 de 474
UNITARIO TOTAL

7,941.00 73.63
74.00 *
216.91 216.91
217.00 *
12,827.54 738.10
12,827.54 660.97
23,422.28 164.75
1,564.00 *
8,241.00 *

8,241.00
4,255.54 4,452.77
4,952.03 155.45
5,627.31 117.76
181.81 214.96
422.75 442.34
950.00 994.03
6,377.00
7,941.00 8.67
9.00 *
7,941.00 73.63
74.00 *
216.91 216.91
217.00 *
12,827.54 738.10
12,827.54 660.97
23,422.28 164.75
1,564.00 *
8,241.00 *

8,241.00
4,255.54 4,452.77
4,952.03 155.45
5,627.31 117.76
181.81 214.96
422.75 442.34
950.00 994.03
6,377.00
7,941.00 8.67
9.00 *
7,941.00 73.63
74.00 *
216.91 216.91
217.00 *
12,827.54 738.10
12,827.54 660.97
23,422.28 164.75
1,564.00 *
8,241.00 *

162 de 474
UNITARIO TOTAL

14,250.00
7,600.00 7,980.00
2,791.54 2,931.11
10,911.00
13,105.00 262.10
262.00 *
13,105.00 655.25
655.00 *
216.91 227.75
228.00 *
12,827.54 1,157.23
12,827.54 1,036.30
2,194.00 *
14,250.00 *

92,971.75
58,563.95 41,287.59
7,615.04 13,356.78
377.94 2,267.67
2,323.26 4,646.51
43,503.63 6,090.51
9,302.88 9,302.88
76,951.93
15,256.97 762.85
762.85 *
15,256.97
15,256.97 *
92,971.75 *

106,720.52
78,065.75 55,036.35
7,615.04 13,356.78
377.94 2,267.67
2,323.26 4,646.51
43,503.63 6,090.51
9,302.88 9,302.88
90,700.70
15,256.97 762.85
762.85 *

163 de 474
UNITARIO TOTAL

15,256.97
15,256.97 *
106,720.52 *

99,846.13
78,065.75 27,518.18
58,563.95 20,643.79
7,615.04 13,356.78
377.94 2,267.67
2,323.26 4,646.51
43,503.63 6,090.51
9,302.88 9,302.88
83,826.31
15,256.97 762.85
762.85 *
15,256.97
15,256.97 *
99,846.13 *

115,612.01
78,065.75 27,518.18
58,563.95 20,643.79
7,615.04 26,713.56
377.94 2,267.67
2,323.26 4,646.51
43,503.63 6,090.51
9,302.88 9,302.88
97,183.09
17,666.07 762.85
762.85 *
17,666.07
17,666.07 *
115,612.01 *

60,229.81
58,563.95 20,643.79
7,615.04 13,356.78
377.94 1,133.83
2,323.26 2,323.26
43,503.63 3,045.25
9,302.88 9,302.88
49,805.79

164 de 474
UNITARIO TOTAL

9,927.64 496.38
496.38
9,927.64
9,927.64 *
60,229.81 *

60,229.81
58,563.95 20,643.79
7,615.04 13,356.78
377.94 1,133.83
2,323.26 2,323.26
43,503.63 3,045.25
9,302.88 9,302.88
49,805.79
9,927.64 496.38
496.38
9,927.64
9,927.64 *
60,229.81 *

5,184.20
5,184.20 5,184.20
5,184.20
0.00 0.00
0.00
0.00
0.00 *
5,184.20 *

50,966.37
41,667.00 1,271.68
20,500.00 5,166.00
3,500.00 52.50
2,511.90 31,398.80
8,071.00 2,033.89
39,922.87 *
51,860.80 120.00
120.00 *
13,800.00 276.00
276.00 *

0.00 *
12,705.37 10,647.51
10,647.51 *

165 de 474
UNITARIO TOTAL

50,966.37 *

43,485.12
41,667.00 1,271.68
20,500.00 5,166.00
3,500.00 52.50
1,913.40 23,917.55
8,071.00 2,033.89
32,441.62 *
51,860.80 120.00
120.00 *
13,800.00 276.00
276.00 *

0.00 *
12,705.37 10,647.51
10,647.51 *
43,485.12 *

2,548.74
2,088.00 2,192.40
2,204.00 66.12
2,258.52

0.00 *
2,498.76 49.98
49.98 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,548.74 *

2,486.62
2,030.00 2,131.50
2,204.00 66.12
2,197.62

0.00 *
2,437.86 48.76
48.76 *
0.00
0.00 *

12,705.37 240.24
240.24 *
2,486.62 *

166 de 474
UNITARIO TOTAL

28,730.82

297,617.70 9,374.96
290.00 9.14
360.00 11.34
9,395.43
25,819.62 781.31
781.31 *
56,000.00 1,907.12
2,938.00 43.48
50.00 100.00
5,800.00 77.14
18.00 2.14
2,129.89 *
0.00
0.00 *
12,705.37 16,424.19
16,424.19 *
28,730.82 *

28,730.82

297,617.70 9,374.96
290.00 9.14
360.00 11.34
9,395.43
25,819.62 781.31
781.31 *
56,000.00 1,907.12
2,938.00 43.48
50.00 100.00
5,800.00 77.14
18.00 2.14
2,129.89 *
0.00
0.00 *
12,705.37 16,424.19
16,424.19 *
28,730.82 *

28,730.82

297,617.70 9,374.96
290.00 9.14
360.00 11.34
9,395.43
25,819.62 781.31
781.31 *
56,000.00 1,907.12
2,938.00 43.48
50.00 100.00
5,800.00 77.14
18.00 2.14
2,129.89 *
0.00
0.00 *

167 de 474
UNITARIO TOTAL

12,705.37 16,424.19
16,424.19 *
28,730.82 *

61,566.04

297,617.70 20,089.19
290.00 19.58
360.00 24.30
20,133.07
55,327.76 1,674.23
1,674.23 *
56,000.00 4,086.69
2,938.00 93.18
50.00 214.29
5,800.00 165.30
18.00 4.59
4,564.04 *
0.00
0.00 *
12,705.37 35,194.69
35,194.69 *
61,566.04 *

215,927.18
35,372.77 9,285.35
297,617.70 78,124.65
10,689.40 2,805.97
22,811.40 5,987.99
360.00 2,160.00
12,604.00 1,512.48
1,500.00 1,350.00
3,583.00 7,166.00
3,357.00 2,014.20
110,406.64 *
141,060.89 200.56
200.56 *
3,915.00 4,058.88
7,000.00 61,590.56
18,451,499.72 9,016.30
74,665.74 *
0.00
0.00 *
12,705.37 30,654.25
30,654.25
215,927.18 *

4,687.73
341,950.60 3,231.43
3,231.43 *
4,627.73 60.00
60.00 *

0.00 *
0.00

168 de 474
UNITARIO TOTAL

0.00 *
12,705.37 1,396.30
1,396.30 *
4,687.73 *

1,452.00
41,667.00 138.54
20,500.00 428.45
566.99
1,413.48 38.48
38.48 *
0.00
0.00 *
0.00
0.00 *

12,705.37 846.49
846.49 *
1,452.00 *

4,480.56
58,900.91 1,502.57
1,502.57 *
496,076.59 284.56###
284.56 *
17,400.00 651.90
651.90 *

0.00 *
12,705.37 2,041.53
2,041.53 *
4,480.56 *

18,479.12
41,667.00 1,933.35
20,500.00 5,945.00
3,679.00 1,066.91
8,945.26 *
18,126.65 243.71
243.71 *
18,126.65 108.76
108.76 *

0.00 *
12,705.37 9,181.39
9,181.39 *
18,479.12 *

169 de 474
UNITARIO TOTAL

18,479.12
41,667.00 1,933.35
20,500.00 5,945.00
3,679.00 1,066.91
8,945.26 *
18,126.65 243.71
243.71 *
18,126.65 108.76
108.76 *

0.00 *
12,705.37 9,181.39
9,181.39 *
18,479.12 *

8,022.73
41,667.00 583.34
20,500.00 1,783.50
3,679.00 320.07
2,686.91 *
7,870.99 104.51
104.51 *
7,870.99 47.23
47.23 *

0.00 *
12,705.37 5,184.07
5,184.07 *
8,022.73 *
8,022.73

193,244.35 193,244.35

209.00 627.00
302.00 604.00
194,475.35 *
7,900.20 237.01
237.01 *
7,900.20 178.54
178.54 *

170 de 474
UNITARIO TOTAL

0.00 *
12,705.37 7,900.20
7,900.20 *
202,791.10 *

202,791.10

193,244.35 193,244.35

209.00 627.00
302.00 604.00
194,475.35 *
7,900.20 237.01
237.01 *
7,900.20 178.54
178.54 *

0.00 *
12,705.37 7,900.20
7,900.20 *
202,791.10 *

202,791.10

193,244.35 193,244.35

209.00 627.00
302.00 604.00
194,475.35 *
7,900.20 237.01
237.01 *
7,900.20 178.54
178.54 *

0.00 *
12,705.37 7,900.20

171 de 474
UNITARIO TOTAL

7,900.20 *
202,791.10 *

50,144.80

43,811.97 43,811.97

209.00 209.00
302.00 302.00
44,322.97 *
5,530.90 165.93
165.93 *
5,530.90 125.00
125.00 *

0.00 *
12,705.37 5,530.90
5,530.90 *
50,144.80 *

101,297.18

89,880.49 89,880.49

209.00 418.00
302.00 604.00
90,902.49 *
9,875.25 296.26
296.26 *
9,875.25 223.18
223.18 *

0.00 *
12,705.37 9,875.25
9,875.25 *
101,297.18 *

120,502.75

110,956.00 110,956.00

209.00 627.00
302.00 604.00
112,187.00 *
7,900.20 237.01
237.01 *
7,900.20 178.54
178.54 *

0.00 *
12,705.37 7,900.20
7,900.20 *
120,502.75 *

172 de 474
UNITARIO TOTAL

126,195.90 126,195.90

209.00 627.00
302.00 604.00
127,426.90 *
7,900.20 237.01
237.01 *
7,900.20 178.54
178.54 *

0.00 *
12,705.37 7,900.20
7,900.20 *
135,742.65 *

72,849.62 72,849.62

209.00 418.00
302.00 604.00
73,871.62 *
9,218.17 276.55
276.55 *
9,218.17 208.33
208.33 *

0.00 *
12,705.37 9,218.17
9,218.17 *
83,574.67 *

55,339.58

45,946.00 45,946.00

45,946.00 *
53,807.46 753.30
753.30 *
53,807.46 322.84
322.84 *

0.00 *
12,705.37 8,317.43

173 de 474
UNITARIO TOTAL

8,317.43 *
55,339.58 *

106,930.00
11,765.80 94,126.37
94,126.37 *
104,833.33 1,467.67
1,467.67 *
104,833.33 629.00
629.00 *

0.00 *
12,705.37 10,706.96
10,706.96 *
106,930.00 *

69,190.00
4,760.53 57,126.37
57,126.37 *
67,833.33 949.67
949.67 *
67,833.33 407.00
407.00 *

0.00 *
12,705.37 10,706.96
10,706.96 *
69,190.00 *

81,770.00
13,891.94 69,459.71
69,459.71 *
80,166.67 1,122.33
1,122.33 *
80,166.67 481.00
481.00 *

0.00 *
12,705.37 10,706.96
10,706.96 *
81,770.00 *

10,064.00
6,909.95 7,255.45
7,255.45 *
9,866.67 138.13
138.13 *

174 de 474
UNITARIO TOTAL

9,866.67 59.20
59.20 *

0.00 *
12,705.37 2,611.22
2,611.22 *
10,064.00 *

8,470.80
63,000.00 2,520.00
94,133.66 2,824.01
41,667.00 465.82
20,500.00 1,424.18
7,234.01 *
8,304.71 116.27
116.27 *
8,304.71 49.83
49.83 *

0.00 *
12,705.37 1,070.70
1,070.70 *
8,470.80 *

132,090.00
126,513.00 126,513.00
126,513.00 *
129,500.00 1,813.00
1,813.00 *
129,500.00 777.00
777.00 *

0.00 *
12,705.37 2,987.00
2,987.00 *
132,090.00 *

106,930.00
101,846.33 101,846.33
101,846.33 *
104,833.33 1,467.67
1,467.67 *
104,833.33 629.00
629.00 *

0.00 *
12,705.37 2,987.00
2,987.00 *

175 de 474
UNITARIO TOTAL

106,930.00 *

69,190.00

64,846.33 64,846.33

64,846.33 *
67,833.33 949.67
949.67 *
67,833.33 407.00
407.00 *

0.00 *
12,705.37 2,987.00
2,987.00 *
69,190.00 *

94,350.00
89,513.00 89,513.00
89,513.00 *
92,500.00 1,295.00
1,295.00 *
92,500.00 555.00
555.00 *

0.00 *
12,705.37 2,987.00
2,987.00 *
94,350.00 *

106,930.00
101,846.33 101,846.33
101,846.33 *
104,833.33 1,467.67
1,467.67 *
104,833.33 629.00
629.00 *

0.00 *
12,705.37 2,987.00
2,987.00 *
106,930.00 *

106,930.00

101,846.33 101,846.33

101,846.33 *
104,833.33 1,467.67
1,467.67 *
104,833.33 629.00
629.00 *

176 de 474
UNITARIO TOTAL

0.00 *
12,705.37 2,987.00
2,987.00 *
106,930.00 *

10,258.14
41,667.00 996.12
20,500.00 3,063.05
4,059.17 *
10,063.46 134.31
134.31 *
10,063.46 60.38
60.38 *

0.00 *
12,705.37 6,004.28
6,004.28 *
10,258.14 *

10,679.87
41,667.00 996.12
20,500.00 3,063.05
3,679.00 413.46
4,472.63 *
10,476.91 140.10
140.10 *
10,476.91 62.86
62.86 *

0.00 *
12,705.37 6,004.28
6,004.28 *
10,679.87 *

10,679.87
41,667.00 996.12
20,500.00 3,063.05
3,679.00 413.46
4,472.63 *
10,476.91 140.10
140.10 *
10,476.91 62.86
62.86 *

0.00 *
12,705.37 6,004.28
6,004.28 *
10,679.87 *

177 de 474
UNITARIO TOTAL

41,667.00 96.67
20,500.00 297.25
393.92 *
3,155.14 94.65
94.65 *
3,155.14 63.10
63.10 *

0.00 *
12,008.85 3,281.35
3,281.35 *
3,833.03 *

1,802.60
41,667.00 48.33
20,500.00 148.63
196.96 *
1,767.25 24.74
24.74 *
1,767.25 10.60
10.60 *

0.00 *
12,705.37 1,570.29
1,570.29 *
1,802.60 *

113,080.71
80,576.87 84,605.72
2,660.00 5,320.00
3,400.00 102.00
90,027.72 *
110,863.44 1,552.09
1,552.09 *
110,863.44 665.18
665.18 *

0.00 *
12,705.37 20,835.72
20,835.72 *
113,080.71 *

178 de 474
UNITARIO TOTAL

69,378.93
32,917.00 658.34
49,896.27 52,391.09
1,000.00 4,000.00
57,049.43 *
68,018.56 952.26
952.26 *
68,018.56 408.11
408.11 *

0.00 *
12,705.37 10,969.13
10,969.13 *
69,378.93 *

69,378.93
32,917.00 658.34
49,896.27 52,391.09
1,000.00 4,000.00
57,049.43 *
68,018.56 952.26
952.26 *
68,018.56 408.11
408.11 *

0.00 *
12,705.37 10,969.13
10,969.13 *
69,378.93 *

375,048.62
324,816.63 341,057.46
2,846.20 5,692.40
3,638.00 109.14
346,859.00 *
367,694.72 5,147.73
5,147.73 *
367,694.72 2,206.17
2,206.17 *

0.00 *
12,705.37 20,835.72
20,835.72 *
375,048.62 *

179 de 474
UNITARIO TOTAL

375,048.62
324,816.63 341,057.46
2,846.20 5,692.40
3,638.00 109.14
346,859.00 *
367,694.72 5,147.73
5,147.73 *
367,694.72 2,206.17
2,206.17 *

0.00 *
12,705.37 20,835.72
20,835.72 *
375,048.62 *

319,352.82
324,816.63 238,740.22
6,292.81 12,585.61
2,846.20 5,692.40
3,638.00 109.14
257,127.37 *
313,091.00 4,383.27
4,383.27 *
313,091.00 1,878.55
1,878.55 *

0.00 *
12,705.37 55,963.63
55,963.63 *
319,352.82 *

319,352.82
324,816.63 238,740.22
6,292.81 12,585.61
2,846.20 5,692.40
3,638.00 109.14
257,127.37 *
313,091.00 4,383.27
4,383.27 *
313,091.00 1,878.55
1,878.55 *

0.00 *
12,705.37 55,963.63
55,963.63 *
319,352.82 *

180 de 474
UNITARIO TOTAL

314,948.61
204,469.06 214,692.51
6,403.33 24,608.00
13,573.46 27,146.92
25,615.82 25,615.82
292,063.25 *
306,475.44 3,064.75
3,064.75 *
306,475.44 5,408.42
5,408.42 *
306,475.44 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
314,948.61 *

275,888.41

192,665.70 202,298.98
6,403.33 24,608.00
13,573.46 27,146.92
254,053.90 *
268,466.09 2,684.66
2,684.66 *
268,466.09 4,737.66
4,737.66 *
268,466.09 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
275,888.41 *

194,663.41

117,389.72 123,259.20
6,403.33 24,608.00
13,573.46 27,146.92
175,014.12 *
189,426.31 1,894.26
1,894.26 *
189,426.31 3,342.83
3,342.83 *
189,426.31 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
194,663.41 *

181 de 474
UNITARIO TOTAL

352,838.41
263,979.78 277,178.77
6,403.33 24,608.00
13,573.46 27,146.92
328,933.69 *
343,345.88 3,433.46
3,433.46 *
343,345.88 6,059.07
6,059.07 *
343,345.88 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
352,838.41 *

352,838.41
263,979.78 277,178.77
6,403.33 24,608.00
13,573.46 27,146.92
328,933.69 *
343,345.88 3,433.46
3,433.46 *
343,345.88 6,059.07
6,059.07 *
343,345.88 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
352,838.41 *

7,082.67
67,025.00 4,691.75
4,691.75
6,971.13 69.71
69.71 *
6,971.13 41.83
41.83 *
0.00
0.00 *
7,467.86 2,279.38
2,279.38 *
7,082.67 *

305,364.75

182 de 474
UNITARIO TOTAL

219,983.15 230,982.31
6,403.33 24,608.00
13,573.46 27,146.92
282,737.23 *
297,149.42 2,971.49
2,971.49 *
297,149.42 5,243.84
5,243.84 *
297,149.42 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
305,364.75 *

194,663.41

117,389.72 123,259.20
6,403.33 24,608.00
13,573.46 27,146.92
175,014.12 *
189,426.31 1,894.26
1,894.26 *
189,426.31 3,342.83
3,342.83 *
189,426.31 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
194,663.41 *

247,604.78
62,833.33 65,975.00
21,760.26 108,801.28
6,403.33 24,608.00
13,573.46 27,146.92
226,531.20 *
240,943.39 2,409.43
2,409.43 *
240,943.39 4,251.96
4,251.96 *
240,943.39 0.00
0.00 *
23,276.80 14,412.19
14,412.19 *
247,604.78 *

183 de 474
UNITARIO TOTAL

9,951.87
41,667.00 871.58
20,500.00 2,680.09
3,551.67 *
6,274.70 87.85
87.85 *
6,274.70 37.65
37.65 *

0.00 *
12,705.37 6,274.70
6,274.70 *
9,951.87 *

13,970.52
41,667.00 1,223.53
20,500.00 3,762.34
4,985.87 *
8,808.48 123.32
123.32 *
8,808.48 52.85
52.85 *

0.00 *
12,705.37 8,808.48
8,808.48 *
13,970.52 *

41,667.00 658.31
20,500.00 1,805.79
346.00 2,076.00
8,071.00 645.39
5,185.48 *
200.00 200.00
200.00 *
13,800.00 70.66
70.66 *
14,025.22
14,025.22 *
19,481.36 *

41,667.00 1,544.01
20,500.00 4,235.34
346.00 4,869.10
8,071.00 1,513.72
12,162.17 *
200.00 200.00
200.00 *

184 de 474
UNITARIO TOTAL

13,800.00 70.66
70.66 *
33,259.25
33,259.25 *
45,692.08 *
45,692.08

84,352.95
41,667.00 833.34
20,500.00 2,570.70
3,400.00 680.00
48,616.16 51,046.97
55,131.01 *
69,511.84 973.17
973.17 *
69,511.84 417.07
417.07 *
13,450.88 13,450.88
13,450.88 *
12,705.37 14,380.83
14,380.83 *
84,352.95 *

87,138.83
41,667.00 833.34
20,500.00 2,570.70
3,400.00 680.00

51,217.35 53,778.22
57,862.26 *
72,243.09 1,011.40
1,011.40 *
72,243.09 433.46
433.46 *
13,450.88 13,450.88
13,450.88 *
12,705.37 14,380.83
14,380.83 *
87,138.83 *

120,000.00

107,006.72 112,357.06
112,357.06 *
117,647.06 1,647.06
1,647.06 *
117,647.06 705.88

185 de 474
UNITARIO TOTAL

705.88 *

0.00 *
12,705.37 5,290.00
5,290.00 *
120,000.00 *

69,658.45 73,141.37
73,141.37 *
78,431.37 1,098.04
1,098.04 *
78,431.37 470.59
470.59 *

0.00 *
12,705.37 5,290.00
5,290.00 *
80,000.00 *

123,189.36
90,015.39 94,516.16
2,660.00 5,320.00
3,400.00 102.00
99,938.16 *
120,773.88 1,690.83
1,690.83 *
120,773.88 724.64
724.64 *

0.00 *
12,705.37 20,835.72
20,835.72 *
123,189.36 *

45,060.92
3,400.00 680.00
27,169.75 28,528.24
1,000.00 4,000.00
33,208.24 *
44,177.37 618.48
618.48 *
44,177.37 265.06
265.06 *

0.00 *
12,705.37 10,969.13
10,969.13 *
45,060.92 *

186 de 474
UNITARIO TOTAL

45,060.92
3,400.00 680.00
27,169.75 28,528.24
1,000.00 4,000.00
33,208.24 *
44,177.37 618.48
618.48 *
44,177.37 265.06
265.06 *

0.00 *
12,705.37 10,969.13
10,969.13 *
45,060.92 *

61,741.10
3,400.00 680.00
42,744.15 44,881.35
1,000.00 4,000.00
49,561.35 *
60,530.49 847.43
847.43 *
60,530.49 363.18
363.18 *

0.00 *
12,705.37 10,969.13
10,969.13 *
61,741.10 *

81,682.77
3,400.00 680.00
61,363.82 64,432.01
1,000.00 4,000.00
69,112.01 *
80,081.14 1,121.14
1,121.14 *
80,081.14 480.49
480.49 *

0.00 *
12,705.37 10,969.13
10,969.13 *
81,682.77 *

187 de 474
UNITARIO TOTAL

61,741.10
3,400.00 680.00
42,744.15 44,881.35
1,000.00 4,000.00
49,561.35 *
60,530.49 847.43
847.43 *
60,530.49 363.18
363.18 *

0.00 *
12,705.37 10,969.13
10,969.13 *
61,741.10 *

406,000.00

318,039.22 318,039.22

318,039.22 *
398,039.22 5,572.55
5,572.55 *
398,039.22 2,388.24
2,388.24 *

0.00 *
12,705.37 80,000.00
80,000.00 *
406,000.00 *

36,937.38

2,054.00 2,054.00

1,723.00 1,723.00

552,673.00 33,160.38

36,937.38 *

62,731.89
3,400.00 680.00
43,669.26 45,852.72
1,000.00 4,000.00
50,532.72 *

188 de 474
UNITARIO TOTAL

61,501.85 861.03
861.03 *
61,501.85 369.01
369.01 *

0.00 *
12,705.37 10,969.13
10,969.13 *
62,731.89 *

51,617.10
3,552.00 47,774.40
47,774.40 *
51,106.04 255.53
255.53 *
51,106.04 255.53
255.53 *

0.00 *
12,008.85 3,331.64
3,331.64 *
51,617.10 *

18,889.82
3,400.00 460.00
2,407.15 9,628.60
1,000.00 280.00
10,368.60 *
18,519.43 259.27
259.27 *
18,519.43 111.12
111.12 *

0.00 *
12,705.37 8,150.83
8,150.83 *
18,889.82 *

56,293.66
41,667.00 166.67
20,500.00 514.14
3,400.00 136.00

39,000.00 40,950.00
41,766.81 *
52,552.43 735.73
735.73 *
52,552.43 315.31
315.31 *
13,450.88 2,690.18

189 de 474
UNITARIO TOTAL

2,690.18 *
12,705.37 10,785.62
10,785.62 *
56,293.66 *

124,466.52
35,372.77 5,199.80
281,984.40 41,451.71
3,583.00 526.70
3,224.80 2,257.36
3,538.00 2,476.60
41,667.00 621.69
20,500.00 1,593.07
340.11 6,309.10
4,479.52 28,471.82
88,907.84 *
117,681.20 1,647.54
1,647.54 *
117,681.20 364.55
3,915.00 4,773.24
5,137.79 *

0.00 *
13,029.61 28,773.35
28,773.35 28,773.35 *
124,466.52 *

58,900.91 3,005.15
496,076.59 1,012.75
26,196.04 26,196.04
120.00 600.00
30,813.94 *
40,336.04 564.70
564.70 *
40,336.04 242.02
3,915.00 549.67
791.68 *

0.00 *
12,705.37 9,522.10
9,522.10 *
41,692.42 *

47,480.56

41,667.00 468.75

190 de 474
UNITARIO TOTAL

20,500.00 1,153.13
982.00 9,341.63
35,372.77 1,857.07
313,316.00 16,449.09
3,583.00 188.11
2,088.00 5,059.22
34,517.00 *
45,161.71 623.08
623.08 *
45,161.71 270.97
61,000.00 1,424.80
3,915.00 0.00
1,695.77 *

0.00 *
12,705.37 10,644.71
10,644.71 *
47,480.56 *

41,667.00 327.00
20,500.00 1,070.10
37,592.00 46,990.00
48,387.10
8,018.53 160.37
160.37 *

0.00 *
0.00
0.00 *

12,216.70 8,018.53
8,018.53 *
56,566.00 *

14,537.76
8,236.00 9,059.60
9,059.60 *
14,258.30 193.92
193.92 *
14,258.30 85.55
85.55 *

0.00 *
12,705.37 5,198.70
5,198.70 *
14,537.76 *

191 de 474
UNITARIO TOTAL

48,338.85
801,071.29 8,900.79
817,328.79 26,365.44
2,817.22 809.67
2,939.71 844.87
540.06 540.06
2,666,897.06 703.74
115.19 508.77
38,673.34 *
47,391.03 663.47
663.47 *
47,391.03 284.35
284.35 *

0.00 *
12,008.85 8,717.69
8,717.69 *
48,338.85 *

48,338.85
801,071.29 8,900.79
817,328.79 26,365.44
2,817.22 809.67
2,939.71 844.87
540.06 540.06
2,666,897.06 703.74
115.19 508.77
38,673.34 *
47,391.03 663.47
663.47 *
47,391.03 284.35
284.35 *

0.00 *
12,008.85 8,717.69
8,717.69 *
48,338.85 *

48,338.85
801,071.29 8,900.79
817,328.79 26,365.44
2,817.22 809.67
2,939.71 844.87
540.06 540.06
2,666,897.06 703.74
115.19 508.77
38,673.34 *
47,391.03 663.47

192 de 474
UNITARIO TOTAL

663.47 *
47,391.03 284.35
284.35 *

0.00 *
12,008.85 8,717.69
8,717.69 *
48,338.85 *

48,338.85
801,071.29 8,900.79
817,328.79 26,365.44
2,817.22 809.67
2,939.71 844.87
540.06 540.06
2,666,897.06 703.74
115.19 508.77
38,673.34 *
47,391.03 663.47
663.47 *
47,391.03 284.35
284.35 *

0.00 *
12,008.85 8,717.69
8,717.69 *
48,338.85 *

57,820.02
474,346.56 2,635.26
1,255,884.75 40,512.41
1,632.34 1,632.34
2,811.85 808.13
2,934.10 843.26
539.03 539.03
2,661,808.83 702.39
114.97 507.80
48,180.61 *
56,686.29 793.61
793.61 *
56,686.29 340.12
340.12 *

0.00 *
12,008.85 8,505.68
8,505.68 *
57,820.02 *

193 de 474
UNITARIO TOTAL

91,577.46
472,723.09 2,626.24
1,251,586.45 40,373.76
54,826.13 35,371.70
2,802.22 805.36
2,924.06 840.37
537.19 537.19
2,652,698.71 699.99
114.58 505.63
81,760.23 *
89,781.82 1,256.95
1,256.95 *
89,781.82 538.69
538.69 *

0.00 *
12,008.85 8,021.59
8,021.59 *
91,577.46 *

79,974.66
472,723.09 2,626.24
1,063,625.81 34,310.51
46,592.46 30,059.65
2,802.22 805.36
2,924.06 840.37
537.19 537.19
2,652,698.71 699.99
114.58 505.63
70,384.94 *
78,406.53 1,097.69
1,097.69 *
78,406.53 470.44
470.44 *

0.00 *
12,008.85 8,021.59
8,021.59 *
79,974.66 *

17,962.64 7,005.43
6,368.78 10,954.30
316.09 1,896.55
1,943.04 3,886.08
1,450.00 1,522.50
41,860.00 2,930.20

194 de 474
UNITARIO TOTAL

28,195.05 *
44,658.55 687.88
687.88 *
44,658.55 267.95
267.95 *

0.00 *
24,207.87 16,463.50
16,463.50 *
45,614.38 *

39,185.14 15,282.20
6,368.78 16,431.45
316.09 2,844.82###
1,943.04 3,886.08
1,450.00 1,522.50
41,860.00 2,930.20
42,897.25 *
69,812.91 1,072.72
1,072.72 *
69,812.91 418.88
418.88 *

0.00 *
24,207.87 26,915.66
26,915.66 *
71,304.50 *

17,962.64 7,005.43
6,368.78 10,954.30
316.09 1,896.55
1,943.04 3,886.08
1,450.00 1,522.50
41,860.00 2,930.20
13,357.90 14,025.80
42,220.85 *
58,684.35 915.40
915.40 *
58,684.35 352.11
352.11 *

0.00 *
24,207.87 16,463.50
16,463.50 *
59,951.86 *
59,951.86

195 de 474
UNITARIO TOTAL

216,590.85

129,932.08 136,428.68
6,403.33 24,608.00
13,573.46 27,146.92
188,183.60 *
215,099.26 1,491.59
1,491.59 *
215,099.26 0.00
0.00 *
215,099.26 0.00
0.00 *
24,207.87 26,915.66
26,915.66 *
216,590.85 *

190,940.85
105,503.51 110,778.68
6,403.33 24,608.00
13,573.46 27,146.92
162,533.60 *
189,449.26 1,491.59
1,491.59 *
189,449.26 0.00
0.00 *
189,449.26 0.00
0.00 *
24,207.87 26,915.66
26,915.66 *
190,940.85 *
190,940.85

751,357.00

372,564.06 372,564.06

281,057.09 281,057.09

653,621.15
292,452.83 5,849.06
5,849.06 *

196 de 474
UNITARIO TOTAL

292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
751,357.00 *
751,357.00

756,068.00

375,249.33 375,249.33

283,082.82 283,082.82

658,332.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
756,068.00 *
756,068.00

763,202.00

379,315.71 379,315.71

286,150.44 286,150.44

665,466.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
763,202.00 *
763,202.00

197 de 474
UNITARIO TOTAL

763,103.00

379,259.28 379,259.28

286,107.87 286,107.87

665,367.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
763,103.00 *
763,103.00

722,622.00

356,185.11 356,185.11

268,701.04 268,701.04

624,886.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
722,622.00 *
722,622.00

6,262,857.00

549,780.34 3,286,586.89

414,746.57 2,479,355.02

5,765,941.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53

198 de 474
UNITARIO TOTAL

2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,262,857.00 *
6,262,857.00
0.00
#DIV/0!
#DIV/0!

