No 2485-0-EL-DL-001
ELECTRICAL LOAD Revision No B
DISTRIBUTION
CLIENT
HEAD QUARTER
WORK SITE
ENGINEERING
PROJECT
SYSTEM
SUMMARY LIST PIPING
MECHANICAL
ELECTRICAL
INSTRUMENT
CIVIL
HVAC / F&F
PROCUREMENT
CONSTRUCTION
QA / QC
HSE
COMMISSIONG
SITE
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. and its use is
conditioned upon the users agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document
for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
Doc. No 2485-0-EL-DL-001
ELECTRICAL LOAD Revision No B
REVISION HISTORY
Notes :
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. and its use is
conditioned upon the users agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document
for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
Doc. No 2485-0-EL-DL-001
ELECTRICAL LOAD Revision No B
1 BASIC CONSIDERATION
The attached electrical load summary indicates the load balance and load consumption under the normal
operating condition.
2.1 Rating and absorbed load of Motors and general loads are based on Electrical Load List Doc No.
2485-0-ME-DL-003, Rev 8.
2.2 Power factor and efficiency for motors is referred to vendor standard data and actual data will be
applied during detail summary stage.
For determining the total electrical loads, the following formula is used.
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. and its use is
conditioned upon the users agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document
for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
Doc. No 2485-0-EL-DL-001
ELECTRICAL LOAD Revision No B
0-SW EM-001 MV SWGR 7968.9 8682.9 3448.3 3200.7 3769.1 1990.5 2366.1 2532.7 903.6 8929.11 9802.78 4045.45
0-OC-EM-001 MV MCC 2029.1 2163.8 751.4 0.00 0.00 0.00 1899.3 2020.2 688.3 2029.1 2163.8 751.4
0-ED-EL-001 L/C 1 SWGR 1236.8 1390.5 635.6 84.7 103.2 59.0 73.2 83.9 41.1 1262.21 1421.25 653.3
0-ED-EL-002 L/C 2 SWGR 1705.4 1856.6 733.8 225.8 257.5 123.7 198.6 215.6 83.8 1773.14 1933.4 770.91
0-ED-EL-003 L/C 3 SWGR 1750.7 1844.8 581.9 115.4 145.1 88.1 194.0 214.0 90.4 1785.32 1886.11 608.33
0-ED-EL-004 ESS SWGR 736.90 852.9 429.5 12.3 14.5 7.7 1.0 1.0 0.0 740.59 857.32 431.9
3-OC-EL-001 ST/HRSG MCC 1 107.0 121.2 56.9 3.3 4.3 2.7 20.8 22.6 8.8 107.99 122.44 57.71
1-OC-EL-001 GT MCC 1 478.4 519.6 202.8 0.0 0.0 0.0 0.1 0.1 0.0 478.4 519.6 202.8 Note 1
0-EH-DB-001 LIGHTING DB 1 67.8 79.8 42.1 0.0 0.0 0.0 0.0 0.0 0.0 67.8 79.8 42.1
0-DP-DB-001 ACDB 1 290.6 342.5 181.3 2.8 3.3 1.7 20.0 23.6 12.6 291.44 343.49 181.81
0-OC-EL-001 BOP MCC 1 293.0 330.3 152.5 78.6 95.7 54.6 32.3 37.8 19.7 316.58 358.8 168.88
5-SY-DB-001 SWYD DB 25.5 29.9 15.7 0.0 0.0 0.0 0.0 0.0 0.0 25.5 29.9 15.7
1-OC-EL-002 GT MCC 2 323.2 350.5 135.7 0.0 0.0 0.0 143.6 158.3 66.7 323.2 350.5 135.7 Note 1
4-OC-EL-001 ACC/AFF MCC 1 849.0 942.9 410.1 142.3 160.3 73.7 34.6 38.6 17.1 891.69 990.9 432.21
2-OC-EL-001 ST/HRSG MCC 2 64.0 74.9 38.9 83.5 97.3 50.0 20.4 20.4 0.0 89.05 104.09 53.9
0-OC-EL-003 HVAC MCC 131.4 154.7 81.6 23.9 28.1 14.8 0.0 0.0 0.0 138.57 163.1 86.04
0-OC-EL-002 BOP MCC 2 86.1 96.2 43.1 86.1 109.3 67.4 155.0 170.1 70.2 111.93 128.59 63.32
0-OC-EL-004 ACC/AFF MCC 2 941.4 1046.5 457.2 5.4 8.0 5.9 39.0 43.9 20.2 943.02 1048.8 458.97
0-OC-EDB-001 ESS MCC 209.0 242.6 123.1 8.5 10.2 5.6 0.0 0.0 0.0 211.55 245.6 124.78
0-EH-EDB-001 E LIGHTING DB 22.7 26.7 14.1 0.0 0.0 0.0 0.0 0.0 0.0 22.7 26.7 14.1
1-OC-EDB-001 GT ESS MCC 227.8 257.7 120.4 3.8 4.3 2.1 1.0 1.0 0.0 228.94 258.96 121.03 Note 1
2-MH-AH-001-28 HRSG PDP 0.0 0.0 0.0 12.7 24.8 21.4 0.0 0.0 0.0 3.81 7.46 6.42 Note 2
2-MH-AH-001-36 HRSG INST CAB 8.9 10.1 4.9 0.0 0.0 0.0 0.0 0.0 0.0 8.9 10.1 4.9 Note 2
0-DP-DC-001 DCDB 1 63.5 63.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 63.5 63.5 0.0
0-DP-DC-002 DCDB 2 8.1 8.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.1 8.1 0.0
0-DP-DC-003 DCDB 3 40.1 40.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.1 40.1 0.0 Note 1
0-DP-UPS-001 UPS ACDB 51.8 60.8 32.0 0.0 0.0 0.0 24.7 29.0 15.3 51.8 60.8 32
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. and its use is
conditioned upon the users agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document
for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
Doc. No 2485-0-EL-DL-001
ELECTRICAL LOAD Revision No B
Maximum Current
Normal based on Calculated Selected
Equipment Item Voltage Transformer
Description Running Load Transformer Bus current Bus Rating
No. (kV) (kVA)
(xF+yG+zH) rating (A) (A) (A)
(kVA)
12000/20000
0-SW EM-001 MV SWGR 4.16 9802.78 2775.72 1360.48 3000
(ONAN/ONAF)
0-OC-EM-001 MV MCC 4.16 2163.8 300.30 3000
2000
0-ED-EL-001 L/C 1 SWGR 0.48 1421.25 2405.62 1709.49 3000
(ONAN)
2500
0-ED-EL-002 L/C 2 SWGR 0.48 1933.4 3007.03 2325.51 3200
(ONAN)
2500
0-ED-EL-003 L/C 3 SWGR 0.48 1886.11 3007.03 2268.63 3200
(ONAN)
1250
0-ED-EL-004 ESS SWGR 0.48 857.32 1503.51 1031.19 2000
(ONAN)
3-OC-EL-001 ST/HRSG MCC 1 0.48 122.44 147.27 800
200
0-EH-DB-001 LIGHTING DB 1 0.48 79.8 240.56 95.98 400
(AN)
0-DP-DB-001 ACDB 1 0.48 343.49 413.15 800
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. and its use is
conditioned upon the users agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document
for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 1-EK-TR-001 EXCITATION TR GTG 459.00 459.00 1.00 90.00 85.0 510.0 600.0 316.1
2 1-EU-TR-001 ISOLATION TRANSFORMER 2486.25 2486.25 1.00 90.00 85.0 2762.5 3250.0 1712.0
3 0-ED-EL-003 L/C 3 SWGR 1750.7 1844.8 581.9 115.4 145.1 88.1 194.0 214.0 90.4
4 0-ED-EL-001 L/C 1 SWGR 1236.8 1390.5 635.6 84.7 103.2 59.0 73.2 83.9 41.1
5 0-OC-EM-001 4.16KV MV MCC 2029.1 2163.8 751.4 0.0 0.0 0.0 1899.3 2020.2 688.3
6 0-ED-EL-004 ESS SWGR 736.9 852.9 429.5 12.3 14.5 7.7 1.0 1.0 0.0
7 0-ED-EL-002 L/C 2 SWGR 1705.4 1856.6 733.8 225.8 257.5 123.7 198.6 215.6 83.8
DEMAND LOAD TOTAL 7968.9 8682.9 3448.3 3200.7 3769.1 1990.5 2366.1 2532.7 903.6 SUBSTATION NO. :
Continuous Intermittent Stand by
0-SW-EM-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 7968.9 8682.9 3448.3 4160V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 8929.11 9802.78 4045.45
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 6 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 6-MH-AD-001-A SPACE HEATER FOR 6-MP-AD-001-A 0.15 0.15 1.00 98.00 100.0 0.2 0.2 0.0 120V,AC
2 6-MH-AD-001-B SPACE HEATER FOR 6-MP-AD-001-B 0.15 0.15 1.00 98.00 100.0 0.2 0.2 0.0 120V,AC
3 6-MH-AE-001-A SPACE HEATER FOR 6-MP-AE-001-A 0.40 0.40 1.00 98.00 100.0 0.4 0.4 0.0 120V,AC
