Vous êtes sur la page 1sur 5

REVISION VALIDATION DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS REV. NO.

DATE REVISION DESCRIPTION


OTHER
THIS REVISION NO. 00B IS COVERED, FOR ALL APPROVAL (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
00B 5-Apr-16 ISSUED FOR FINAL
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER ENGG./DATE CERTIFIED/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

DRAWING COMPLETION CERTIFICATE NO. XF.Du B.Anders JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION
5-Apr-16 5-Apr-16 10-01525-0004 UNTIL CERTIFIED AND DATED

JAZAN
Saudi Aramco 2714-ENG (11/2010)

00A
00B

Rev

DATA SHEET
Date
5-Apr-16

POWER GENERATION UNIT


17-Aug-15

HRSG BLOWDOWN COOLER


Description
Issued for Final
Issued for Purchase
Prep
XF.Du
XF.Du

DAT

SAUDI ARABIA
DWG. TYPE
Chk
XP.Wu
XP.Wu

A10
PLANT NO.
POWER GENERATION

SEPCO Revision History (to be removed after IFP issue)


EQUIPMENT DATA SHEET

E
SAUDI ARABIAN OIL COMPANY

HRSG BLOWDOWN COOLER

INDEX
A10-E-5104 A/B, A10-E-5204 A/B
A10-E-4104 A/B, A10-E-4204 A/B
A10-E-3104 A/B, A10-E-3204 A/B
A10-E-2104 A/B, A10-E-2204 A/B
A10-E-1104 A/B, A10-E-1204 A/B

Appvd
HY.Liang
HY.Liang
JAZAN IGCC POWER BLOCK PROJECT

PM

DRAWING NO.
B.Anders
B.Anders

VD-068284
5
1
OF
SHT.NO
SAPMT

00B
REV.NO.

EKRD/2714-1110.XLS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Equip.No. Service HORIZ. Total Sets: Date THICKNESS
A10-E-1104A/B, A10-E-1204A/B, A10-E-2104A/B, HRSG BLOWDOWN COOLER VERT. 05-04-16 B. CONSTRUCTION DATA (continued) MATERIAL SPECIFICATIONS BASE METAL/ PWHT/RT**
A10-E-2204A/B, A10-E-3104A/B, A10-E-3204A/B,
A10-E-4104A/B, A10-E-4204A/B,
A10-E-5104A/B, A10-E-5204A/B TWENTY (20) CLADDING
Shell I.D. mm Tube Length mm TEMA Type Per Unit TUBES: OD 19.05 mm WALL THK. 1.651 mm SA213-TP316L
630 3658 AES 1 1 NUMBER/LENGTH 364 / 3658 mm WALL: avg
Shell in Series Shell in Parallel PITCH 25.55 mm TUBE PATTERN 90 C
Order No. Manufacturer Mfr. Order No. STATIONARY TUBE SHEET/CLADDING SA-182 F316L
FLOATING TUBESHEET/CLADDING SA-182 F316L
CHANNEL OR BONNET/CLADDING SA240 316L
Serial No. M Mfr. Dwg. No. M Sour Service YES NO Cyclic Service YES NO CHANNEL COVER/CLADDING SA-182 F316L
Lethal Service YES NO SHELL/CLADDING SA516-70N
SHELL COVER/CLADDING SA516-70N
Total Effective Surface / No. of Shells per Unit 78.55 m 2/ 1 BACKING RING SA-182 F316L
Effective Surface Per Shell / Gross Surface per Shell 78.55 m 2/ 79.69 m2 FLOATING HEAD COVER/CLADDING SA240 316L
SHELL SIDE TUBE SIDE BAFFLES/SUPPORTS SINGLE SEG. TYPE: HORIZONTAL SA240 316L
A. PROCESS /PERFORMANCE DATA OF ONE UNIT IN OUT IN OUT % CUT (DIA.) 29 PITCH (spacing c/c) 300 mm
FLUID CIRCULATED BD Blow Down Cooling Water INLET 506.29 mm LONGITUDINAL BAFFLE NO
TOTAL FLUID ENTERING kg/h 18266.7 92150.9 EXPANSION JOINT N/A
VAPOR kg/h - - - - BYPASS SEAL ARRANGEMENT BY VENDOR
LIQUID kg/h 18266.7 18266.7 92150.9 92150.9 NOZZLE FLANGE (SHELL SIDE) SA-105N
STEAM kg/h - - - - NOZZLE NECK (SHELL SIDE) SA-106 Gr. BN
WATER kg/h NOZZLE FLANGE (TUBE SIDE) SA-182 F316L
NONCONDENSABLE kg/h - - - - NOZZLE NECK (TUBE SIDE) SA-312 TP316L
TEMPERATURE C 100 50 37 47 TIE-ROD / NUT SS316L
SPECIFIC GRAVITY, LIQUID 0.9593 0.9875 0.9927 0.9888 SPACER SA213-TP316L
DENSITY, LIQUID/VAPOUR kg/m - - - - - - - - COUPLING/ PLUG SS316L
VISCOSITY, LIQUID/VAPOR Cp 0.2819 0.5471 0.6914 0.5755 BOLTING: SHELL COVER TO SHELL SA193 B7/ SA194-2H
MOLECULAR WEIGHT, VAPOR - - - - CHANNEL TO SHELL SA193 B7/ SA194-2H
MOLECULAR WEIGHT, NONCONDENSABLE - - - - CHANNEL COVER TO CHANNEL SA193 B7/ SA194-2H
SPECIFIC HEAT, LIQUID/VAPOUR kJ/kg.C 4.3006 4.2234 4.2186 4.2218 FLOATING HEAD COVER TO TUBESHEET SS316L