746,384.00

369,729.45 369,729.45

278,918.70 278,918.70

648,648.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
746,384.00 *
746,384.00

763,825.00

379,670.82 379,670.82

286,418.33 286,418.33

666,089.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
763,825.00 *
763,825.00

199 de 474
UNITARIO TOTAL

868,969.00

439,602.90 439,602.90

331,630.25 331,630.25

771,233.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
868,969.00 *
868,969.00

929,337.00

474,012.66 474,012.66

357,588.49 357,588.49

831,601.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
929,337.00 *
929,337.00

621,999.00

298,830.00 298,830.00

225,433.15 225,433.15

524,263.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58

200 de 474
UNITARIO TOTAL

8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
621,999.00 *
621,999.00

6,222,199.00

545,903.62 3,263,411.83

411,822.03 2,461,872.08

5,725,283.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,222,199.00 *
6,222,199.00

711,729.00

349,976.10 349,976.10

264,017.05 264,017.05

613,993.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
711,729.00 *
711,729.00

6,222,199.00

545,903.62 3,263,411.83

201 de 474
UNITARIO TOTAL

411,822.03 2,461,872.08

5,725,283.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,222,199.00 *
6,222,199.00

757,082.00

375,827.31 375,827.31

283,518.84 283,518.84

659,346.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
757,082.00 *
757,082.00

757,082.00

375,827.31 375,827.31

283,518.84 283,518.84

659,346.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *

202 de 474
UNITARIO TOTAL

757,082.00 *
757,082.00

682,933.00

333,562.38 333,562.38

251,634.77 251,634.77

585,197.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
682,933.00 *
682,933.00

3,556,722.28

686,166.60 2,017,329.81

517,634.46 1,521,845.30

3,539,175.11
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 0.00
0.00 *
3,556,722.28 *
3,792,477.00

747,263.00

370,230.48 370,230.48

279,296.67 279,296.67

649,527.15
292,452.83 5,849.06
5,849.06 *

203 de 474
UNITARIO TOTAL

292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
747,263.00 *
747,263.00

748,376.00

370,864.89 370,864.89

279,775.26 279,775.26

650,640.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
748,376.00 *
748,376.00

6,222,199.00

545,903.62 3,263,411.83

411,822.03 2,461,872.08

5,725,283.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,222,199.00 *

768,929.00

382,580.10 382,580.10

288,613.05 288,613.05

204 de 474
UNITARIO TOTAL

671,193.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
768,929.00 *
768,929.00

719,111.00

354,183.84 354,183.84

267,191.31 267,191.31

621,375.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
719,111.00 *
719,111.00

662,813.00

322,093.98 322,093.98

242,983.17 242,983.17

565,077.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
662,813.00 *

205 de 474
UNITARIO TOTAL

662,813.00

322,093.98 322,093.98

242,983.17 242,983.17

565,077.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
662,813.00 *

6,222,199.00

545,903.62 3,263,411.83

411,822.03 2,461,872.08

5,725,283.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,222,199.00 *

746,245.00

369,650.22 369,650.22

278,858.93 278,858.93

648,509.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68

206 de 474
UNITARIO TOTAL

80,188.68 *
746,245.00 *

699,378.00

342,936.03 342,936.03

258,706.12 258,706.12

601,642.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
699,378.00 *

6,117,269.00

830,291.81 3,295,428.19

626,360.49 2,486,024.77

5,781,452.96
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 318,268.87
318,268.87 *
6,117,269.00 *
6,117,269.00
0.00
#DIV/0!
#DIV/0!

746,591.00

369,847.44 369,847.44

279,007.71 279,007.71

648,855.15
292,452.83 5,849.06

207 de 474
UNITARIO TOTAL

5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
746,591.00 *
746,591.00
0.00
0.00
0.00

447,874.00

199,578.75 199,578.75

150,559.40 150,559.40

350,138.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
447,874.00 *
447,874.00
0.00
0.00
0.00

2,353,147.00

286,000.00 1,799,561.22
40,000.00 251,686.88
2,051,248.11
2,262,641.35 22,626.41
22,626.41 *
2,262,641.35 45,252.83
45,252.83 *
2,262,641.35 22,626.41
22,626.41 *
22,000.75 211,393.24

208 de 474
UNITARIO TOTAL

211,393.24 *
2,353,147.00 *

1,138,785.00

286,000.00 870,881.98
40,000.00 121,801.68
992,683.66
1,094,985.58 10,949.86
10,949.86 *
1,094,985.58 21,899.71
21,899.71 *
1,094,985.58 10,949.86
10,949.86 *
22,000.75 102,301.92
102,301.92 *
1,138,785.00 *

4,545,800.00

286,000.00 3,476,385.20
40,000.00 486,207.72
3,962,592.92
4,370,961.54 43,709.62
43,709.62 *
4,370,961.54 87,419.23
87,419.23 *
4,370,961.54 43,709.62
43,709.62 *
22,000.75 408,368.62
408,368.62 *
4,545,800.00 *

4,547,606.00

286,000.00 3,477,766.33
40,000.00 486,400.89
3,964,167.22
4,372,698.08 43,726.98
43,726.98 *
4,372,698.08 87,453.96
87,453.96 *
4,372,698.08 43,726.98
43,726.98 *

209 de 474
UNITARIO TOTAL

22,000.75 408,530.86
408,530.86 *
4,547,606.00 *

20,004,033.00

286,000.00 15,298,016.69
40,000.00 2,139,582.75
17,437,599.45
19,234,647.12 192,346.47
192,346.47 *
19,234,647.12 384,692.94
384,692.94 *
19,234,647.12 192,346.47
192,346.47 *
22,000.75 1,797,047.67
1,797,047.67 *
20,004,033.00 *

2,406,018.00

286,000.00 1,839,994.14
40,000.00 257,341.84
2,097,335.98
2,313,478.85 23,134.79
23,134.79 *
2,313,478.85 46,269.58
46,269.58 *
2,313,478.85 23,134.79
23,134.79 *
22,000.75 216,142.87
216,142.87 *
2,406,018.00 *

6,247,859.00

286,000.00 4,778,029.07
40,000.00 668,255.81
5,446,284.89
6,007,556.73 60,075.57
60,075.57 *
6,007,556.73 120,151.13

210 de 474
UNITARIO TOTAL

120,151.13 *
6,007,556.73 60,075.57
60,075.57 *
22,000.75 561,271.84
561,271.84 *
6,247,859.00 *

711,729.00

349,976.10 349,976.10

264,017.05 264,017.05

613,993.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
711,729.00 *

6,222,199.00

545,903.62 3,263,411.83

411,822.03 2,461,872.08

5,725,283.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,222,199.00 *

711,729.00

349,976.10 349,976.10

264,017.05 264,017.05

613,993.15

211 de 474
UNITARIO TOTAL

292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
711,729.00 *
711,729.00
0.00
0.00
0.00

6,222,199.00

545,903.62 3,263,411.83

411,822.03 2,461,872.08

5,725,283.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,222,199.00 *

734,484.00

362,946.45 362,946.45

273,801.70 273,801.70

636,748.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
734,484.00 *

711,729.00

212 de 474
UNITARIO TOTAL

349,976.10 349,976.10

264,017.05 264,017.05

613,993.15
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 80,188.68
80,188.68 *
711,729.00 *
711,729.00
0.00
0.00
0.00

6,222,199.00

545,903.62 3,263,411.83

411,822.03 2,461,872.08

5,725,283.91
292,452.83 5,849.06
5,849.06 *
292,452.83 8,773.58
8,773.58 *
292,452.83 2,924.53
2,924.53 *
22,000.75 479,367.92
479,367.92 *
6,222,199.00 *

1,143,753.59

213 de 474
UNITARIO TOTAL

98,020.00 197,770.37
2,135.42 2,506.87
5,763.54 4,194.98
26,627.08 1,863.90
212,710.36 212,710.36
177,616.88 177,616.88
177,616.88 177,616.88
774,280.23 *
1,079,012.82 21,580.26
21,580.26 *
1,079,012.82 32,370.38
32,370.38 *
1,079,012.82 10,790.13
10,790.13 *
24,207.87 304,732.59
304,732.59 *
1,143,753.59 *
1,143,753.59

1,143,753.48 3,530,767.00
3,530,767.00 *

1,143,753.59 4,539,558.00
4,539,558.00 *

214 de 474
UNITARIO TOTAL

1,143,753.59 4,539,558.00
4,539,558.00 *

1,143,753.79 5,212,086.00
5,212,086.00 *

1,143,753.72 5,772,525.00
5,772,525.00 *

1,143,864.57 4,467,935.00
4,467,935.00 *

215 de 474
UNITARIO TOTAL

332,793.10
62,833.33 153,887.34
2,135.42 3,042.97
5,763.54 5,092.09
19,520.00 47,843.52
26,627.08 1,770.70
18,952.63 36,010.00
247,646.62 *
313,955.76 6,279.12
6,279.12 *
313,955.76 9,418.67
9,418.67 *
313,955.76 3,139.56
3,139.56 *
24,207.87 66,309.14
66,309.14 *
332,793.10 *

332,793.14 1,299,890.00
1,299,890.00 *

332,793.14 1,299,890.00
1,299,890.00 *

332,793.14 1,299,890.00
1,299,890.00 *

332,793.14 1,299,890.00
1,299,890.00 *

216 de 474
UNITARIO TOTAL

332,793.15 670,911.00
670,911.00 *

335,153.33 992,389.00
992,389.00 *

332,793.14 1,299,890.00
1,299,890.00 *

332,793.14 1,299,890.00
1,299,890.00 *

332,793.15 670,911.00
670,911.00 *

332,793.15 670,911.00
670,911.00 *

332,792.89 880,570.00
880,570.00 *

332,792.61 531,137.00
531,137.00 *

332,793.15 670,911.00
670,911.00 *

217 de 474
UNITARIO TOTAL

392,965.61
4,255.54 155,578.87
5,212.66 5,717.11
5,923.48 4,331.14
191.37 7,906.00
1,000.00 36,559.11
445.00 16,325.62
226,417.86
281,194.18 307.05
307.05 *
281,194.18 2,607.39
2,607.39 *
207.51 7,250.27
7,250.27 *

101,606.73 101,606.73
*
12,216.70 25,853.57
12,216.70 23,151.87
22,306.93 5,770.89
54,776.32 *
392,965.61 *

392,965.61 8,169,755.00
8,169,755.00 *

392,965.61 10,249,329.00
10,249,329.00 *

392,965.61 5,479,316.00
5,479,316.00 *

394,250.00

218 de 474
UNITARIO TOTAL

50,715.56 76,073.34
23,582.73 35,374.10
135,047.62 141,800.00
111,447.44 5,572.37
258,819.81 *
371,933.96 7,438.68
7,438.68 *
371,933.96 11,158.02
11,158.02 *
371,933.96 3,719.34
3,719.34 *
22,880.78 113,114.15
113,114.15 *
394,250.00 *
394,250.00

239,685.00
50,715.56 50,715.56
27,893.25 81,118.44
23,582.73 23,582.73
155,416.74 7,770.84
163,187.58 *
226,117.92 4,522.36
4,522.36 *
226,117.92 6,783.54
6,783.54 *
226,117.92 2,261.18
2,261.18 *
22,880.78 62,930.35
62,930.35 *
239,685.00 *

239,685.00
50,715.56 50,715.56
27,893.25 81,118.44
23,582.73 23,582.73
155,416.74 7,770.84
163,187.58 *
226,117.92 4,522.36
4,522.36 *
226,117.92 6,783.54
6,783.54 *
226,117.92 2,261.18
2,261.18 *
22,880.78 62,930.35
62,930.35 *
239,685.00 *

219 de 474
UNITARIO TOTAL

156,769.00
30,801.48 30,801.48
16,940.63 50,821.89
5,533.00 2,479.39
25,562.00 862.17
84,964.93 *
147,895.28 2,957.91
2,957.91 *
147,895.28 4,436.86
4,436.86 *
147,895.28 1,478.95
1,478.95 *
22,880.78 62,930.35
62,930.35 *
156,769.00 *

327,294.00 178,820.38
7,925.21 19,108.65
81,700.00 39,397.72
11,130.20 11,405.41
85,500.00 2,067.83
250,800.00
250,800.00 112,860.00
363,660.00 *

327,294.00 555,335.86
7,925.21 59,342.88
81,700.00 122,351.65
11,130.20 35,420.09
85,500.00 6,421.76
778,872.24
778,872.24 350,492.51
1,129,364.75 *

327,294.00 325,127.97
7,925.21 34,742.99
81,700.00 71,632.22
11,130.20 20,737.11
85,500.00 3,759.70
456,000.00
456,000.00 205,200.00
661,200.00 *

220 de 474
UNITARIO TOTAL

327,294.00 186,635.60
7,925.21 19,943.78
81,700.00 41,119.57
11,130.20 11,903.88
85,500.00 2,158.21
261,761.03
261,761.03 117,792.47
379,553.50 *

327,294.00 108,375.99
7,925.21 11,581.00
81,700.00 23,877.41
11,130.20 6,912.37
85,500.00 1,253.23
152,000.00
152,000.00 68,400.00
220,400.00 *

327,294.00 140,888.79
7,925.21 15,055.30
81,700.00 31,040.63
11,130.20 8,986.08
85,500.00 1,629.20
197,600.00
197,600.00 88,920.00
286,520.00 *

375,382.22
121,625.84 127,707.13
19,639.50 78,558.00
37,063.64 37,063.64
36,049.04 36,049.04
279,377.81 *
354,134.17 7,082.68
7,082.68 *
354,134.17 10,624.03
10,624.03 *
354,134.17 3,541.34
3,541.34 *
22,000.75 74,756.36
74,756.36 *
375,382.22 *

221 de 474
UNITARIO TOTAL

375,382.22 675,688.00
675,688.00 *

375,382.14 525,535.00
525,535.00 *

375,382.14 1,051,070.00
1,051,070.00 *

273,663.85
66,628.00 46,043.67
106,995.16 92,728.17
79,900.00 31,410.29
31,850.00 6,089.64
33,872.00 11,290.67
26.60 201.50
3,759.00 969.77
188,733.69 *
258,173.45 5,163.47
5,163.47 *
258,173.45 7,745.20
7,745.20 *
258,173.45 2,581.73
2,581.73 *
22,880.78 69,439.75
69,439.75 *
273,663.85 *

222 de 474
UNITARIO TOTAL

8,874,142.68
2,518,438.03 5,968,698.14
77,889.84 184,598.91
6,153,297.05 *
8,371,832.72 167,436.65
167,436.65 *
8,371,832.72 251,154.98
251,154.98 *
8,371,832.72 83,718.33
83,718.33 *
22,880.78 2,218,535.67
2,218,535.67 *
8,874,142.68 *

3,555,273.62
2,518,438.03 2,391,256.91
77,889.84 73,956.40
2,465,213.31 *
3,354,031.72 67,080.63
67,080.63 *
3,354,031.72 100,620.95
100,620.95 *
3,354,031.72 33,540.32
33,540.32 *
22,880.78 888,818.40
888,818.40 *
3,555,273.62 *

6,694,922.83
2,518,438.03 4,502,967.20
77,889.84 139,267.03
4,642,234.23 *
6,315,964.94 126,319.30
126,319.30 *
6,315,964.94 189,478.95
189,478.95 *
6,315,964.94 63,159.65
63,159.65 *
22,880.78 1,673,730.71

223 de 474
UNITARIO TOTAL

1,673,730.71 *
6,694,922.83 *

6,694,922.83
2,518,438.03 4,502,967.20
77,889.84 139,267.03
4,642,234.23 *
6,315,964.94 126,319.30
126,319.30 *
6,315,964.94 189,478.95
189,478.95 *
6,315,964.94 63,159.65
63,159.65 *
22,880.78 1,673,730.71
1,673,730.71 *
6,694,922.83 *

5,592,125.25

106,995.16 2,005,232.41
66,628.00 995,687.19
79,900.00 679,242.63
31,850.00 131,687.45
950.00 40,380.51
26.60 4,357.33
3,759.00 20,971.03
3,877,558.55 *
5,275,589.86 105,511.80
105,511.80 *
5,275,589.86 158,267.70
158,267.70 *
5,275,589.86 52,755.90
52,755.90 *
22,880.78 1,398,031.31
1,398,031.31 *
5,592,125.25 *

4,059,468.70

106,995.16 1,455,650.19
66,628.00 722,795.15
79,900.00 493,079.83
31,850.00 95,595.33
950.00 29,313.26

224 de 474
UNITARIO TOTAL

26.60 3,163.10
3,759.00 15,223.42
2,814,820.28 *
3,829,687.45 76,593.75
76,593.75 *
3,829,687.45 114,890.62
114,890.62 *
3,829,687.45 38,296.87
38,296.87 *
22,880.78 1,014,867.18
1,014,867.18 *
4,059,468.70 *

5,898,656.56

106,995.16 2,115,148.85
66,628.00 1,050,265.60
79,900.00 716,475.18
31,850.00 138,905.87
950.00 42,593.96
26.60 4,596.18
3,759.00 22,120.55
4,090,106.20 *
5,564,770.34 111,295.41
111,295.41 *
5,564,770.34 166,943.11
166,943.11 *
5,564,770.34 55,647.70
55,647.70 *
22,880.78 1,474,664.14
1,474,664.14 *
5,898,656.56 *

2,706,000.00

106,995.16 970,321.42
66,628.00 481,807.79
79,900.00 328,681.93
31,850.00 63,722.86
950.00 19,539.91
26.60 2,108.49
3,759.00 10,147.77
1,876,330.19 *
2,552,830.19 51,056.60
51,056.60 *
2,552,830.19 76,584.91
76,584.91 *
2,552,830.19 25,528.30
25,528.30 *

225 de 474
UNITARIO TOTAL

22,880.78 676,500.00
676,500.00 *
2,706,000.00 *

4,797,000.00

106,995.16 1,720,115.24
66,628.00 854,113.82
79,900.00 582,663.43
31,850.00 112,963.26
950.00 34,638.94
26.60 3,737.78
3,759.00 17,989.23
3,326,221.70 *
4,525,471.70 90,509.43
90,509.43 *
4,525,471.70 135,764.15
135,764.15 *
4,525,471.70 45,254.72
45,254.72 *
22,880.78 1,199,250.00
1,199,250.00 *
4,797,000.00 *

425,000.00
8,747.27 183,692.76
115,000.08 7,752.60
7,489.27 148,996.94
340,442.30 *
400,943.40 8,018.87
8,018.87 *
400,943.40 12,028.30
12,028.30 *
400,943.40 4,009.43
4,009.43 *
22,880.78 60,501.10
60,501.10 *
425,000.00 *

170,000.00
8,747.27 73,477.10
115,000.08 3,101.04
7,489.27 59,598.78
136,176.92 *
160,377.36 3,207.55
3,207.55 *
160,377.36 4,811.32
4,811.32 *

226 de 474
UNITARIO TOTAL

160,377.36 1,603.77
1,603.77 *
22,880.78 24,200.44
24,200.44 *
170,000.00 *

410,900.00

410,900.00 410,900.00

410,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
410,900.00 *

410,900.00

410,900.00 410,900.00

410,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
410,900.00 *

368,900.00

368,900.00 368,900.00

368,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
368,900.00 *

332,900.00

227 de 474
UNITARIO TOTAL

332,900.00 332,900.00
332,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
332,900.00 *

159,900.00

159,900.00 159,900.00

159,900.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
159,900.00 *

86,084.00

86,084.00 86,084.00

86,084.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
86,084.00 *

195,904.00 195,904.00

195,904.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
195,904.00 *

228 de 474
UNITARIO TOTAL

936,000.00

936,000.00 936,000.00

936,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
936,000.00 *

169,453.00

169,453.00 169,453.00

169,453.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
169,453.00 *

458,413.00 458,413.00

458,413.00
0.00
0.00 *
0.00
0.00 *

229 de 474
UNITARIO TOTAL

0.00
0.00 *
0.00
458,413.00 *

998,000.00

998,000.00 998,000.00

998,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
998,000.00 *

998,000.00

998,000.00 998,000.00

998,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
998,000.00 *

182,770.00

182,770.00 182,770.00

182,770.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
182,770.00 *

936,000.00

936,000.00 936,000.00

936,000.00

230 de 474
UNITARIO TOTAL

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
936,000.00 *

97,997.00 97,997.00

97,997.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
97,997.00 *

936,000.00

936,000.00 936,000.00

936,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
936,000.00 *

182,770.00

182,770.00 182,770.00

182,770.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
182,770.00 *

231 de 474
UNITARIO TOTAL

27,060.00

27,060.00 27,060.00

27,060.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
27,060.00 *

146,236.16

142,150.00 142,150.00

800.00 1,600.00
63.00 126.00
120.00 120.00
143,996.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,058.47 2,240.16
146,236.16 *

126,472.09

122,256.00 122,256.00

800.00 1,600.00
63.00 126.00
120.00 120.00
124,102.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,370.09

232 de 474
UNITARIO TOTAL

126,472.09 *

174,216.09

170,000.00 170,000.00

800.00 1,600.00
63.00 126.00
120.00 120.00
171,846.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,370.09
174,216.09 *

111,041.09

106,825.00 106,825.00

800.00 1,600.00
63.00 126.00
120.00 120.00
108,671.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,370.09
111,041.09 *

29,469.93
26,116.84 26,116.84
800.00 800.00
63.00 63.00
120.00 120.00
27,099.84
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,370.09
29,469.93 *

233 de 474
UNITARIO TOTAL

247,402.09

241,340.00 241,340.00

800.00 3,200.00
63.00 252.00
120.00 240.00
245,032.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,370.09
247,402.09 *

149,370.09

143,308.00 143,308.00

800.00 3,200.00
63.00 252.00
120.00 240.00
147,000.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,370.09
149,370.09 *

586,878.09

580,816.00 580,816.00

800.00 3,200.00
63.00 252.00
120.00 240.00
584,508.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,370.09
586,878.09 *

234 de 474
UNITARIO TOTAL

115,409.39

103,359.87 103,359.87

5,000.00 666.67
26,100.00 3,915.00
107,941.53
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 7,467.86
115,409.39 *

4,420.49

32,917.00 82.29
1,550.00 1,550.00
1,000.00 200.00
1,832.29
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,588.20
4,420.49 *

27,035.97
32,917.00 82.29
24,165.48 24,165.48
1,000.00 200.00
24,447.77
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,588.20
27,035.97 *

47,116.64
37,900.00 37,900.00
6,500.00 650.00
38,550.00

235 de 474
UNITARIO TOTAL

46,192.78 923.86
923.86 *
0.00
0.00 *
0.00
0.00 *
7,467.86 7,642.78
47,116.64 *

59,356.64
49,900.00 49,900.00
6,500.00 650.00
50,550.00
58,192.78 1,163.86
1,163.86 *
0.00
0.00 *
0.00
0.00 *
7,467.86 7,642.78
59,356.64 *

49,156.64
39,900.00 39,900.00
6,500.00 650.00
40,550.00
48,192.78 963.86
963.86 *
0.00
0.00 *
0.00
0.00 *
7,467.86 7,642.78
49,156.64 *

67,516.64
57,900.00 57,900.00
6,500.00 650.00
58,550.00
66,192.78 1,323.86
1,323.86 *
0.00
0.00 *
0.00
0.00 *
7,467.86 7,642.78
67,516.64 *

1,188,079.85
954,900.00 954,900.00

236 de 474
UNITARIO TOTAL

136,000.00 159,440.00
1,114,340.00
1,164,784.17 23,295.68
23,295.68 *
0.00
0.00 *
0.00
0.00 *
7,467.86 50,444.17
1,188,079.85 *

4,344.61
1,942.81 1,942.81
1,942.81
4,259.42 85.19
85.19 *
0.00
0.00 *
0.00
0.00 *
7,467.86 2,316.61
4,344.61 *

65,476.64
55,900.00 55,900.00
6,500.00 650.00
56,550.00
64,192.78 1,283.86
1,283.86 *
0.00
0.00 *
0.00
0.00 *
7,467.86 7,642.78
65,476.64 *

152,486.78
144,194.00 144,194.00
6,500.00 650.00
144,844.00
152,486.78 0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
7,467.86 7,642.78
152,486.78 *

237 de 474
UNITARIO TOTAL

6,700.60
41,860.00 2,930.20
6,500.00 130.00
870.00 17.40
3,077.60 *
6,336.15 237.73
237.73 *
6,336.15 126.72
126.72 *

0.00 *
23,199.21 3,258.55
3,258.55 *
6,700.60 *

6,700.60
41,860.00 2,930.20
6,500.00 130.00
870.00 17.40
3,077.60 *
6,336.15 237.73
237.73 *
6,336.15 126.72
126.72 *

0.00 *
23,199.21 3,258.55
3,258.55 *
6,700.60 *

6,583.12
41,860.00 2,930.20
6,500.00 130.00
870.00 17.40
3,077.60 *
6,336.15 126.72
126.72 *
6,336.15 120.25
120.25 *

0.00 *
23,199.21 3,258.55
3,258.55 *
6,583.12 *

15,091.98
103,100.00 7,217.00
97,728.00 4,104.58
6,500.00 130.00

238 de 474
UNITARIO TOTAL

870.00 17.40
11,468.98 *
14,727.52 217.18
217.18 *
14,727.52 147.28
147.28 *

0.00 *
23,199.21 3,258.55
3,258.55 *
15,091.98 *

18,952.63
58,320.00 4,216.54
66,664.00 3,999.84
49,560.00 793.45
10,700.00 321.20
928.00 97.50
9,428.52
18,590.86 250.23
250.23 *
18,590.86 111.55
111.55 *

0.00 *
23,199.21 9,162.34
9,162.34 *
18,952.63 *
18,952.63

10,629.33

58,320.00 2,319.09
66,664.00 2,199.91
49,560.00 436.40
10,700.00 176.66
928.00 53.63
5,185.69
10,426.54 140.23
140.23 *
10,426.54 62.56
62.56 *

0.00 *
23,199.21 5,240.86
5,240.86 *
10,629.33 *

12,360.38
79,045.00 4,041.94
79,045.00 4,041.94
10,700.00 1,290.48

239 de 474
UNITARIO TOTAL

6,500.00 332.38
9,706.75 *
12,360.38 0.00
0.00 *
12,360.38 0.00
0.00 *

0.00 *
23,199.21 2,653.63
2,653.63 *
12,360.38 *

2,998.27
79,045.00 703.22
79,045.00 703.22
10,700.00 224.52
6,500.00 57.83
1,688.79 *
2,998.27 0.00
0.00 *
2,998.27 0.00
0.00 *

0.00 *
23,199.21 1,309.48
1,309.48 *
2,998.27 *

2,998.27
79,045.00 703.22
79,045.00 703.22
10,700.00 224.52
6,500.00 57.83
1,688.79 *
2,998.27 0.00
0.00 *
2,998.27 0.00
0.00 *

0.00 *
23,199.21 1,309.48
1,309.48 *
2,998.27 *

143,919,376.87

143,919,376.87 143,919,376.87
143,919,376.87 *
0.00

240 de 474
UNITARIO TOTAL

0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
143,919,376.87 *

127,782,885.60

127,782,885.60 127,782,885.60
127,782,885.60 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
127,782,885.60 *

180,000,000.00

180,000,000.00 180,000,000.00
180,000,000.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
180,000,000.00 *

1,994.16

120.00 60.00
275.00 137.50
197.50
1,964.28 18.09
18.09 *
1,964.28 11.79
11.79 *
0.00
0.00 *

241 de 474
UNITARIO TOTAL

7,467.86 1,766.78
1,766.78 *
1,994.16 *

4,682.69
14,558.00 2,183.70
4,400.00 660.00
2,843.70
4,610.48 44.56
44.56 *
4,610.48 27.66
27.66 *
0.00
0.00 *
7,467.86 1,766.78
1,766.78 *
4,682.69 *

3,027.61
120.00 120.00
275.00 275.00
656.25 9.84
4,050.00 60.75
465.59
2,982.10 27.61
27.61 *
2,982.10 17.89
17.89 *
0.00
0.00 *
7,467.86 2,516.51
2,516.51 *
3,027.61 *

242 de 474
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

INSTALACIONES HIDROSANITARIAS

DESAGUES, CLOACALES, SECUNDARIOS y VENTILACIONES

6.1.1 Caeria PVCS Soldable 6" inc.acc. en tierra m

Tubera PVCS 6". Incluye suministro, regata y resane, instalacin


. 6.1.1 a m
y uniones para el correcto tendido de la tubera
25K159 - Tubera PVCS 6" PAVCO m 1.050 20,316.67
25K164 - Unin PVCS 6" PAVCO un 0.144 17,166.84

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.040 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.040 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 44,209.08
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.813 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.1 b Accesorios PVCS 6" (se excluyen las uniones) un


25K054 - Codo 90 PVCS CxC 6" un 1.000 43,900.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.040 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.040 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 58,501.91
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.542 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.2 Caeria PVCS Soldable 4" inc.acc. en tierra m

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


. 6.1.2 a m
y uniones para el correcto tendido de la tubera
25K158 - Tubera PVCS 4" PAVCO m 1.050 9,483.33
25K163 - Unin PVCS 4" PAVCO un 0.112 2,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 17,720.21
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL HERRAMIENTAS ...