4 6-MH-AE-001-B SPACE HEATER FOR 6-MP-AE-001-B 0.40 0.40 1.00 98.00 100.0 0.4 0.4 0.0 120V,AC
5 6-MH-WB-001-A SPACE HEATER FOR 6-MP-WB-001-A 0.15 0.15 1.00 98.00 100.0 0.2 0.2 0.0 120V,AC
6 6-MH-WB-001-B SPACE HEATER FOR 6-MP-WB-001-B 0.15 0.15 1.00 98.00 100.0 0.2 0.2 0.0 120V,AC
7 6-MP-AD-001-A CONDENSATE PUMP 1 214.00 240.00 0.89 93.57 91.6 228.7 249.8 100.4
8 6-MP-AD-001-B CONDENSATE PUMP 2 214.00 240.00 0.89 93.57 91.6 228.7 249.8 100.4
9 6-MP-AE-001-A BOILER FEED WATER PUMP 1 1335.00 1400.00 0.95 94.63 94.8 1410.8 1487.9 472.9
10 6-MP-AE-001-B BOILER FEED WATER PUMP 2 1335.00 1400.00 0.95 94.63 94.8 1410.8 1487.9 472.9
11 6-MP-PF-001 MAIN FIR WATER PUMP 120.00 186.50 0.64 91.29 90.1 131.4 145.8 63.1
12 6-MP-WB-001-A COMPONENT COOLING WATER PUMP 241.00 288.00 0.84 93.35 91.3 258.2 282.6 115.0
13 6-MP-WB-001-B COMPONENT COOLING WATER PUMP 241.00 288.00 0.84 93.35 91.3 258.2 282.6 115.0
DEMAND LOAD TOTAL 2029.1 2163.8 751.4 0.0 0.0 0.0 1899.3 2020.2 688.3 SUBSTATION NO. :
Continuous Intermittent Stand by
0-OC-EM-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 2029.1 2163.8 751.4 4160V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 2029.1 2163.8 751.4
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 7 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 3-OC-EL-001 ST/HRSG MCC 1 107.0 121.2 56.9 3.3 4.3 2.7 20.8 22.6 8.8
2 1-OC-EL-001 GT MCC 1 478.4 519.6 202.8 0.0 0.0 0.0 0.1 0.1 0.0
3 0-EH-DB-001 LIGHTING DB 1 67.8 79.8 42.1 0.0 0.0 0.0 0.0 0.0 0.0
4 0-DP-DB-001 ACDB 1 290.6 342.5 181.3 2.8 3.3 1.7 20.0 23.6 12.6
5 0-OC-EL-001 BOP MCC 1 293.0 330.3 152.5 78.6 95.7 54.6 32.3 37.8 19.7
DEMAND LOAD TOTAL 1236.8 1390.5 635.6 84.7 103.2 59.0 73.2 83.9 41.1 SUBSTATION NO. :
Continuous Intermittent Stand by
0-ED-EL-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 1236.8 1390.5 635.6 480V
Max. Normal Running Load =F x X(%) + G x Y(%) + H x Z(%) 1262.21 1421.25 653.3
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 8 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-BC-ER-002 BATTERY CHARGER 2 216.50 216.50 1.00 90.00 85.0 240.6 283.0 149.1
2 6-ME-AB-001 AUXILIARY STEAM ELECTRICAL HEATER 224.00 224.00 1.00 98.00 100.0 228.6 228.6 0.0
3 1-OC-EL-002 GT MCC 2 323.2 350.5 135.7 0.0 0.0 0.0 143.6 158.3 66.7
4 4-OC-EL-001 ACC/AFF MCC 1 849.0 942.9 410.1 142.3 160.3 73.7 34.6 38.6 17.1
5 2-OC-EL-001 ST/HRSG MCC 2 64.0 74.9 38.9 83.5 97.3 50.0 20.4 20.4 0.0
DEMAND LOAD TOTAL 1705.4 1856.6 733.8 225.8 257.5 123.7 198.6 215.6 83.8 SUBSTATION NO. :
Continuous Intermittent Stand by
0-ED-EL-002
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 1705.4 1856.6 733.8 480V
Max. Normal Running Load =F x X(%) + G x Y(%) + H x Z(%) 1773.14 1933.4 770.91
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 9 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 6-ME-FG-001 FUEL GAS ELECTRIC HEATER 580.00 580.00 1.00 98.00 100.0 591.8 591.8 0.0
2 0-OC-EL-003 HVAC MCC 131.4 154.7 81.6 23.9 28.1 14.8 0.0 0.0 0.0
3 0-OC-EL-002 BOP MCC 2 86.1 96.2 86.1 109.3 67.4 58.0 155.0 170.1 70.2
4 0-OC-EL-004 ACC/AFF MCC 2 941.4 1046.5 457.2 5.4 8.0 5.9 39.0 43.9 20.2
DEMAND LOAD TOTAL 1750.7 1844.8 581.9 115.4 145.1 88.1 194.0 214.0 90.4
Continuous Intermittent Stand by
0-ED-EL-003
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 1750.7 1844.8 581.9 480V
Max. Normal Running Load =F x X(%) + G x Y(%) + H x Z(%) 1785.32 1886.11 608.33
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 10 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-BC-ER-001 BATTERY CHARGER 1 216.50 216.50 1.00 90.00 85.0 240.6 283.0 149.1
2 0-ED-TR-001 BY PASS TR FOR UPS 53.55 53.55 1.00 90.00 85.0 59.5 70.0 36.9
3 0-OC-EDB-001 ESS MCC 209.0 242.6 123.1 8.5 10.2 5.6 0.0 0.0 0.0
4 1-OC-EDB-001 GT ESS MCC 227.8 257.7 120.4 3.8 4.3 2.1 1.0 1.0 0.0
DEMAND LOAD TOTAL 736.9 852.9 429.5 12.3 14.5 7.7 1.0 1.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
0-ED-EL-004
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 736.9 852.93 429.5 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 740.59 857.32 431.9
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 11 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 2-MH-AH-001-38 CPH RECIRCULATION PUMP 1 16.65 18.50 0.90 90.00 88.6 18.5 20.9 9.7
2 2-MH-AH-001-40 DUCT BURNER COOLING AIR FAN 1 13.50 15.00 0.90 90.00 85.0 15.0 17.6 9.3
3 CJN01 AC POWER SUPPLY CJN01-04 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V,AC
4 EF-0001-A-2 EXHAUST FAN NOISE ENCL 15.00 15.00 1.00 90.00 91.0 16.7 18.3 7.6
5 EF-0001-B-2 EXHAUST FAN NOISE ENCL 15.00 15.00 1.00 90.00 91.0 16.7 18.3 7.6
6 MAM10AN005-M01 FAN GLAND STEAM COND 1 1.70 3.70 0.46 88.00 76.0 1.9 2.5 1.6 NEMA 5HP
7 MAV10AN005-M01 OIL MIST FILTER UNIT LUBE OIL 1 2.30 3.00 0.77 90.00 85.0 2.5 3.0 1.6 NEMA 4.1HP
8 MAV10AN010-M01 OIL MIST FILTER UNIT LUBE OIL 2 2.30 3.00 0.77 90.00 85.0 2.5 3.0 1.6 NEMA 4.1HP
9 MAV16AP005-M01 OIL PURIFYING PUMP LUBE OIL 0.99 1.10 0.90 81.40 80.0 1.2 1.5 0.9
10 MAV21AP005-M01 MAIN OIL PUMP LUBE OIL 1 27.40 37.00 0.74 91.92 88.8 29.8 33.5 15.4 NEMA 50.5HP
11 MAV85AP005-M01 JACKING OIL PUMP LUBE OIL 13.50 15.00 0.90 90.00 90.2 15.0 16.6 7.2 NEMA 20.5HP
12 MAX10AH010 TANK HEATER CONTL OIL SUPPLY 1.00 1.00 1.00 98.00 100.0 1.0 1.0 0.0
13 MAX30AP010-M01 PUMP OFF-LINE FILTER 1.00 1.80 0.56 83.44 80.0 1.2 1.5 0.9
14 MAX31AP010-M01 PUMP OFF-LINE FILTER 1.00 1.80 0.56 83.44 80.0 1.2 1.5 0.9
15 MAX70AP010-M01 SELEXORB FILTER PUMP 1.00 1.80 0.56 83.44 80.0 1.2 1.5 0.9 HOLD
16 MKA10AA005 COOLING WATER SHUTOFF VALVE 0.10 0.10 1.00 50.00 50.0 0.2 0.4 0.3
17 MKA10AH010-R1 GENERATOR STAND STILL HEATERS TE 1.60 1.60 1.00 98.00 100.0 1.6 1.6 0.0 120V,AC
SUBSTATION NO. :
3-OC-EL-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 12 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 MKA10AH010-R2 GENERATOR STAND STILL HEATERS EE 1.60 1.60 1.00 98.00 100.0 1.6 1.6 0.0 120V,AC
19 MKA10SP010 GENERATOR CONDITION MONITORING 0.03 0.03 1.00 90.00 85.0 0.0 0.0 0.0 120V,AC
20 MPR20AA105-M01 FORCED COOLING MOV IPT 0.70 0.75 0.93 80.00 50.0 0.9 1.7 1.5 NEMA 1 HP
DEMAND LOAD TOTAL 107.0 121.2 56.9 3.3 4.3 2.7 20.8 22.6 8.8 SUBSTATION NO. :
Continuous Intermittent Stand by
3-OC-EL-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 107 121.18 56.9 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 107.99 122.44 57.71