316L SS KAMMPROFILE
THERMAL CONDUCTIVITY, LIQUID/VAPOUR W/m.C 0.6796 0.644 0.6267 0.6403 GASKETS: SHELL COVER TO SHELL

316L SS KAMMPROFILE
LATENT HEAT kJ/kg @ C - - - - SHELL TO STAT. TUBESHEET

316L SS KAMMPROFILE
SURFACE TENSION mN/m - - - - CHANNEL TO STAT. TUBESHEET

316L SS KAMMPROFILE
INLET PRESSURE / CRITICAL PRESSURE barg 5.5434 - 5.2 - CHANNEL COVER TO CHANNEL
Jacketed gasket, SS316L with
VELOCITY m/s 0.08515 1.54 FLOATING HEAD COVER TO TUBESHEET flexible graphite fillers
PRESSURE DROP, ALLOW/CALC. bar 0.5/ 0.01988 0.5 /0.3702 SUPPORT TYPE/MATERIAL 2-SADDLES SA516-70
MAXIMUM OPERATING PRESSURE barg 7.273 9.091 LIFTING LUG SA240 316L/SA516-70N
FOULING RESISTANCE (MIN.) m.C/kW 0.352 0.352 EARTHING LUG SS304
FILM COEFFICIENT W/m.C INSULATION CLIPS/RINGS SA516-70
M.T.D. (CORRECTED) & CORRECTION FACTOR C 24.2 NAME PLATES SS304
TRANSFER RATE: SERVICE W/m.C SERVICE 567.44 CLEAN 1253.69 ACTUAL 634.73 IMPINGEMENT PROTECTION IMPINGEMENT PLATE IF REQUIRED BY TEMA SS316L
MEAN WALL TEMPERATURE C ANCHOR BOLTS ASTM A193 B7
HEAT EXCHANGED kW 1078.508 INSULATION THICKNESS (SHELL SIDE/ TUBE SIDE) mm 40 /-
rhoV2 INLET NOZZLE: 1180.29 BUNDLE ENTRANCE: 26.53 BUNDLE EXIT: 41.4 kg/m.s FIREPROFING THICKNESS (SHELL SIDE/ TUBE SIDE) mm N/A
CONDENSING/BOILING HEAT DUTY PROFILE: N.A. PAINTING REQUIREMENTS (SHELL SIDE/ TUBE SIDE) mm See Note 37
B. CONSTRUCTION DATA OF ONE SHELL SHELL SIDE TUBE SIDE C.MISCELLANEOUS DIAMETER (mm) LENGTH (mm) WEIGHT (kg)
CORROSION ALLOWANCE mm 3.2 0 OVERALL DIMENSIONS 630 3658
DESIGN TEMPERATURE MAX / MIN C 130 80 OVERALL DIMENSIONS, PACKED FOR SHIPPING 3700
DESIGN PRESSURE barg 8/FV 10/FV EXCHANGER, EMPTY 3500
TEST PRESSURE barg as per code as per code EXCHANGER, OPERATING 4500
MDMT / LPFT. C 10 10 EXCHANGER, FULL OF WATER 4800
NON-DESTRUCTIVE TESTING 100% RT 100% RT BUNDLE 1250
NUMBER OF PASSES PER SHELL 1 4
PROCESS & ANCILLIARY CONNECTIONS SIZE (inch) NUMBER RATING TYPE / FACING
SHELL - INLET 3 1 150 WN/RF TUBE TO TUBESHEET JOINT: STRENGTH WELD & LIGHT EXPANSION
SHELL - OUTLET 3 1 150 WN/RF
TUBE - INLET 6 1 150 WN/RF **PWHT = PER CODE RT = PERCENTAGE RADIOGRAPHED
TUBE - OUTLET 6 1 150 WN/RF
VENT CONN 2 2 150 WN/RF REQUIREMENTS:
DRAIN CONN 2 1 150 WN/RF For notes, refer sheet 5.
CHEM CLEANING D
REV. JO DRAWN BY: CERTIFIED BY SAUDI ARABIAN OIL COMPANY
REFERENCE DRAWINGS No
DATE
EWO
DESCRIPTION CHKD ENG'G. CERT. PMT OPRNS
DWG TYPE
SHELL AND TUBE HEAT EXCHANGER SPECIFICATION
A10-A-PID-VA-718586-102 00 P&ID DATE: DATE: DAT