(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.279 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.2 b Accesorios PVCS 4" (se excluyen las uniones) un


25K053 - Codo 90 PVCS CxC 4" un 1.000 4,300.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 7,304.18
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.070 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.3 Caeria PVCS Soldable 4" inc.acc. vert./susp. m

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


. 6.1.3 a m
y uniones para el correcto tendido de la tubera
25K158 - Tubera PVCS 4" PAVCO m 1.050 9,483.33
25K163 - Unin PVCS 4" PAVCO un 0.112 2,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 17,720.21
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.279 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.3 b Accesorios PVCS 4" (se excluyen las uniones) un


25K053 - Codo 90 PVCS CxC 4" un 1.000 4,300.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 7,304.18
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL EQUIPOS ...


(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.070 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.4 Caeria PVCS Soldable 4" inc.acc. p/ventilacin m

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


. 6.1.4 a m
y uniones para el correcto tendido de la tubera
25K158 - Tubera PVCL 4" PAVCO m 1.050 6,742.65
25K163 - Unin PVCS 4" PAVCO un 0.112 2,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 14,034.47
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.24 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.4 b Accesorios PVCS 4" (se excluyen las uniones) un


25K053 - Codo 90 PVCS CxC 4" un 1.000 4,300.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 7,102.68
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.060 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.5 Caeria PVCS Soldable 3" inc.acc. en tierra m

Tubera PVCL 3". Incluye suministro, regata y resane, instalacin


. 6.1.5 a m
y uniones para el correcto tendido de la tubera
25K157 - Tubera PVCS 3" PAVCO m 1.050 6,650.00
25K162 - Unin PVCS 3" PAVCO un 0.063 1,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.013 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.013 50,993.60
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MATERIALES ...


20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 12,602.97
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.212 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.5 b Accesorios PVCS 3" (se excluyen las uniones) un


25K052 - Codo 90 PVCS CxC 3" un 1.000 2,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.010 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.010 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,392.09
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.053 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.7 Caeria PVCS Soldable 3" inc.acc. vert./susp. m

Tubera PVCL 3". Incluye suministro, regata y resane, instalacin


. 6.1.7 a m
y uniones para el correcto tendido de la tubera
25K157 - Tubera PVCS 3" PAVCO m 1.050 6,650.00
25K162 - Unin PVCS 3" PAVCO un 0.063 1,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.013 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.013 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 12,602.97
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.212 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.5 b Accesorios PVCS 3" (se excluyen las uniones) un


25K052 - Codo 90 PVCS CxC 3" un 1.000 2,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.010 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.010 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,392.09
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL HERRAMIENTAS ...


(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.053 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.8 Caeria PVCS Soldable 3" inc.acc. p/ventilacin m

Tubera PVCL 3". Incluye suministro, regata y resane, instalacin


. 6.1.8 a m
y uniones para el correcto tendido de la tubera
25K157 - Tubera PVCL 3" PAVCO m 1.000 3,817.10
25K162 - Unin PVCS 3" PAVCO un 0.063 1,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.010 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.010 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 8,623.03
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.8 b Accesorios PVCS 3" (se excluyen las uniones) un


25K052 - Codo 90 PVCS CxC 3" un 1.000 2,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.010 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.010 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,269.52
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.047 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.1.9 Caeria PVCS Soldable 2" inc.acc. descargas artefactos m

Tubera PVCS 2". Incluye suministro, regata y resane, instalacin


. 6.1.9 a m
y uniones para el correcto tendido de la tubera
218pa14 - Tubera PVCS 2" PAVCO m 1.050 4,650.00
218pa83 - Unin PVCS 2" PAVCO un 0.127 900.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.001 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,052.50
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.184 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.9 b Accesorios PVCS 2" (se excluyen las uniones) un


218pa84 - Codo 90 PVCS CxC 2" PAVCO un 1.000 1,300.00
218xx230 - un 0.001 24,578.36
218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.001 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,399.07
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.046 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.10 Tapa Inspeccion en pared 4" un


- Sifn 135 PVCS 4" PAVCO un 1.000 11,204.67
- Codo 45 PVCS CxC 4" PAVCO un 1.000 6,957.22
- Tubera PVCS 4" PAVCO m 1.000 9,483.33
- Tapa de Prueba 4" PAVCO un 1.000 9,851.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.040 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.040 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 66,715.18
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.223 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.11 Camara inspeccin 30x30 con reja des. piso un


01D200 - Recebo B-200 m3 0.126 31,700.00
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
02A030 - m3 0.263 270,500.40
CEMEX
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

02B010 - Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.745 18,620.32


01D010 - Arena de pea - sin tamizar m3 0.119 41,667.00
04C010 - Acero figurado 60.000 psi CODIACERO kg 1.301 2,227.20
06Q010 - Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 136.981 350.00
22G044 - Listn ordinario 5x3 cm x 3,00 m un 2.614 5,500.00
22G082 - Tabla burra ordinaria 20x3 cm un 2.614 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 272,038.89
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
04P015 m2 0.217 286,603.15
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
04P100 corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.217 234,493.51
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 4.646 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.12 Camara inspeccin 30x30 con tapa ciega recinto ferial un


01D200 - Recebo B-200 m3 0.126 31,700.00
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
02A030 - m3 0.263 270,500.40
CEMEX
02B010 - Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.745 18,620.32
01D010 - Arena de pea - sin tamizar m3 0.119 41,667.00
04C010 - Acero figurado 60.000 psi CODIACERO kg 1.301 2,227.20
06Q010 - Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 136.981 350.00
22G044 - Listn ordinario 5x3 cm x 3,00 m un 2.614 5,500.00
22G082 - Tabla burra ordinaria 20x3 cm un 2.614 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 272,038.89
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
04P015 m2 0.217 286,603.15
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
04P100 corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.217 234,493.51
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 4.646 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.13 Camara inspeccin 60x60 con tapa ciega (aguas negras) un


01D200 - Recebo B-200 m3 0.235 31,700.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Concreto grava comn de planta f'c=2500 psi (175kg/cm2)


02A030 - m3 0.492 270,500.40
CEMEX
02B010 - Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 1.398 18,620.32
01D010 - Arena de pea - sin tamizar m3 0.223 41,667.00
04C010 - Acero figurado 60.000 psi CODIACERO kg 2.440 2,227.20
06Q010 - Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 256.840 350.00
22G044 - Listn ordinario 5x3 cm x 3,00 m un 4.901 5,500.00
22G082 - Tabla burra ordinaria 20x3 cm un 4.901 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 510,073.71
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
04P015 m2 0.406 286,603.15
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
04P100 corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.406 234,493.51
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS 0.000
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 8.712 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.14 Camara inspeccin 30x30 con tapa ciega (aguas negras) un


01D200 - Recebo B-200 m3 0.126 31,700.00
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
02A030 - m3 0.263 270,500.40
CEMEX
02B010 - Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.745 18,620.32
01D010 - Arena de pea - sin tamizar m3 0.119 41,667.00
04C010 - Acero figurado 60.000 psi CODIACERO kg 1.301 2,227.20
06Q010 - Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 136.981 350.00
22G044 - Listn ordinario 5x3 cm x 3,00 m un 2.614 5,500.00
22G082 - Tabla burra ordinaria 20x3 cm un 2.614 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 272,038.89
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
04P015 m2 0.217 286,603.15
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
04P100 corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.217 234,493.51
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 4.646 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.15 Camara inspeccion 6" con sifon un


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

25K055 - Sifon PVCS 6" un 1.000 30,521.76


25K054 - Codo 45 PVCS CxC 6" un 1.000 21,291.50
25K159 - Tubera PVCS 6" PAVCO m 1.050 20,316.67
25k056 - Tapa de Prueba 6" PAVCO un 1.000 20,347.84

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.080 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.080 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 128,558.94
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.355 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.16 Camara inspeccion 4" con sifon un


- Sifn 135 PVCS 4" PAVCO un 1.000 11,204.67
- Codo 45 PVCS CxC 4" PAVCO un 1.000 6,957.22
- Tubera PVCS 4" PAVCO m 1.000 9,483.33
- Tapa de Prueba 4" PAVCO un 1.000 9,851.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.040 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.040 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 65,257.34
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.155 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.17 Sifon de piso 3" con reja un


- Sifn 135 PVCS 3" PAVCO un 1.000 6,863.00
- Codo 45 PVCS CxC 3" PAVCO un 1.000 4,609.80
- Tubera PVCS 3" PAVCO m 1.050 6,650.00
- Tapa de Prueba 3" PAVCO un 1.000 4,575.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.040 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.040 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 50,791.42
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.155 21,413.54
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.18 Sifon de piso 2" con reja un


- Sifn 180 PVCS 2" PAVCO un 1.000 2,564.06
- Codo 90 PVCS CxC 2" PAVCO un 1.000 1,300.00
- Tubera PVCS 2" PAVCO m 1.000 4,650.00
- Tapa de Prueba 2" PAVCO un 1.000 1,710.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.037 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.037 50,993.60
20H600 SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 42,280.03
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.366 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.19 Caeria Bombeo Cloacal 4" inc.acc. ml

Tubera PVCP RDE 21 - 4". Incluye suministro, regata y resane,


. 6.1.19 a m
instalacin y uniones para el correcto tendido de la tubera

218pa9 - Tubera PVCP RDE 21 - 4" PAVCO m 1.050 30,020.80


218pa67 - Unin PVCP 4" PAVCO un 0.167 21,708.70

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 42,351.18
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.266 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.19 b Accesorios PVCP 4" (se excluyen las uniones) un


218pa68 - Codo 90 PVCP 4" PAVCO un 1.000 40,012.58

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 42,947.15
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.066 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.20 Caeria Bombeo Cloacal 3" inc.acc. ml

Tubera PVCP RDE 21 - 3". Incluye suministro, regata y resane,


. 6.1.20 a m
instalacin y uniones para el correcto tendido de la tubera

- Tubera PVCP RDE 21 - 3" PAVCO m 1.050 16,650.00


- Unin PVCP 3" PAVCO un 0.167 9,398.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.010 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.010 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 24,321.41
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.211 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.20 b Accesorios PVCP 3" (se excluyen las uniones) un


- Codo 90 PVCP 3" PAVCO un 1.000 19,580.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.010 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.010 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 21,464.15
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.053 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.21 Valvula Esferica Bombeo Cloacal 3" un


- Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 291,361.76
Ref.206A RED WHITE, tipo pesado 200 psi 3"
- Cinta tefln - rollo un 0.298 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 343,129.11
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.355 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.22 Valvula Retencion Bombeo Cloacal 3" un


- Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
Vlvula cheque tipo cortina / horizontal en bronce Ref. HICC
- un 1.000 510,427.45
HELBERT 150 psi 3", sello metlico
- Cinta tefln - rollo un 0.307 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 562,223.90
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.355 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.23 Equipo de 2 bombas sumergidas inc.tablero pozo cloacal N 3 un

Suministro de equipo de bombeo eyector no.3 para aguas


residuales, incluye dos (2) motobombas, con una caudal de 7.19
. lit/seg, cabeza dinamica de 8 m y de 5 hp de potencia. incluye
arrancadores y tablero de control, segn especificaciones. NO
incluye montaje

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 14,634,560.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

TOTAL UNITARIO

. 6.1.24 Equipo de 2 bombas sumergidas inc.tablero pozo cloacal N 4 un

Suministro de equipo de bombeo eyector no.4 para aguas


residuales, incluye dos (2) motobombas, con una caudal de 7.19
. lit/seg, cabeza dinamica de 8 m y de 5 hp de potencia. incluye
arrancadores y tablero de control, segn especificaciones. NO
incluye montaje

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 14,634,560.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.25 Equipo de 2 bombas sumergidas inc.tablero pozo cloacal N 5 un

Suministro de equipo de bombeo eyector no.5 para aguas


residuales, incluye dos (2) motobombas, con una caudal de 7.19
. lit/seg, cabeza dinamica de 8 m y de 5 hp de potencia. incluye
arrancadores y tablero de control, segn especificaciones. NO
incluye montaje

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 14,634,560.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.1 Caeria PVC Estructural Tipo Fort 20" inc.acc. en tierra ml


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Tubera para alcantarillado de pared estructural 500 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
6.2.1 a m
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
- Tubera Novafort 500 mm S8 PAVCO m 1.000 158,953.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 195,590.06
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.711 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorios para tubera alcantarillado corrugada PVC 500 mm.


. 6.2.2 b un
Incluye Hidrosellos en caucho para ambos extremos
- Unin Novafort 500 mm PAVCO un 0.242 107,328.33
- Hidrosello Novafort 500 mm S8 PAVCO un 0.484 7,170.92
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 33,500.84
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.190 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.2 Caeria PVC Estructural Tipo Fort 16" inc.acc. en tierra ml

Tubera para alcantarillado de pared estructural 400 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
6.2.2 a m
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
- Tubera Novafort 400 mm S8 PAVCO m 1.000 97,405.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 128,546.50
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.454 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorios para tubera alcantarillado corrugada PVC 400 mm.


. 6.2.2 b un
Incluye Hidrosellos en caucho para ambos extremos
- Unin Novafort 400 mm PAVCO un 0.167 58,443.00
- Hidrosello Novafort 400 mm S8 PAVCO un 0.333 5,937.81
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 15,179.94


SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.162 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.3 Caeria PVC Estructural Tipo Fort 14" inc.acc. en tierra ml

Tubera para alcantarillado de pared estructural 355 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
6.2.3 a m
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
- Tubera Novafort 355 mm S8 PAVCO m 1.050 69,378.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 103,988.40
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.454 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorios para tubera alcantarillado corrugada PVC 355 mm.


. 6.2.3 b un
Incluye Hidrosellos en caucho para ambos extremos
- Unin Novafort 355 mm PAVCO un 0.205 46,483.26
- Hidrosello Novafort 355 mm S8 PAVCO un 0.409 4,856.46
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 14,965.40
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.162 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.4 Caeria PVC Estructural Tipo Fort 12" inc.acc. en tierra ml

Tubera para alcantarillado de pared estructural 315 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
6.2.2 a m
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
- Tubera Novafort 315 mm S8 PAVCO m 1.000 60,085.00
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 85,463.59


SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorios para tubera alcantarillado corrugada PVC 315 mm.


. 6.2.2 b un
Incluye Hidrosellos en caucho para ambos extremos
- Unin Novafort 315 mm PAVCO un 0.167 32,908.55
- Hidrosello Novafort 315 mm S8 PAVCO un 0.333 3,004.25
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,306.34
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.132 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.5 Caeria PVC Estructural Tipo Fort 10" inc.acc. en tierra ml

Tubera para alcantarillado de pared estructural 250 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
6.2.5 a m
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
- Tubera Novafort 250 mm S8 PAVCO m 1.000 42,515.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 67,893.59
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorios para tubera alcantarillado corrugada PVC 250 mm.


. 6.2.5 b un
Incluye Hidrosellos en caucho para ambos extremos
- Unin Novafort 250 mm PAVCO un 0.242 28,707.00
- Hidrosello Novafort 250 mm S8 PAVCO un 0.484 1,918.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 10,691.79
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.132 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.6 Caeria PVC Estructural Tipo Fort 8" inc.acc. en tierra ml

Tubera para alcantarillado de pared estructural 200 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
6.2.6 a m
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
- Tubera Novafort 200 mm S8 PAVCO m 1.000 26,382.82
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 43,794.11
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.813 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorios para tubera alcantarillado corrugada PVC 200 mm.


. 6.2.6 b un
Incluye Hidrosellos en caucho para ambos extremos
- Unin Novafort 200 mm PAVCO un 0.167 10,553.13
- Hidrosello Novafort 200 mm S8 PAVCO un 0.333 422.13
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,640.69
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.081 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.7 Caeria PVC Estructural Tipo Fort 6" inc.acc. en tierra ml

Tubera para alcantarillado de pared estructural 200 mm PVC,


doble extrusin, pared interior lisa y exterior corrugada, sistema
6.2.7 a m
de unin mecnico, campana espigo con hidrosello de caucho.
Incluye suministro e instalacin
- Tubera Novafort 150 mm S8 PAVCO m 1.000 19,005.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 36,115.08
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.799 21,413.54
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.7 b Caeria PVC Estructural Tipo Fort 6" inc.acc. en tierra un


- Unin Novafort 150 mm PAVCO un 0.167 3,801.00
- Hidrosello Novafort 150 mm S8 PAVCO un 0.333 760.20
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,597.91
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.080 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.8 Caeria PVCS Soldable 6" inc.acc. en tierra m

Tubera PVCS 6". Incluye suministro, regata y resane, instalacin


. 6.2.8 a m
y uniones para el correcto tendido de la tubera
25K159 - Tubera PVCS 6" PAVCO m 1.050 20,316.67
25K164 - Unin PVCS 6" PAVCO un 0.144 17,166.84

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.040 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.040 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 44,209.08
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.813 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.8 b Accesorios PVCS 6" (se excluyen las uniones) un


25K054 - Codo 90 PVCS CxC 6" un 1.000 43,900.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.040 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.040 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 58,501.91
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.542 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

6.2.9 Caeria PVCS Soldable 4" inc.acc. en tierra m

Tubera PVCS 4". Incluye suministro, regata y resane, instalacin


. 6.2.9 a m
y uniones para el correcto tendido de la tubera
25K158 - Tubera PVCS 4" PAVCO m 1.050 9,483.33
25K163 - Unin PVCS 4" PAVCO un 0.112 2,500.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 17,720.21
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.279 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.9 b Accesorios PVCS 4" (se excluyen las uniones) un


25K053 - Codo 90 PVCS CxC 4" un 1.000 4,300.00

25K080 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.020 24,578.36

25K110 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.020 50,993.60
SUBTOTAL MATERIALES ...
20H600 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 7,304.18
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.070 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.10 Tragante 6" inc. reja un


- Tragante 6" en bronce incluye rejilla m3 1.000 211,358.82
Concreto grava comn de planta f'c=3000 psi (280kg/cm2)
- m3 0.063 281,984.00
CEMEX
Epotoc 1-1 TOXEMENT, adhesivo epxico para pega de concreto
- kg 0.011 43,900.00
nuevo a concreto viejo o endurecido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 250,921.90
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.995 21,413.54
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.11 Tragante con tapa 6" inc. reja en canaletas un


- Tragante 6" en bronce incluye rejilla m3 1.000 211,358.82
Concreto grava comn de planta f'c=3000 psi (280kg/cm2)
- m3 0.063 281,984.00
CEMEX
Epotoc 1-1 TOXEMENT, adhesivo epxico para pega de concreto
- kg 0.011 43,900.00
nuevo a concreto viejo o endurecido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 250,921.90
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.995 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.12 Camara inspeccin 60x60 con tapa ciega (aguas negras) un


01D200 - Recebo B-200 m3 0.235 31,700.00
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
02A030 - m3 0.492 270,500.40
CEMEX
02B010 - Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 1.398 18,620.32
01D010 - Arena de pea - sin tamizar m3 0.223 41,667.00
04C010 - Acero figurado 60.000 psi CODIACERO kg 2.440 2,227.20
06Q010 - Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 256.840 350.00
22G044 - Listn ordinario 5x3 cm x 3,00 m un 4.901 5,500.00
22G082 - Tabla burra ordinaria 20x3 cm un 4.901 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 510,073.71
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
04P015 m2 0.406 286,603.15
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
04P100 corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.406 234,493.51
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS 0.000
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 8.712 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.13 Camara inspeccin 30x30 con tapa ciega (aguas negras) un


01D200 - Recebo B-200 m3 0.126 31,700.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Concreto grava comn de planta f'c=2500 psi (175kg/cm2)


02A030 - m3 0.263 270,500.40
CEMEX
02B010 - Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.745 18,620.32
01D010 - Arena de pea - sin tamizar m3 0.119 41,667.00
04C010 - Acero figurado 60.000 psi CODIACERO kg 1.301 2,227.20
06Q010 - Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 136.981 350.00
22G044 - Listn ordinario 5x3 cm x 3,00 m un 2.614 5,500.00
22G082 - Tabla burra ordinaria 20x3 cm un 2.614 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 272,038.89
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
04P015 m2 0.217 286,603.15
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
04P100 corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.217 234,493.51
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 4.646 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.14 Camara inspeccin 45x40 con reja un


01D200 - Recebo B-200 m3 0.177 31,700.00
Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
02A030 - m3 0.369 270,500.40
CEMEX
02B010 - Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 1.048 18,620.32
01D010 - Arena de pea - sin tamizar m3 0.167 41,667.00
04C010 - Acero figurado 60.000 psi CODIACERO kg 1.830 2,227.20
06Q010 - Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 192.630 350.00
22G044 - Listn ordinario 5x3 cm x 3,00 m un 3.676 5,500.00
22G082 - Tabla burra ordinaria 20x3 cm un 3.676 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 382,555.81
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Marco metlico en ngulo 2" con anclajes laterales. Incluye
04P015 m2 0.305 286,603.15
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
04P100 corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.305 234,493.51
en obra
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 6.534 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.2.15 Caeria Bombeo Pluvial 14" inc.acc. en tierra m


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Tubera PVCP RDE 21 - 14" PAVCO m 1.000 110,169.61


- Unin PVCP 14" PAVCO un 0.167 458,419.50

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.050 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.050 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 221,645.76
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.454 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.16 Valvula Retencion Bombeo Pluvial Due-Check 14" un


- Adaptador macho PVCP 14" PAVCO un 2.000 72,017.08
- Vlvula Retencion Due-Check 150 psi 14", sello metlico un 1.000 3,664,698.77
- Cinta tefln - rollo un 2.109 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.076 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.076 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,077,711.73
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 12.245 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.2.17 Bombas sumergidas inc.tablero pozo pluvial un

Suministro de equipo de bombeo eyector no.? para aguas lluvias,


incluye una (1) bomba, con una caudal de 7.19 lit/seg, cabeza
.
dinamica de 8 m y de 5 hp de potencia. incluye arrancadores y
tablero de control, segn especificaciones. NO incluye montaje

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Sucontrato para suministro de Equipo Eyector segn


- glb 1.000 7,317,280.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

REDES DE AGUA FRIA

6.3.1 Caeria Hierro Galvanizado 6" inc.acc. (Colectores) m

Tubera Acero Carbn (AC) SCH-40 con costura 6". Incluye


. 6.3.1 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 6" m 1.050 170,520.00
- Vaselina x tarro un 0.010 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 193,715.02
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.010 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.683 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 6" (se excluyen las


. 6.3.1 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 6" un 0.516 46,382.61
- Tee Hierro dctil ranurado HD 6" un 0.129 77,962.25
- Vaselina x tarro un 0.034 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 38,740.47
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.213 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.2 Caeria Hierro Galvanizado 3" inc.acc. (Colectores) m


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


. 6.3.2 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 3" m 1.050 84,629.09
- Vaselina x tarro un 0.006 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 103,281.89
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.006 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.672 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


. 6.3.2 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 3" un 0.800 22,540.43
- Tee Hierro dctil ranurado HD 3" un 0.200 29,273.29
- Vaselina x tarro un 0.053 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 31,326.96
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.335 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.3 Caeria PVC Presion RDE 21 4" inc.acc. m

Tubera PVCP RDE 21 - 4". Incluye suministro, regata y resane,


. 6.3.3 a m
instalacin y uniones para el correcto tendido de la tubera

218pa9 - Tubera PVCP RDE 21 - 4" PAVCO m 1.050 30,020.80


218pa67 - Unin PVCP 4" PAVCO un 0.167 21,708.70

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.006 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 43,115.36
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.351 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.3 b Accesorios PVCP 4" (se excluyen las uniones) un


218pa68 - Codo 90 PVCP 4" PAVCO un 0.818 40,012.58

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.027 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.027 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 42,182.16
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.347 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.4 Caeria PVC Presion RDE 21 3" inc.acc. m

Tubera PVCP RDE 21 - 3". Incluye suministro, regata y resane,


. 6.3.4 a m
instalacin y uniones para el correcto tendido de la tubera

218pa8 - Tubera PVCP RDE 21 - 3" PAVCO m 1.050 16,650.00


218pa64 - Unin PVCP 3" PAVCO un 0.167 20,900.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.004 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.004 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 26,673.39
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.252 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.4 b Accesorios PVCP 3" (se excluyen las uniones) un


218pa65 - Codo 90 PVCP 3" PAVCO un 0.806 20,900.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.018 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.018 50,993.60
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 19,112.05


SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.043 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.5 Caeria PVC Presion RDE 21 2" inc.acc. m

Tubera PVCP RDE 21 - 2,1/2". Incluye suministro, regata y


6.3.13 resane, instalacin y uniones para el correcto tendido de la m
tubera
218pa7 - Tubera PVCP RDE 21 - 2,1/2" PAVCO m 1.050 13,316.67
218pa61 - Unin PVCP 2,1/2" PAVCO un 0.167 8,900.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.003 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.003 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 21,541.35
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.273 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.14 Accesorios PVCP 2,1/2" (se excluyen las uniones) un


218pa62 - Codo 90 PVCP 2,1/2" PAVCO un 0.795 17,900.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.012 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.012 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 16,932.50
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.084 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

6.3.6 Caeria PVC Presion RDE 21 2" inc.acc. m

Tubera PVCP RDE 21 - 2". Incluye suministro, regata y resane,


. 6.3.6 a m
instalacin y uniones para el correcto tendido de la tubera

218pa6 - Tubera PVCP RDE 21 - 2" PAVCO m 1.050 6,983.33


218pa58 - Unin PVCP 2" PAVCO un 0.167 2,300.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.002 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.002 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 14,920.88
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.329 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.6 b Accesorios PVCP 2" (se excluyen las uniones) un


218pa59 - Codo 90 PVCP 2" PAVCO un 0.611 5,900.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.007 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.007 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,495.91
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.018 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.7 Caeria PVC Presion RDE 21 1" inc.acc. m

Tubera PVCP RDE 21 - 1,1/2". Incluye suministro, regata y


. 6.3.9 resane, instalacin y uniones para el correcto tendido de la m
tubera
218pa5 - Tubera PVCP RDE 21 - 1,1/2" PAVCO m 1.050 5,316.67
218pa55 - Unin PVCP 1,1/2" PAVCO un 0.167 1,300.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.002 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.002 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 11,239.42
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.247 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.10 Accesorios PVCP 1,1/2" (se excluyen las uniones) un


218pa56 - Codo 90 PVCP 1,1/2" PAVCO un 0.564 3,500.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.005 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.005 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,778.53
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.020 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.8 Caeria PVC Presion RDE 21 1" inc.acc. m

Tubera PVCP RDE 21 - 1,1/4". Incluye suministro, regata y


. 6.3.8 a resane, instalacin y uniones para el correcto tendido de la m
tubera
218pa4 - Tubera PVCP RDE 21 - 1,1/4" PAVCO m 1.050 4,316.67
218pa52 - Unin PVCP 1,1/4" PAVCO un 0.167 1,000.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.001 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,754.79
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.233 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.9 b Accesorios PVCP 1,1/4" (se excluyen las uniones) un


218pa53 - Codo 90 PVCP 1,1/4" PAVCO un 0.453 1,900.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.004 24,578.36
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.004 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,668.76
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.025 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.9 Caeria PVC Presion RDE 21 1" inc.acc. m

Tubera PVCP RDE 13,5 - 1". Incluye suministro, regata y resane,


. 6.3.9 a m
instalacin y uniones para el correcto tendido de la tubera

- Tubera PVCP RDE 13,5 - 1" PAVCO m 1.050 3,316.67


- Unin PVCP 1" PAVCO un 0.167 600.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.001 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 6,137.17
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.116 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. Accesorios PVCP 1" (se excluyen las uniones) un


- Codo 90 PVCP 1" PAVCO un 0.421 800.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.003 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.003 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 791.17
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.011 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

6.3.10 Caeria PVC Presion RDE 11 " inc.acc. m

Tubera PVCP RDE 11 - 3/4". Incluye suministro, regata y resane,


. 6.3.10 a m
instalacin y uniones para el correcto tendido de la tubera

- Tubera PVCP RDE 11 - 3/4" PAVCO m 1.050 2,394.00


- Unin PVCP 3/4" PAVCO un 0.167 400.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.004 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.004 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 5,339.01
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.116 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.10 b Accesorios PVCP 3/4" (se excluyen las uniones) un


- Codo 90 PVCP 3/4" PAVCO un 1.000 634.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.005 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.005 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,243.56
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.011 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.11 Caeria PVC Presion RDE 9 " inc.acc. m

Tubera PVCP RDE 9 - 1/2". Incluye suministro, regata y resane,


. 6.3.11 a m
instalacin y uniones para el correcto tendido de la tubera

218pa1 - Tubera PVCP RDE 9 - 1/2" PAVCO m 1.050 1,920.39


218pa43 - Unin PVCP 1/2" PAVCO un 0.167 200.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.004 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.004 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,831.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL HERRAMIENTAS ...


