Vous êtes sur la page 1sur 8

ANEXO 3: SISTEMA DE TUBERIAS EN CIRCUITO CERRADO - METODO CROSS

PROYECTO DE AGUA POTABLE Y DESAGUE APV LUCERINAS.

1ra Iteracion 2da Iteracion


Circuito tramo L (m) C Qo (l/s) D (mm) S (m/m) H (m) H/Q Q Qcorregido (l/s) L C Qo (l/s) D S (m/m) H (m) H/Q Q Qcorregido (l/s)
1-1 600.000 125 180.0000 400 0.00506 3.0344 0.0169 19.0271 199.0271 600.000 125 199.0271 400 0.00609 3.6550 0.0184 -2.0633 196.9638
1-2 300.000 125 60.0000 300 0.00268 0.8054 0.0134 19.0271 79.0271 300.000 125 79.0271 300 0.00447 1.3413 0.0170 -2.0633 76.9638
I 1-3 300.000 125 10.0000 200 0.00070 0.2102 0.0210 19.0271 29.0271 300.000 125 29.0271 200 0.00504 1.5123 0.0521 -2.0633 26.9638
1-4 600.000 125 -70.0000 300 0.00357 -2.1429 0.0306 19.0271 -50.9729 600.000 125 -50.9729 300 0.00198 -1.1909 0.0234 -2.0633 -53.0362
1-5 600.000 125 -250.0000 400 0.00929 -5.5754 0.0223 19.0271 -230.9729 600.000 125 -230.9729 400 0.00803 -4.8152 0.0208 -2.0633 -233.0362
-3.6683 0.1042 19.0271 0.5025 0.1316 -2.0633

II

III

IV

VI
VI

VII

VIII

IX
ANEXO 3: SISTEMA DE TUBERIAS EN CIRCUITO CERRADO - METODO CROSS ANEXO 3 : SISTEMA DE TUBERIAS EN CIRCUITO CERRADO - METODO CROSS

PROYECTO DE AGUA POTABLE Y DESAGUE APV LUCERINAS. PROYECTO DE AGUA POTABLE Y DESAGUE APV LUCERINAS.

3ra Iteracion 4ta Iteracion 5ta Iteracion


L C Qo (l/s) D S (m/m) H (m) H/Q Q Qcorregido (l/s) L C Qo (l/s) D S (m/m) H (m) H/Q Q Qcorregido (l/s) L C Qo (l/s) D S (m/m) H (m) H/Q Q Qcorregido (l/s)
600.000 125 196.9638 400 0.00598 3.5852 0.0182 -0.0199 196.9439 600.000 125 196.9439 400 0.00597 3.5845 0.0182 0.0000 196.9439 600.000 125 196.9439 400 0.00597 3.5845 0.0182 0.0000 196.9439
300.000 125 76.9638 300 0.00426 1.2771 0.0166 -0.0199 76.9439 300.000 125 76.9439 300 0.00426 1.2765 0.0166 0.0000 76.9439 300.000 125 76.9439 300 0.00426 1.2765 0.0166 0.0000 76.9439
300.000 125 26.9638 200 0.00440 1.3193 0.0489 -0.0199 26.9439 300.000 125 26.9439 200 0.00439 1.3175 0.0489 0.0000 26.9439 300.000 125 26.9439 200 0.00439 1.3175 0.0489 0.0000 26.9439
600.000 125 -53.0362 300 0.00214 -1.2817 0.0242 -0.0199 -53.0561 600.000 125 -53.0561 300 0.00214 -1.2826 0.0242 0.0000 -53.0561 600.000 125 -53.0561 300 0.00214 -1.2826 0.0242 0.0000 -53.0561
600.000 125 -233.0362 400 0.00816 -4.8951 0.0210 -0.0199 -233.0561 600.000 125 -233.0561 400 0.00816 -4.8959 0.0210 0.0000 -233.0561 600.000 125 -233.0561 400 0.00816 -4.8959 0.0210 0.0000 -233.0561
0.0047 0.1289 -0.0199 0.0000 0.1289 0.0000 0.0000 0.1289 0.0000
ANEXO 3: SISTEMA DE TUBERIAS EN CIRCUITO CERRADO - METODO CROSS

PROYECTO DE AGUA POTABLE Y DESAGUE APV LUCERINAS.

COTA PRESION
Tuberia L C Q D S H V (m/s) DEL NUDO AL NUDO DE NUDO A NUDO
P1 6.000 150 2.3400 90 0.00166 0.0100 0.3678 3251.3300 3251.4600 156.0000 155.8600
P2 146.900 150 2.3400 63 0.00942 1.3841 0.7507 3251.4600 3257.8000 50.5000 42.7759

P7 (AF) 93.000 150 1.0683 63 0.00221 0.2051 0.3427 3257.8000 3275.1700 42.7759 25.2008
P12 (FG) 51.200 150 0.4056 63 0.00037 0.0188 0.1301 3275.1700 3278.5200 25.2008 21.8320
P8 (BG) 103.000 150 0.5295 63 0.00060 0.0619 0.1699 3259.8300 3278.5200 40.5840 21.8320
P3 (AB) 52.800 150 1.2717 63 0.00305 0.1608 0.4080 3257.8000 3259.8300 42.7748 40.5840