CHECKED BY: A10-E-1104A/B, A10-E-1204A/B, A10-E-2104A/B, A10-E-2204A/B, A10-E-3104A/B,


CONSTRUCTION A10-E-3204A/B, A10-E-4104A/B, A10-E-4204A/B, A10-E-5104A/B, A10-E-5204A/B
REVISION CERTIFICATION EDSD DATE: AGENCY
JAZAN IGCC POWER BLOCK PROJECT
THIS INDICATES THAT REV. NO._____00B VERIFICATION DISCIP. ENGR.
______
OF THIS DRAWING IS COVERED FOR ALL JAZAN SAUDI ARABIA
APPROVAL/CERTIFICATION
CONTROL NUMBER DATE: OPERATIONS
REQUIREMENTS, BY: PROJECT ENGR. PLANT NO. INDEX DWG TYPE DRAWING NO. SHEET NO. REV.NO.
BY DRAWING COMPLETION CERTIFICATE DATE:
(DCC) NUMBER; A10 E DAT VD-068284 2 OF 5 00B
DATE:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
NOZZLE & MANWAY SCHEDULE
MARK SIZE (IN.) SERVICE TYPE/FACING RATING SCH. REMARK
A 3 SHELL INLET WN/RF 150# See remark 5
B 3 SHELL OUTLET WN/RF 150# See remark 5
C 6 TUBE INLET WN/RF 150# See remark 5
D 6 TUBE OUTLET WN/RF 150# See remark 5
V1 2 SHELL SIDE VENT WN/RF 150# WITH BLIND FLANGE
DR1 2 DRAIN WN/RF 150# WITH BLIND FLANGE
V2 2 VENT WN/RF 150# WITH BLIND FLANGE

REMARKS:
1. ASME B16.5 FOR FLANGES NPS24 AND SMALLER.
2. THE MINIMUM PROJECTIONS FOR NOZZLES AND MANWAY NECKS IN ACCORDANCE
WITH 32-SAMSS-004, PARA. 8.1.2.
3. SCH. BY VENDOR.
4. FLANGE GASKET:SPIRAL-WOUNDED GASKET; SS316L WINDINGS FILLED WITH
FLEXIBLE GRAPHITE AND WITH SS316L INNER & OUTER RING.
5. WITH ALL EXTERNAL CONNECTION COUNTER-FLANGES INCLUDING ALL NECESSARY BOLTS,
NUTS AND GASKETS.

For notes, refer sheet 5.

