Vous êtes sur la page 1sur 2

buildera TM

SCAN QR CODE WITH MOBILE PHONE FOR DETAILED


ONLINE DOCUMENTATION AND ORDERING INFORMATION

CRACKMON 4020A Crack Monitor


Installation Guide and 2D (X-Y) Crack Progress Sheet
Thank you for purchasing Buildera CRACKMON structural crack monitors, the engineers choice. Buildera designs and manufactures
the CRACKMON 4020A in the USA, providing years of reliable indoor and outdoor endurance. Follow this installation guide and all safety
precautions to ensure a fail-proof installation. Always wear eye protection and gloves when using power tools and structural adhesives.
!

Anchor & Fastener (Method 1) Structural Epoxy (Method 2) Engineering Specifications


-20mm -10 0 +10 +20
1. Clean and remove loose debris from 1. If surface is damp, use Method 1.
crack using stiff bristle or wire brush. +5
2. Clean and remove loose debris from 0
2. Adhere CRACKMON 4020-TMP crack using stiff bristle or wire brush. -5
drilling template over crack or use

Y-axis
CRACKMON 4020A-DT installation 3. Mix approved Buildera StruPoxy BUILDERA CRACKMON CRACK MONITOR X-axis

Drill Tool (EAN 0816291010372). adhesive or Aboweld 8101-5 epoxy


following directions on package. CRACKMON 4020A Crack Monitor
3. Bore four 1-1/2 (3.8cm) deep holes Dimensions : 30 mm x 152 mm x 9 mm
using a cordless hammer drill and Range : 20 mm (X), 10 mm (Y)
4. Apply 1-2mm layer of epoxy to back- Discrimination : 0.5 mm (visual)
3/16 (5 mm) concrete bit. Blow out side of both CRACKMON mounting Material : Proprietary clear polymer
debris from hole. Use eye protection! tabs in the vicinity of holes (2cm x 3cm Temperature Range : -30C/+80C (-22F/+175F)
area). Rough or uneven mounting sur- CoE (ASTM D696) : 22 m/m-C, -30C to +30C
4. Insert one 3/16 (5 mm) A5 Toggler Mounting Holes : 4 per side (2 vert., 2 horiz.)
faces may require a thicker application. Min Hole Diameter : 4 mm (0.16) / 5mm (0.20)
Alligator anchor into each hole. Tap Fastener Sizes : #6/M3.5 or #8/M4 SS-SMS
flush with a hammer. For best results, 5. Press CRACKMON firmly into place
do not use any other anchor. across crack at 1-m (3-ft) typical unit- Structural Epoxy Adhesive
to-unit spacing. Epoxy fills holes. Product : StruPoxy/Aboweld 8101-5
5. Fasten CRACKMON with four #6 or #8 Viscosity : Thixotropic (no sag)
Color : Translucent
x 1-1/2 stainless-steel pan-head SMS 6. Center red crosshairs on grid and Pot Life / Gel Time : 5 min / 5 min @ 1.3 mm
and washers, or use optional mounting over crack. Level and adjust to ensure Cure Time : 24 hrs typ.
plate in lieu of washers. Over-torquing accurate grid alignment prior to initial Hardness (Shore D) : 74 (24 hrs)
screws may inadvertently damage the Water Absorption : <0.8% (24 hrs)
setup. Hold in place for approximately Tensile Strength : 2,270 psi
gauge or shear off the screw head. five (5) minutes until initial bond sets. Shelf Life : 12 months from DoM
Mixing Temperature : 2025 C
6. Tighten last turns by hand. Cut/score 7. Secure CRACKMON in place with
clear tape with a sharp knife or razor duct tape for 24 hrs until epoxy cures. Ordering Information & Accessories
blade. Remove residual tape from CRACKMON 4020A : EAN 0816291010259
CRACKMON Kit : EAN 0816291010006
CRACKMON to allow free motion. 8. After curing, remove duct tape. Cut/ CRACKMON 224R : EAN 0816291010112
score clear tape with a sharp knife or CRACKMON Drill Tool : EAN 0816291010372
7. Note X-Y start position on TraCard razor blade. Remove residual tape from Fastening Kit : EAN 0816291010242
or progress sheet. Inspect movement StruPoxy Adhesive : EAN 0816291010099
CRACKMON to allow free motion. TraCard 3D StarterPak : EAN 0816291010068
periodically. Document with phone/
camera and CRACKMON 224R Crack- 9. Note X-Y start position on TraCard Notices
Width Comparator (ACI compliant). or progress sheet. Inspect movement Wear gloves and eye protection during installation.
periodically. Document with phone/ Consult Buildera Safety Data Sheet (SDS) for safety
8. Mount with tamper-resistant screws camera and CRACKMON 224R Crack- information. CRACKMON is a registered trademark.
and epoxy for best results and security. Patent Pending. All rights reserved. Made in USA.
Width Comparator (ACI compliant).

