Académique Documents
Professionnel Documents
Culture Documents
factory: DALIAN BUILT DP15NT 12 GP15NT(Z) 12 Dalian extended Lead time options:
country: China DP18NT 12 GP18NT(Z) 12
term: FOB Dalian port DP20CNT 12 GP20CNT 12 Some option codes from te factory
DP20NT 12 GP20NT(Z) 12 have an extended lead time. Click on
DP25NT 12 GP25NT(Z) 12 below link to view the details.
DP30NT 12 GP30NT 12
DIESEL
LPG
DP35NT 12 GP35NT 12 >> Extended lead time options
DP40NT 13 GP40NT 13
DP45NT 13 GP45NT 13
DP50CNT 13 GP50CNT 13
DP50NT 13 GP50NT 13
DP55NT 13 GP55NT 13
DP30NM 20 GP30NM 21
DP35NM 19 GP35NM 21
DP40NM1 20 GP40N1 21
DIESEL
DP45NM1 23 GP45N1 19
LPG
DP50CNM1 23 GP50CN1 22
DP50NM1 23 GP50N1 21
DP55NM1 22 GP55N1 23
DP70NM 22
DP100NM1 25
DP120NM1 27
DP135NM1 27
DP150NM1 25
factory: JRVENP BUILT EP10KRT-PAC-24E 12 EP16CPN-48E 12 Jrvenp extended Lead time options:
country: Finland EP12KRT-PAC-24E 12 EP16PN-48E 12
term: EX Works Moerdijk EP15KRT-PAC-24E 12 EP18CPN-48E 12 Some option codes from te factory
EP18PN-48E 12 have an extended lead time. Click on
EP13PNT-48E 14 EP20PN-48E 12 below link to view the details.
3 WHEEL
4 WHEEL
EP15PNT-48E 14
EP16CPNT-48E 14 EP25CN-80E 14 >> Extended lead time options
EP16PNT-48E 14 EP25N-80E 14
EP18CPNT-48E 14 EP30CN-80E 14
EP18PNT-48E 14 EP30N-80E 14
EP20PNT-48E 14 EP35N-80E 14
EP45 2 10
EP45C 2 10
EP50 2 10
EP50S 2 10
4 WHEEL
NPF25N2 11
POWERPALLET
NSR12N 29 NR14N2(H)S 12
STACKER
OTHER
NTR30N 19
Note:
* Availabilities quoted are for regular order quantities and truck specifications and are subject to prior sale. Volume orders, certain options/attachments and CSM items may result in longer lead times due to the procurement of parts.
Please contact MCFE Customer Relations Department for specific information before making binding customer commitments.
EXTENDED LEAD TIME OPTIONS (in weeks) NON-EU ZONE
Update: 10-04-2017 [09:47] Week: 15 - 2017
ICP 1.5T-3.5T
ICP 4.0T-5.5T
ICB Products
80V MODEL
term: EX Works Moerdijk
The mentioned lead times are total lead time including the selected option(s). If multiple extended lead time options are chosen, the longest lead time is leading. The mentioned popularity (% of orders) is the percentage of the total
orders in the model group.