(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.116 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.11 b Accesorios PVCP 1/2" (se excluyen las uniones) un


218pa44 - Codo 90 PVCP 1/2" PAVCO un 1.000 200.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.005 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.005 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 809.56
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.011 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.12 Valvula mariposa 6" u


- Adaptador macho PVCP 6" PAVCO un 2.000 27,169.98
- Valvula mariposa 6" un 1.000 936,717.65
- Cinta tefln - rollo un 0.782 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.028 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.028 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,071,327.12
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 3.631 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.13 Valvula esferica 4" u


- Adaptador macho PVCP 4" PAVCO un 2.000 20,019.74
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 707,505.88
Ref.206A RED WHITE, tipo pesado 200 psi 4"
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Cinta tefln - rollo un 0.576 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.021 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.021 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 806,690.63
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.676 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.14 Valvula esferica 3" u


- Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 290,781.37
Ref.206A RED WHITE, tipo pesado 200 psi 3"
- Cinta tefln - rollo un 0.298 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 343,129.21
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.383 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.15 Valvula esferica 2" u


- Adaptador macho PVCP 2,1/2" PAVCO un 2.000 7,198.50
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 218,697.06
Ref.206A RED WHITE, tipo pesado 200 psi 2,1/2"
- Cinta tefln - rollo un 0.225 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.008 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.008 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 256,191.31
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL TRANSPORTE ...


- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.044 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.16 Valvula esferica 2" u


- Adaptador macho PVCP 2" un 2.000 2,478.25
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 123,038.24
Ref.206A RED WHITE, tipo pesado 200 psi 2"
- Cinta tefln - rollo un 0.152 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.006 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 143,611.32
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.706 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.17 Valvula esferica 1" u


- Adaptador macho PVCP 1,1/2" un 2.000 1,734.50
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 77,314.71
Ref.206A RED WHITE, tipo pesado 200 psi 1,1/2"
- Cinta tefln - rollo un 0.225 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.007 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.007 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 95,547.87
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.660 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.18 Valvula esferica 1" u


- Adaptador macho PVCP 1,1/4" un 2.000 1,479.35
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Vlvula registro tipo paso directo / cortina / compuerta en bronce


- un 1.000 63,031.37
Ref.206A RED WHITE, tipo pesado 200 psi 1,1/4"
- Cinta tefln - rollo un 0.180 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.005 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.005 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 75,498.19
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.423 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.19 Valvula esferica 1" u


- Adaptador macho PVCP 1" un 2.000 702.12
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 47,168.63
Ref.206A RED WHITE, tipo pesado 200 psi 1"
- Cinta tefln - rollo un 0.155 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.004 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.004 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 53,847.94
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.20 Valvula esferica " u


- Adaptador macho PVCP 3/4" un 2.000 334.78
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 34,968.63
Ref.206A RED WHITE, tipo pesado 200 psi 3/4"
- Cinta tefln - rollo un 0.510 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.008 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.008 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 41,458.96
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.21 Valvula esferica " u


- Adaptador macho PVCP 1/2" un 2.000 183.67
Vlvula cheque tipo hidro / vertical / universal en bronce Ref.
- un 1.000 29,150.00
HFVC HELBERT 150 psi 1/2"
- Cinta tefln - rollo un 0.679 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.009 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.009 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 35,465.96
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.22 Junta antivibratoria con fuelle acero inoxidable 6" un


- Junta antivibratoria con fuelle acero inoxidable 6" un 1.000 396,689.22
- Vaselina x tarro un 0.012 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 450,327.96
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.502 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.23 Junta antivibratoria con fuelle acero inoxidable 3" un


- Junta antivibratoria con fuelle acero inoxidable 3" un 1.000 259,648.04
- Vaselina x tarro un 0.011 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 311,274.99
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL EQUIPOS ...


(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.408 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.24 Valvula de Retencion Horizontal 3" u


218pa462 - Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
Vlvula cheque tipo cortina / horizontal en bronce Ref. HICC
221he27 - un 1.000 373,905.88
HELBERT 150 psi 3", sello metlico
218xx280 - Cinta tefln - rollo un 0.307 500.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 426,282.83
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.383 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.3.25 Valvula a flotante a presion inc. boya de cobre 3" u


218pa462 - Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
221he27 - Valvula a flotante a presion inc. boya de cobre 3" un 1.000 257,751.96
218xx280 - Cinta tefln - rollo un 0.307 500.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36

218xx231 - Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 310,128.91
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.383 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.26 Canilla de servicio 13 c/pico manga un


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

. Pnto AF mexcladro lavaplatos/lavamanos/vertederos PVCP 1/2" un


- Codo 90 PVCP 1/2" PAVCO un 3.000 200.00
- Tee PVCP 1/2" PAVCO un 1.000 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.000 168.90
- Adaptador macho PVCP 1/2" un 1.000 183.67
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera PVCP RDE 9 - 1/2" PAVCO m 3.000 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.051 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.051 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 36,552.39
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. Montaje Mezcladro Lavaplatos c/ acople fleximetalico un


- Acople fleximetal un 1.000 5,500.00
- Cinta tefln - rollo un 0.241 500.00
Sikaflex 1-A SIKA, masilla elstica sellante y adhesiva con base
- un 0.048 21,500.00
en poliuretano - cartucho 305 cc.
- Mezclador Lavaplatos Monocontrol (Canilla) un 1.000 340,344.12
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 365,025.83
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.842 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.3.27 Bomba Pozo Semisurgente un

Suministro de equipo de bombeo agua lluvias tratadas. Incluye


(9) nueve bombas centrifugas con un caudal de 5.4 lit/seg,
cabeza dinamica de 52 m y de 15 hp de potencia, un
.
hidroneumatico de 200 lit. de capacidad y presion de 500 psi.,
incluye arrancadores y tablero de control, segn
especificaciones. NO incluye montaje

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 43,905,200.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Equipo Presurizador de velocidad variable bombas completo con


. 6.3.28 un
tablero, tanque pulmon, valvulas, etc.

Suministro de equipo de bombeo suministro agua potable.


Incluye seis (6) bombas centrifugas con un caudal de 7.29
lit/seg, cabeza dinamica de 51 m y de 15 hp de potencia, un
.
hidroneumatico de 500lit. de capacidad y presion de 150 psi.,
incluye arrancadores y tablero de control, segn
especificaciones. NO incluye montaje

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 49,757,200.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Equipo de 2 bombas centrifugas con tablero, (Torres


. 6.3.29 un
Enfriamiento)

Suministro de equipo de bombeo para medidores nuevos y


usados. Incluye dos (3) bombas centrifugas con un caudal de 12
lit/seg, cabeza dinamica de 118 m y de 17 hp de potencia, un
.
hidroneumatico de 200 lit. de capacidad y presion de 150 psi.,
incluye arrancadores y tablero de control, segn
especificaciones. NO incluye montaje

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL TRANSPORTE ...


Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 14,634,560.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

REDES DE AGUA CALIENTE CPVC

6.4.1 Caeria CPVC Presion RDE 21 1" inc.acc.y aislacin u

Tubera CPVC 1,1/4". Incluye suministro, regata y resane,


. 6.4.1 a m
instalacin y uniones para el correcto tendido de la tubera
- Tubera CPVC 1,1/4" PAVCO m 1.050 16,800.00
- Unin CPVC 1,1/4" PAVCO un 0.167 2,350.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.002 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.002 48,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 24,108.31
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.277 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.4.1 b Accesorios CPVC 1" (se excluyen las uniones) un


- Codo 90 CPVC 1" PAVCO un 0.807 6,500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.006 48,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,685.13
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

6.4.2 Caeria CPVC Presion RDE 21 1" inc.acc.y aislacin u

Tubera CPVC 1". Incluye suministro, regata y resane, instalacin


. 6.4.2 a m
y uniones para el correcto tendido de la tubera
- Tubera CPVC 1" PAVCO m 1.050 8,488.42
- Unin CPVC 1" PAVCO un 0.167 1,312.19

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.001 48,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 12,961.07
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.175 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.5.2 b Accesorios CPVC 1" (se excluyen las uniones) un


- Codo 90 CPVC 1" PAVCO un 0.816 3,620.13

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.006 48,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 5,609.97
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.104 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.3 Caeria CPVC Presion RDE 11 " inc.acc.y aislacin u

Tubera CPVC 3/4". Incluye suministro, regata y resane,


. 6.4.3 a m
instalacin y uniones para el correcto tendido de la tubera
218pa11 - Tubera CPVC 3/4" PAVCO m 1.050 5,017.70
218pa73 - Unin CPVC 3/4" PAVCO un 0.167 700.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

218xx232 - Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.001 48,900.00
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 8,894.51
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.160 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.4.3 b Accesorios CPVC 3/4" (se excluyen las uniones) un


218pa74 - Codo 90 CPVC 3/4" PAVCO un 0.608 1,200.00

218xx230 - Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.003 24,578.36

218xx232 - Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.003 48,900.00
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,276.38
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.015 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.4 Caeria CPVC Presion RDE 9 " inc.acc.y aislacin u

Tubera CPVC 1/2". Incluye suministro, regata y resane,


. 6.4.4 a m
instalacin y uniones para el correcto tendido de la tubera
- Tubera CPVC 1/2" PAVCO m 1.050 3,053.12
- Unin CPVC 1/2" PAVCO un 0.167 400.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.001 48,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 6,477.52
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.146 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.4.4 b Accesorios CPVC 1/2" (se excluyen las uniones) un


- Codo 90 CPVC 1/2" PAVCO un 0.686 550.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.003 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.003 48,900.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MATERIALES ...


- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 986.48
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.019 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.5 Caeria Chapa 6" inc.acc. p/ventilacin m

. 6.1.1 a Ducto Extraccion en Lamina 6" m


- Ducto Extraccion en Lamina 6" m 1.000 96,845.74
- Tornillos Traxxx 3 UND 2.00 209.00
- Tornillo Graxx 1 UND 2.00 302.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 115,279.04
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.813 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.1.1 b Conector para ducto extraccion en lamina 6 un

- Conector para ducto extraccion en lamina 6 un 1.000 46,940.54


- Tornillos Traxxx 3 UND 2.00 209.00
- Tornillo Graxx 1 UND 2.00 302.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 59,570.82
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.542 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.6 Valvula esferica " u


- Adaptador macho PVCP 3/4" un 2.000 334.78
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 34,968.63
Ref.206A RED WHITE, tipo pesado 200 psi 3/4"
- Cinta tefln - rollo un 0.510 500.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.008 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.008 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 41,458.96
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.7 Valvula esferica " u


- Adaptador macho PVCP 1/2" un 2.000 183.67
Vlvula cheque tipo hidro / vertical / universal en bronce Ref.
- un 1.000 29,150.00
HFVC HELBERT 150 psi 1/2"
- Cinta tefln - rollo un 0.679 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.009 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.009 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 35,465.96
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.4.8 Valvula de Retencion Horizontal " u


- Adaptador macho PVCP 3/4" un 2.000 334.78
Vlvula Chequetipo paso directo / cortina / compuerta en bronce
- un 1.000 33,484.31
Ref.206A RED WHITE, tipo pesado 200 psi 3/4"
- Cinta tefln - rollo un 0.510 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.008 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.008 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 39,974.65
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.4.9 Termotanque a gas de 500 litros un

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 5,225,000.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.4.10 Termotanque elctrico de 85 litros un

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 1,045,000.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.4.11 Bomba Recirculadora de agua caliente un

(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE ...
Sucontrato para suministro de Equipo Eyector segn
- glb 1.000 7,315,000.00
especificaciones

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

SALIDAS SANITARIAS PVCS (PARAL VERTICAL HASTA RAMAL HORIZONTAL MAS CERCANO).

. 6.5.1 Salida PVCS sanitario de 4" un


- Codo 90 PVCS CxC 4" un 3.000 4,300.00
- Tubera PVCS 4" PAVCO m 1.000 9,483.33

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.084 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.084 50,993.60
- Tapa de Prueba 4" PAVCO un 1.137 1,200.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 58,885.35
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.344 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.5.2 Salida PVCS lavamanos de 2" un


- Codo 90 PVCS CxC 2" PAVCO un 3.000 1,300.00
- Tubera PVCS 2" PAVCO m 1.248 4,650.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.061 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.061 50,993.60
- Tapa de Prueba 2" PAVCO un 1.085 500.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 40,757.82
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.210 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

. 6.5.3 Salida PVCS duchas de 3" un


- Sifn 135 PVCS 3" PAVCO un 1.000 5,172.67
- Codo 45 PVCS CxC 3" PAVCO un 1.355 3,985.76
- Tubera PVCS 3" PAVCO m 1.084 6,650.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.076 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.000 50,993.60
- Tapa de Prueba 3" PAVCO un 1.355 600.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 48,603.37
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.314 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.5.4 Salida PVCS lavaplatos de 2" un


- Codo 90 PVCS CxC 2" PAVCO un 3.000 1,300.00
- Tubera PVCS 2" PAVCO m 1.248 4,650.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.061 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.061 50,993.60
- Tapa de Prueba 2" PAVCO un 1.085 500.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 40,757.82
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.210 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.5.5 Salida PVCS poceta de aseo de 2" un


- Codo 90 PVCS CxC 2" PAVCO un 3.000 1,300.00
- Tubera PVCS 2" PAVCO m 1.248 4,650.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.061 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.061 50,993.60
- Tapa de Prueba 2" PAVCO un 1.085 500.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 40,757.82
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.210 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.5.6 Salida PVCS orinal de 3" un


- Sifn 135 PVCS 3" PAVCO un 1.000 5,172.67
- Codo 45 PVCS CxC 3" PAVCO un 1.355 3,985.76
- Tubera PVCS 3" PAVCO m 1.084 6,650.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.076 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.000 50,993.60
- Tapa de Prueba 3" PAVCO un 1.355 600.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 48,603.37
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.314 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.5.7 Suministro e instalacion brida sanitarios de 4" un

Brida Sanitaria PVC 4" para instalacin de sanitarios, incluye


- un 1.000 20,555.88
empaques de caucho y chazos, tornilleria y complementarios

SUBTOTAL MATERIALES ...


- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 46,889.11
SUBTOTAL HERRAMIENTAS ...
- Rotomartillo. Incluye juego de brocas y accesorios d 0.082 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

SALIDAS SANITARIAS PVCS (PARAL VERTICAL HASTA RAMAL HORIZONTAL MAS CERCANO).
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

. 6.6.1 Pnto AF sanitarios de fluxometro 1 1/4" PVCP 1/2" un


- Codo 90 PVCP 1,1/4" PAVCO un 2.250 1,900.00
- Tee PVCP 1,1/4" PAVCO un 1.000 3,700.00
- Tapn soldado PVCP 1,1/4" PAVCO un 1.000 1,389.22
- Adaptador macho PVCP 1,1/4" un 1.000 1,479.35
- Tapn roscado PVCP 1,1/4" PAVCO un 1.000 1,735.36
- Tubera PVCP RDE 21 - 1,1/4" PAVCO m 2.000 4,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.041 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.041 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 51,511.12
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.6.2 Punto AF lavamanos PVCP 1/2" un


- Codo 90 PVCP 1/2" PAVCO un 3.000 200.00
- Tee PVCP 1/2" PAVCO un 1.000 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.000 168.90
- Adaptador macho PVCP 1/2" un 1.000 183.67
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera PVCP RDE 9 - 1/2" PAVCO m 3.000 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.046 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.046 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 36,164.70
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.6.3 Pnto AF ducha PVCP 1/2" un


- Codo 90 PVCP 1/2" PAVCO un 2.000 200.00
- Tee PVCP 1/2" PAVCO un 1.000 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.000 168.90
- Adaptador macho PVCP 1/2" un 1.000 183.67
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78


- Tubera PVCP RDE 9 - 1/2" PAVCO m 3.000 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.036 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.036 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 0.020 36,164.70
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.6.4 Pnto AF lavaplatos PVCP 1/2" un


- Codo 90 PVCP 1/2" PAVCO un 3.000 200.00
- Tee PVCP 1/2" PAVCO un 1.000 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.000 168.90
- Adaptador macho PVCP 1/2" un 1.000 183.67
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera PVCP RDE 9 - 1/2" PAVCO m 3.000 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.046 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.046 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 36,164.70
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.6.5 Pnto AF orinal PVCP 3/4" un


- Codo 90 PVCP 1/2" PAVCO un 4.217 200.00
- Tee PVCP 1/2" PAVCO un 1.406 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.406 168.90
- Adaptador macho PVCP 1/2" un 1.406 183.67
- Tapn roscado PVCP 1/2" PAVCO un 1.406 234.78
- Tubera PVCP RDE 9 - 1/2" PAVCO m 4.217 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.041 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.041 50,993.60
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 39,195.19


SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.330 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.6.6 Pnto AF llaves mangera PVCP 1/2" un


- Codo 90 PVCP 1/2" PAVCO un 3.000 200.00
- Tee PVCP 1/2" PAVCO un 1.000 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.000 168.90
- Adaptador macho PVCP 1/2" un 1.000 183.67
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera PVCP RDE 9 - 1/2" PAVCO m 3.000 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.051 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.051 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 36,552.39
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.6.7 Pnto AF neveras PVCP 1/2" un


- Codo 90 PVCP 1/2" PAVCO un 3.000 200.00
- Tee PVCP 1/2" PAVCO un 1.000 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.000 168.90
- Adaptador macho PVCP 1/2" un 1.000 183.67
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera PVCP RDE 9 - 1/2" PAVCO m 3.000 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.046 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.046 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 36,164.70
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.6.8 Pnto AF poceta aseo PVCP 1/2" un


- Codo 90 PVCP 1/2" PAVCO un 3.000 200.00
- Tee PVCP 1/2" PAVCO un 1.000 300.00
- Tapn soldado PVCP 1/2" PAVCO un 1.000 168.90
- Adaptador macho PVCP 1/2" un 1.000 183.67
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera PVCP RDE 9 - 1/2" PAVCO m 3.000 1,316.67

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.051 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.051 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 36,552.39
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

PUNTOS HIDRAULICOS DE AGUA CALIENTE CPVC (paral correspondiente al tramo vertical). PARAL DE TECHO h max=2.00m.

. 6.7.1 PUNTO AC DUCHAS CPVC 1/2" un


- Codo 90 CPVC 1/2" PAVCO un 3.000 550.00
- Tee CPVC 1/2" PAVCO un 1.000 700.00
- Tapn soldado CPVC 1/2" PAVCO un 1.000 637.54
- Adaptador macho CPVC 1/2" PAVCO un 1.000 731.26
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera CPVC 1/2" PAVCO m 2.000 3,053.12

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.039 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.039 48,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 40,145.26
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

TOTAL UNITARIO

. 6.7.2 PUNTO AC LAVAPLATOS CPVC 1/2" un


- Codo 90 CPVC 1/2" PAVCO un 3.000 550.00
- Tee CPVC 1/2" PAVCO un 1.000 700.00
- Tapn soldado CPVC 1/2" PAVCO un 1.000 637.54
- Adaptador macho CPVC 1/2" PAVCO un 1.000 731.26
- Tapn roscado PVCP 1/2" PAVCO un 1.000 234.78
- Tubera CPVC 1/2" PAVCO m 2.000 3,053.12

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.039 24,578.36

- Soldadura lquida para tubera CPVC 760 g = 1/4 gal un 0.039 48,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 40,145.26
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.272 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

M.O. MONTAJE, CONEXION DE APARATOS Y EQUIPOS

. 6.8.1 Montaje sanitarios de tanque acople feximetal un


- Acople fleximetal un 1.000 5,500.00
- Cinta tefln - rollo un 0.278 500.00
- Cemento blanco - empaque 40 kg ARGOS un 0.049 36,900.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 25,974.73
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.865 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.2 Montaje vlvula antivandalica para fluxmetro un


(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 16,805.35
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(El valor de la totalidad de insumos incluye el transporte)


SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.785 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.3 Montaje de Aditamento de Duchas un


(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 18,976.47
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.89 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.4 Montaje de mezclador duchas un


- Arena lavada de pea / de pozo m3 0.021 41,125.00
- Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.174 18,620.32
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 28,349.48
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.172 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.5 Montaje lavaplatos acople fleximetalico un


- Acople fleximetal un 1.000 5,500.00
- Cinta tefln - rollo un 0.241 500.00
Sikaflex 1-A SIKA, masilla elstica sellante y adhesiva con base
- un 0.048 21,500.00
en poliuretano - cartucho 305 cc.
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 23,633.09
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.841 21,413.54
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.6 Montaje lavamanos acople fleximetalico un


- Acople fleximetal un 1.000 5,500.00
- Cinta tefln - rollo un 0.241 500.00
Sikaflex 1-A SIKA, masilla elstica sellante y adhesiva con base
- un 0.048 21,500.00
en poliuretano - cartucho 305 cc.
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 23,645.93
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.842 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.7 Conexin llave manguera un


- Cinta tefln - rollo un 0.190 500.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 12,049.98
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.558 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.8 Montaje tanque de agua caliente central un


(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 154,200.00
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- Subcontrato para montaje de equipos hidrosanitarios glb 7.201 21,413.54
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

TOTAL UNITARIO

. 6.8.9 Montaje bomba sistema de agua caliente central un


(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 338,572.55
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- Subcontrato para montaje de equipos hidrosanitarios glb 15.811 21,413.54
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.10 Montaje equipo de presin un


(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,554,228.43
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- Subcontrato para montaje de equipos hidrosanitarios glb 1.000 1,554,228.43
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.8.11 Montaje bombas eyectoras un


(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 203,738.24
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- Subcontrato para montaje de equipos hidrosanitarios glb 1.000 203,738.24
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

. 6.8.12 Montaje y suministro cajilla 1 medidor sin tapa un

Cajilla para medidor de acueducto 1/2"-3/4" FIBRIT Ref. CIMA


- un 1.000 59,400.00
530 38x53x30 cm (a x l x h). NO incluye marco ni tapa

- Arena de pea - sin tamizar m3 0.025 41,667.00


- Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.183 18,620.32
Toxement polvo TOXEMENT, impermeabilizante integral para
- un 0.007 88,900.00
hormign y mortero - empaque x 25 kg
- Cal - empaque 10 kg un 0.025 3,500.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 96,875.49
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- Subcontrato para montaje de equipos hidrosanitarios glb 0.164 228,395.39

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.17.14 Montaje de medidores agua fria un


Montaje de medidores agua fria
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 19,209.80
SUBTOTAL HERRAMIENTAS ...
Montaje de medidores agua fria
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.897 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

ABRAZADERAS

. 6.9.1 Abrazaderas tipo pera 1/2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.082 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,587.96


SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.002 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.200 1,000.00
INDICE GENERAL

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.018 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.2 Abrazaderas tipo pera 3/4" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.088 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,634.06
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.002 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.242 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.019 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.3 Abrazaderas tipo pera 1" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.113 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,934.21
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.003 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.312 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.026 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.4 Abrazaderas tipo pera 1.1/4" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
212xx27 - un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
241fi21 - Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.150 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
241xx23 - un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,363.02
SUBTOTAL HERRAMIENTAS ...
108a.5 Rotomartillo. Incluye juego de brocas y accesorios d 0.004 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
310a.17 glb 0.412 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.036 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.5 Abrazaderas tipo pera 1.1/2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
212xx27 - un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
241fi21 - Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.156 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
241xx23 - un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,434.04
SUBTOTAL HERRAMIENTAS ...
108a.5 Rotomartillo. Incluye juego de brocas y accesorios d 0.004 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
310a.17 glb 0.429 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.037 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.6 Abrazaderas tipo pera 2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.174 5,900.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador


- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,648.30
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.004 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.479 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.042 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.7 Abrazaderas tipo pera 2.1/2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.186 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,792.14
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.005 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.512 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.046 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.8 Abrazaderas tipo pera 3" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.223 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,219.48
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.006 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Corte de lmina galvanizada y figurado para abrazaderas.


glb 0.612 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.055 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.9 Abrazaderas tipo pera 4" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.259 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,649.57
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.006 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.713 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.066 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.10 Abrazaderas tipo pera 6" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
212xx27 - un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
241fi21 - Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.308 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
241xx23 - un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 5,221.47
SUBTOTAL HERRAMIENTAS ...
108a.5 Rotomartillo. Incluye juego de brocas y accesorios d 0.008 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
310a.17 glb 0.846 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.079 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

PINTURA PARA TUBERIAS COLGANTES

Pintura esmalte tuberas colgantes .=1/2". Incluye preparacin


. 6.10.1 m
de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.006 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,559.82
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.060 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=3/4". Incluye preparacin


. 6.10.2 m
de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.007 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,835.63
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.071 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=1". Incluye preparacin de


. 6.10.3 m
la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.008 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,159.48
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.083 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Pintura esmalte tuberas colgantes .=1,1/4". Incluye preparacin


. 6.10.4 m
de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.010 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,541.20
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.098 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=1,1/2". Incluye preparacin


. 6.10.5 m
de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.012 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,988.76
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.115 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=2". Incluye preparacin de


. 6.10.6 m
la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.014 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,516.95
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.135 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=2,1/2". Incluye preparacin


. 6.10.7 m
de la superficie
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Esmalte base aceite, brillante Ref. Domestico PINTUCO,


- gal 0.016 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,138.01
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.159 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=3". Incluye preparacin de


. 6.10.8 m
la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.019 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,867.41
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.187 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=4". Incluye preparacin de


. 6.10.9 m
la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.022 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 5,727.47
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.220 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

OBRAS COMPLEMENTARIAS

. 6.11.1 Lavado de tanques un


(No Aplica)
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MATERIALES ...