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 13 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 1-MG-AG-001-11 TURBINE COMPT. SPACE HEATER 23HT-1A 30.00 30.00 1.00 98.00 100.0 30.6 30.6 0.0
2 1-MG-AG-001-23 IMMERSION HEATER-LUBE OIL TANK 23QT-3 15.00 15.00 1.00 98.00 100.0 15.3 15.3 0.0
3 1-MG-AG-001-24 SP HEATER VALVE COMP 23VS-1 30.00 30.00 1.00 98.00 100.0 30.6 30.6 0.0
4 1-MG-AG-001-25 SP HEATER ACCESSORY COMPT GAS 23VS-3 3.60 3.60 1.00 98.00 100.0 3.7 3.7 0.0
5 1-MG-AG-001-26 SPACE HEATER 23TK-1 FOR 1-MG-AG-001-4 0.12 0.12 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
6 1-MG-AG-001-27 TURBINE INLET EVAP COOLER PUMP M 88AC-1A 13.42 14.91 0.90 91.00 81.0 14.7 18.2 10.7 NEMA 20HP
7 1-MG-AG-001-28 FAN MOTOR HEATER 23AC-1A 0.04 0.04 1.00 98.00 100.0 0.0 0.0 0.0 120V,AC
8 1-MG-AG-001-4 EXHAUST FRAME BLOWER MOTOR 88TK-1 134.19 149.10 0.90 94.00 90.6 142.8 157.6 66.7 NEMA 200HP
9 1-MG-AG-001-41 FAN MOTOR HEATER 23BL-1 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
10 1-MG-AG-001-43 FP CO2 REFRI COMPRESSOR 88FP-1A 2.24 2.24 1.00 90.00 85.0 2.5 2.9 1.5 NEMA 2HP
11 1-MG-AG-001-49 COOLING AIR FAN MOTOR LUBE OIL SK 88BL-1 5.03 5.59 0.90 90.00 85.4 5.6 6.5 3.4 NEMA 7.5HP
12 1-MG-AG-001-57 TURBINE COMPT. SPACE HEATER 23HT-3A 3.60 3.60 1.00 98.00 100.0 3.7 3.7 0.0
13 1-MG-AG-001-62 IMMERSION HEATER-LUBE OIL TANK 23QT-1 15.00 15.00 1.00 98.00 100.0 15.3 15.3 0.0
14 1-MG-AG-001-63 IMMERSION HEATER-LUBE OIL TANK 23QT-2 15.00 15.00 1.00 98.00 100.0 15.3 15.3 0.0
15 1-MG-AG-001-65 TURBINE COMPT. SPACE HEATER 23HT-3B 3.60 3.60 1.00 98.00 100.0 3.7 3.7 0.0
16 1-MG-AG-001-71 AIR CONDITIONING - PEECC 88KA-3 25.00 25.00 1.00 90.00 85.0 27.8 32.7 17.2
17 1-MG-AG-001-77 AIR CONDITIONING - PEECC 88KA-4 25.00 25.00 1.00 90.00 85.0 27.8 32.7 17.2
SUBSTATION NO. :
1-OC-EL-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 14 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 1-MG-AG-001-78 TO LCI/EXT COMPT 100.00 100.00 1.00 90.00 85.0 111.1 130.7 68.9
19 1-MG-AG-001-79 H2 GAS DRYER 25.00 25.00 1.00 90.00 85.0 27.8 32.7 17.2
DEMAND LOAD TOTAL 478.4 519.6 202.8 0.0 0.0 0.0 0.1 0.1 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
1-OC-EL-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 478.4 519.6 202.8 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 478.4 519.6 202.8
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 15 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-EH-DB-001-A STREET LIGHTING 4.50 4.50 1.00 90.00 85.0 5.0 5.9 3.1
2 2-MH-AH-001-32 LIGHTING PANEL 9.45 9.45 1.00 90.00 85.0 10.5 12.4 6.5
3 LP-001 LIGHTING PANEL 1 - SWGR ROOM 11.00 11.00 1.00 90.00 85.0 12.2 14.4 7.6
4 LP-002 LIGHTING PANEL 2 - AIS CONTL ROOM 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7
5 LP-003 LIGHTING PANEL 3 -FIRE WATER PUMP H 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7
6 LP-004 LIGHTING PANEL 4 -ADMIN BLDG 11.20 11.20 1.00 90.00 85.0 12.4 14.6 7.7
7 LP-005 LIGHTING PANEL 5 - ACC PIPE RACK 14.20 14.50 0.98 90.00 85.0 15.8 18.6 9.8
8 LP-006 LIGHTING PANEL 6 - GSUT 2 8.70 8.70 1.00 90.00 85.0 9.7 11.4 6.0
DEMAND LOAD TOTAL 67.8 79.8 42.1 0.0 0.0 0.0 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
0-EH-DB-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 67.8 79.8 42.1 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 67.8 79.8 42.1
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 16 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-ED-EL-001-A 480V L/C1 AC CONTL SUPPLY A 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
2 0-ED-EL-001-B 480V L/C1 AC SPACE HET SUPPLY B 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
3 0-ED-EL-002-A 480V L/C2 AC CONTL SUPPLY A 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
4 0-ED-EL-002-B 480V L/C2 AC SPACE HET SUPPLY B 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
5 0-ED-EL-003-A 480V L/C3 AC CONTL SUPPLY A 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
6 0-ED-EL-003-B 480V L/C3 AC SPACE HET SUPPLY B 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
7 0-ED-EL-004-A 480V ESS AC CONTL SUPPLY A 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
8 0-ED-EL-004-B 480V ESS AC SPACE HET SUPPLY B 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
9 0-EX-EX-003-A TARIFF METERING SYSTEM 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1 120V, AC
10 0-OC-EDB-001-A ESS MCC AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
11 0-OC-EL-001-A BOP MCC 1 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
12 0-OC-EL-002-A BOP MCC 2 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
13 0-OC-EL-004-A ACC/AFF MCC 2 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
14 0-OC-EM-001-A 4.16KV MCC AC SPACE HEATER 3.50 3.50 1.00 90.00 85.0 3.9 4.6 2.4 120V, AC
15 0-SM-JA-001 SWAS PANEL 6.06 6.06 1.00 90.00 85.0 6.7 7.9 4.2 120V, AC
16 0-SM-JA-001A CHILLER 13.00 13.00 1.00 90.00 85.0 14.4 17.0 8.9 120V, AC
17 0-ST-ECP-001-A L/C # 1 TR 1 AUX SUPPLY 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1 120V, AC
SUBSTATION NO. :
0-DP-DB-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 17 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 0-ST-ECP-002-A L/C # 2 TR 2 AUX SUPPLY 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1 120V, AC
19 0-ST-ECP-003-A L/C # 3 TR 3 AUX SUPPLY 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1 120V, AC
20 0-ST-ECP-004-A ESS TR AUX SUPPLY 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1 120V, AC
21 0-SW-EM-001-A 4.16KV SWGR AC CONTROL CKT 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
22 0-SW-EM-001-B 4.16KV SWGR AC SPACE HEATER 4.00 4.00 1.00 90.00 85.0 4.4 5.2 2.8 120V, AC
23 0-XX-XX-001 WEATHER STATION 0.20 0.20 1.00 90.00 85.0 0.2 0.3 0.1 120V, AC
24 1-BK-EH-001-A GCB AUX SUPPLY A 1.27 1.27 1.00 90.00 85.0 1.4 1.7 0.9 120V, AC
25 1-BK-EH-001-B GCB AUX SUPPLY B 0.43 0.43 1.00 90.00 85.0 0.5 0.6 0.3
26 1-ET-ECP-001 GSU 1 PROTECTION PANEL 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
27 1-ET-ECP-001-A GSUT # 1 AUX SUPPLY A 37.98 37.98 1.00 90.00 85.0 42.2 49.6 26.1 120V, AC
28 1-ET-ECP-001-B GSUT # 1 AUX SUPPLY B 3.07 3.07 1.00 90.00 85.0 3.4 4.0 2.1 120V, AC
29 1-ET-ECP-002-A GSUT # 1 RTCC SUPPLY A 2.14 2.14 1.00 90.00 85.0 2.4 2.8 1.5 120V, AC
30 1-IB-BD-001-B IPBD # 1 HOT AIR BLOWER 18.00 18.00 1.00 90.00 85.0 20.0 23.5 12.4
31 1-UT-ECP-001 UAT PROTECTION PANEL 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1 120V, AC
32 1-UT-ECP-001-A UAT AUX SUPPLY A 2.20 2.20 1.00 90.00 85.0 2.4 2.9 1.5
