Vous êtes sur la page 1sur 2

STANDARD PRODUCT AVAILABILITY GUIDE (in weeks)* NON-EU ZONE

Update: 10-04-2017 [09:47] Week: 15 - 2017

factory: DALIAN BUILT DP15NT 12 GP15NT(Z) 12 Dalian extended Lead time options:
country: China DP18NT 12 GP18NT(Z) 12
term: FOB Dalian port DP20CNT 12 GP20CNT 12 Some option codes from te factory
DP20NT 12 GP20NT(Z) 12 have an extended lead time. Click on
DP25NT 12 GP25NT(Z) 12 below link to view the details.
DP30NT 12 GP30NT 12

DIESEL

LPG
DP35NT 12 GP35NT 12 >> Extended lead time options

DP40NT 13 GP40NT 13
DP45NT 13 GP45NT 13
DP50CNT 13 GP50CNT 13
DP50NT 13 GP50NT 13
DP55NT 13 GP55NT 13

factory: HOUSTON BUILT GP15NM 16


country: USA GP18NM 15
term: FOB Houston GP20CNM 20
DP20NM 20 GP20NM 21
DP25NM 22 GP25NM 19
ICB Products

DP30NM 20 GP30NM 21
DP35NM 19 GP35NM 21

DP40NM1 20 GP40N1 21
DIESEL

DP45NM1 23 GP45N1 19

LPG
DP50CNM1 23 GP50CN1 22
DP50NM1 23 GP50N1 21
DP55NM1 22 GP55N1 23

DP70NM 22

DP100NM1 25
DP120NM1 27
DP135NM1 27
DP150NM1 25

factory: SAGAMIHARA BUILT DP70NMS 29


country: Japan
DIESEL

term: FOB Yokohama DP100NM1S 31 *


DP120NM1S 31 *
DP135NM1S 31 *
DP150NM1S 31 *
*) Lead time is for trucks equiped with 2SP300, 2SP400 and 2SP450 mast. The lead time for all other masts are 31 weeks.

factory: JRVENP BUILT EP10KRT-PAC-24E 12 EP16CPN-48E 12 Jrvenp extended Lead time options:
country: Finland EP12KRT-PAC-24E 12 EP16PN-48E 12
term: EX Works Moerdijk EP15KRT-PAC-24E 12 EP18CPN-48E 12 Some option codes from te factory
EP18PN-48E 12 have an extended lead time. Click on
EP13PNT-48E 14 EP20PN-48E 12 below link to view the details.
3 WHEEL

4 WHEEL

EP15PNT-48E 14
EP16CPNT-48E 14 EP25CN-80E 14 >> Extended lead time options
EP16PNT-48E 14 EP25N-80E 14
EP18CPNT-48E 14 EP30CN-80E 14
EP18PNT-48E 14 EP30N-80E 14
EP20PNT-48E 14 EP35N-80E 14

factory: MOOSBURG BUILT EP40 2 10


ECB Products

country: Germany EP40C 2 10


term: Ex Works Moerdijk EP40S 2 10
4 WHEEL

EP45 2 10
EP45C 2 10
EP50 2 10
EP50S 2 10

factory: KYOTO BUILT EP30CA 17


country: Japan
4 WHEEL

term: FOB Kyoto

factory: RAYONG BUILT EP13TCB 12 EP10CA 12


country: Thailand EP15TCB 12 EP14CA 12
3 WHEEL

4 WHEEL

term: FOB Laemchabang EP16T(B)CB 12 EP15CA 12


EP18T(B)CB 12 EP18CA 12
EP20T(B)CB 12 EP20CA 12
EP25CA 12

factory: JRVENP BUILT NPP16N2 11 NSP10N2(R) 10 NO10NEF(P) 19


country: Finland NPP18N2(R) 11 NSP12N2(i)(R) 10 NO20NE(P)(X) 19
term: EX Works Moerdijk NPP20N2(E)(R) 14 NSP14N2(i)(R) 10 NOL10N(F)(V) on request
NPV20N2 11 NSP16N2(i)(R)(S) 10 NOH10N 13
NPV20ND 19 NSV16N(i)(S) 19 NOH10NH 13
WH Products

NPF25N2 11
POWERPALLET

NSR12N 29 NR14N2(H)S 12
STACKER

OTHER

NPR20N 24 NSR16N(i) 29 NR16N2(H)(S)(C) 12


NPS20N on request NSR20N 31 NR20N2(H) 12
NSS15N(i) on request NR20N2X 12
NSS20N on request NR25N2X 12
NRM20N2 14
NRM25N2 14

NTR30N 19

Note:
* Availabilities quoted are for regular order quantities and truck specifications and are subject to prior sale. Volume orders, certain options/attachments and CSM items may result in longer lead times due to the procurement of parts.
Please contact MCFE Customer Relations Department for specific information before making binding customer commitments.
EXTENDED LEAD TIME OPTIONS (in weeks) NON-EU ZONE
Update: 10-04-2017 [09:47] Week: 15 - 2017

factory: DALIAN BUILT Special mast: Special mast:


country: China >> Back
term: FOB Dalian port

ICP 1.5T-3.5T

ICP 4.0T-5.5T
ICB Products

Special options: Special options:


HG/LOW 12 HG/LOW 12
SPELD 17 WDB 17
SPEUD 17 SHIFT CTRL 21

factory: JRVENP BUILT LUX/CABIN 48V 14 LUX/CABIN 80V 15


country: Finland
48V MODEL

80V MODEL
term: EX Works Moerdijk

The mentioned lead times are total lead time including the selected option(s). If multiple extended lead time options are chosen, the longest lead time is leading. The mentioned popularity (% of orders) is the percentage of the total
orders in the model group.

Vous aimerez peut-être aussi