(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...

Subcontrato para lavado y desinfeccin de tanque de reserva de


- glb 1.000 845,204.00
agua potable. Incluye entrega de certificado del trabajo realizado

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.11.2 Desinfeccin del sistema de agua potable un


(No Aplica)
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...

Subcontrato para desinfeccin de la red de agua potable. Incluye


- glb 1.000 359,041.00
entrega de certificado del trabajo realizado

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS

(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.11.3 Prueba de presin un

Ejecucin de la totalidad de las pruebas de presin para


. garantizar y certificar la totalidad de las redes de suministro de
agua ejecutadas
(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 152,418.63
SUBTOTAL HERRAMIENTAS ...
Flauta de presin en tubera y accesorios de cobre, con
- un 1.092 200,000.00
manometro de gliserina debidamente calibrado y certificado
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 7.118 21,413.54
SUBTOTAL MANO DE OBRA
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Redondeo a entero ms cercano


TOTAL UNITARIO

. 6.11.4 Prueba de flujo un

Ejecucin de la totalidad de las pruebas de desages para


. garantizar y certificar la totalidad de las redes de desages de un
aguas residuales y aguas lluvias ejecutadas
(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 238,594.12
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 11.142 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.11.5 Prueba de estanqueidad por bajante un

Ejecucin de la totalidad de las pruebas de estanquedad para


. garantizar y certificar la totalidad de las redes de desages de un
aguas residuales y aguas lluvias ejecutadas
(No Aplica)
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 161,482.35
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 7.541 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.11.6 Malla plstica proteccin de ductos M2

21B160 - Malla Plastica M2 1.00 5,216.00


SUBTOTAL MATERIALES ...
20H700 - HERRAMIENTAS MENORES % (M+MO) 2.0% 6,450.98
SUBTOTAL HERRAMIENTAS ...
- (No Aplica)
SUBTOTAL EQUIPO ...
(El valor de los insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
MANO DE OBRA CUADRILLA AA HR 0.06 21,413.54
SUBTOTAL MANO DE OBRA
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

INSTALACION A GAS

. 6.12.1 Caeria Hierro Galvanizado Sch.40 1" inc.acc. m

Tubera Acero Galvanizado (AG) SCH-40 1". Incluye suministro,


. 6.12.1 a regata y resane, instalacin y uniones para el correcto tendido de m
la tubera
- Tubera Acero galvanizado SCH-40 1" COLMENA m 1.030 16,046.67
- Unin Acero galvanizado 1" MECH un 0.153 1,542.80
- Cinta tefln - rollo un 0.151 500.00
- Sellador ETERNA - botella un 0.028 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 23,687.67
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.005 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.386 17,116.00
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.12.1 b Accesorio Acero Galvanizado (AG) 1" (se excluyen las uniones) un

- Codo 90 Acero galvanizado 1" MECH un 0.504 2,088.00


- Cinta tefln - rollo un 0.046 500.00
- Sellador ETERNA - botella un 0.019 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,254.78
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.048 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.12.2 Caeria Hierro Galvanizado 4" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 4". Incluye


. 6.12.2 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 4" m 1.050 95,816.00
- Vaselina x tarro un 0.006 5,000.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MATERIALES ...


- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 112,140.16
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.006 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.672 17,116.00
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 4" (se excluyen las


. 6.12.2. b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 4" un 0.535 23,513.03
- Tee Hierro dctil ranurado HD 4" un 0.134 36,520.23
- Vaselina x tarro un 0.036 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 22,419.29
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.224 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.3 Caeria Hierro Galvanizado 3" inc.acc. (Colectores) m

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


. 6.12.3 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 3" m 1.050 63,558.86
- Vaselina x tarro un 0.005 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 77,567.64
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.005 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.505 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


. 6.12.3 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 3" un 0.800 16,928.51
- Tee Hierro dctil ranurado HD 3" un 0.200 21,985.08
- Vaselina x tarro un 0.040 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 23,527.44
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.252 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12. 4 Caeria Hierro Galvanizado 2" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 2,1/2". Incluye


. 6.12.4 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 2,1/2" m 1.050 45,639.70
- Vaselina x tarro un 0.004 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 57,692.66
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.004 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.455 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2,1/2" (se excluyen las
. 6.12.4 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 2,1/2" un 0.336 6,814.64
- Tee Acero roscado 150 libras H/N 2,1/2" un 0.336 8,793.08
- Cinta tefln - rollo un 0.127 500.00
- Sellador ETERNA - botella un 0.025 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,687.27
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.195 21,413.54
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.5 Caeria Hierro Galvanizado 2" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


. 6.12.5 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
218xx400 - Tubera Acero Carbn SCH-40 2" m 1.050 32,944.00
240xx1 - Vaselina x tarro un 0.002 5,000.00
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 39,414.98
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
108a.6 - Incluye dados, armazn, montaje, operario, transporte, d 0.002 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.225 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
. 6.12.5 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 2" un 0.364 5,958.14
- Tee Acero roscado 150 libras H/N 2" un 0.364 7,687.92
218xx280 - Cinta tefln - rollo un 0.121 500.00
218et281 - Sellador ETERNA - botella un 0.024 8,250.00
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,191.93
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano 0.823
TOTAL UNITARIO

6.12.6 Caeria Hierro Galvanizado 1" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 1,1/2". Incluye


. 6.38.5 suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
218xx399 - Tubera Acero Carbn SCH-40 1,1/2" m 1.050 24,708.00
240xx1 - Vaselina x tarro un 0.001 5,000.00
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 29,415.49


SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
108a.6 - Incluye dados, armazn, montaje, operario, transporte, d 0.001 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.162 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 1,1/2" (se excluyen las
. 6.38.6 un
uniones)
- Codo 90 Acero roscado 150 libras H/N 1,1/2" un 0.224 5,265.56
- Tee Acero roscado 150 libras H/N 1,1/2" un 0.224 6,794.27
218xx280 - Cinta tefln - rollo un 0.066 500.00
218et281 - Sellador ETERNA - botella un 0.013 8,250.00
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,123.73
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.060 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.7 Valvula esferica 4" u


- Adaptador macho PVCP 4" PAVCO un 2.000 20,019.74
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 707,505.88
Ref.206A RED WHITE, tipo pesado 200 psi 4"
- Cinta tefln - rollo un 0.576 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.021 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.021 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 806,690.63
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.676 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

6.12.8 Valvula esferica 3" u


- Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 290,781.37
Ref.206A RED WHITE, tipo pesado 200 psi 3"
- Cinta tefln - rollo un 0.298 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 343,129.21
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.383 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.9 Valvula esferica 2" u


- Adaptador macho PVCP 2,1/2" PAVCO un 2.000 7,198.50
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 218,697.06
Ref.206A RED WHITE, tipo pesado 200 psi 2,1/2"
- Cinta tefln - rollo un 0.225 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.008 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.008 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 256,191.31
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.044 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.10 Valvula esferica 2" u


- Adaptador macho PVCP 2" un 2.000 2,478.25
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 123,038.24
Ref.206A RED WHITE, tipo pesado 200 psi 2"
- Cinta tefln - rollo un 0.152 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.006 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 143,611.32
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL HERRAMIENTAS ...


(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.706 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.11 Valvula esferica 1" u


- Adaptador macho PVCP 1,1/2" un 2.000 1,734.50
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 77,314.71
Ref.206A RED WHITE, tipo pesado 200 psi 1,1/2"
- Cinta tefln - rollo un 0.225 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.007 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.007 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 95,547.87
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.660 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.12 Valvula esferica 1" u


- Adaptador macho PVCP 1" un 2.000 702.12
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 47,168.63
Ref.206A RED WHITE, tipo pesado 200 psi 1"
- Cinta tefln - rollo un 0.155 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.004 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.004 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 53,847.94
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

6.12.13 Valvula Shut-Off 3" u


- Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
- Valvula Shut-Off 3" un 1.000 267,112.75
- Cinta tefln - rollo un 0.298 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 319,460.59
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.383 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.14 Valvula Shut-Off 2" u


- Adaptador macho PVCP 2,1/2" PAVCO un 2.000 7,198.50
- Valvula Shut-Off 2" un 1.000 255,888.24
- Cinta tefln - rollo un 0.225 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.008 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.008 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 293,382.49
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.044 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.12.15 Valvula Shut-Off 2" u


- Adaptador macho PVCP 2" un 2.000 2,478.25
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 245,626.47
Ref.206A RED WHITE, tipo pesado 200 psi 2"
- Cinta tefln - rollo un 0.152 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.006 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 266,199.56
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.706 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.13.1 Abrazaderas tipo pera 1" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.113 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,934.21
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.003 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.312 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.026 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.13.2 Abrazaderas tipo pera 1.1/2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
212xx27 - un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
241fi21 - Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.156 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
241xx23 - un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,434.04
SUBTOTAL HERRAMIENTAS ...
108a.5 Rotomartillo. Incluye juego de brocas y accesorios d 0.004 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
310a.17 glb 0.429 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.037 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

. 6.13.3 Abrazaderas tipo pera 2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.174 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,648.30
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.004 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.479 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.042 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.13.4 Abrazaderas tipo pera 2.1/2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.186 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,792.14
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.005 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.512 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.046 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.13.5 Abrazaderas tipo pera 3" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.223 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,219.48
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.006 20,000.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL EQUIPOS ...


(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.612 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.055 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.9.6 Abrazaderas tipo pera 4" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.259 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,649.57
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.006 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.713 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.066 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.14.1 Punto de gas en acero galvanizado un


- Tubera Acero galvanizado SCH-40 1/2" COLMENA m 0.900 7,926.67
- Unin Acero galvanizado 1/2" MECH un 1.000 649.60
- Codo 90 Acero galvanizado 1/2" MECH un 2.000 858.40
- Tapn hembra Acero galvanizado 1/2" un 1.000 910.00
- Cinta tefln - rollo un 0.534 500.00
- Sellador ETERNA - botella un 0.107 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 30,820.64
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.024 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.899 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

TOTAL UNITARIO

. 6.14.2 Conexin aparatos un


Manguera de conexin flexible L.=100 cm, conectores de acero
- un 1.000 21,900.00
recubiertos con nitrilo
- Cinta tefln - rollo un 0.839 500.00
- Sellador ETERNA - botella un 0.159 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 51,918.77
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.321 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

RED DE INCENDIO

6.15.1 Caeria HN Sch.40 p/soldar 6" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 6". Incluye


. 6.15.1 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 6" m 1.050 170,520.00
- Vaselina x tarro un 0.010 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 193,715.02
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.010 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.683 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 6" (se excluyen las


. 6.15.1 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 6" un 0.516 46,382.61
- Tee Hierro dctil ranurado HD 6" un 0.129 77,962.25
- Vaselina x tarro un 0.034 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 38,740.47
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL HERRAMIENTAS ...


(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.213 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.15.2 Caeria HN Sch.40 p/soldar 4" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 4". Incluye


. 6.15.2 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 4" m 1.050 95,816.00
- Vaselina x tarro un 0.006 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 112,140.16
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.006 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.672 17,116.00
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 4" (se excluyen las


. 6.15.2 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 4" un 0.535 23,513.03
- Tee Hierro dctil ranurado HD 4" un 0.134 36,520.23
- Vaselina x tarro un 0.036 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 22,419.29
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.224 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.3 Caeria HN Sch.40 p/soldar 3" inc.acc. m


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


. 6.15.3 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 3" m 1.050 63,558.86
- Vaselina x tarro un 0.005 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 77,567.64
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.005 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.505 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


. 6.15.3 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 3" un 0.800 16,928.51
- Tee Hierro dctil ranurado HD 3" un 0.200 21,985.08
- Vaselina x tarro un 0.040 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 23,527.44
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.252 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.4 Caeria HN Sch.40 p/soldar 2" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 2,1/2". Incluye


. 6.15.4 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 2,1/2" m 1.050 45,639.70
- Vaselina x tarro un 0.004 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 57,692.66
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.004 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.455 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2,1/2" (se excluyen las
. 6.15.4 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 2,1/2" un 0.336 6,814.64
- Tee Acero roscado 150 libras H/N 2,1/2" un 0.336 8,793.08
- Cinta tefln - rollo un 0.127 500.00
- Sellador ETERNA - botella un 0.025 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,687.27
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.195 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.5 Caeria HN Sch.40 p/soldar 2" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


. 6.15.5 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 2" m 1.050 32,944.00
- Vaselina x tarro un 0.002 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 39,414.98
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.002 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.225 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
. 6.15.5 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 2" un 0.364 5,958.14
- Tee Acero roscado 150 libras H/N 2" un 0.364 7,687.92
- Cinta tefln - rollo un 0.121 500.00
- Sellador ETERNA - botella un 0.024 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,191.93
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL HERRAMIENTAS ...


(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano 0.823
TOTAL UNITARIO

6.15.7 Valvula esclusa 4" u


- Adaptador macho PVCP 4" PAVCO un 2.000 20,019.74
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 793,588.24
Ref.206A RED WHITE, tipo pesado 200 psi 4"
- Cinta tefln - rollo un 0.576 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.021 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.021 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 892,772.98
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.676 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.8 Valvula esferica 3" u


- Adaptador macho PVCP 3" PAVCO un 2.000 10,883.58
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 290,781.37
Ref.206A RED WHITE, tipo pesado 200 psi 3"
- Cinta tefln - rollo un 0.298 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.011 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.011 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 343,129.21
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 1.383 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

6.15.9 Valvula esferica 2" u


- Adaptador macho PVCP 2" un 2.000 2,478.25
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 123,038.24
Ref.206A RED WHITE, tipo pesado 200 psi 2"
- Cinta tefln - rollo un 0.152 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.006 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 143,611.32
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.706 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.10 Valvula retencion 6" bridada u


- Adaptador macho PVCP 6" PAVCO un 2.000 27,169.98
- Valvula retencion 6" bridada un 1.000 1,077,025.43
- Cinta tefln - rollo un 0.782 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.028 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.028 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,211,634.90
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 3.631 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.11 Valvula retencion 2" bridada u


- Adaptador macho PVCP 2" un 2.000 2,478.25
- Valvula retencion 2" bridada un 1.000 621,590.20
- Cinta tefln - rollo un 0.152 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.006 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 642,163.28
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.706 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.15.12 Boca Incendio Completa 1" u


- Adaptador macho PVCP 1,3/4" un 2.000 1,734.50
- Boca Incendio Completa 1" un 1.000 388,556.86
- Cinta tefln - rollo un 0.225 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.007 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.007 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 406,790.03
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.660 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.15.13 Boca Impulsion Doble Completa inc.marco y tapa un


Conjunto Siamesa de pared tipo Placa 4"X2,1/2"X2,1/2" Bronce
PRODESEG, rosca NPT, niples con tuerca giratoria, tapas macho
210pr1 - un 1.000 1,209,691.18
2,1/2" rosca NH, placa "INYECCION COLUMNA", todo el
conjunto en bronce acabado brillante
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,271,924.40
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.906 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

INSTALACION DE ROCIADORES

. 6.16.1 Caeria HN Sch.40 p/soldar 4" inc.acc. m


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Tubera Acero Carbn (AC) SCH-40 con costura 4". Incluye


. 6.16.1 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 4" m 1.050 95,816.00
- Vaselina x tarro un 0.006 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 112,140.16
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.006 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.672 17,116.00
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 4" (se excluyen las


. 6.16.1 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 4" un 0.535 23,513.03
- Tee Hierro dctil ranurado HD 4" un 0.134 36,520.23
- Vaselina x tarro un 0.036 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 22,419.29
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.224 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.16.2 Caeria HN Sch.40 p/soldar 3" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 3". Incluye


. 6.16.2 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 3" m 1.050 63,558.86
- Vaselina x tarro un 0.005 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 77,567.64
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.005 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.505 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio Hierro Dctil (HD) ranurado 3" (se excluyen las


. 6.16.2 b un
uniones). NO incluye los acoples laterales
- Codo 90 Hierro dctil ranurado HD 3" un 0.800 16,928.51
- Tee Hierro dctil ranurado HD 3" un 0.200 21,985.08
- Vaselina x tarro un 0.040 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 23,527.44
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.252 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.16. 3 Caeria HN Sch.40 p/soldar 2" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 2,1/2". Incluye


. 6.16.3 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 2,1/2" m 1.050 45,639.70
- Vaselina x tarro un 0.004 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 57,692.66
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.004 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.455 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2,1/2" (se excluyen las
. 6.16.3 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 2,1/2" un 0.336 6,814.64
- Tee Acero roscado 150 libras H/N 2,1/2" un 0.336 8,793.08
- Cinta tefln - rollo un 0.127 500.00
- Sellador ETERNA - botella un 0.025 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,687.27
SUBTOTAL HERRAMIENTAS ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.195 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.16. 4 Caeria HN Sch.40 p/soldar 2" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


. 6.16.4 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 2" m 1.050 32,944.00
- Vaselina x tarro un 0.002 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 39,414.98
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.002 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.225 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
. 6.16.4 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 2" un 0.364 5,958.14
- Tee Acero roscado 150 libras H/N 2" un 0.364 7,687.92
- Cinta tefln - rollo un 0.121 500.00
- Sellador ETERNA - botella un 0.024 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,191.93
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano 0.823
TOTAL UNITARIO

6.16.5 Caeria Hierro Galvanizado 1" inc.acc. m


ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Tubera Acero Carbn (AC) SCH-40 con costura 1,1/2". Incluye


. 6.16.5 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
218xx399 - Tubera Acero Carbn SCH-40 1,1/2" m 1.050 24,708.00
240xx1 - Vaselina x tarro un 0.001 5,000.00
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 29,415.49
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
108a.6 - Incluye dados, armazn, montaje, operario, transporte, d 0.001 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.162 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 1,1/2" (se excluyen las
. 6.16.5 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 1,1/2" un 0.224 5,265.56
- Tee Acero roscado 150 libras H/N 1,1/2" un 0.224 6,794.27
218xx280 - Cinta tefln - rollo un 0.066 500.00
218et281 - Sellador ETERNA - botella un 0.013 8,250.00
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,123.73
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.060 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.16.6 Caeria HN Sch.40 p/soldar 1" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 1,1/4". Incluye


. 6.16.6 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 1,1/4" m 1.050 21,720.82
- Vaselina x tarro un 0.001 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 26,278.51
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.001 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL TRANSPORTE ...


- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.162 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 1,1/4" (se excluyen las
. 6.16.6 B un
uniones)
- Codo 90 Acero roscado 150 libras H/N 1,1/4" un 0.500 3,596.00
- Tee Acero roscado 150 libras H/N 1,1/4" un 0.500 4,640.00
- Cinta tefln - rollo un 0.066 500.00
- Sellador ETERNA - botella un 0.013 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 5,535.03
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.060 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.16.7 Caeria Hierro Galvanizado Sch.40 1" inc.acc. m

Tubera Acero Galvanizado (AG) SCH-40 1". Incluye suministro,


. 6.16.7 a regata y resane, instalacin y uniones para el correcto tendido de m
la tubera
- Tubera Acero galvanizado SCH-40 1" COLMENA m 1.030 16,046.67
- Unin Acero galvanizado 1" MECH un 0.153 1,542.80
- Cinta tefln - rollo un 0.151 500.00
- Sellador ETERNA - botella un 0.028 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 20,496.39
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.005 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.160 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.216.7 b Accesorio Acero Galvanizado (AG) 1" (se excluyen las uniones) un

- Codo 90 Acero galvanizado 1" MECH un 0.504 2,088.00


- Cinta tefln - rollo un 0.046 500.00
- Sellador ETERNA - botella un 0.019 8,250.00
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MATERIALES ...


- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,254.78
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.048 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.16.8 Rociador Pendent 68C m

Suministro de rociador tipo Pendent K=5,6 (Cobertura Normal


. 6.44.2 un
Temperatura) 1/2", acabado cromado. NO INCLUYE MONTAJE

Rociador tipo Pendent K=5,6 (Cobertura Normal Temperatura)


- un 1.000 20,661.00
1/2", acabado cromado
SUBTOTAL MATERIALES ...
(No Aplica)
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
(No Aplica)
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.44.3 Suministro e instalacin de Escudo cromado para rociador 1/2" un

- Escudo para rociador 1/2", acabado cromado un 1.000 5,000.00


SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 7,307.74
SUBTOTAL HERRAMIENTAS ...
Andamio tubular seccin completa, incluyendo los dos laterales y
105xx2 - h 0.550 51.00
correspondiente cruceta
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.108 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Montaje de rociador tipo Pendent K=5,6 (Cobertura Normal


. 6.44.4 Temperatura) 1/2", acabado cromado. NO INCLUYE un
SUMINISTRO
218xx280 - Cinta tefln - rollo un 0.147 500.00
218et281 - Sellador ETERNA - botella un 0.037 8,250.00
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 6,799.67


SUBTOTAL HERRAMIENTAS ...
Andamio tubular seccin completa, incluyendo los dos laterales y
105xx2 - h 0.916 51.00
correspondiente cruceta
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.300 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.17.1 Abrazaderas tipo pera 1" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.113 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,934.21
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.003 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.312 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.026 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.17.2 Abrazaderas tipo pera 1.1/2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
212xx27 - un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
241fi21 - Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.156 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
241xx23 - un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,434.04
SUBTOTAL HERRAMIENTAS ...
108a.5 Rotomartillo. Incluye juego de brocas y accesorios d 0.004 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
310a.17 glb 0.429 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.037 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

TOTAL UNITARIO

. 6.17.3 Abrazaderas tipo pera 2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.174 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,648.30
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.004 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.479 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.042 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.17.4 Abrazaderas tipo pera 2.1/2" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.186 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,792.14
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.005 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.512 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.046 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.17.5 Abrazaderas tipo pera 3" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.223 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,219.48


SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.006 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.612 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.055 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.17.6 Abrazaderas tipo pera 4" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
- un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
- Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.259 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
- un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,649.57
SUBTOTAL HERRAMIENTAS ...
Rotomartillo. Incluye juego de brocas y accesorios d 0.006 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
glb 0.713 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.066 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.17.7 Abrazaderas tipo pera 6" un


Lmina de Acero Cold Rolled Galvanizado 1,22x2,44m cal.16
212xx27 - un 0.003 139,084.00
(1,50mm) - 34,90 kg/un
241fi21 - Varilla roscada / esparrago 1/2" L=100 cm FIXSER un 0.308 5,900.00
Chazo / ancla multiuso de rosca interna 1/2"x2" RL42. Punzador
241xx23 - un 1.000 1,300.00
RT incluido
SUBTOTAL MATERIALES ...
501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 5,221.47
SUBTOTAL HERRAMIENTAS ...
108a.5 Rotomartillo. Incluye juego de brocas y accesorios d 0.008 20,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Corte de lmina galvanizada y figurado para abrazaderas.
310a.17 glb 0.846 1,000.00
INDICE GENERAL
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.079 21,413.54
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=1". Incluye preparacin de


. 6.18.1 m
la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.008 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,159.48
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.083 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=1,1/4". Incluye preparacin


. 6.18.2 m
de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.010 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,541.20
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.098 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=1,1/2". Incluye preparacin


. 6.18.3 m
de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.012 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,988.76
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.115 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

Pintura esmalte tuberas colgantes .=2". Incluye preparacin de


. 6.18.4 m
la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.014 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 3,516.95
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.135 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=2,1/2". Incluye preparacin


. 6.18.5 m
de la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.016 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,138.01
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.159 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Pintura esmalte tuberas colgantes .=4". Incluye preparacin de


. 6.18.6 m
la superficie
Esmalte base aceite, brillante Ref. Domestico PINTUCO,
- gal 0.022 44,900.00
proteccin y decoracin en interiores
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 5,727.47
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA AA (incl. prestaciones) HR 0.220 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

INSTALACION DE AIRE COMPRIMIDO

6.20.1 Caeria HN Sch.40 p/soldar 2" inc.acc. m

Tubera Acero Carbn (AC) SCH-40 con costura 2". Incluye


. 6.20.1 a suministro, regata y resane, instalacin, para el correcto tendido m
de la tubera. NO incluye uniones (acople)
- Tubera Acero Carbn SCH-40 2" m 1.050 32,944.00
- Vaselina x tarro un 0.002 5,000.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 39,414.98
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.002 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.225 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

Accesorio H/N acero roscado 150 lbs 2" (se excluyen las
. 6.20.1 b un
uniones)
- Codo 90 Acero roscado 150 libras H/N 2" un 0.364 5,958.14
- Tee Acero roscado 150 libras H/N 2" un 0.364 7,687.92
- Cinta tefln - rollo un 0.121 500.00
- Sellador ETERNA - botella un 0.024 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,191.93
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.185 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano 0.823
TOTAL UNITARIO

. 6.20.2 Caeria Hierro Galvanizado Sch.40 1" inc.acc. m

Tubera Acero Galvanizado (AG) SCH-40 1". Incluye suministro,


. 6.20.2 a regata y resane, instalacin y uniones para el correcto tendido de m
la tubera
- Tubera Acero galvanizado SCH-40 1" COLMENA m 1.030 16,046.67
- Unin Acero galvanizado 1" MECH un 0.153 1,542.80
- Cinta tefln - rollo un 0.151 500.00
- Sellador ETERNA - botella un 0.028 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 20,496.39
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL HERRAMIENTAS ...


Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.005 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.160 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.20.2 b Accesorio Acero Galvanizado (AG) 1" (se excluyen las uniones) un

- Codo 90 Acero galvanizado 1" MECH un 0.504 2,088.00


- Cinta tefln - rollo un 0.046 500.00
- Sellador ETERNA - botella un 0.019 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 2,254.78
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.048 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.20.3 Caeria Hierro Galvanizado " inc.acc. m

Tubera Acero Galvanizado (AG) SCH-40 3/3". Incluye suministro,


. 6.20.4 a regata y resane, instalacin y uniones para el correcto tendido de m
la tubera
- Tubera Acero galvanizado SCH-40 3/4" COLMENA m 1.000 8,534.88
- Unin Acero galvanizado 1/2" MECH un 0.129 739.23
- Cinta tefln - rollo un 0.109 500.00
- Sellador ETERNA - botella un 0.020 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 12,690.91
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.003 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.224 17,116.00
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

. 6.20.4 b Accesorio Acero Galvanizado (AG) 3/4" (se excluyen las uniones) un

- Codo 90 Acero galvanizado 3/4" MECH un 0.614 976.85


- Cinta tefln - rollo un 0.033 500.00
- Sellador ETERNA - botella un 0.023 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,150.07
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.020 17,116.00
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.20.4 Caeria Hierro Galvanizado " inc.acc. m

Tubera Acero Galvanizado (AG) SCH-40 1/2". Incluye suministro,


. 6.20.4 a regata y resane, instalacin y uniones para el correcto tendido de m
la tubera
- Tubera Acero galvanizado SCH-40 1/2" COLMENA m 1.000 7,500.00
- Unin Acero galvanizado 1/2" MECH un 0.129 649.60
- Cinta tefln - rollo un 0.096 500.00
- Sellador ETERNA - botella un 0.018 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 11,152.09
SUBTOTAL HERRAMIENTAS ...
Roscadora y/o Ranuradora para tubera de hierro y/o acero.
- Incluye dados, armazn, montaje, operario, transporte, d 0.002 200,000.00
relacionados y complementarios
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.197 17,116.00
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

. 6.20.4 b Accesorio Acero Galvanizado (AG) 1/2" (se excluyen las uniones) un

- Codo 90 Acero galvanizado 1/2" MECH un 0.614 858.40


- Cinta tefln - rollo un 0.029 500.00
- Sellador ETERNA - botella un 0.020 8,250.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 1,010.62
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.018 17,116.00


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.5 Valvula esferica 2" u


- Adaptador macho PVCP 2" un 2.000 2,478.25
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 123,038.24
Ref.206A RED WHITE, tipo pesado 200 psi 2"
- Cinta tefln - rollo un 0.152 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.006 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.006 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 143,611.32
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.706 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.6 Valvula esferica 1" u


- Adaptador macho PVCP 1" un 2.000 702.12
Vlvula registro tipo paso directo / cortina / compuerta en bronce
- un 1.000 47,168.63
Ref.206A RED WHITE, tipo pesado 200 psi 1"
- Cinta tefln - rollo un 0.155 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.004 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.004 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 53,847.94
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

6.20.7 Valvula esferica " u


- Adaptador macho PVCP 1/2" un 2.000 183.67
Vlvula cheque tipo hidro / vertical / universal en bronce Ref.
- un 1.000 29,150.00
HFVC HELBERT 150 psi 1/2"
ANALISIS DE PRECIOS UNITARIOS
. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Cinta tefln - rollo un 0.679 500.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.009 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.009 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 35,465.96
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.230 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
IS DE PRECIOS UNITARIOS
TOTAL

104,765.00

45,093.00

21,332.50
2,471.66

973.62

2,020.01
26,797.78 *
884.18
884.18 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *
-0.26 *
45,093.00 *

59,672.00
43,900.00

973.62

2,020.01
46,893.63 *
1,170.04
1,170.04 *
0.00
0.00 *
0.00
0.00 *
11,608.28
11,608.28 *
0.05 *
59,672.00 *

25,525.00

18,075.00

9,957.50
280.11

491.57

1,019.87
11,749.05 *
354.40
IS DE PRECIOS UNITARIOS
TOTAL

354.40 *
0.00
0.00 *
0.00
0.00 *
5,971.17
5,971.17 *
0.38 *
18,075.00 *

7,450.00
4,300.00

491.57

1,019.87
5,811.44 *
146.08
146.08 *
0.00
0.00 *
0.00
0.00 *
1,492.75
1,492.75 *
-0.27 *
7,450.00 *

25,525.00

18,075.00

9,957.50
280.11

491.57

1,019.87
11,749.05 *
354.40
354.40 *
0.00
0.00 *
0.00
0.00 *
5,971.17
5,971.17 *
0.38 *
18,075.00 *

7,450.00
4,300.00

491.57

1,019.87
5,811.44 *
146.08
146.08 *
0.00
IS DE PRECIOS UNITARIOS
TOTAL

0.00 *
0.00
0.00 *
1,492.75
1,492.75 *
-0.27 *
7,450.00 *

21,560.00

14,315.00

7,079.78
280.11

491.57

1,019.87
8,871.33 *
280.69
280.69 *
0.00
0.00 *
0.00
0.00 *
5,163.14
5,163.14 *
-0.16 *
14,315.00 *

7,245.00
4,300.00

491.57

1,019.87
5,811.44 *
142.05
142.05 *
0.00
0.00 *
0.00
0.00 *
1,291.24
1,291.24 *
0.27 *
7,245.00 *

17,335.00

12,855.00

6,982.50
94.06

319.03

661.90
IS DE PRECIOS UNITARIOS
TOTAL

8,057.48 *
252.06
252.06 *
0.00
0.00 *
0.00
0.00 *
4,545.49
4,545.49 *
-0.03 *
12,855.00 *

4,480.00
2,500.00

245.78

509.94
3,255.72 *
87.84
87.84 *
0.00
0.00 *
0.00
0.00 *
1,136.37
1,136.37 *
0.07 *
4,480.00 *

17,335.00

12,855.00

6,982.50
94.06

319.03

661.90
8,057.48 *
252.06
252.06 *
0.00
0.00 *
0.00
0.00 *
4,545.49
4,545.49 *
-0.03 *
12,855.00 *

4,480.00
2,500.00

245.78

509.94
3,255.72 *
87.84
IS DE PRECIOS UNITARIOS
TOTAL

87.84 *
0.00
0.00 *
0.00
0.00 *
1,136.37
1,136.37 *
0.07 *
4,480.00 *

13,150.00

8,795.00

3,817.10
94.06

245.78

509.94
4,666.88 *
172.46
172.46 *
0.00
0.00 *
0.00
0.00 *
3,956.15
3,956.15 *
-0.49 *
8,795.00 *

4,355.00
2,500.00

245.78

509.94
3,255.72 *
85.39
85.39 *
0.00
0.00 *
0.00
0.00 *
1,013.80
1,013.80 *
0.09 *
4,355.00 *

11,681.00

9,234.00

4,882.50
114.58
IS DE PRECIOS UNITARIOS
TOTAL

36.81

76.37
5,110.26 *
181.05
181.05 *
0.00
0.00 *
0.00
0.00 *
3,942.23
3,942.23 *
0.45 *
9,234.00 *

2,447.00
1,300.00
36.81
76.37
1,413.19 *
47.98
47.98 *
0.00
0.00 *
0.00
0.00 *
985.88
985.88 *
-0.05 *
2,447.00 *

68,049.00
11,204.67
6,957.22
9,483.33
9,851.00

983.13

2,039.74
40,519.10 *
1,334.30
1,334.30 *
0.00
0.00 *
0.00
0.00 *
26,196.08
26,196.08 *
-0.48 *
68,049.00 *

390,369.00
3,980.45

71,019.14
IS DE PRECIOS UNITARIOS
TOTAL

13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *

62,089.16

50,800.22

112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

390,369.00
3,980.45

71,019.14

13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *

62,089.16

50,800.22

112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

731,943.00
7,463.35
IS DE PRECIOS UNITARIOS
TOTAL

133,161.10

26,024.47
9,274.86
5,434.33
89,894.04
26,957.51
25,305.75
323,515.41 *
10,201.47
10,201.47 *
0.00
0.00 *
0.00
0.00 *

116,417.35

95,250.57

211,667.92 *
186,558.30
186,558.30 *
-0.10 *
731,943.00 *

390,369.00
3,980.45

71,019.14

13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *

62,089.16

50,800.22

112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

131,130.00
IS DE PRECIOS UNITARIOS
TOTAL

30,521.76
21,291.50
21,332.50
20,347.84

1,966.27

4,079.49
99,539.36 *
2,571.18
2,571.18 *
0.00
0.00 *
0.00
0.00 *
29,019.58
29,019.58 *
-0.12 *
131,130.00 *

66,562.00
11,204.67
6,957.22
9,483.33
9,851.00

983.13

2,039.74
40,519.10 *
1,305.15
1,305.15 *
0.00
0.00 *
0.00
0.00 *
24,738.24
24,738.24 *
-0.48 *
66,562.00 *

51,807.00
6,863.00
4,609.80
6,982.50
4,575.00

983.13

2,039.74
26,053.18 *
1,015.83
1,015.83 *
0.00
0.00 *
0.00
0.00 *
24,738.24
IS DE PRECIOS UNITARIOS
TOTAL

24,738.24 *
-0.25 *
51,807.00 *

43,126.00
2,564.06
1,300.00
4,650.00
1,710.00

912.91

1,894.04
13,031.01 *
845.60
845.60 *
0.00
0.00 *
0.00
0.00 *
29,249.02
29,249.02 *
0.37 *
43,126.00 *

87,004.00

43,198.00

31,521.84
3,625.35

491.57

1,019.87
36,658.63 *
847.02
847.02 *
0.00
0.00 *
0.00
0.00 *
5,692.55
5,692.55 *
-0.21 *
43,198.00 *

43,806.00
40,012.58

491.57

1,019.87
41,524.02 *
858.94
858.94 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *
1,423.14
1,423.14 *
-0.10 *
43,806.00 *

46,701.00

24,808.00

17,482.50
1,569.47

245.78

509.94
19,807.69 *
486.43
486.43 *
0.00
0.00 *
0.00
0.00 *
4,513.73
4,513.73 *
0.16 *
24,808.00 *

21,893.00
19,580.00

245.78

509.94
20,335.72 *
429.28
429.28 *
0.00
0.00 *
0.00
0.00 *
1,128.43
1,128.43 *
-0.43 *
21,893.00 *

349,992.00
21,767.17

291,361.76

149.07

268.69
IS DE PRECIOS UNITARIOS
TOTAL

557.45
314,104.15 *
6,862.58
6,862.58 *
0.00
0.00 *
0.00
0.00 *
29,024.96
29,024.96 *
0.31 *
349,992.00 *

573,468.00
21,767.17

510,427.45

153.52

276.71

574.10
533,198.94 *
11,244.48
11,244.48 *
0.00
0.00 *
0.00
0.00 *
29,024.96
29,024.96 *
-0.38 *
573,468.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

14,634,560.00

14,634,560.00 *

0.00
0.00 *
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

14,634,560.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

14,634,560.00

14,634,560.00 *

0.00
0.00 *
0.00 *
14,634,560.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

14,634,560.00

14,634,560.00 *

0.00
0.00 *
0.00 *
14,634,560.00 *

233,673.00
IS DE PRECIOS UNITARIOS
TOTAL

199,502.00

158,953.00
158,953.00 *
3,911.80
3,911.80 *
0.00
0.00 *
0.00
0.00 *
36,637.06
36,637.06 *
0.14 *
199,502.00 *

34,171.00

25,961.00
3,469.06
29,430.06 *
670.02
670.02 *
0.00
0.00 *
0.00
0.00 *
4,070.78
4,070.78 *
0.14 *
34,171.00 *

146,601.00

131,117.00

97,405.00
97,405.00 *
2,570.93
2,570.93 *
0.00
0.00 *
0.00
0.00 *
31,141.50
31,141.50 *
-0.43 *
131,117.00 *

15,484.00

9,740.50
1,979.27
11,719.77 *
IS DE PRECIOS UNITARIOS
TOTAL

303.60
303.60 *
0.00
0.00 *
0.00
0.00 *
3,460.17
3,460.17 *
0.47 *
15,484.00 *

121,333.00

106,068.00

72,846.90
72,846.90 *
2,079.77
2,079.77 *
0.00
0.00 *
0.00
0.00 *
31,141.50
31,141.50 *
-0.17 *
106,068.00 *

15,265.00

9,516.67
1,988.56
11,505.23 *
299.31
299.31 *
0.00
0.00 *
0.00
0.00 *
3,460.17
3,460.17 *
0.29 *
15,265.00 *

96,665.00

87,173.00

60,085.00
60,085.00 *
IS DE PRECIOS UNITARIOS
TOTAL

1,709.27
1,709.27 *
0.00
0.00 *
0.00
0.00 *
25,378.59
25,378.59 *
0.14 *
87,173.00 *

9,492.00

5,484.76
1,001.42
6,486.18 *
186.13
186.13 *
0.00
0.00 *
0.00
0.00 *
2,820.16
2,820.16 *
-0.47 *
9,492.00 *

80,157.00

69,251.00

42,515.00
42,515.00 *
1,357.87
1,357.87 *
0.00
0.00 *
0.00
0.00 *
25,378.59
25,378.59 *
-0.46 *
69,251.00 *

10,906.00

6,943.76
927.87
7,871.63 *
213.84
213.84 *
0.00
0.00 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

2,820.16
2,820.16 *
0.37 *
10,906.00 *

48,384.00

44,670.00

26,382.82
26,382.82 *
875.88
875.88 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *
0.00 *
44,670.00 *

3,714.00

1,758.85
140.71
1,899.56 *
72.81
72.81 *
0.00
0.00 *
0.00
0.00 *
1,741.13
1,741.13 *
0.49 *
3,714.00 *

39,487.00

36,837.00

19,005.00
19,005.00 *
722.30
722.30 *
0.00
0.00 *
0.00
0.00 *
17,110.08
IS DE PRECIOS UNITARIOS
TOTAL

17,110.08 *
-0.38 *
36,837.00 *

2,650.00
633.50
253.40
886.90 *
51.96
51.96 *
0.00
0.00 *
0.00
0.00 *
1,711.01
1,711.01 *
0.13 *
2,650.00 *

104,765.00

45,093.00

21,332.50
2,471.66

973.62

2,020.01
26,797.78 *
884.18
884.18 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *
-0.26 *
45,093.00 *

59,672.00
43,900.00

973.62

2,020.01
46,893.63 *
1,170.04
1,170.04 *
0.00
0.00 *
0.00
0.00 *
11,608.28
11,608.28 *
0.05 *
59,672.00 *
IS DE PRECIOS UNITARIOS
TOTAL

25,525.00

18,075.00

9,957.50
280.11

491.57

1,019.87
11,749.05 *
354.40
354.40 *
0.00
0.00 *
0.00
0.00 *
5,971.17
5,971.17 *
0.38 *
18,075.00 *

7,450.00
4,300.00

491.57

1,019.87
5,811.44 *
146.08
146.08 *
0.00
0.00 *
0.00
0.00 *
1,492.75
1,492.75 *
-0.27 *
7,450.00 *

255,940.00
211,358.82

17,764.99

496.90

229,620.72 *
5,018.44
5,018.44 *
0.00
0.00 *
0.00
0.00 *
21,301.19
IS DE PRECIOS UNITARIOS
TOTAL

21,301.19 *
-0.34 *
255,940.00 *

255,940.00
211,358.82

17,764.99

496.90

229,620.72 *
5,018.44
5,018.44 *
0.00
0.00 *
0.00
0.00 *
21,301.19
21,301.19 *
-0.34 *
255,940.00 *

731,943.00
7,463.35

133,161.10

26,024.47
9,274.86
5,434.33
89,894.04
26,957.51
25,305.75
323,515.41 *
10,201.47
10,201.47 *
0.00
0.00 *
0.00
0.00 *

116,417.35

95,250.57

211,667.92 *
186,558.30
186,558.30 *
-0.10 *
731,943.00 *

390,369.00
3,980.45
IS DE PRECIOS UNITARIOS
TOTAL

71,019.14

13,879.70
4,946.58
2,898.30
47,943.42
14,377.32
13,496.38
172,541.28 *
5,440.78
5,440.78 *
0.00
0.00 *
0.00
0.00 *

62,089.16

50,800.22

112,889.38 *
99,497.61
99,497.61 *
-0.05 *
390,369.00 *

548,958.00
5,597.52

99,870.96

19,518.38
6,956.15
4,075.75
67,420.62
20,218.16
18,979.34
242,636.89 *
7,651.12
7,651.12 *
0.00
0.00 *
0.00
0.00 *

87,313.13

71,438.02

158,751.15 *
139,918.92
139,918.92 *
-0.08 *
548,958.00 *

226,079.00
IS DE PRECIOS UNITARIOS
TOTAL

110,169.61
76,556.06

1,228.92

2,549.68
190,504.26 *
4,432.92
4,432.92 *
0.00
0.00 *
0.00
0.00 *
31,141.50
31,141.50 *
0.32 *
226,079.00 *

4,159,266.00
144,034.15
3,664,698.77
1,054.42

1,860.62

3,860.30
3,815,508.26 *
81,554.23
81,554.23 *
0.00
0.00 *
0.00
0.00 *
262,203.47
262,203.47 *
0.03 *
4,159,266.00 *

7,317,280.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

7,317,280.00

7,317,280.00 *

0.00
0.00 *
0.00 *
7,317,280.00 *

239,008.00

199,493.00

179,046.00
47.59
179,093.59 *
3,874.30
3,874.30 *

1,903.57

1,903.57 *
0.00
0.00 *
14,621.43
14,621.43 *
0.11 *
199,493.00 *

39,515.00

23,943.81
10,061.49
170.18
34,175.48 *
774.81
774.81 *
0.00
0.00 *
0.00
0.00 *
4,564.98
4,564.98 *
-0.27 *
39,515.00 *

138,550.00
IS DE PRECIOS UNITARIOS
TOTAL

106,597.00

88,860.54
31.22
88,891.77 *
2,065.64
2,065.64 *

1,248.97

1,248.97 *
0.00
0.00 *
14,390.13
14,390.13 *
0.50 *
106,597.00 *

31,953.00

18,032.35
5,854.66
267.39
24,154.40 *
626.54
626.54 *
0.00
0.00 *
0.00
0.00 *
7,172.56
7,172.56 *
-0.50 *
31,953.00 *

87,004.00

43,978.00

31,521.84
3,625.35

147.47

305.96
35,600.63 *
862.31
862.31 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
7,514.73
7,514.73 *
0.34 *
43,978.00 *

43,026.00
32,712.89

663.12

1,375.79
34,751.79 *
843.64
843.64 *
0.00
0.00 *
0.00
0.00 *
7,430.37
7,430.37 *
0.20 *
43,026.00 *

46,701.00

27,207.00

17,482.50
3,490.30

98.31

203.97
21,275.09 *
533.47
533.47 *
0.00
0.00 *
0.00
0.00 *
5,398.30
5,398.30 *
0.15 *
27,207.00 *

19,494.00
16,841.29

435.72

904.00
18,181.01 *
IS DE PRECIOS UNITARIOS
TOTAL

382.24
382.24 *
0.00
0.00 *
0.00
0.00 *
931.04
931.04 *
-0.30 *
19,494.00 *

39,243.00

21,972.00

13,982.50
1,486.30

73.74

152.98
15,695.52 *
430.83
430.83 *
0.00
0.00 *
0.00
0.00 *
5,845.83
5,845.83 *
-0.18 *
21,972.00 *

17,271.00
14,235.43

293.20

608.31
15,136.94 *
338.65
338.65 *
0.00
0.00 *
0.00
0.00 *
1,795.56
1,795.56 *
-0.15 *
17,271.00 *
IS DE PRECIOS UNITARIOS
TOTAL

19,805.00

15,219.00

7,332.50
384.10

49.16

101.99
7,867.74 *
298.42
298.42 *
0.00
0.00 *
0.00
0.00 *
7,053.14
7,053.14 *
-0.30 *
15,219.00 *

4,586.00
3,602.85

165.10

342.53
4,110.48 *
89.92
89.92 *
0.00
0.00 *
0.00
0.00 *
385.43
385.43 *
0.17 *
4,586.00 *

14,298.00

11,464.00

5,582.50
217.10

49.16

101.99
5,950.74 *
224.79
224.79 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *
5,288.67
5,288.67 *
-0.21 *
11,464.00 *

2,834.00
1,974.72

124.81

258.94
2,358.46 *
55.57
55.57 *
0.00
0.00 *
0.00
0.00 *
420.08
420.08 *
-0.10 *
2,834.00 *

11,652.00

9,950.00

4,532.50
167.00

24.58

50.99
4,775.07 *
195.10
195.10 *
0.00
0.00 *
0.00
0.00 *
4,979.71
4,979.71 *
0.12 *
9,950.00 *

1,702.00
860.51

89.05
IS DE PRECIOS UNITARIOS
TOTAL

184.76
1,134.32 *
33.38
33.38 *
0.00
0.00 *
0.00
0.00 *
534.43
534.43 *
-0.13 *
1,702.00 *

7,067.00

6,260.00

3,482.50
100.20

24.58

50.99
3,658.27 *
122.74
122.74 *
0.00
0.00 *
0.00
0.00 *
2,478.89
2,478.89 *
0.09 *
6,260.00 *

807.00
336.78

72.43

150.27
559.47 *
15.82
15.82 *
0.00
0.00 *
0.00
0.00 *
231.70
231.70 *
0.00 *
807.00 *
IS DE PRECIOS UNITARIOS
TOTAL

6,714.00

5,446.00

2,513.70
66.80

90.94

188.68
2,860.12 *
106.78
106.78 *
0.00
0.00 *
0.00
0.00 *
2,478.89
2,478.89 *
0.21 *
5,446.00 *

1,268.00
634.00

122.89

254.97
1,011.86 *
24.87
24.87 *
0.00
0.00 *
0.00
0.00 *
231.70
231.70 *
-0.43 *
1,268.00 *

5,754.00

4,928.00

2,016.41
33.40

98.31

203.97
2,352.10 *
96.62
IS DE PRECIOS UNITARIOS
TOTAL

96.62 *
0.00
0.00 *
0.00
0.00 *
2,478.89
2,478.89 *
0.38 *
4,928.00 *

826.00
200.00

122.89

254.97
577.86 *
16.19
16.19 *
0.00
0.00 *
0.00
0.00 *
231.70
231.70 *
0.25 *
826.00 *

1,092,754.00
54,339.95
936,717.65
391.20

690.30

1,432.20
993,571.30 *
21,426.54
21,426.54 *
0.00
0.00 *
0.00
0.00 *
77,755.82
77,755.82 *
0.34 *
1,092,754.00 *

822,824.00
40,039.49

707,505.88
IS DE PRECIOS UNITARIOS
TOTAL

288.25

508.64

1,055.29
749,397.55 *
16,133.81
16,133.81 *
0.00
0.00 *
0.00
0.00 *
57,293.08
57,293.08 *
-0.44 *
822,824.00 *

349,992.00
21,767.17

290,781.37

149.07

268.69

557.45
313,523.75 *
6,862.58
6,862.58 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
349,992.00 *

261,315.00
14,396.99

218,697.06

112.59

202.94

421.04
233,830.62 *
5,123.83
5,123.83 *
0.00
0.00 *
0.00
IS DE PRECIOS UNITARIOS
TOTAL

0.00 *
22,360.69
22,360.69 *
-0.14 *
261,315.00 *

146,484.00
4,956.50

123,038.24

76.13

137.21

284.67
128,492.75 *
2,872.23
2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

97,459.00
3,469.00

77,314.71

112.62

166.07

344.56
81,406.95 *
1,910.96
1,910.96 *
0.00
0.00 *
0.00
0.00 *
14,140.91
14,140.91 *
0.17 *
97,459.00 *

77,008.00
2,958.70
IS DE PRECIOS UNITARIOS
TOTAL

63,031.37

90.21

118.25

245.34
66,443.88 *
1,509.96
1,509.96 *
0.00
0.00 *
0.00
0.00 *
9,054.31
9,054.31 *
-0.16 *
77,008.00 *

54,925.00
1,404.24

47,168.63

77.51

88.90

184.45
48,923.73 *
1,076.96
1,076.96 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
0.10 *
54,925.00 *

42,288.00
669.56

34,968.63

254.77

208.73

433.06
36,534.74 *
829.18
829.18 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
4,924.21
4,924.21 *
-0.14 *
42,288.00 *

36,175.00
367.34

29,150.00

339.74

222.67

461.99
30,541.74 *
709.32
709.32 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.28 *
36,175.00 *

459,335.00
396,689.22
58.69
396,747.91 *
9,006.56
9,006.56 *
0.00
0.00 *
0.00
0.00 *
53,580.05
53,580.05 *
0.48 *
459,335.00 *

317,500.00
259,648.04
56.49
259,704.53 *
6,225.50
6,225.50 *
0.00
IS DE PRECIOS UNITARIOS
TOTAL

0.00 *
0.00
0.00 *
51,570.46
51,570.46 *
-0.49 *
317,500.00 *

434,808.00
21,767.17

373,905.88

153.52

276.71

574.10
396,677.37 *
8,525.66
8,525.66 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
-0.49 *
434,808.00 *

316,331.00
21,767.17
257,751.96
153.52

276.71

574.10
280,523.45 *
6,202.58
6,202.58 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
-0.49 *
316,331.00 *

409,609.00
IS DE PRECIOS UNITARIOS
TOTAL

37,283.00
600.00
300.00
168.90
183.67
234.78
3,950.00

1,261.36

2,616.99
9,315.70 *
731.05
731.05 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.43 *
37,283.00 *

372,326.00
5,500.00
120.44

1,035.79

340,344.12
347,000.34 *
7,300.52
7,300.52 *
0.00
0.00 *
0.00
0.00 *
18,025.49
18,025.49 *
-0.35 *
372,326.00 *

43,905,200.00

0.00
0.00 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *

43,905,200.00

43,905,200.00 *

0.00
0.00 *
0.00 *
43,905,200.00 *

49,757,200.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

49,757,200.00

49,757,200.00 *

0.00
0.00 *
0.00 *
49,757,200.00 *

14,634,560.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
IS DE PRECIOS UNITARIOS
TOTAL

0.00 *

14,634,560.00

14,634,560.00 *

0.00
0.00 *
0.00 *
14,634,560.00 *

34,469.00

24,590.00

17,640.00
392.45

49.16

97.80
18,179.41 *
482.17
482.17 *
0.00
0.00 *
0.00
0.00 *
5,928.90
5,928.90 *
-0.47 *
24,590.00 *

9,879.00
5,245.34

158.67

315.69
5,719.71 *
193.70
193.70 *
0.00
0.00 *
0.00
0.00 *
3,965.43
3,965.43 *
0.17 *
9,879.00 *
IS DE PRECIOS UNITARIOS
TOTAL

18,942.00

13,220.00

8,912.84
219.14

24.58

48.90
9,205.45 *
259.22
259.22 *
0.00
0.00 *
0.00
0.00 *
3,755.62
3,755.62 *
-0.29 *
13,220.00 *

5,722.00
2,952.87

140.34

279.21
3,372.41 *
112.20
112.20 *
0.00
0.00 *
0.00
0.00 *
2,237.56
2,237.56 *
-0.17 *
5,722.00 *

10,374.00

9,072.00

5,268.58
116.90

24.58

48.90
5,458.96 *
177.89
177.89 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *
3,435.55
3,435.55 *
-0.40 *
9,072.00 *

1,302.00
730.09

74.77

148.76
953.62 *
25.53
25.53 *
0.00
0.00 *
0.00
0.00 *
322.76
322.76 *
0.09 *
1,302.00 *

7,613.00

6,607.00

3,205.78
66.80

24.58

48.90
3,346.05 *
129.55
129.55 *
0.00
0.00 *
0.00
0.00 *
3,131.47
3,131.47 *
-0.07 *
6,607.00 *

1,006.00
377.42

67.46

134.22
IS DE PRECIOS UNITARIOS
TOTAL

579.11 *
19.73
19.73 *
0.00
0.00 *
0.00
0.00 *
407.36
407.36 *
-0.21 *
1,006.00 *

178,347.00

117,585.00
96,845.74
418.00
604.00
97,867.74 *
2,305.58
2,305.58 *
0.00
0.00 *
0.00
0.00 *
17,411.30
17,411.30 *
0.38 *
117,585.00 *

60,762.00

46,940.54
418.00
604.00
47,962.54 *
1,191.42
1,191.42 *
0.00
0.00 *
0.00
0.00 *
11,608.28
11,608.28 *
-0.23 *
60,762.00 *

42,288.00
669.56

34,968.63

254.77
IS DE PRECIOS UNITARIOS
TOTAL

208.73

433.06
36,534.74 *
829.18
829.18 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.14 *
42,288.00 *

36,175.00
367.34

29,150.00

339.74

222.67

461.99
30,541.74 *
709.32
709.32 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.28 *
36,175.00 *

40,774.00
669.56

33,484.31

254.77

208.73

433.06
35,050.43 *
799.49
799.49 *
0.00
0.00 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

4,924.21
4,924.21 *
-0.14 *
40,774.00 *

5,225,000.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

5,225,000.00

5,225,000.00 *

0.00
0.00 *
0.00 *
5,225,000.00 *

1,045,000.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

1,045,000.00

1,045,000.00 *

0.00
0.00 *
0.00 *
1,045,000.00 *

7,315,000.00

0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *

7,315,000.00

7,315,000.00 *

0.00
0.00 *
0.00 *
7,315,000.00 *

60,063.00
12,900.00
9,483.33

2,067.53

4,289.58
1,364.77
30,105.22 *
1,177.71
1,177.71 *
0.00
0.00 *
0.00
0.00 *
28,780.13
28,780.13 *
-0.05 *
60,063.00 *

41,573.00
3,900.00
5,802.27

1,493.59

3,098.80
542.58
14,837.24 *
815.16
815.16 *
0.00
0.00 *
0.00
0.00 *
25,920.59
25,920.59 *
0.02 *
41,573.00 *
IS DE PRECIOS UNITARIOS
TOTAL

49,575.00
5,172.67
5,399.41
7,206.87

1,864.56

0.00
812.80
20,456.31 *
972.07
972.07 *
0.00
0.00 *
0.00
0.00 *
28,147.06
28,147.06 *
-0.44 *
49,575.00 *

41,573.00
3,900.00
5,802.27

1,493.59

3,098.80
542.58
14,837.24 *
815.16
815.16 *
0.00
0.00 *
0.00
0.00 *
25,920.59
25,920.59 *
0.02 *
41,573.00 *

41,573.00
3,900.00
5,802.27

1,493.59

3,098.80
542.58
14,837.24 *
815.16
815.16 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *
25,920.59
25,920.59 *
0.02 *
41,573.00 *

49,575.00
5,172.67
5,399.41
7,206.87

1,864.56

0.00
812.80
20,456.31 *
972.07
972.07 *
0.00
0.00 *
0.00
0.00 *
28,147.06
28,147.06 *
-0.44 *
49,575.00 *

49,471.00

20,555.88

20,555.88 *
937.78
937.78 *
1,644.17
1,644.17 *
0.00
0.00 *
26,333.23
26,333.23 *
-0.07 *
49,471.00 *
IS DE PRECIOS UNITARIOS
TOTAL

52,541.00
4,275.00
3,700.00
1,389.22
1,479.35
1,735.36
8,633.33

995.92

2,066.26
24,274.44 *
1,030.22
1,030.22 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.34 *
52,541.00 *

36,888.00
600.00
300.00
168.90
183.67
234.78
3,950.00

1,135.27

2,355.39
8,928.02 *
723.29
723.29 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
0.00 *
36,888.00 *

35,899.00
400.00
300.00
168.90
183.67
IS DE PRECIOS UNITARIOS
TOTAL

234.78
3,950.00

878.68

1,823.02
7,939.05 *
723.29
723.29 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.02 *
35,899.00 *

36,888.00
600.00
300.00
168.90
183.67
234.78
3,950.00

1,135.27

2,355.39
8,928.02 *
723.29
723.29 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
0.00 *
36,888.00 *

39,979.00
843.31
421.65
237.39
258.15
329.99
5,551.78

1,000.59

2,075.95
10,718.81 *
IS DE PRECIOS UNITARIOS
TOTAL

783.90
783.90 *
0.00
0.00 *
0.00
0.00 *
28,476.38
28,476.38 *
-0.10 *
39,979.00 *