33 1-UT-ECP-001-B UAT AUX SUPPLY B 2.20 2.20 1.00 90.00 85.0 2.4 2.9 1.5
34 1-UT-ECP-001-C UAT FAN CONTL POWER 0.20 0.20 1.00 90.00 85.0 0.2 0.3 0.1 120V, AC
SUBSTATION NO. :
0-DP-DB-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 18 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
35 1-UT-ECP-001-D UAT TRANSFIX CONTROL POWER 0.20 0.20 1.00 90.00 85.0 0.2 0.3 0.1 120V, AC
36 1-UT-NGR-001 UAT NGR POWER SUPPLY 0.20 0.20 1.00 90.00 85.0 0.2 0.3 0.1 120V, AC
37 2-OC-EL-001-A ST /HRSG MCC 2 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
38 2-SM-XX-001 CEMS 15.30 15.30 1.00 90.00 85.0 17.0 20.0 10.5
39 3-ET-ECP-001 GSU 2 PROTECTION PANEL 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1 120V, AC
40 3-ET-ECP-001-A GSUT # 2 AUX SUPPLY A 37.98 37.98 1.00 90.00 85.0 42.2 49.6 26.1
41 3-ET-ECP-001-B GSUT # 2 AUX SUPPLY B 3.07 3.07 1.00 90.00 85.0 3.4 4.0 2.1 120V, AC
42 3-ET-ECP-002-A GSUT # 2 RTCC SUPPLY A 2.14 2.14 1.00 90.00 85.0 2.4 2.8 1.5 120V, AC
43 3-IB-BD-001-B IPBD # 2 HOT AIR BLOWER 18.00 18.00 1.00 90.00 85.0 20.0 23.5 12.4
44 3-OC-EL-001-A ST /HRSG MCC 1 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
45 4-OC-EL-001-A ACC/AFF MCC 1 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
46 EWH-0001 ELECTRIC WATER HEATER 2.50 2.50 1.00 90.00 85.0 2.8 3.3 1.7 120V, AC
47 HE-0001-A ELECTRIC UNIT HEATER MCBLDG 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
48 HE-0001-B ELECTRIC UNIT HEATER MCBLDG 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
49 HE-0001-C ELECTRIC UNIT HEATER MCBLDG 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
50 HE-0002-A ELECTRIC UNIT HEATER MCBLDG 5.00 5.00 1.00 90.00 85.0 5.6 6.5 3.4
51 HE-0003 ELECTRIC UNIT HEATER FWPH 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
SUBSTATION NO. :
0-DP-DB-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 19 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
52 HE-0004 ELECTRIC UNIT HEATER FWPH 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
RECEPTACLE TYPE,
53 MSI-0001 MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
54 MSI-0002 MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
55 MSI-0003-A MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
56 MSI-0003-B MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
57 MSI-0004-A MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
58 MSI-0005-A MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
59 MSI-0005-C MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
60 MSI-0006-A MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
61 MSI-0006-B MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
62 MSI-0007-A MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
63 MSI-0007-B MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
64 MSO-0001-A MULTISPLIT A/C MCBLDG 15.00 15.00 1.00 90.00 85.0 16.7 19.6 10.3
65 MSO-0001-B MULTISPLIT A/C MCBLDG 15.00 15.00 1.00 90.00 85.0 16.7 19.6 10.3
66 MSO-0001-C MULTISPLIT A/C MCBLDG 15.00 15.00 1.00 90.00 85.0 16.7 19.6 10.3
67 RP-001 RECEPTACLE PANEL -1 SWGR ROOM 7.00 7.00 1.00 90.00 85.0 7.8 9.1 4.8
68 RP-002 RECEPTACLE PANEL -2 PIPE RACK 10.20 10.20 1.00 90.00 85.0 11.3 13.3 7.0
DEMAND LOAD TOTAL 290.6 342.5 181.3 2.8 3.3 1.7 20.0 23.6 12.6 SUBSTATION NO. :
Continuous Intermittent Stand by
0-DP-DB-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 290.6 342.5 181.3 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 291.44 343.49 181.81
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 20 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 1-MG-AG-001-76 WATER WASH SKID 73.00 73.00 1.00 90.00 85.0 81.1 95.4 50.3
2 6-MC-PI-001-A AIR COMPRESSOR 1 118.62 118.62 1.00 90.00 85.0 131.8 143.9 57.9
3 6-MP-AB-001-B EXTERNAL DRAIN WATER PUMP B 16.65 18.50 0.90 90.00 88.6 18.5 20.9 9.7
4 6-MP-WD-001-B CYCLE MAKEUP PUMP B 12.52 14.91 0.84 91.00 81.0 13.8 17.0 10.0
5 6-MP-WD-002-A CYCLE MAKE-UP START UP PUMP 22.50 25.00 0.90 91.00 89.2 24.7 27.7 12.5
6 6-MP-WP-001-A POTABLE WATER PUMP A 13.50 15.00 0.90 90.00 90.2 15.0 16.6 7.2
7 6-MP-WR-001-A SERVICE WATER PUMP A 7.32 11.19 0.65 89.62 84.7 8.2 9.6 5.1
8 6-MP-WR-002 SERVICE WATER PUMP FOR ACC CLEANING 4.66 7.46 0.62 88.00 81.0 5.3 6.5 3.8
9 6-MP-XW-001 POWER BLOCK OILY WATER SUMP PUMP 22.00 22.00 1.00 90.00 85.0 24.4 28.7 15.1
10 6-MP-XW-002 HRSG AREA CH SUMP PUMP 22.00 22.00 1.00 90.00 85.0 24.4 28.7 15.1
11 6-MP-XW-003 ACC DUCT DRAIN SUMP PUMP 7.40 7.40 1.00 90.00 85.0 8.2 9.6 5.1
12 6-MP-XW-006 ELEC BLDG TR AREA OILY SUMP PUMP 15.00 15.00 1.00 90.00 85.0 16.6 19.6 10.3
13 EK-ER01 CATHODIC PROTECTION SYSTEM 1.27 1.27 1.00 90.00 85.0 1.4 1.7 0.9
14 MOV-AB-001 HP STEAM SYSTEM A 0.60 0.92 0.65 80.00 50.0 0.7 1.5 1.3
15 MOV-AB-002 HP STEAM SYSTEM B 0.60 0.92 0.65 80.00 50.0 0.7 1.5 1.3
16 MOV-AB-003 HP STEAM SYSTEM C 0.60 0.92 0.65 80.00 50.0 0.7 1.5 1.3
17 MOV-AB-004 HP STEAM SYSTEM D 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
SUBSTATION NO. :
0-OC-EL-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 21 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 MOV-AB-011 HOT REHEAT SYSTEM A 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
19 MOV-AB-012 HOT REHEAT SYSTEM B 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
20 MOV-AB-014 HOT REHEAT SYSTEM C 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
21 MOV-AB-015 HOT REHEAT SYSTEM D 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
22 MOV-AB-026 HOT REHEAT SYSTEM E 0.17 0.26 0.65 80.00 50.0 0.2 0.4 0.4
23 MOV-AD-001 CONDENSATE SYSTEM A 0.62 0.95 0.65 80.00 50.0 0.8 1.5 1.3
24 MOV-AD-002 CONDENSATE SYSTEM B 0.62 0.95 0.65 80.00 50.0 0.8 1.5 1.3
25 MOV-AD-003 CONDENSATE SYSTEM C 0.50 0.77 0.65 80.00 50.0 0.6 1.3 1.1
26 5-SY-DB-001 SWYD DB 25.5 29.9 15.7 0.0 0.0 0.0 0.0 0.0 0.0
DEMAND LOAD TOTAL 293.0 330.3 152.5 78.6 95.7 54.6 32.3 37.8 19.7 SUBSTATION NO. :
Continuous Intermittent Stand by
0-OC-EL-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 293 330.3 152.5 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 316.58 358.8 168.88
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 22 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 BK-5-001 EHV BREAKER 1 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V,AC
2 BK-5-002 EHV BREAKER 2 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V,AC
3 BK-5-003 EHV BREAKER 3 AUX SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V,AC
4 CC-5-001 COMMUNICATION PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