BUILDERA | 570 EL CAMINO REAL STE 150-415 | REDWOOD CITY, CA 94063-1262 | USA P/N CM-IG-90200-04020EN VER 1.0 REV NOV 17, 2014
WWW.BUILDERA.COM | US TOLL-FREE 1-(888) 888-3111 | INTERNATIONAL +1 (650) 587-6738 PAGE 1 OF 2
buildera TM
SCAN QR CODE WITH MOBILE PHONE FOR DETAILED
ONLINE DOCUMENTATION AND ORDERING INFORMATION

BUILDERA CRACKMON PROGRESS SHEET


CLIENT / PROJECT NAME: ________________________________________________________________________________________
STREET ADDRESS: ______________________________________________________________________________________________
CITY: _______________________________________________ STATE / PROVINCE: ____________________ COUNTRY: ___________
COMPANY: __________________________________________ ENGINEER / LICENSE NO: _____________________________________
Scale: 200% | www.buildera.com/charts
COMMENTS: ________________________________________________________________________
2014 Buildera | All rights reserved

-20mm -10 0 +10 +20 CHART LEGEND DRY SOIL DAMP / WET SOIL

Crack Location ID ____________ CRACKMON Serial Number _____________


Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________

+5 Date (YY/MM/DD)
Date (YY/MM/DD)
____________
____________
X-axis __________ Y-axis
X-axis __________ Y-axis
__________
__________
Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
0 Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
-5 Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
Y-axis

Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________


Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
BUILDERA CRACKMON CRACK MONITOR X-axis Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________

-20mm -10 0 +10 +20 CHART LEGEND DRY SOIL DAMP / WET SOIL

Crack Location ID ____________ CRACKMON Serial Number _____________


Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________

+5 Date (YY/MM/DD)
Date (YY/MM/DD)
____________
____________
X-axis __________ Y-axis
X-axis __________ Y-axis
__________
__________
Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
0 Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
-5 Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
Y-axis

Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________


Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
BUILDERA CRACKMON CRACK MONITOR X-axis Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________

-20mm -10 0 +10 +20 CHART LEGEND DRY SOIL DAMP / WET SOIL

Crack Location ID ____________ CRACKMON Serial Number _____________


Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
+5 Date (YY/MM/DD)
Date (YY/MM/DD)
____________
____________
X-axis __________ Y-axis
X-axis __________ Y-axis
__________
__________

0 Date (YY/MM/DD)
Date (YY/MM/DD)
____________
____________
X-axis __________ Y-axis
X-axis __________ Y-axis
__________
__________
Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
-5 Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
Y-axis

Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________


Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________
BUILDERA CRACKMON CRACK MONITOR X-axis Date (YY/MM/DD) ____________ X-axis __________ Y-axis __________

BUILDERA | 570 EL CAMINO REAL STE 150-415 | REDWOOD CITY, CA 94063-1262 | USA P/N CM-IG-90200-04020EN VER 1.0 REV NOV 17, 2014
WWW.BUILDERA.COM | US TOLL-FREE 1-(888) 888-3111 | INTERNATIONAL +1 (650) 587-6738 PAGE 2 OF 2

Vous aimerez peut-être aussi