37,283.00
600.00
300.00
168.90
183.67
234.78
3,950.00

1,261.36

2,616.99
9,315.70 *
731.05
731.05 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.43 *
37,283.00 *

36,888.00
600.00
300.00
168.90
183.67
234.78
3,950.00

1,135.27

2,355.39
8,928.02 *
723.29
723.29 *
0.00
0.00 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

27,236.68
27,236.68 *
0.00 *
36,888.00 *

37,283.00
600.00
300.00
168.90
183.67
234.78
3,950.00

1,261.36

2,616.99
9,315.70 *
731.05
731.05 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.43 *
37,283.00 *

40,948.00
1,650.00
700.00
637.54
731.26
234.78
6,106.24

952.90

1,895.85
12,908.58 *
802.91
802.91 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.17 *
IS DE PRECIOS UNITARIOS
TOTAL

40,948.00 *

40,948.00
1,650.00
700.00
637.54
731.26
234.78
6,106.24

952.90

1,895.85
12,908.58 *
802.91
802.91 *
0.00
0.00 *
0.00
0.00 *
27,236.68
27,236.68 *
-0.17 *
40,948.00 *

26,494.00
5,500.00
138.81
1,808.84
7,447.65 *
519.49
519.49 *
0.00
0.00 *
0.00
0.00 *
18,527.08
18,527.08 *
-0.22 *
26,494.00 *

17,141.00
0.00
0.00 *
336.11
336.11 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
16,805.35
16,805.35 *
-0.45 *
17,141.00 *

19,356.00
0.00
0.00 *
379.53
379.53 *
0.00
0.00 *
0.00
0.00 *
18,976.47
18,976.47 *
0.00 *
19,356.00 *

28,916.00
883.04
3,248.50
3,248.50 *
566.99
566.99 *
0.00
0.00 *
0.00
0.00 *
25,100.98
25,100.98 *
-0.47 *
28,916.00 *

24,106.00
5,500.00
120.34

1,034.97

5,620.34 *
472.66
472.66 *
0.00
0.00 *
0.00
0.00 *
18,012.75
IS DE PRECIOS UNITARIOS
TOTAL

18,012.75 *
0.25 *
24,106.00 *

24,119.00
5,500.00
120.44

1,035.79

5,620.44 *
472.92
472.92 *
0.00
0.00 *
0.00
0.00 *
18,025.49
18,025.49 *
0.15 *
24,119.00 *

12,291.00
95.08
95.08 *
241.00
241.00 *
0.00
0.00 *
0.00
0.00 *
11,954.90
11,954.90 *
0.02 *
12,291.00 *

157,284.00
0.00
0.00 *
3,084.00
3,084.00 *
0.00
0.00 *
0.00
0.00 *
154,200.00
154,200.00 *
0.00
0.00 *
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

157,284.00 *

345,344.00
0.00
0.00 *
6,771.45
6,771.45 *
0.00
0.00 *
0.00
0.00 *
338,572.55
338,572.55 *
0.00
0.00 *
0.00 *
345,344.00 *

1,585,313.00
0.00
0.00 *
31,084.57
31,084.57 *
0.00
0.00 *
0.00
0.00 *
1,554,228.43
1,554,228.43 *
0.00
0.00 *
0.00 *
1,585,313.00 *

207,813.00
0.00
0.00 *
4,074.76
4,074.76 *
0.00
0.00 *
0.00
0.00 *
203,738.24
203,738.24 *
0.00
0.00 *
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

207,813.00 *

98,813.00

59,400.00

1,046.82
3,402.24

609.13

87.93
59,400.00 *
1,937.51
1,937.51 *
0.00
0.00 *
0.00
0.00 *
37,475.49

37,475.49 *

0.00
0.00 *
0.00 *
98,813.00 *

19,594.00
0.00
0.00 *
384.20
384.20 *
0.00
0.00 *
0.00
0.00 *
19,209.80
19,209.80 *
0.00 *
19,594.00 *

2,881.00

417.25

483.46

1,300.00

2,200.71 *
IS DE PRECIOS UNITARIOS
TOTAL

51.76
51.76 *
40.97
40.97 *
0.00
0.00 *

200.00

200.00 *

387.25
387.25 *
0.30 *
2,881.00 *

2,973.00

417.25

518.77

1,300.00

2,236.02 *
52.68
52.68 *
43.96
43.96 *
0.00
0.00 *

241.80

241.80 *
398.04
398.04 *
0.50 *
2,973.00 *

3,361.00

417.25

668.92

1,300.00

2,386.17 *
58.68
58.68 *
56.69
56.69 *
0.00
0.00 *

311.78

311.78 *
IS DE PRECIOS UNITARIOS
TOTAL

548.04
548.04 *
-0.37 *
3,361.00 *

3,917.00

417.25

884.00

1,300.00

2,601.25 *
67.26
67.26 *
74.92
74.92 *
0.00
0.00 *

412.03

412.03 *
761.76
761.76 *
-0.23 *
3,917.00 *

4,009.00

417.25

919.73

1,300.00

2,636.98 *
68.68
68.68 *
77.94
77.94 *
0.00
0.00 *

428.69

428.69 *
797.06
797.06 *
-0.35 *
4,009.00 *

4,287.00

417.25

1,027.13
IS DE PRECIOS UNITARIOS
TOTAL

1,300.00

2,744.38 *
72.97
72.97 *
87.04
87.04 *
0.00
0.00 *

478.75

478.75 *
903.92
903.92 *
-0.06 *
4,287.00 *

4,474.00

417.25

1,099.40

1,300.00

2,816.65 *
75.84
75.84 *
93.17
93.17 *
0.00
0.00 *

512.43

512.43 *
975.49
975.49 *
0.42 *
4,474.00 *

5,028.00

417.25

1,313.99

1,300.00

3,031.25 *
84.39
84.39 *
111.36
111.36 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

612.46

612.46 *
1,188.24
1,188.24 *
0.32 *
5,028.00 *

5,585.00

417.25

1,529.37

1,300.00

3,246.63 *
92.99
92.99 *
129.61
129.61 *
0.00
0.00 *

712.84

712.84 *
1,402.94
1,402.94 *
-0.01 *
5,585.00 *

6,326.00

417.25

1,815.98

1,300.00

3,533.24 *
104.43
104.43 *
153.90
153.90 *
0.00
0.00 *

846.43

846.43 *
1,688.24
1,688.24 *
-0.23 *
6,326.00 *
IS DE PRECIOS UNITARIOS
TOTAL

1,285.29

1,591.00

274.53

274.53 *
31.20
31.20 *
0.00
0.00 *
0.00
0.00 *
1,285.29
1,285.29 *
-0.02 *
1,591.00 *

1,872.00

322.88

322.88 *
36.71
36.71 *
0.00
0.00 *
0.00
0.00 *
1,512.75
1,512.75 *
-0.34 *
1,872.00 *

2,203.00

380.07

380.07 *
43.19
43.19 *
0.00
0.00 *
0.00
0.00 *
1,779.41
1,779.41 *
0.33 *
2,203.00 *
IS DE PRECIOS UNITARIOS
TOTAL

2,592.00

447.08

447.08 *
50.82
50.82 *
0.00
0.00 *
0.00
0.00 *
2,094.12
2,094.12 *
-0.02 *
2,592.00 *

3,049.00

526.01

526.01 *
59.78
59.78 *
0.00
0.00 *
0.00
0.00 *
2,462.75
2,462.75 *
0.47 *
3,049.00 *

3,587.00

618.91

618.91 *
70.34
70.34 *
0.00
0.00 *
0.00
0.00 *
2,898.04
2,898.04 *
-0.29 *
3,587.00 *

4,221.00
IS DE PRECIOS UNITARIOS
TOTAL

728.21

728.21 *
82.76
82.76 *
0.00
0.00 *
0.00
0.00 *
3,409.80
3,409.80 *
0.23 *
4,221.00 *

4,965.00

856.63

856.63 *
97.35
97.35 *
0.00
0.00 *
0.00
0.00 *
4,010.78
4,010.78 *
0.24 *
4,965.00 *

5,842.00

1,007.86

1,007.86 *
114.55
114.55 *
0.00
0.00 *
0.00
0.00 *
4,719.61
4,719.61 *
-0.01 *
5,842.00 *

845,204.00
0.00
IS DE PRECIOS UNITARIOS
TOTAL

0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

845,204.00

845,204.00 *

0.00
0.00 *
0.00 *
845,204.00 *

359,041.00
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *

359,041.00

359,041.00 *

0.00
0.00 *
0.00 *
359,041.00 *

373,849.00

0.00
0.00 *
3,048.37
3,048.37 *

218,381.85

218,381.85 *
0.00
0.00 *
152,418.63
152,418.63 *
IS DE PRECIOS UNITARIOS
TOTAL

0.15 *
373,849.00 *

243,366.00

0.00
0.00 *
4,771.88
4,771.88 *
0.00
0.00 *
0.00
0.00 *
238,594.12
238,594.12 *
0.00 *
243,366.00 *

164,712.00

0.00
0.00 *
3,229.65
3,229.65 *
0.00
0.00 *
0.00
0.00 *
161,482.35
161,482.35 *
0.00 *
164,712.00 *

6,580.00
5,216.00
5,216.00 *
129.02
129.02 *
0.00
0.00 *

0.00 *
1,234.98
1,234.98 *
6,580.00 *
IS DE PRECIOS UNITARIOS
TOTAL

27,379.00

25,079.00

16,528.07
236.40
75.70
234.66
17,074.82 *
473.75
473.75 *

917.53

917.53 *
0.00
0.00 *
6,612.85
6,612.85 *
0.05 *
25,079.00 *

2,300.00

1,052.47
23.20
154.36
1,230.03 *
45.10
45.10 *
0.00
0.00 *
0.00
0.00 *
1,024.76
1,024.76 *
0.12 *
2,300.00 *

138,500.00

115,632.00

100,606.80
31.22
IS DE PRECIOS UNITARIOS
TOTAL

100,638.02 *
2,242.80
2,242.80 *

1,248.97

1,248.97 *
0.00
0.00 *
11,502.13
11,502.13 *
0.07 *
115,632.00 *

22,868.00

12,568.13
4,880.18
178.66
17,626.96 *
448.39
448.39 *
0.00
0.00 *
0.00
0.00 *
4,792.33
4,792.33 *
0.33 *
22,868.00 *

104,055.00

80,057.00

66,736.80
23.45
66,760.25 *
1,551.35
1,551.35 *

938.01

938.01 *
0.00
0.00 *
10,807.39
10,807.39 *
-0.01 *
80,057.00 *
IS DE PRECIOS UNITARIOS
TOTAL

23,998.00

13,542.81
4,397.02
200.82
18,140.64 *
470.55
470.55 *
0.00
0.00 *
0.00
0.00 *
5,386.80
5,386.80 *
0.01 *
23,998.00 *

69,610.00

59,729.00

47,921.68
22.05
47,943.74 *
1,153.85
1,153.85 *

882.17

882.17 *
0.00
0.00 *
9,748.92
9,748.92 *
0.33 *
59,729.00 *

9,881.00

2,286.90
2,950.84
63.60
209.87
5,511.20 *
193.75
193.75 *
0.00
0.00 *
0.00
0.00 *
4,176.08
IS DE PRECIOS UNITARIOS
TOTAL

4,176.08 *
-0.02 *
9,881.00 *

49,928.00

40,552.00

34,591.20
8.71
34,599.91 *
788.30
788.30 *

348.57

348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *
40,552.00 *

9,376.00

2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
183.84 *
0.00
0.00 *
0.00
0.00 *
3,962.54
3,962.54 *
0.23 *
9,376.00 *

34,459.00

30,253.00

25,943.40
6.24
25,949.64 *
IS DE PRECIOS UNITARIOS
TOTAL

588.31
588.31 *

249.69

249.69 *
0.00
0.00 *
3,465.85
3,465.85 *
-0.49 *
30,253.00 *

4,206.00

1,181.80
1,524.90
32.86
108.45
2,848.02 *
82.47
82.47 *
0.00
0.00 *
0.00
0.00 *
1,275.71
1,275.71 *
-0.21 *
4,206.00 *

822,824.00
40,039.49

707,505.88

288.25

508.64

1,055.29
749,397.55 *
16,133.81
16,133.81 *
0.00
0.00 *
0.00
0.00 *
57,293.08
57,293.08 *
-0.44 *
822,824.00 *
IS DE PRECIOS UNITARIOS
TOTAL

349,992.00
21,767.17

290,781.37

149.07

268.69

557.45
313,523.75 *
6,862.58
6,862.58 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
349,992.00 *

261,315.00
14,396.99

218,697.06

112.59

202.94

421.04
233,830.62 *
5,123.83
5,123.83 *
0.00
0.00 *
0.00
0.00 *
22,360.69
22,360.69 *
-0.14 *
261,315.00 *

146,484.00
4,956.50

123,038.24

76.13

137.21

284.67
128,492.75 *
2,872.23
IS DE PRECIOS UNITARIOS
TOTAL

2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

97,459.00
3,469.00

77,314.71

112.62

166.07

344.56
81,406.95 *
1,910.96
1,910.96 *
0.00
0.00 *
0.00
0.00 *
14,140.91
14,140.91 *
0.17 *
97,459.00 *

54,925.00
1,404.24

47,168.63

77.51

88.90

184.45
48,923.73 *
1,076.96
1,076.96 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
0.10 *
54,925.00 *
IS DE PRECIOS UNITARIOS
TOTAL

325,850.00
21,767.17
267,112.75
149.07

268.69

557.45
289,855.13 *
6,389.21
6,389.21 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
325,850.00 *

299,250.00
14,396.99
255,888.24
112.59

202.94

421.04
271,021.80 *
5,867.65
5,867.65 *
0.00
0.00 *
0.00
0.00 *
22,360.69
22,360.69 *
-0.14 *
299,250.00 *

271,524.00
4,956.50

245,626.47

76.13

137.21

284.67
251,080.98 *
5,323.99
5,323.99 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
271,524.00 *

3,361.00

417.25

668.92

1,300.00

2,386.17 *
58.68
58.68 *
56.69
56.69 *
0.00
0.00 *

311.78

311.78 *
548.04
548.04 *
-0.37 *
3,361.00 *

4,009.00

417.25

919.73

1,300.00

2,636.98 *
68.68
68.68 *
77.94
77.94 *
0.00
0.00 *

428.69

428.69 *
797.06
797.06 *
-0.35 *
4,009.00 *
IS DE PRECIOS UNITARIOS
TOTAL

4,287.00

417.25

1,027.13

1,300.00

2,744.38 *
72.97
72.97 *
87.04
87.04 *
0.00
0.00 *

478.75

478.75 *
903.92
903.92 *
-0.06 *
4,287.00 *

4,474.00

417.25

1,099.40

1,300.00

2,816.65 *
75.84
75.84 *
93.17
93.17 *
0.00
0.00 *

512.43

512.43 *
975.49
975.49 *
0.42 *
4,474.00 *

5,028.00

417.25

1,313.99

1,300.00

3,031.25 *
84.39
84.39 *
111.36
IS DE PRECIOS UNITARIOS
TOTAL

111.36 *
0.00
0.00 *

612.46

612.46 *
1,188.24
1,188.24 *
0.32 *
5,028.00 *

5,585.00

417.25

1,529.37

1,300.00

3,246.63 *
92.99
92.99 *
129.61
129.61 *
0.00
0.00 *

712.84

712.84 *
1,402.94
1,402.94 *
-0.01 *
5,585.00 *

36,217.00
7,134.00
649.60
1,716.80
910.00
267.25
881.91
11,559.56 *
616.41
616.41 *

4,780.00

4,780.00 *
0.00
0.00 *
19,261.08
19,261.08 *
-0.05 *
IS DE PRECIOS UNITARIOS
TOTAL

36,217.00 *

52,957.00

21,900.00

419.36
1,309.98
23,629.34 *
1,038.38
1,038.38 *
0.00
0.00 *
0.00
0.00 *
28,289.43
28,289.43 *
-0.15 *
52,957.00 *

239,008.00

199,493.00

179,046.00
47.59
179,093.59 *
3,874.30
3,874.30 *

1,903.57

1,903.57 *
0.00
0.00 *
14,621.43
14,621.43 *
0.11 *
199,493.00 *

39,515.00

23,943.81
10,061.49
170.18
34,175.48 *
774.81
IS DE PRECIOS UNITARIOS
TOTAL

774.81 *
0.00
0.00 *
0.00
0.00 *
4,564.98
4,564.98 *
-0.27 *
39,515.00 *

138,500.00

115,632.00

100,606.80
31.22
100,638.02 *
2,242.80
2,242.80 *

1,248.97

1,248.97 *
0.00
0.00 *
11,502.13
11,502.13 *
0.07 *
115,632.00 *

22,868.00

12,568.13
4,880.18
178.66
17,626.96 *
448.39
448.39 *
0.00
0.00 *
0.00
0.00 *
4,792.33
4,792.33 *
0.33 *
22,868.00 *

104,055.00
IS DE PRECIOS UNITARIOS
TOTAL

80,057.00

66,736.80
23.45
66,760.25 *
1,551.35
1,551.35 *

938.01

938.01 *
0.00
0.00 *
10,807.39
10,807.39 *
-0.01 *
80,057.00 *

23,998.00

13,542.81
4,397.02
200.82
18,140.64 *
470.55
470.55 *
0.00
0.00 *
0.00
0.00 *
5,386.80
5,386.80 *
0.01 *
23,998.00 *

69,610.00

59,729.00

47,921.68
22.05
47,943.74 *
1,153.85
1,153.85 *

882.17

882.17 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

9,748.92
9,748.92 *
0.33 *
59,729.00 *

9,881.00

2,286.90
2,950.84
63.60
209.87
5,511.20 *
193.75
193.75 *
0.00
0.00 *
0.00
0.00 *
4,176.08
4,176.08 *
-0.02 *
9,881.00 *

49,928.00

40,552.00

34,591.20
8.71
34,599.91 *
788.30
788.30 *

348.57

348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *
40,552.00 *

9,376.00

2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
IS DE PRECIOS UNITARIOS
TOTAL

183.84 *
0.00
0.00 *
0.00
0.00 *
3,962.54
3,962.54 *
0.23 *
9,376.00 *

910,628.00
40,039.49

793,588.24

288.25

508.64

1,055.29
835,479.90 *
17,855.46
17,855.46 *
0.00
0.00 *
0.00
0.00 *
57,293.08
57,293.08 *
-0.44 *
910,628.00 *

349,992.00
21,767.17

290,781.37

149.07

268.69

557.45
313,523.75 *
6,862.58
6,862.58 *
0.00
0.00 *
0.00
0.00 *
29,605.46
29,605.46 *
0.20 *
349,992.00 *
IS DE PRECIOS UNITARIOS
TOTAL

146,484.00
4,956.50

123,038.24

76.13

137.21

284.67
128,492.75 *
2,872.23
2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

1,235,868.00
54,339.95
1,077,025.43
391.20

690.30

1,432.20
1,133,879.08 *
24,232.70
24,232.70 *
0.00
0.00 *
0.00
0.00 *
77,755.82
77,755.82 *
0.40 *
1,235,868.00 *

655,007.00
4,956.50
621,590.20
76.13

137.21

284.67
627,044.71 *
12,843.27
12,843.27 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
655,007.00 *

414,926.00
3,469.00
388,556.86
112.62

166.07

344.56
392,649.11 *
8,135.80
8,135.80 *
0.00
0.00 *
0.00
0.00 *
14,140.91
14,140.91 *
0.17 *
414,926.00 *

1,297,363.00

1,209,691.18

1,209,691.18 *
25,438.49
25,438.49 *
0.00
0.00 *
0.00
0.00 *
62,233.22
62,233.22 *
0.12 *
1,297,363.00 *

138,500.00
IS DE PRECIOS UNITARIOS
TOTAL

115,632.00

100,606.80
31.22
100,638.02 *
2,242.80
2,242.80 *

1,248.97

1,248.97 *
0.00
0.00 *
11,502.13
11,502.13 *
0.07 *
115,632.00 *

22,868.00

12,568.13
4,880.18
178.66
17,626.96 *
448.39
448.39 *
0.00
0.00 *
0.00
0.00 *
4,792.33
4,792.33 *
0.33 *
22,868.00 *

104,055.00

80,057.00

66,736.80
23.45
66,760.25 *
1,551.35
1,551.35 *

938.01

938.01 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

10,807.39
10,807.39 *
-0.01 *
80,057.00 *

23,998.00

13,542.81
4,397.02
200.82
18,140.64 *
470.55
470.55 *
0.00
0.00 *
0.00
0.00 *
5,386.80
5,386.80 *
0.01 *
23,998.00 *

69,610.00

59,729.00

47,921.68
22.05
47,943.74 *
1,153.85
1,153.85 *

882.17

882.17 *
0.00
0.00 *
9,748.92
9,748.92 *
0.33 *
59,729.00 *

9,881.00

2,286.90
2,950.84
63.60
209.87
5,511.20 *
193.75
193.75 *
IS DE PRECIOS UNITARIOS
TOTAL

0.00
0.00 *
0.00
0.00 *
4,176.08
4,176.08 *
-0.02 *
9,881.00 *

49,928.00

40,552.00

34,591.20
8.71
34,599.91 *
788.30
788.30 *

348.57

348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *
40,552.00 *

9,376.00

2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
183.84 *
0.00
0.00 *
0.00
0.00 *
3,962.54
3,962.54 *
0.23 *
9,376.00 *

34,459.00
IS DE PRECIOS UNITARIOS
TOTAL

30,253.00

25,943.40
6.24
25,949.64 *
588.31
588.31 *

249.69

249.69 *
0.00
0.00 *
3,465.85
3,465.85 *
-0.49 *
30,253.00 *

4,206.00

1,181.80
1,524.90
32.86
108.45
2,848.02 *
82.47
82.47 *
0.00
0.00 *
0.00
0.00 *
1,275.71
1,275.71 *
-0.21 *
4,206.00 *

32,682.00

27,036.00

22,806.86
5.80
22,812.66 *
525.57
525.57 *

231.99

231.99 *
0.00
IS DE PRECIOS UNITARIOS
TOTAL

0.00 *
3,465.85
3,465.85 *
-0.07 *
27,036.00 *

5,646.00

1,798.00
2,320.00
32.86
108.45
4,259.32 *
110.70
110.70 *
0.00
0.00 *
0.00
0.00 *
1,275.71
1,275.71 *
0.27 *
5,646.00 *

24,124.00

21,824.00

16,528.07
236.40
75.70
234.66
17,074.82 *
409.93
409.93 *

917.53

917.53 *
0.00
0.00 *
3,421.57
3,421.57 *
0.16 *
21,824.00 *

2,300.00

1,052.47
23.20
154.36
IS DE PRECIOS UNITARIOS
TOTAL

1,230.03 *
45.10
45.10 *
0.00
0.00 *
0.00
0.00 *
1,024.76
1,024.76 *
0.12 *
2,300.00 *

35,125.00

20,661.00

20,661.00

20,661.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00
0.00 *
0.00 *
20,661.00 *

7,482.00

5,000.00
5,000.00 *
146.15
146.15 *

28.04

28.04 *
0.00
0.00 *
2,307.74
2,307.74 *
0.07 *
7,482.00 *

6,982.00

73.29
302.32
375.61 *
IS DE PRECIOS UNITARIOS
TOTAL

135.99
135.99 *

46.72

46.72 *
0.00
0.00 *
6,424.06
6,424.06 *
-0.39 *
6,982.00 *

3,361.00

417.25

668.92

1,300.00

2,386.17 *
58.68
58.68 *
56.69
56.69 *
0.00
0.00 *

311.78

311.78 *
548.04
548.04 *
-0.37 *
3,361.00 *

4,009.00

417.25

919.73

1,300.00

2,636.98 *
68.68
68.68 *
77.94
77.94 *
0.00
0.00 *

428.69

428.69 *
797.06
797.06 *
-0.35 *
IS DE PRECIOS UNITARIOS
TOTAL

4,009.00 *

4,287.00

417.25

1,027.13

1,300.00

2,744.38 *
72.97
72.97 *
87.04
87.04 *
0.00
0.00 *

478.75

478.75 *
903.92
903.92 *
-0.06 *
4,287.00 *

4,474.00

417.25

1,099.40

1,300.00

2,816.65 *
75.84
75.84 *
93.17
93.17 *
0.00
0.00 *

512.43

512.43 *
975.49
975.49 *
0.42 *
4,474.00 *

5,028.00

417.25

1,313.99

1,300.00

3,031.25 *
IS DE PRECIOS UNITARIOS
TOTAL

84.39
84.39 *
111.36
111.36 *
0.00
0.00 *

612.46

612.46 *
1,188.24
1,188.24 *
0.32 *
5,028.00 *

5,585.00

417.25

1,529.37

1,300.00

3,246.63 *
92.99
92.99 *
129.61
129.61 *
0.00
0.00 *

712.84

712.84 *
1,402.94
1,402.94 *
-0.01 *
5,585.00 *

6,326.00

417.25

1,815.98

1,300.00

3,533.24 *
104.43
104.43 *
153.90
153.90 *
0.00
0.00 *

846.43

846.43 *
1,688.24
IS DE PRECIOS UNITARIOS
TOTAL

1,688.24 *
-0.23 *
6,326.00 *

2,203.00

380.07

380.07 *
43.19
43.19 *
0.00
0.00 *
0.00
0.00 *
1,779.41
1,779.41 *
0.33 *
2,203.00 *

2,592.00

447.08

447.08 *
50.82
50.82 *
0.00
0.00 *
0.00
0.00 *
2,094.12
2,094.12 *
-0.02 *
2,592.00 *

3,049.00

526.01

526.01 *
59.78
59.78 *
0.00
0.00 *
0.00
0.00 *
2,462.75
2,462.75 *
0.47 *
3,049.00 *
IS DE PRECIOS UNITARIOS
TOTAL

3,587.00

618.91

618.91 *
70.34
70.34 *
0.00
0.00 *
0.00
0.00 *
2,898.04
2,898.04 *
-0.29 *
3,587.00 *

4,221.00

728.21

728.21 *
82.76
82.76 *
0.00
0.00 *
0.00
0.00 *
3,409.80
3,409.80 *
0.23 *
4,221.00 *

5,842.00

1,007.86

1,007.86 *
114.55
114.55 *
0.00
0.00 *
0.00
0.00 *
4,719.61
4,719.61 *
-0.01 *
5,842.00 *
IS DE PRECIOS UNITARIOS
TOTAL

49,928.00

40,552.00

34,591.20
8.71
34,599.91 *
788.30
788.30 *

348.57

348.57 *
0.00
0.00 *
4,815.06
4,815.06 *
0.15 *
40,552.00 *

9,376.00

2,169.96
2,799.95
60.34
199.13
5,229.39 *
183.84
183.84 *
0.00
0.00 *
0.00
0.00 *
3,962.54
3,962.54 *
0.23 *
9,376.00 *

24,124.00

21,824.00

16,528.07
236.40
75.70
234.66
17,074.82 *
409.93
IS DE PRECIOS UNITARIOS
TOTAL

409.93 *

917.53

917.53 *
0.00
0.00 *
3,421.57
3,421.57 *
0.16 *
21,824.00 *

2,300.00

1,052.47
23.20
154.36
1,230.03 *
45.10
45.10 *
0.00
0.00 *
0.00
0.00 *
1,024.76
1,024.76 *
0.12 *
2,300.00 *

14,647.00

13,474.00

8,534.88
95.67
54.67
167.33
8,852.56 *
253.82
253.82 *

529.11

529.11 *
0.00
0.00 *
3,838.35
3,838.35 *
0.16 *
13,474.00 *
IS DE PRECIOS UNITARIOS
TOTAL

1,173.00

599.48
16.51
190.67
806.66 *
23.00
23.00 *
0.00
0.00 *
0.00
0.00 *
343.41
343.41 *
-0.07 *
1,173.00 *

12,871.00

11,840.00

7,500.00
84.07
48.05
147.04
7,779.15 *
223.04
223.04 *

464.95

464.95 *
0.00
0.00 *
3,372.94
3,372.94 *
-0.09 *
11,840.00 *

1,031.00

526.79
14.51
167.55
708.85 *
20.21
20.21 *
0.00
0.00 *
0.00
0.00 *
IS DE PRECIOS UNITARIOS
TOTAL

301.77
301.77 *
0.17 *
1,031.00 *

146,484.00
4,956.50

123,038.24

76.13

137.21

284.67
128,492.75 *
2,872.23
2,872.23 *
0.00
0.00 *
0.00
0.00 *
15,118.58
15,118.58 *
0.45 *
146,484.00 *

54,925.00
1,404.24

47,168.63

77.51

88.90

184.45
48,923.73 *
1,076.96
1,076.96 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
0.10 *
54,925.00 *

36,175.00
367.34

29,150.00
IS DE PRECIOS UNITARIOS
TOTAL

339.74

222.67

461.99
30,541.74 *
709.32
709.32 *
0.00
0.00 *
0.00
0.00 *
4,924.21
4,924.21 *
-0.28 *
36,175.00 *
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

INSTALACIONES ELECTRICAS

SISTEMA DE ENERGIA ININTERRUPTIBLE

. 7.7.1 UPS 120KVA- 480-208/120 un

- UPS 120KVA- 480-208/120 un 1.000 164,856,703.92

SUBTOTAL MATERIALES ...