5 DS-5-001 SWYRD DISCONNECTOR SWITCH -1 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
6 DS-5-002 SWYRD DISCONNECTOR SWITCH -2 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
7 DS-5-003 SWYRD DISCONNECTOR SWITCH -3 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
8 DS-5-004 SWYRD DISCONNECTOR SWITCH -4 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
9 DS-5-005 SWYRD DISCONNECTOR SWITCH -5 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
10 DS-5-006 SWYRD DISCONNECTOR SWITCH -6 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
11 DS-5-007 SWYRD DISCONNECTOR SWITCH -7 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
12 ES-5-001 SWYD EARTH SWITCH -1 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
13 ES-5-002 SWYD EARTH SWITCH -2 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
14 ES-5-003 SWYD EARTH SWITCH -3 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
15 ES-5-004 SWYD EARTH SWITCH -4 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
16 ES-5-005 SWYD EARTH SWITCH -5 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
17 ES-5-006 SWYD EARTH SWITCH -6 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
SUBSTATION NO. :
5-SY-DB-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 23 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 ES-5-007 SWYD EARTH SWITCH -7 0.60 0.60 1.00 90.00 85.0 0.7 0.8 0.4
19 PP-5-001 230kV LINE FEEDER PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
20 PP-5-002 230kV GSU-1 FEEDER PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
21 PP-5-003 230kV GSU-2 FEEDER PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
22 PP-5-004 230kV BUS BAR PROTECTION PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
23 PP-5-005 230kV LINE FEEDER CONTROL PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
24 PP-5-006 230kV GSU-1 FEEDER CONTROL PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
25 PP-5-007 230kV GSU-2 FEEDER CONTROL PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
26 PP-5-008 230kV METERING PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
27 PP-5-009 230kV FAULT RECORDER PANEL 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
28 RT-5-001 RTU SUPPLY 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
29 SACI-0001-A SPLIT A/C AIS CR 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4
30 SACO-0001-A SPLIT A/C AIS CR 4.00 4.00 1.00 90.00 85.0 4.4 5.2 2.8 120V,AC
31 0-XX-XX-04 CFE PANEL POWER SUPPLY 0.30 0.30 1.00 90.00 85.0 0.3 0.4 0.2 120V,AC
32 0-XX-XX-05 CFE PANEL CNTL SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V,AC
33 0-XX-XX-06 CFE PANEL SPACE HEATER SUPPLY 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 208V,AC
DEMAND LOAD TOTAL 25.5 29.9 15.7 0.0 0.0 0.0 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
5-SY-DB-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 25.5 29.9 15.7 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 25.5 29.9 15.7
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 24 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 1-MG-AG-001-13 SPACE HEATER 23BT-2 FOR 1-MG-AG-001-2 0.20 0.20 1.00 98.00 100.0 0.2 0.2 0.0 120V,AC
2 1-MG-AG-001-14 GENERATOR SPACE HEATER 23HG-1A 2.25 2.25 1.00 98.00 100.0 2.3 2.3 0.0
3 1-MG-AG-001-15 FAN MOTOR HEATER 23AC-1B 0.04 0.04 1.00 98.00 100.0 0.0 0.0 0.0 120V,AC
4 1-MG-AG-001-17 AUX LUBE OIL PUMP MOTOR 88QA-2 67.11 74.57 0.90 92.00 91.0 72.9 80.2 33.2 NEMA 100HP
5 1-MG-AG-001-19 HYDRAULIC SUPPLY PUMP MOTOR 88HQ-2 40.28 44.76 0.90 92.00 89.0 43.8 49.2 22.4 NEMA 60HP
6 1-MG-AG-001-2 TURBINE COMPT. COOLING AIR FAN 88BT-2 26.85 29.83 0.90 91.00 89.2 29.5 33.1 14.9 NEMA 40HP
7 1-MG-AG-001-21 SP HEATER ACCESSORY COMPT LUBE 23HL-3 3.60 3.60 1.00 98.00 100.0 3.7 3.7 0.0
8 1-MG-AG-001-29 SPACE HEATER 23TK-2 FOR 1-MG-AG-001-5 0.12 0.12 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
9 1-MG-AG-001-31 MIST ELIMINATOR FAN MOTOR 88QV-1B 3.36 3.73 0.90 88.00 87.4 3.8 4.4 2.1 NEMA 5HP
10 1-MG-AG-001-33 SP HEATER 23QV-2B FOR 1-MG-AG-001-31 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
11 1-MG-AG-001-44 AIR CONDITIONING - PEECC 88KA-2 25.00 25.00 1.00 90.00 85.0 27.8 32.7 17.2
12 1-MG-AG-001-45 COOLING AIR FAN MOTOR LUBE OIL SK 88BL-2 5.03 5.59 0.90 90.00 85.4 5.6 6.5 3.4 NEMA 7.5HP
13 1-MG-AG-001-46 FAN MOTOR HEATER 23BL-2 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
14 1-MG-AG-001-5 EXHAUST FRAME BLOWER MOTOR 88TK-2 134.19 149.10 0.90 94.00 90.6 142.8 157.6 66.7 NEMA 200HP
15 1-MG-AG-001-51 BATTERY CHARGER 2 11.48 11.48 1.00 90.00 85.0 12.8 15.0 7.9
16 1-MG-AG-001-52 SPACE HEATER 23BN-2 FOR 1-MG-AG-001-7 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
17 1-MG-AG-001-54 SPACE HEATER 23VG-2 FOR 1-MG-AG-001-9 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
SUBSTATION NO. :
1-OC-EL-002
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 25 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 1-MG-AG-001-56 TURBINE COMPT. SPACE HEATER 23HT-1B 30.00 30.00 1.00 98.00 100.0 30.6 30.6 0.0
19 1-MG-AG-001-59 SPACE HEATER 23QA-2 FOR 1-MG-AG-001-17 0.10 0.10 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
20 1-MG-AG-001-60 SPACE HEATER 23HQ-2 FOR 1-MG-AG-001-19 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V,AC
21 1-MG-AG-001-64 TURBINE INLET EVAP COOLER PUMP M 88AC-1B 13.42 14.91 0.90 91.00 81.0 14.7 18.2 10.7 NEMA 20HP
22 1-MG-AG-001-66 GENERATOR SPACE HEATER 23HG-1B 2.25 2.25 1.00 98.00 100.0 2.3 2.3 0.0
23 1-MG-AG-001-67 GENERATOR SPACE HEATER 23HG-2 2.25 2.25 1.00 98.00 100.0 2.3 2.3 0.0
24 1-MG-AG-001-68 SPACE HEATER LUBE OIL SKID 23HL-1 30.00 30.00 1.00 98.00 100.0 30.6 30.6 0.0
25 1-MG-AG-001-7 BEARING AREA BLOWER 88BN-2 10.07 11.19 0.90 90.00 88.8 11.2 12.6 5.8 NEMA 15HP
26 1-MG-AG-001-80 EXT FAN-2 (BRIDGE-2) 21.20 21.20 1.00 90.00 85.0 23.5 27.7 14.6
27 1-MG-AG-001-9 LOAD COUPLING COMP VENT FAN 88VG-2 5.03 5.59 0.90 90.00 85.4 5.6 6.5 3.4 NEMA 7.5HP
DEMAND LOAD TOTAL 323.2 350.5 135.7 0.0 0.0 0.0 143.6 158.3 66.7 SUBSTATION NO. :
Continuous Intermittent Stand by
1-OC-EL-002
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 323.2 350.5 135.7 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 323.2 350.5 135.7
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 26 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 4-BTV-AR-644-A VACUUM SKID A INLET VALVE 0.05 0.05 1.00 80.00 50.0 0.1 0.1 0.1 120V, AC
2 4-BTV-AR-645-A VACUUM EJECT BY-PASS A INLET VALVE 0.05 0.05 1.00 80.00 50.0 0.1 0.1 0.1 120V, AC