REV. JO DRAWN BY: CERTIFIED BY SAUDI ARABIAN OIL COMPANY


REFERENCE DRAWINGS No
DATE
EWO
DESCRIPTION CHKD ENG'G. CERT. PMT OPRNS
DWG TYPE
SHELL AND TUBE HEAT EXCHANGER SPECIFICATION
A10-A-PID-VA-718586-102 00 P&ID DATE: DATE: DAT

CHECKED BY: A10-E-1104A/B, A10-E-1204A/B, A10-E-2104A/B, A10-E-2204A/B, A10-E-3104A/B,


CONSTRUCTION A10-E-3204A/B, A10-E-4104A/B, A10-E-4204A/B, A10-E-5104A/B, A10-E-5204A/B
REVISION CERTIFICATION EDSD DATE: AGENCY
JAZAN IGCC POWER BLOCK PROJECT
THIS INDICATES THAT REV. VERIFICATION DISCIP. ENGR.
NO._____00B______
OF THIS DRAWING IS COVERED FOR ALL JAZAN SAUDI ARABIA
APPROVAL/CERTIFICATION
CONTROL NUMBER DATE: OPERATIONS
REQUIREMENTS, BY: PROJECT ENGR. PLANT NO. INDEX DWG TYPE DRAWING NO. SHEET NO. REV.NO.
BY DRAWING COMPLETION CERTIFICATE DATE:
(DCC) NUMBER; A10 E DAT VD-068284 3 OF 5 00B
DATE:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For notes, refer sheet 5.

REV. JO DRAWN BY: CERTIFIED BY SAUDI ARABIAN OIL COMPANY


REFERENCE DRAWINGS No
DATE
EWO
DESCRIPTION CHKD ENG'G. CERT. PMT OPRNS
DWG TYPE
SHELL AND TUBE HEAT EXCHANGER SPECIFICATION
A10-A-PID-VA-718586-102 00 P&ID DATE: DATE: DAT
CHECKED BY: A10-E-1104A/B, A10-E-1204A/B, A10-E-2104A/B, A10-E-2204A/B, A10-E-3104A/B,
CONSTRUCTION A10-E-3204A/B, A10-E-4104A/B, A10-E-4204A/B, A10-E-5104A/B, A10-E-5204A/B
REVISION CERTIFICATION EDSD DATE: AGENCY
JAZAN IGCC POWER BLOCK PROJECT
THIS INDICATES THAT REV. VERIFICATION DISCIP. ENGR.
NO._____00B______
OF THIS DRAWING IS COVERED FOR ALL JAZAN SAUDI ARABIA
APPROVAL/CERTIFICATION
CONTROL NUMBER DATE: OPERATIONS
REQUIREMENTS, BY: PROJECT ENGR. PLANT NO. INDEX DWG TYPE DRAWING NO. SHEET NO. REV.NO.
BY DRAWING COMPLETION CERTIFICATE DATE:
(DCC) NUMBER;
A10 E DAT VD-068284 4 OF 5 00B
DATE:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
NOTES
1) Heat Exchanger shall be designed and constructed in accordance with SAES-E-004 and 32-SAMSS-007. 27) Surface preparation and painting requirements in accordance with SAES-H-001.
2) Heat Exchanger passport including ASME U-stamp required. 28) Shipping protection requirements in accordance with 32-SAMSS-007, para.11, and preparation for shipping, loading with
3) There are totally twenty (20) sets of heat exchangers for five block. The weights listed refer to one set of equipment. suitable supports for transportation to site shall be provided by Supplier.
4) Wind design Code / Wind Velocity km/hr: ASCE 7-05/ 165km/hr. 29) External attachments directly welded on to the heat exchanger must choose the same material as the heat exchanger.
5) Seismic factor ASCE 7-05, detailed data as per the SPEC of A10-A-DOC-VE-911677. 30) All body/saddles material, flanges, forgings, fittings and piping for use of internals shall be purchased from SAUDI ARAMCO
6) Girth flanges integral hub shall be fabricated according ASME. The minimum length of the hub shall be at least approved manufacturers.
equal to the adjacent shell thickness. 31) Deleted
7) All flanged covers, heads, manholes and inspection hole blind flanges that can be completely removed shall have the tag 32) Insulation Specification requirements in accordance with A10-A-DOC-VE-046372.
number clearly stamped on the component flange periphery. 33) Supplier's Scope shall be in accordance with the DOC. NO.SEP-PGB-ME-SOW-0009.
8) For transportation, nozzles not provided w/ blind covers shall be sealed w/ 3mm thick steel plate and a 6mm thick rubber gasket. 34) All equipment bolt/nut to be coated as per SAES-H-001 "G" fasteners. Fluoropolymer coating to be applied with 09-SAMSS-107.
9) Tube holes shall have a 1.5 mm radius at the shell side face of the tubesheet. 35) Flanged shall be reaised face, and have facing suface roughness of 125-250 AARH.
10) Tube to tubesheet welds shall be 100% dye penetrant checked before hydrotesting. Soap air leak test after welding prior to expansion. 36) All welding shall be performed in accordance with code requirements and SAES-W-010 welding requirements for pressure vessels,
11) The welding of the tubes to the tubesheets, where applicable, shall be performed with a minimum of 2 passes, welding procedures including PQR's and weld map shall be submited for engineering review, which shall be completed prior to
each pass shall start and end 180 degrees from the other. commencement of fabrication.
12) Channel cover and shell cover shall be provided with two lifting lugs. 37) The exterior surface of shell side shall be painted with APCS-2C, and tube side painted with APCS-1B
13) Two Lifing lugs are to be designed and furnished on the shell side by heat exchanger supplier to lift the whole heat exchangers. according to the specification of A10-A-DOC-VE-046373.
Lifting attachment shall be designed for the erection weight of the vessel times an impact factor of 2.0. 38) The heat exchanger shall be hydro. tested as per 32-SAMSS-007 para.10.3.
14) All nozzles shall be set-in design with full penetration welds and shall be flanged.
15) All nozzles shall be WN flanged. Tapped, screwed or socket weld branch connections and pad type nozzles are not allowed.
16) Table with max. allowable nozzle loads shall be shown on the general arrangement drawing.
Min. nozzle design loads shall be in accordance with SPEC J95-L-DAT-VE-525361.
17) Solid forged SS material for tubesheet, as well as for all channel parts.
18) Exchanger shall be designed in accordance ASME SEC VIII, DIV1, Current Edition and add./API 660 8th edition
& TEMA Class R (Ninth Edition).
19) All dimensinons are in mm from reference tangent line, unless otherwise indicated.
20) Bolt holes shall straddle natural equipment centerlines, unless otherwise indicated.
21) The thickness indicated on datasheet is to be considered as minimum and reference, Supplier shall check and confirm under his guarantee
that such thickness provide the proper strength under specified conditions. Any lesser thickness considered by the Supplier
shall immediately be informed to Purchaser.
22) External attachmets
- Saddle
- Insulation support
- Lifting lugs
- Ladder and platform clips, if any
- Grounding lugs
- Vacuum rings, if any
- Nameplate support;
- Nameplate
23) Tube bundle
- Tubes
- Tube sheets / Floating head cover
- Baffles/ Support plates
- Tie rods
- Impingment rods, if any
24) Formed componets including heads shall be checked whether heat treatment is needed or not in accordance with
32-SAMSS-004, para. 13.2.12 and 32-SAMSS-007, para.9.6.
25) All exchanger bolt/nut and nozzle flange bolt/nut shall be coated with a fluoropolymer/ceramic coating in accordance with
09-SAMSS-107, galvanized bolts and nuts are not acceptable.
26) M.A.W.P. shown on the nameplate is based on the nominal thickness, exclusive of corrosion allowance on design
temperature, and shall not be limited by flange ratings.