P13 (GH) 53.000 150 0.4149 63 0.00038 0.0203 0.1331 3278.5200 3282.6600 21.8320 17.6717
P9 (CH) 111.000 150 0.2880 63 0.00019 0.0216 0.0924 3262.0900 3282.6600 38.2633 17.6717
P4 (BC) 54.000 150 0.7122 63 0.00104 0.0562 0.2285 3259.8300 3262.0900 40.5796 38.2633

P14 (HI) 53.000 150 0.2586 63 0.00016 0.0085 0.0830 3282.6600 3284.4600 17.6717 15.8633
P10 (DI) 111.000 150 0.1911 63 0.00009 0.0101 0.0613 3264.2800 3284.4600 36.0534 15.8633
P5 (CD) 53.000 150 0.3943 63 0.00035 0.0185 0.1265 3262.0900 3264.2800 38.2618 36.0534

P15 (IJ) 53.000 150 0.0939 63 0.00002 0.0013 0.0301 3284.4600 3285.2900 15.8633 15.0320
P11 (EJ) 111.000 150 0.1432 63 0.00005 0.0059 0.0459 3262.9400 3285.2900 37.3879 15.0320
P6 (DE) 53.000 150 0.1732 63 0.00008 0.0040 0.0556 3264.2800 3262.9400 36.0519 37.3879

P17 (KL) 21.700 150 0.2053 63 0.00010 0.0023 0.0659 3275.9200 3274.2400 24.4155 26.0932
P18 (LM) 113.400 150 0.1953 63 0.00009 0.0108 0.0627 3274.2400 3270.2200 26.0932 30.1025
P19 (MN) 39.000 150 0.0753 63 0.00002 0.0006 0.0242 3270.2200 3268.9500 30.1025 31.3718
P20 (NO) 30.600 150 0.0553 63 0.00001 0.0003 0.0178 3268.9500 3272.5200 31.3718 27.8015
P21 (KO) 93.300 150 0.2473 63 0.00015 0.0137 0.0793 3275.9200 3272.5200 24.4152 27.8015

P16 (FK) 54.300 150 0.5527 63 0.00065 0.0353 0.1773 3275.1700 3275.9200 25.2008 24.4155
P26 (OP) 55.200 150 0.1427 63 0.00005 0.0029 0.0458 3272.5200 3270.5100 27.8015 29.8086
P22 (GP) 130.500 150 0.3102 63 0.00022 0.0291 0.0995 3278.5200 3270.5100 21.8278 29.8086

P27 (PQ) 53.400 150 0.2029 63 0.00010 0.0054 0.0651 3270.5100 3269.1900 29.8086 31.1232
P23 (HQ) 123.800 150 0.2043 63 0.00010 0.0128 0.0655 3282.6600 3269.1900 17.6659 31.1232

P28 (QR) 53.1 150 0.1572 63 0.00006 0.0034 0.0504 3269.1900 3272.1200 31.1232 28.1898
P24 (IR) 120.1 150 0.1158 63 0.00004 0.0043 0.0371 3284.4600 3272.1200 15.8541 28.1898

P29 (RS) 53 150 0.0429 63 0.00001 0.0003 0.0138 3272.1200 3276.0700 28.1898 24.2395
P25 (JS) 119.8 150 0.0911 63 0.00002 0.0028 0.0292 3285.2900 3276.0700 15.0223 24.2395
ANEXO 3: CUADRO COMPARATIVO DE ANALISIS DE LA RED DE AGUA POTABLE.

PROYECTO DE AGUA POTABLE Y DESAGUE APV LUCERINAS.

ANALISIS WATER CAD METODO CROSS DIFERENCIA


PUNTO PRESION (m) PUNTO PRESION (m) PRESION (m)
EMPALME(J-1) 156.00 EMPALME 156.00 0.00
A (J-2) 42.82 A 42.78 0.04
B (J-3) 40.62 B 40.58 0.04
C (J-4) 38.31 C 38.26 0.05
D (J-5) 36.11 D 36.05 0.06
E (J-6) 37.44 E 37.39 0.05
F (J-7) 25.29 F 25.20 0.09
G (J-8) 21.93 G 21.83 0.10
H (J-9) 17.78 H 17.67 0.11
I (J-10) 15.97 I 15.86 0.11
J (J-11) 15.14 J 15.03 0.11
K (J-12) 24.51 K 24.42 0.09
L (J-13) 26.19 L 26.09 0.10
M (J-14) 30.19 M 30.10 0.09
N (J-15) 31.45 N 31.37 0.08
O (J-16) 27.89 O 27.80 0.09
P (J-17) 29.89 P 29.81 0.08
Q (J-18) 31.21 Q 31.12 0.09
R (J-19) 28.28 R 28.19 0.09
S (J-20) 24.34 S 24.24 0.10

NOTA: Se aprecia discrepancias entre ambos resultados, producto de las aproximaciones


que se toman en cuenta en el proceso de calculo

Vous aimerez peut-être aussi