3 4-BTV-AR-646-A VACUUM EJECT A MAKE-UP VALVE 0.05 0.05 1.00 80.00 50.0 0.1 0.1 0.1 120V, AC
4 4-GLV-AC-042 STEAM DUCT DAMPER PNEUM V/V 0.05 0.05 1.00 80.00 50.0 0.1 0.1 0.1 120V, AC
5 4-MH-AC-203 SPACE HEATER FOR 4-ML-AC-203 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
6 4-MH-AC-204 SPACE HEATER FOR 4-ML-AC-204 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
7 4-MH-AC-301 SPACE HEATER FOR 4-ML-AC-301 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
8 4-MH-AC-302 SPACE HEATER FOR 4-ML-AC-302 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
9 4-MH-AC-303 SPACE HEATER FOR 4-ML-AC-303 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
10 4-MH-AC-304 SPACE HEATER FOR 4-ML-AC-304 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
11 4-MH-AC-501-A SPACE HEATER FOR 4-MP-AC-501-A 0.03 0.03 1.00 98.00 100.0 0.0 0.0 0.0 120V, AC
12 4-MH-AC-701 SPACE HEATER FOR 4-MP-AC-701 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
13 4-MH-AR-601-B SPACE HEATER FOR 4-MP-AR-601-B 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
14 4-ML-AC-203 ACC FAN3-STREET2 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
15 4-ML-AC-204 ACC FAN4-STREET2 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
16 4-ML-AC-301 ACC FAN1-STREET3 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
17 4-ML-AC-302 ACC FAN2-STREET3 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
SUBSTATION NO. :
4-OC-EL-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 27 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 4-ML-AC-303 ACC FAN3-STREET3 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
19 4-ML-AC-304 ACC FAN4-STREET3 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
20 4-MP-AC-501-A DUCT DRAIN PUMP A 3.95 5.60 0.71 89.82 81.6 4.4 5.4 3.1 NEMA 7.5HP
21 4-MP-AC-701 CLEANING PUMP 41.50 44.76 0.93 92.00 89.0 45.1 50.7 23.1 NEMA 60HP
22 4-MP-AR-601-B VACUUM SKID PUMP B 85.00 111.90 0.76 92.04 89.1 92.3 103.7 47.1 NEMA 150HP
23 6-MA-WB-001-5 AIR FIN COOLER FAN 5 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
24 6-MA-WB-001-6 AIR FIN COOLER FAN 6 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
25 6-MA-WB-001-7 AIR FIN COOLER FAN 7 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
26 6-MA-WB-001-8 AIR FIN COOLER FAN 8 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
27 6-MP-XW-008-A SURGE TANK OILY WATER SUMP SOV 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.0 120V,AC
DEMAND LOAD TOTAL 849.0 942.9 410.1 142.3 160.3 73.7 34.6 38.6 17.1 SUBSTATION NO. :
Continuous Intermittent Stand by
4-OC-EL-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 849 942.9 410.1 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 891.69 990.9 432.21
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 28 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 2-MH-AH-001-28 POWER DISTRIBUTION PANEL 45.00 45.00 1.00 90.00 85.0 50.0 58.8 31.0
2 2-MH-AH-001-29 HEAT TRACING PANEL 40.00 40.00 1.00 90.00 85.0 44.4 52.3 27.5
3 2-MH-AH-001-39 CPH RECIRCULATION PUMP 2 16.65 18.50 0.90 90.00 88.6 18.5 20.9 9.7
4 2-MH-AH-001-41 DUCT BURNER COOLING AIR FAN 2 13.50 15.00 0.90 90.00 85.0 15.0 17.6 9.3
5 2-MH-AH-001-42 DUCT BURNER BMS PANEL 5.00 5.00 1.00 90.00 85.0 5.6 6.5 3.4
6 CJJ10 AC POWER SUPPLY CJJ10-50 1.00 2.00 0.50 90.00 85.0 1.1 1.3 0.7 120V, AC
7 MAM10AN010-M01 FAN GLAND STEAM COND 2 1.70 3.70 0.46 88.00 76.0 1.9 2.5 1.6
8 MAV10AH010-R01 TANK HEATER 1 LUBE OIL 5.00 5.00 1.00 98.00 100.0 5.1 5.1 0.0
9 MAV10AH011-R02 TANK HEATER 2 LUBE OIL 5.00 5.00 1.00 98.00 100.0 5.1 5.1 0.0
10 MAV10AH012-R03 TANK HEATER 3 LUBE OIL 5.00 5.00 1.00 98.00 100.0 5.1 5.1 0.0
11 MAV10AH013-R04 TANK HEATER 4 LUBE OIL 5.00 5.00 1.00 98.00 100.0 5.1 5.1 0.0
12 MAX21AP010-M01 MAIN CONTROL OIL PUMP 1 9.90 11.00 0.90 90.00 88.8 11.0 12.4 5.7
DEMAND LOAD TOTAL 64.0 74.9 38.9 83.5 97.3 50.0 20.4 20.4 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
2-OC-EL-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 64 74.9 38.9 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 89.05 104.09 53.9
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 29 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-XX-XX-01 MAINTENANCE BLDG OHCRANE 18.50 18.50 1.00 90.00 85.0 20.5 24.2 12.7
2 DWH-0001 ELECTRIC WATER HEATER ADMIN BLDG 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
3 EF-0001 EXHAUST FAN ADMIN BLDG 0.20 0.20 1.00 67.00 69.0 0.3 0.4 0.3 120V,AC
4 EF-0001-A-1 EXHAUST FAN MAINTENANCE AND WARE 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
5 EF-0001-B-1 EXHAUST FAN MAINTENANCE AND WARE 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
6 EF-0001-C-1 EXHAUST FAN MAINTENANCE AND WARE 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
7 EF-0002 EXHAUST FAN ADMIN BLDG 0.20 0.20 1.00 67.00 69.0 0.3 0.4 0.3 120V,AC
8 EF-0002-A-1 EXHAUST FAN MAINTENANCE AND WARE 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
9 EF-0002-B-1 EXHAUST FAN MAINTENANCE AND WARE 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
10 EF-0003 EXHAUST FAN ADMIN BLDG 0.20 0.20 1.00 67.00 69.0 0.3 0.4 0.3 120V,AC
11 EF-0003-A EXHAUST FAN MAINTENANCE AND WARE 0.10 0.10 1.00 50.00 50.0 0.2 0.4 0.3 120V,AC
12 EF-0004 EXHAUST FAN ADMIN BLDG 0.20 0.20 1.00 67.00 69.0 0.3 0.4 0.3 120V,AC
13 EF-0004-A EXHAUST FAN MAINTENANCE AND WARE 0.20 0.20 1.00 67.00 69.0 0.3 0.4 0.3 120V,AC
14 EF-0005 EXHAUST FAN ADMIN BLDG 0.20 0.20 1.00 67.00 69.0 0.3 0.4 0.3 120V,AC
15 HE-0001-A-1 ELECTRIC UNIT HEATER MAIN AND WARE 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
16 HE-0001-B-1 ELECTRIC UNIT HEATER MAIN AND WARE 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
17 HE-0001-C-1 ELECTRIC UNIT HEATER MAIN AND WARE 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
SUBSTATION NO. :
0-OC-EL-003
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 30 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 HE-0001-D-1 ELECTRIC UNIT HEATER MAIN AND WARE 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
19 HE-0001-E-1 ELECTRIC UNIT HEATER MAIN AND WARE 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
20 HE-0001-F-1 ELECTRIC UNIT HEATER MAIN AND WARE 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
21 HE-0002-A-1 ELECTRIC UNIT HEATER MAIN AND WARE 5.00 5.00 1.00 90.00 85.0 5.6 6.5 3.4
22 HE-0002-B-1 ELECTRIC UNIT HEATER MAIN AND WARE 5.00 5.00 1.00 90.00 85.0 5.6 6.5 3.4