REV. JO DRAWN BY: CERTIFIED BY SAUDI ARABIAN OIL COMPANY


REFERENCE DRAWINGS No
DATE
EWO
DESCRIPTION CHKD ENG'G. CERT. PMT OPRNS
DWG TYPE
SHELL AND TUBE HEAT EXCHANGER SPECIFICATION
A10-A-PID-VA-718586-102 00 P&ID DATE: DATE: DAT
CHECKED BY: A10-E-1104A/B, A10-E-1204A/B, A10-E-2104A/B, A10-E-2204A/B, A10-E-3104A/B,
CONSTRUCTION A10-E-3204A/B, A10-E-4104A/B, A10-E-4204A/B, A10-E-5104A/B, A10-E-5204A/B
REVISION CERTIFICATION EDSD DATE: AGENCY
JAZAN IGCC POWER BLOCK PROJECT
THIS INDICATES THAT REV. VERIFICATION DISCIP. ENGR.
NO._____00B____
OF THIS DRAWING IS COVERED FOR ALL JAZAN SAUDI ARABIA
APPROVAL/CERTIFICATION
CONTROL NUMBER DATE: OPERATIONS
REQUIREMENTS, BY: PROJECT ENGR. PLANT NO. INDEX DWG TYPE DRAWING NO. SHEET NO. REV.NO.
BY DRAWING COMPLETION CERTIFICATE DATE:
(DCC) NUMBER; A10 E DAT VD-068284 5 OF 5 00B
DATE:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

Vous aimerez peut-être aussi