501a.1 - Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 167,895,190.03
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 141.896 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

CAERIAS, CAJAS, BANDEJAS

7.11.2 Caero MT 8 x 6" ml

Canalizacin 8 tubos PVC corrugados doble pared TDP 6" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
.
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

- Arena lavada de pea / de pozo m3 0.040 41,125.00


- Recebo B-600 m3 0.120 26,680.00
- Tubera Corrugada - Doble pared Tipo TDP 6" PAVCO m 8.400 23,419.00
- Unin para tubera TDP 6" PAVCO un 2.667 9,798.00
- Terminal campana para tubera TDP 6" PAVCO un 2.667 10,701.00
SUBTOTAL MATERIALES ...
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 406,685.69


SUBTOTAL HERRAMIENTAS ...
- Vibro compactador tipo rana d 0.113 22,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en recebo compactado. Incluye M.O., H.M,
- m3 0.160 41,468.00
cargue, retiro, disposicin de escombros
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 7.026 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.3 Caero MT 6 x 6" ml

Canalizacin 6 tubos PVC corrugados doble pared TDP 6" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
.
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

- Arena lavada de pea / de pozo m3 0.031 41,125.00


- Recebo B-600 m3 0.092 26,680.00
- Tubera Corrugada - Doble pared Tipo TDP 6" PAVCO m 6.436 23,419.00
- Unin para tubera TDP 6" PAVCO un 2.043 9,798.00
- Terminal campana para tubera TDP 6" PAVCO un 2.043 10,701.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 311,611.15
SUBTOTAL HERRAMIENTAS ...
- Vibro compactador tipo rana d 0.087 22,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en recebo compactado. Incluye M.O., H.M,
- m3 0.123 41,468.00
cargue, retiro, disposicin de escombros
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 5.384 21,413.54


SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.4 Caero MT 4 x 6" ml

Canalizacin 4 tubos PVC corrugados doble pared TDP 6" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
.
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

- Arena lavada de pea / de pozo m3 0.023 41,125.00


- Recebo B-600 m3 0.068 26,680.00
- Tubera Corrugada - Doble pared Tipo TDP 6" PAVCO m 4.730 23,419.00
- Unin para tubera TDP 6" PAVCO un 1.502 9,798.00
- Terminal campana para tubera TDP 6" PAVCO un 1.502 10,701.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 229,004.66
SUBTOTAL HERRAMIENTAS ...
- Vibro compactador tipo rana d 0.064 22,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en recebo compactado. Incluye M.O., H.M,
- m3 0.090 41,468.00
cargue, retiro, disposicin de escombros
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 3.956 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.5 Camara de pase 1,5x1,5x1,2 un


PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

Caja de inspeccin segn norma, medidas internas tiles


150x150x120cm (a x L x h). Incluye excavacin, relleno, retiro y
. disposicin de escombros, marco y contramarco reforzado un
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

- Recebo B-200 m3 0.225 31,700.00


Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
- m3 0.471 270,500.40
CEMEX
- Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 1.337 18,620.32
- Arena de pea - sin tamizar m3 0.213 41,667.00
Toxement polvo TOXEMENT, impermeabilizante integral para
- un 0.053 88,900.00
hormign y mortero - empaque x 25 kg
- Acero figurado 60.000 psi CODIACERO kg 2.333 2,227.20
- Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 294.740 350.00
- Listn ordinario 5x3 cm x 3,00 m un 4.687 5,500.00
- Tabla burra ordinaria 20x3 cm un 4.687 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 473,925.00
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en material comn. Incluye M.O., H.M,
- m3 2.341 35,843.00
cargue, retiro, disposicin de escombros
Marco metlico en ngulo 2" con anclajes laterales. Incluye
- m2 1.003 144,877.41
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
- corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 1.003 118,536.07
en obra

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 6.659 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.6 Camara de pase 1,2x1,2x1,2 un


PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

Caja de inspeccin segn norma, medidas internas tiles


150x150x120cm (a x L x h). Incluye excavacin, relleno, retiro y
. disposicin de escombros, marco y contramarco reforzado un
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

- Recebo B-200 m3 0.154 31,700.00


Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
- m3 0.322 270,500.40
CEMEX
- Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.913 18,620.32
- Arena de pea - sin tamizar m3 0.145 41,667.00
Toxement polvo TOXEMENT, impermeabilizante integral para
- un 0.037 88,900.00
hormign y mortero - empaque x 25 kg
- Acero figurado 60.000 psi CODIACERO kg 1.595 2,227.20
- Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 201.413 350.00
- Listn ordinario 5x3 cm x 3,00 m un 3.203 5,500.00
- Tabla burra ordinaria 20x3 cm un 3.203 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 323,860.21
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en material comn. Incluye M.O., H.M,
- m3 1.600 35,843.00
cargue, retiro, disposicin de escombros
Marco metlico en ngulo 2" con anclajes laterales. Incluye
- m2 0.685 144,877.41
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
- corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.685 118,536.07
en obra

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 4.551 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.7 Caero BT 4 x 4" ml


PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

Canalizacin 4 tubos PVC corrugados doble pared TDP 4" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
.
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

- Arena lavada de pea / de pozo m3 0.023 41,125.00


- Recebo B-600 m3 0.068 26,680.00
- Tubera Corrugada - Doble pared Tipo TDP 4" PAVCO m 4.730 11,851.04
- Unin para tubera TDP 4" PAVCO un 1.502 4,745.00
- Terminal campana para tubera TDP 4" PAVCO un 1.502 6,426.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 160,281.19
SUBTOTAL HERRAMIENTAS ...
- Vibro compactador tipo rana d 0.064 22,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en recebo compactado. Incluye M.O., H.M,
- m3 0.113 41,468.00
cargue, retiro, disposicin de escombros
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 3.956 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.8 Caero BT 2" ml

Tubera Conduit PVC 2". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
m
relacionados y complementarios para su correcta puesta en
funcionamiento
- Tubera CONDUIT PVC 2" PAVCO m 1.000 5,539.95
- Curva para tubera CONDUIT PVC 2" PAVCO un 0.223 5,541.25

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.001 50,993.60
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MATERIALES ...


- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,338.24
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.117 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.9 Camara de pase BT 0,8x0,80x0,80 un

Caja de inspeccin segn norma, medidas internas tiles


80x80x80cm (a x L x h). Incluye excavacin, relleno, retiro y
. disposicin de escombros, marco y contramarco reforzado un
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

- Recebo B-200 m3 0.084 31,700.00


Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
- m3 0.176 270,500.40
CEMEX
- Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.499 18,620.32
- Arena de pea - sin tamizar m3 0.079 41,667.00
Toxement polvo TOXEMENT, impermeabilizante integral para
- un 0.020 88,900.00
hormign y mortero - empaque x 25 kg
- Acero figurado 60.000 psi CODIACERO kg 0.871 2,227.20
- Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 109.965 350.00
- Listn ordinario 5x3 cm x 3,00 m un 1.749 5,500.00
- Tabla burra ordinaria 20x3 cm un 1.749 5,163.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 176,816.83
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

Excavacin manual en material comn. Incluye M.O., H.M,


- m3 0.873 35,843.00
cargue, retiro, disposicin de escombros
Marco metlico en ngulo 2" con anclajes laterales. Incluye
- m2 0.374 144,877.41
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
- corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.374 118,536.07
en obra

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.485 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.10 Caero CD 6 x 4" ml

Canalizacin 6 tubos PVC corrugados doble pared TDP 4" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
.
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

- Arena lavada de pea / de pozo m3 0.026 41,125.00


- Recebo B-600 m3 0.079 26,680.00
- Tubera Corrugada - Doble pared Tipo TDP 4" PAVCO m 6.300 11,851.04
- Unin para tubera TDP 4" PAVCO un 1.766 4,745.00
- Terminal campana para tubera TDP 4" PAVCO un 1.766 6,426.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 188,551.60
SUBTOTAL HERRAMIENTAS ...
- Vibro compactador tipo rana d 0.075 22,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en recebo compactado. Incluye M.O., H.M,
- m3 0.132 41,468.00
cargue, retiro, disposicin de escombros
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 4.247 21,413.54
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL MANO DE OBRA


Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.11 Caero CD 4 x 4" ml

Canalizacin 4 tubos PVC corrugados doble pared TDP 4" bajo


calzada en concreto segn norma. Incluye excavacin (a.<=60cm
h.<=115cm), rellenos en capas con arena de pea (h.<=50cm) y
.
recebo B-600 (h.<=50cm), retiro y disposicin de escombros,
campanas en las cajas, uniones. NO incluye demolicin ni
rehabilitacin de la calzada

- Arena lavada de pea / de pozo m3 0.023 41,125.00


- Recebo B-600 m3 0.068 26,680.00
- Tubera Corrugada - Doble pared Tipo TDP 4" PAVCO m 4.730 11,851.04
- Unin para tubera TDP 4" PAVCO un 1.502 4,745.00
- Terminal campana para tubera TDP 4" PAVCO un 1.502 6,426.00
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 160,281.19
SUBTOTAL HERRAMIENTAS ...
- Vibro compactador tipo rana d 0.064 22,000.00
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en recebo compactado. Incluye M.O., H.M,
- m3 0.113 41,468.00
cargue, retiro, disposicin de escombros
SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 3.956 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.12 Caero CD 2" ml


PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

Tubera Conduit PVC 2". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
m
relacionados y complementarios para su correcta puesta en
funcionamiento
- Tubera CONDUIT PVC 2" PAVCO m 1.000 5,539.95
- Curva para tubera CONDUIT PVC 2" PAVCO un 0.223 5,541.25

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.001 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.001 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 9,338.24
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.117 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.13 Camara de pase BT 0,8x0,80x0,80 un

Caja de inspeccin segn norma, medidas internas tiles


80x80x80cm (a x L x h). Incluye excavacin, relleno, retiro y
. disposicin de escombros, marco y contramarco reforzado un
metlico, tapas de concreto, paetado 1:3 impermeabilizado
interno completo

- Recebo B-200 m3 0.084 31,700.00


Concreto grava comn de planta f'c=2500 psi (175kg/cm2)
- m3 0.176 270,500.40
CEMEX
- Cemento gris Portland tipo 1 ARGOS - empaque 50 kg un 0.499 18,620.32
- Arena de pea - sin tamizar m3 0.079 41,667.00
Toxement polvo TOXEMENT, impermeabilizante integral para
- un 0.020 88,900.00
hormign y mortero - empaque x 25 kg
- Acero figurado 60.000 psi CODIACERO kg 0.871 2,227.20
- Ladrillo tolete rstico recocido 25x12x6 cm (l x a x h) un 109.965 350.00
- Listn ordinario 5x3 cm x 3,00 m un 1.749 5,500.00
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

- Tabla burra ordinaria 20x3 cm un 1.749 5,163.00


SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 176,816.83
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
Excavacin manual en material comn. Incluye M.O., H.M,
- m3 0.873 35,843.00
cargue, retiro, disposicin de escombros
Marco metlico en ngulo 2" con anclajes laterales. Incluye
- m2 0.374 144,877.41
materiales, fabricacin y puesta en obra
Tapa metlica en platina 2" con refuerzo interno en varilla
- corrugada 1/2" 15x15 cm. Incluye materiales, fabricacin y puesta m2 0.374 118,536.07
en obra

SUBTOTAL COMPUESTOS / SUCONTRATOS / ANIDADOS


- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 2.485 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.12 Caeria AIF 1/2" un

Tubera Conduit PVC 1/2". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
.
relacionados y complementarios para su correcta puesta en
funcionamiento
- Tubera CONDUIT PVC 1/2" PAVCO m 1.050 1,150.00
- Curva para tubera CONDUIT PVC 1/2" PAVCO un 0.352 599.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.008 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.008 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 4,328.43
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
PUERTA DE ORO
CENTRO DE EVENTOS DEL CARIBE BARANQUILLA

EGOZCUE VIDAL + PASTORINO POZZOLO


EV+PP Arquitectos

RECINTO FERIAL + CALLE SERVICIO SO + PASEO PEATO


PRESUPUESTO DE OBRA
ELABORO : ALVARO LEON RODRIGUEZ Ingeniero Civil

FECHA : Mayo 11 de 2012

ANALISIS DE PRECIOS UNITARIOS


. . MATERIAL UNIDAD CANTIDAD UNITARIO

SUBTOTAL TRANSPORTE ...


- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.108 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO

7.11.13 Caeria AIF 3/4" un

Tubera Conduit PVC 3/4". Incluye regata y resane, suministro,


instalacin, accesorios (curvas, uniones, etc.), chazos, pernos,
.
relacionados y complementarios para su correcta puesta en
funcionamiento
- Tubera CONDUIT PVC 3/4" PAVCO m 1.050 2,030.00
- Curva para tubera CONDUIT PVC 3/4" PAVCO un 0.352 956.00

- Limpiador removedor para tubera PVC y CPVC 760 g = 1/4 gal un 0.010 24,578.36

- Soldadura lquida para tubera PVC 760 g = 1/4 gal un 0.010 50,993.60
SUBTOTAL MATERIALES ...
- Herramienta menor. INDICE GENERAL % (MAT+MO) 2% 6,183.33
SUBTOTAL HERRAMIENTAS ...
(No Aplica)
SUBTOTAL EQUIPOS ...
(El valor de la totalidad de insumos incluye el transporte)
SUBTOTAL TRANSPORTE ...
- MANO DE OBRA CUADRILLA BB (incl. prestaciones) HR 0.138 21,413.54
SUBTOTAL MANO DE OBRA
Redondeo a entero ms cercano
TOTAL UNITARIO
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

171,253,094.00

164,856,703.92

164,856,703.92 *
3,357,903.80
3,357,903.80 *
0.00
0.00 *
0.00
0.00 *
3,038,486.11
3,038,486.11 *
0.17 *
171,253,094.00 *

423,939.00

1,645.00
3,201.60
196,719.60
26,127.35
28,535.29
256,228.83 *
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

8,133.71
8,133.71 *
2,484.26
2,484.26 *
0.00
0.00 *

6,634.88

6,634.88 *
150,456.86
150,456.86 *
0.45 *
423,939.00 *

324,831.00

1,260.43
2,453.13
150,730.71
20,019.32
21,864.34
196,327.93 *
6,232.22
6,232.22 *
1,903.49
1,903.49 *
0.00
0.00 *

5,083.78

5,083.78 *
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

115,283.22
115,283.22 *
0.35 *
324,831.00 *

238,720.00

926.30
1,802.82
110,772.78
14,712.31
16,068.22
144,282.43 *
4,580.09
4,580.09 *
1,398.89
1,398.89 *
0.00
0.00 *

3,736.10

3,736.10 *
84,722.24
84,722.24 *
0.26 *
238,720.00 *

831,493.00
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

7,137.22

127,342.34

24,887.28
8,869.57

4,752.83

5,196.86
103,159.12
25,779.55
24,199.96
331,324.72 *
9,478.50
9,478.50 *
0.00
0.00 *
0.00
0.00 *

83,902.29

145,302.75

118,884.08

348,089.11 *
142,600.27
142,600.27 *
0.39 *
831,493.00 *

568,207.00
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

4,877.27

87,020.35

17,006.91
6,061.09

3,247.88

3,551.31
70,494.56
17,616.65
16,537.23
226,413.24 *
6,477.20
6,477.20 *
0.00
0.00 *
0.00
0.00 *

57,335.26

99,293.73

81,240.33

237,869.32 *
97,446.97
97,446.97 *
0.27 *
568,207.00 *

169,556.00
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

926.30
1,802.82
56,055.88
7,124.91
9,649.04
75,558.95 *
3,205.62
3,205.62 *
1,398.89
1,398.89 *
0.00
0.00 *

4,670.13

4,670.13 *
84,722.24
84,722.24 *
0.17 *
169,556.00 *

9,525.00

5,539.95
1,235.67

16.61

34.46
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

6,826.68 *
186.76
186.76 *
0.00
0.00 *
0.00
0.00 *
2,511.55
2,511.55 *
*
9,525.00 *

310,222.00

2,662.83

47,510.20

9,285.20
3,309.15

1,773.23

1,938.90
38,487.67
9,618.10
9,028.77
123,614.05 *
3,536.34
3,536.34 *
0.00
0.00 *
0.00
0.00 *
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

31,303.13

54,211.05

44,354.50

129,868.68 *
53,202.78
53,202.78 *
0.15 *
310,222.00 *

199,462.00

1,089.68
2,120.80
74,661.55
8,381.59
11,350.92
97,604.54 *
3,771.03
3,771.03 *
1,645.62
1,645.62 *
0.00
0.00 *

5,493.83

5,493.83 *
90,947.06
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

90,947.06 *
-0.09 *
199,462.00 *

169,556.00

926.30
1,802.82
56,055.88
7,124.91
9,649.04
75,558.95 *
3,205.62
3,205.62 *
1,398.89
1,398.89 *
0.00
0.00 *

4,670.13

4,670.13 *
84,722.24
84,722.24 *
0.17 *
169,556.00 *

9,525.00
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

5,539.95
1,235.67

16.61

34.46
6,826.68 *
186.76
186.76 *
0.00
0.00 *
0.00
0.00 *
2,511.55
2,511.55 *
*
9,525.00 *

310,222.00

2,662.83

47,510.20

9,285.20
3,309.15

1,773.23

1,938.90
38,487.67
9,618.10
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

9,028.77
123,614.05 *
3,536.34
3,536.34 *
0.00
0.00 *
0.00
0.00 *

31,303.13

54,211.05

44,354.50

129,868.68 *
53,202.78
53,202.78 *
0.15 *
310,222.00 *

4,415.00

1,207.50
211.11

196.63

407.95
2,023.19 *
86.57
86.57 *
0.00
0.00 *
0.00
CALLE SERVICIO SO + PASEO PEATONAL

IS DE PRECIOS UNITARIOS
TOTAL

0.00 *
2,305.24
2,305.24 *
*
4,415.00 *

6,307.00

2,131.50
336.94

245.78

509.94
3,224.16 *
123.67
123.67 *
0.00
0.00 *
0.00
0.00 *
2,959.18
2,959.18 *
*
6,307.00 *
CALCULO DE CUADRILLAS 2012

Clave Descripcin Unidad Cantidad Precio con


prestaciones

O00050 Cuadrilla AA (Albaileria) hora


O00001 Ayudante jor 0.125 33,627.68
O00002 Oficial jor 0.125 47,947.72
Subtotal
O00901 Factor por Hora Efectiva % 24.6%
Total

O00051 Cuadrilla AA 1Of+2Ay (Albaile hora


O00001 Ayudante jor 0.250 33,627.68
O00002 Oficial jor 0.125 47,947.72
Subtotal
O00901 Factor por Hora Efectiva % 24.6%
Total

O00050 Cuadrilla AA (Albaileria) 1 hora


O00001 Ayudante jor 0.125 33,627.68
O00002 Oficial jor 0.000 47,947.72
Subtotal
O00901 Factor por Hora Efectiva % 24.6%
Total

O00050 Cuadrilla AA (Albaileria) 1 Of hora


O00001 Ayudante jor 0.000 33,627.68
O00002 Oficial jor 0.125 47,947.72
Subtotal
O00901 Factor por Hora Efectiva % 24.6%
Total

O00052 Cuadrilla BB (Instalaciones) hora


O00004 Ayudante Instalaciones jor 0.125 33,627.68
O00005 Oficial Instalaciones jor 0.125 47,947.72
Subtotal 1
Incremento Oficio % 10%
Subtotal 2
O00901 Factor por Hora Efectiva % 24.6%
Total

O00053 Cuadrilla CC (Pintura) (AA+15 hora


O00006 Ayudante Pinturas jor 0.125 33,627.68
O00007 Oficial Pinturas jor 0.125 47,947.72
O00901 Incremento Oficio %
Subtotal 1
Incremento Oficio % 15%
Subtotal 2
O00901 Factor por Hora Efectiva % 24.6%
Total

O00054 Cuadrilla DD (Carpinteria) (A hora


O00006 Ayudante Pinturas jor 0.125 33,627.68
O00007 Oficial Pinturas jor 0.125 47,947.72
O00901 Incremento Oficio %
Subtotal 1
Incremento Oficio % 20%
Subtotal 2
O00901 Factor por Hora Efectiva % 24.6%
Total

O00055 Cuadrilla EE (Electricos) (AA hora


O00006 Ayudante Pinturas jor 0.125 33,627.68
O00007 Oficial Pinturas jor 0.125 47,947.72
O00901 Incremento Oficio %
Subtotal 1
Incremento Oficio % 40%
Subtotal 2
O00901 Factor por Hora Efectiva % 24.6%
Total
Total
prestaciones

4,203.46
5,993.46
10,196.92
2,508.44
12,705.37

8,406.92
5,993.46
14,400.38
3,542.49
18,565.72

4,203.46
0.00
4,203.46
1,034.05
5,237.51

0.00
5,993.46
5,993.46
1,474.39
7,467.86

4,203.46
5,993.46
10,196.92
1,019.69
11,216.62
2,759.29
21,413.54

4,203.46
5,993.46
10,196.92
16,190.39
2,428.56
18,618.95
4,580.26
23,199.21

4,203.46
5,993.46
10,196.92
16,190.39
3,238.08
19,428.47
4,779.40
24,207.87

4,203.46
5,993.46
10,196.92
16,190.39
6,476.16
22,666.55
5,575.97
28,242.52
SUELDOS Y PARAFISCALES PERSONA

ENERO DE 2012

SUELDO CON PRESTACIONES SOCIALES AYUDANTE OBRA

DESCRIPCION % SUELDO MES


546,749.01
CESANTIAS 10.00000% 54,674.90
VACACIONES 4.16667% 22,781.21
PRIMA 8.33333% 45,562.42
INTERES DE CESANTIA 1.00000% 5,467.49
FONDO FORMACION PROFESIONAL DEL SENA 1.50000% 8,201.24
AUXILIO DE TRANSPORTE 11.66448% 63,775.44
SALUD, ENFERMEDAD GENERAL Y MUERTE 12.00000% 65,609.88
PENSION 15.50000% 84,746.10
RIESGOS PROFESIONALES 6.96000% 38,053.73
SUBSIDIO FAMILIAR 4.00000% 21,869.96
SENA 2.00000% 10,934.98
BIENESTAR FAMILIAR 3.00000% 16,402.47
DOTACION 3.28000% 17,933.37
EXAMEN MEDICO 1.50000% 8,201.24
TOTAL 84.90448% 1,010,963.42

MES 1,010,963.42
DIA (Jornal) 33,698.78
HORA 4,212.35

VALOR CUADRILLA OF + AYUDANTE MES 2,452,436.24


VALOR CUADRILLA OF + AYUDANTE DIA 81,747.87
VALOR CUADRILLA OF + AYUDANTE HORA 10,218.48
VALOR CUADRILLA AY + AYUDANTE MES 2,021,926.84
VALOR CUADRILLA AY + AYUDANTE DIA 67,397.56
VALOR CUADRILLA AY + AYUDANTE HORA 8,424.70

Cuadro para saber cuales son las prestaciones sociales y


aportes de parafiscales discriminando el % de EPS Y
PENSION a cargo del patrono % %
DESCRIPCION PATRON TRABAJADOR

CESANTIAS 10.00000% 0.00000%


VACACIONES 4.16667% 0.00000%
PRIMA 8.33333% 0.00000%
INTERES DE CESANTIA 1.00000% 0.00000%
FONDO FORMACION PROFESIONAL DEL SENA 1.50000% 0.00000%
AUXILIO DE TRANSPORTE 11.66448% 0.00000%
SALUD, ENFERMEDAD GENERAL Y MUERTE 9.00000% 3.00000%
PENSION 11.62500% 3.87500%
RIESGOS PROFESIONALES 6.96000% 0.00000%
SUBSIDIO FAMILIAR 4.00000% 0.00000%
SENA 2.00000% 0.00000%
BIENESTAR FAMILIAR 3.00000% 0.00000%
DOTACION 3.28000% 0.00000%
EXAMEN MEDICO 1.50000% 0.00000%
TOTAL 78.02948% 6.87500%

MES con prestaciones


DIA (jornal) con prestaciones
HORA con prestaciones
S Y PARAFISCALES PERSONAL DE OBRA POR ADMINISTRACION

AYUDANTE OBRA OFICIAL DE OBRA EJERO DE OBRA CONTRAMAESTRO

SUELDO MES SUELDO MES SUELDO MES


1.100 779,577.00 1.100 871,013.00 1.100 1,135,090.00
77,957.70 87,101.30 113,509.00
32,482.37 36,292.21 47,295.42
64,964.75 72,584.42 94,590.83
7,795.77 8,710.13 11,350.90
11,693.66 13,065.20 17,026.35
90,933.62 101,599.16 132,402.37
93,549.24 104,521.56 136,210.80
120,834.44 135,007.02 175,938.95
54,258.56 60,622.50 79,002.26
31,183.08 34,840.52 45,403.60
15,591.54 17,420.26 22,701.80
23,387.31 26,130.39 34,052.70
25,570.13 28,569.23 37,230.95
11,693.66 13,065.20 17,026.35
1,441,472.82 1,610,542.08 2,098,832.29

1,441,472.82 1,610,542.08 2,098,832.29


48,049.09 53,684.74 69,961.08
6,006.14 6,710.59 8,745.13

AYUDANTE OBRA OFICIAL OBRA EJERO OBRA


% % % % % %
TOTAL PATRON TRABAJADOR PATRON TRABAJADOR PATRON
546,749.01 779,577.00 871,013.00
10.00000% 54,674.90 0.00 77,957.70 0.00 87,101.30
4.16667% 22,781.21 0.00 32,482.37 0.00 36,292.21
8.33333% 45,562.42 0.00 64,964.75 0.00 72,584.42
1.00000% 5,467.49 0.00 7,795.77 0.00 8,710.13
1.50000% 8,201.24 0.00 11,693.66 0.00 13,065.20
11.66448% 63,775.44 0.00 90,933.62 0.00 101,599.16
12.00000% 49,207.41 16,402.47 70,161.93 23,387.31 78,391.17
15.50000% 63,559.57 21,186.52 90,625.83 30,208.61 101,255.26
6.96000% 38,053.73 0.00 54,258.56 0.00 60,622.50
4.00000% 21,869.96 0.00 31,183.08 0.00 34,840.52
2.00000% 10,934.98 0.00 15,591.54 0.00 17,420.26
3.00000% 16,402.47 0.00 23,387.31 0.00 26,130.39
3.28000% 17,933.37 0.00 25,570.13 0.00 28,569.23
1.50000% 8,201.24 0.00 11,693.66 0.00 13,065.20
84.90448% 426,625.42 37,588.99 608,299.90 53,595.92 679,646.93

973,374.43 1,387,876.90 1,550,659.93


32,445.81 46,262.56 51,688.66
4,055.73 5,782.82 6,461.08
CONTRAMAESTRO MAESTRO DE OBRA

SUELDO MES
1.100 1,339,970.00 1.100
133,997.00
55,832.08
111,664.17
13,399.70
20,099.55
156,300.56
160,796.40
207,695.35
93,261.91
53,598.80
26,799.40
40,199.10
43,951.02
20,099.55
2,477,664.59

2,477,664.59
82,588.82
10,323.60

EJERO OBRA CONTRAMAESTRO DE OBRA MAESTRO DE OBRA


% % % % %
TRABAJADOR PATRON TRABAJADOR PATRON TRABAJADOR
1,135,090.00 1,339,970.00
0.00 113,509.00 0.00 133,997.00 0.00
0.00 47,295.42 0.00 55,832.08 0.00
0.00 94,590.83 0.00 111,664.17 0.00
0.00 11,350.90 0.00 13,399.70 0.00
0.00 17,026.35 0.00 20,099.55 0.00
0.00 132,402.37 0.00 156,300.56 0.00
26,130.39 102,158.10 34,052.70 120,597.30 40,199.10
33,751.75 131,954.21 43,984.74 155,771.51 51,923.84
0.00 79,002.26 0.00 93,261.91 0.00
0.00 45,403.60 0.00 53,598.80 0.00
0.00 22,701.80 0.00 26,799.40 0.00
0.00 34,052.70 0.00 40,199.10 0.00
0.00 37,230.95 0.00 43,951.02 0.00
0.00 17,026.35 0.00 20,099.55 0.00
59,882.14 885,704.85 78,037.44 1,045,571.65 92,122.94

2,020,794.85 2,385,541.65
67,359.83 79,518.06
8,419.98 9,939.76

Vous aimerez peut-être aussi