23 HE-0002-C-1 ELECTRIC UNIT HEATER MAIN AND WARE 5.00 5.00 1.00 90.00 85.0 5.6 6.5 3.4
24 HE-0002-D-1 ELECTRIC UNIT HEATER MAIN AND WARE 5.00 5.00 1.00 90.00 85.0 5.6 6.5 3.4
25 MSO-0002-A MULTISPLIT A/C ADMIN BLDG 15.00 15.00 1.00 90.00 85.0 16.7 19.6 10.3
26 MSO-0002-B MULTISPLIT A/C ADMIN BLDG 15.00 15.00 1.00 90.00 85.0 16.7 19.6 10.3
27 MSO-0002-C MULTISPLIT A/C ADMIN BLDG 15.00 15.00 1.00 90.00 85.0 16.7 19.6 10.3
28 RP-003 RECEPTACLE PANEL -3 ADMIN BLDG 12.40 12.40 1.00 90.00 85.0 13.8 16.2 8.5
29 RP-004 RECEPTACLE PANEL -4 WARE HOUSE 12.90 12.90 1.00 90.00 85.0 14.3 16.9 8.9
DEMAND LOAD TOTAL 131.4 154.7 81.6 23.9 28.1 14.8 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
0-OC-EL-003
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 131.4 154.7 81.6 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 138.57 163.1 86.04
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 31 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-XX-XX-002 HEAT TRACING SYSTEM 30.00 30.00 1.00 90.00 85.0 33.3 39.2 20.6
2 6-MC-PI-001-B AIR COMPRESSOR 2 118.62 118.62 1.00 90.00 85.0 131.8 143.9 57.9
3 6-ME-FG-002 DUCT BURNER ELECTRIC HEATER 18.00 18.00 1.00 98.00 100.0 18.4 18.4 0.0
4 6-MP-AB-001-A EXTERNAL DRAIN WATER PUMP A 16.65 18.50 0.90 90.00 88.6 18.5 20.9 9.7
5 6-MP-WD-001-A CYCLE MAKEUP PUMP A 12.52 14.91 0.84 91.00 81.0 13.8 17.0 10.0
6 6-MP-WP-001-B POTABLE WATER PUMP B 13.50 15.00 0.90 90.00 90.2 15.0 16.6 7.2
7 6-MP-WR-001-B SERVICE WATER PUMP B 7.32 11.19 0.65 89.62 84.7 8.2 9.6 5.1
8 6-MP-XW-005 POWER BLOCK TR AREA OILY SUMP PUMP 11.00 11.00 1.00 90.00 85.0 12.2 14.3 7.5
9 6-MP-XW-007 MAINTENANCE BLDG OILY SUMP PUMP 11.00 11.00 1.00 90.00 85.0 12.2 14.3 7.5
10 6-MP-XW-009 WASTE WATER TRANSFER SUMP PUMP 44.00 44.00 1.00 90.00 85.0 48.8 57.5 30.2
11 6-MU-AJ-001 CHEMICAL INJECTION SYSTEM 1.89 1.89 1.00 90.00 85.0 2.1 3.5 2.8
12 MOV-AB-005 COLD REHEAT SYSTEM A 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
13 MOV-AB-006 COLD REHEAT SYSTEM B 0.62 0.95 0.65 80.00 50.0 0.8 1.5 1.3
14 MOV-AB-007 COLD REHEAT SYSTEM C 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
15 MOV-AB-008 COLD REHEAT SYSTEM D 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
16 MOV-AB-009 COLD REHEAT SYSTEM E 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
17 MOV-AB-020 LP STEAM AND TURBINE A 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
SUBSTATION NO. :
0-OC-EL-002
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 32 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 MOV-AB-021 LP STEAM AND TURBINE B 0.07 0.11 0.65 80.00 50.0 0.1 0.2 0.2
19 MOV-AB-029 AUXILIARY STEAM SYSTEM 0.17 0.26 0.65 80.00 50.0 0.2 0.4 0.4
20 MOV-AE-001 FEED WATER SYSTEM A 0.62 0.95 0.65 80.00 50.0 0.8 1.5 1.3
21 MOV-AE-002 FEED WATER SYSTEM B 3.46 5.32 0.65 80.00 50.0 4.3 8.6 7.5
22 MOV-AE-003 FEED WATER SYSTEM C 0.62 0.95 0.65 80.00 50.0 0.8 1.5 1.3
23 MOV-AE-004 FEED WATER SYSTEM D 3.99 5.32 0.75 80.00 50.0 5.0 10.0 8.6
24 MOV-WD-001 DEMINERALISED WATER SYSTEM 0.16 0.25 0.65 80.00 50.0 0.2 0.4 0.3
25 MOV-WR-001 SERVICE WATER SYSTEM 0.16 0.25 0.65 80.00 50.0 0.2 0.4 0.3
DEMAND LOAD TOTAL 86.1 96.2 43.1 86.1 109.3 67.4 155.0 170.1 70.2 SUBSTATION NO. :
Continuous Intermittent Stand by
0-OC-EL-002
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 86.1 96.2 43.1 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 111.93 128.59 63.32
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 33 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 4-BTV-AC-041 STEAM DUCT ISOLATION VALVE 1.71 1.90 0.90 80.00 50.0 2.1 4.3 3.7
2 4-BTV-AR-644-B VACUUM SKID B INLET VALVE 0.05 0.05 1.00 80.00 50.0 0.1 0.1 0.1 120V, AC
3 4-BTV-AR-645-B VACUUM EJECT BY-PASS B INLET VALVE 0.05 0.05 1.00 80.00 50.0 0.1 0.1 0.1 120V, AC
4 4-BTV-AR-646-B VACUUM EJECT B MAKE-UP VALVE 0.05 0.05 1.00 80.00 50.0 0.1 0.1 0.1 120V, AC
5 4-MH-AC-101 SPACE HEATER FOR 4-ML-AC-101 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
6 4-MH-AC-102 SPACE HEATER FOR 4-ML-AC-102 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
7 4-MH-AC-103 SPACE HEATER FOR 4-ML-AC-103 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
8 4-MH-AC-104 SPACE HEATER FOR 4-ML-AC-104 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
9 4-MH-AC-201 SPACE HEATER FOR 4-ML-AC-201 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
10 4-MH-AC-202 SPACE HEATER FOR 4-ML-AC-202 0.14 0.14 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
11 4-MH-AC-501-B SPACE HEATER FOR 4-MP-AC-501-B 0.03 0.03 1.00 98.00 100.0 0.0 0.0 0.0 120V, AC
12 4-MH-AR-601-A SPACE HEATER FOR 4-MP-AR-601-A 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
13 4-ML-AC-101 ACC FAN1-STREET1 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
14 4-ML-AC-102 ACC FAN2-STREET1 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
15 4-ML-AC-103 ACC FAN3-STREET1 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
16 4-ML-AC-104 ACC FAN4-STREET1 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
17 4-ML-AC-201 ACC FAN1-STREET2 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
SUBSTATION NO. :
0-OC-EL-004
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 34 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 4-ML-AC-202 ACC FAN2-STREET2 117.07 149.14 0.78 94.00 90.1 124.5 138.2 59.8 NEMA 200HP
19 4-MP-AC-501-B DUCT DRAIN PUMP B 3.95 5.60 0.71 89.82 81.6 4.4 5.4 3.1 NEMA 7.5HP
20 4-MP-AR-601-A VACUUM SKID PUMP A 85.00 111.90 0.76 92.04 89.1 92.3 103.7 47.1 NEMA 150HP
21 4-MZ-AC-801 ACC CHAIN HOIST 2.72 3.00 0.91 90.00 85.0 3.0 3.5 1.9
22 6-MA-WB-001-1 AIR FIN COOLER FAN 1 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
23 6-MA-WB-001-2 AIR FIN COOLER FAN 2 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
24 6-MA-WB-001-3 AIR FIN COOLER FAN 3 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
25 6-MA-WB-001-4 AIR FIN COOLER FAN 4 31.30 37.00 0.85 92.00 89.4 34.0 38.1 17.1
DEMAND LOAD TOTAL 941.4 1046.5 457.2 5.4 8.0 5.9 39.0 43.9 20.2 SUBSTATION NO. :
Continuous Intermittent Stand by
0-OC-EL-004
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 941.4 1046.5 457.2 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 943.02 1048.8 458.97
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 35 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-XX-XX-03 FIRE ALARM PANEL 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7 120V, AC
2 2-MH-AH-001-36 INSTRUMENT CABINET 4.00 4.00 1.00 90.00 85.0 4.4 5.2 2.8 120V, AC
3 2-MH-AH-001-43 POWER DISTRIBUTION PANEL 13.00 13.00 1.00 90.00 85.0 14.4 17.0 8.9
4 6-MP-PF-003 FIRE WATER JOCKEY PUMP 4.03 5.60 0.72 89.88 82.0 4.5 5.5 3.1
5 EF-0001-A EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
6 EF-0001-B EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
7 EF-0001-C EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
8 EF-0001-D EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
9 EF-0001-E EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
10 EF-0001-F EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
11 EF-0001-G EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
12 EF-0001-H EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
13 EF-0002-A EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
14 EF-0002-B EXHAUST FAN MCBLDG 1.50 1.50 1.00 85.00 86.0 1.8 2.0 1.0
15 EF-0003-B EXHAUST FAN MCBLDG 0.10 0.10 1.00 50.00 50.0 0.2 0.4 0.3 120V, AC
16 EF-0004-B EXHAUST FAN MCBLDG 0.10 0.10 1.00 50.00 50.0 0.2 0.4 0.3 120V, AC
17 EF-0005-B EXHAUST FAN MCBLDG 0.10 0.10 1.00 50.00 50.0 0.2 0.4 0.3 120V, AC
SUBSTATION NO. :
0-OC-EDB-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 36 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 GD-22361A-GN1-A EDG AUX SUPPLY A 1.50 1.50 1.00 90.00 85.0 1.7 2.0 1.0 120V, AC
19 HCP-0001 HVAC CONTROL PANEL MCBLDG 2.50 2.50 1.00 90.00 85.0 2.8 3.3 1.7 120V, AC
20 HCP-0001-A HVAC CONTROL PANEL MAIN AND WARE 2.50 2.50 1.00 90.00 85.0 2.8 3.3 1.7 120V, AC
21 HE-0001-D ELECTRIC UNIT HEATER MCBLDG 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
22 HE-0001-E ELECTRIC UNIT HEATER MCBLDG 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
23 HE-0001-F ELECTRIC UNIT HEATER MCBLDG 3.00 3.00 1.00 90.00 85.0 3.3 3.9 2.1
24 HE-0002-B ELECTRIC UNIT HEATER MCBLDG 5.00 5.00 1.00 90.00 85.0 5.6 6.5 3.4
25 MAV22AP0050M01 MAIN OIL PUMP LUBE OIL 2 27.40 37.00 0.74 91.92 88.8 29.8 33.5 15.4
26 MAV80AP005-M01 JACKING OIL PUMP LUBE OIL 13.50 15.00 0.90 90.00 90.2 15.0 16.6 7.2
27 MAX22AP010-M01 MAIN CONTROL OIL PUMP 2 9.90 11.00 0.90 90.00 88.8 11.0 12.4 5.7
28 MKA10AE010-M01 TURNING GEAR MOTOR 7.50 7.50 1.00 90.00 85.0 8.3 9.8 5.2
RECEPTACLE TYPE,
29 MSI-0004-B MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
30 MSI-0005-B MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
31 MSI-0005-D MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
32 MSI-0006-C MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
33 MSI-0006-D MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
RECEPTACLE TYPE,
34 MSI-0007-C MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
SUBSTATION NO. :
0-OC-EDB-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 37 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
RECEPTACLE TYPE,
35 MSI-0007-D MULTISPLIT A/C MCBLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V AC
36 MSO-0002-A-1 MULTISPLIT A/C MCBLDG 19.50 19.50 1.00 90.00 85.0 21.7 25.5 13.4
37 MSO-0002-B-1 MULTISPLIT A/C MCBLDG 19.50 19.50 1.00 90.00 85.0 21.7 25.5 13.4
38 SACI-0001-B SPLIT A/C AIS CR 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4 120V, AC
39 SACO-0001-B SPLIT A/C AIS CR 4.00 4.00 1.00 90.00 85.0 4.4 5.2 2.8
40 SF-0001-A SUPPLY FAN MCBLDG 5.50 5.50 1.00 90.00 87.0 6.1 7.0 3.5
41 SF-0001-B SUPPLY FAN MCBLDG 5.50 5.50 1.00 90.00 87.0 6.1 7.0 3.5
42 SF-0002 SUPPLY FAN FWPH 0.70 0.70 1.00 77.00 80.0 0.9 1.1 0.7 120V, AC
43 SF-0003 SUPPLY FAN FWPH 0.70 0.70 1.00 77.00 80.0 0.9 1.1 0.7 120V, AC
44 0-EH-EDB-001 EMERGENCY LIGHTING DB 22.7 26.7 14.1 0.0 0.0 0.0 0.0 0.0 0.0
45 MAG-10-AA-005 VACUUM BEAKER VALVE 0.18 0.20 0.90 80.00 50.0 0.2 0.4 0.4
DEMAND LOAD TOTAL 209.0 242.6 123.1 8.5 10.2 5.6 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
0-OC-EDB-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 209 242.6 123.1 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 211.55 245.6 124.78
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 38 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 2-MH-AH-001-54 EMERGENCY LIGHTING PANEL 4.03 4.03 1.00 90.00 85.0 4.5 5.3 2.8
2 2-MH-AH-001-55 AIRCRAFT WARNING LIGHT 1.30 1.30 1.00 90.00 85.0 1.4 1.7 0.9
3 ELP-001 E LIGHTING PANEL -1 SWGR ROOM 4.60 4.60 1.00 90.00 85.0 5.1 6.0 3.2
4 ELP-002 E LIGHTING PANEL -2 ADMIN BLDG 4.20 4.20 1.00 90.00 85.0 4.7 5.5 2.9
5 ELP-003 E LIGHTING PANEL -3 ACC PIPE RACK 2.90 2.90 1.00 90.00 85.0 3.2 3.8 2.0
6 ELP-004 E LIGHTING PANEL -4 GSUT 2 3.40 3.40 1.00 90.00 85.0 3.8 4.4 2.3
DEMAND LOAD TOTAL 22.7 26.7 14.1 0.0 0.0 0.0 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
0-EH-EDB-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 22.7 26.7 14.1 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 22.7 26.7 14.1
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 39 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 1-MG-AG-001-1 TURBINE COMPT. COOLING AIR FAN 88BT-1 26.85 29.83 0.90 91.00 89.2 29.5 33.1 14.9 NEMA 40HP
2 1-MG-AG-001-10 TURNING GEAR MOTOR 88TG-1 3.36 3.73 0.90 88.00 87.4 3.8 4.4 2.1 NEMA 5HP
3 1-MG-AG-001-12 SPACE HEATER 23BT-1 FOR 1-MG-AG-001-1 0.20 0.20 1.00 98.00 100.0 0.2 0.2 0.0 120V, AC
4 1-MG-AG-001-16 AUX LUBE OIL PUMP MOTOR 88QA-1 67.11 74.57 0.90 92.00 91.0 72.9 80.2 33.2 NEMA 100HP
5 1-MG-AG-001-18 HYDRAULIC SUPPLY PUMP MOTOR 88HQ-1 40.28 44.76 0.90 92.00 89.0 43.8 49.2 22.4 NEMA 60HP
6 1-MG-AG-001-20 GEN AUX SEAL OIL PUMP 88QS-1 6.71 7.46 0.90 88.00 81.0 7.6 9.4 5.5 NEMA 10HP
7 1-MG-AG-001-3 SPACE HEATER 23HQ-1 FOR 1-MG-AG-001-18 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
8 1-MG-AG-001-30 MIST ELIMINATOR FAN MOTOR 88QV-1A 3.36 3.73 0.90 88.00 87.4 3.8 4.4 2.1 NEMA 5HP
9 1-MG-AG-001-32 SP HEATER 23QV-2A FOR 1-MG-AG-001-30 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
10 1-MG-AG-001-36 SPACE HEATER 23BN-1 FOR 1-MG-AG-001-6 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
11 1-MG-AG-001-40 AIR CONDITIONING - PEECC 88KA-1 25.00 25.00 1.00 90.00 85.0 27.8 32.7 17.2
12 1-MG-AG-001-42 CONTROL, LIGHTING, MISC HEATERS, ETC. 11.48 11.48 1.00 90.00 85.0 12.8 15.0 7.9
13 1-MG-AG-001-50 BATTERY CHARGER 1 11.48 11.48 1.00 90.00 85.0 12.8 15.0 7.9
14 1-MG-AG-001-53 SPACE HEATER 23VG-1 FOR 1-MG-AG-001-8 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
15 1-MG-AG-001-55 SPACE HEATER 23TG-1 FOR 1-MG-AG-001-10 0.08 0.08 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
16 1-MG-AG-001-58 SPACE HEATER 23QA-1 FOR 1-MG-AG-001-16 0.10 0.10 1.00 98.00 100.0 0.1 0.1 0.0 120V, AC
17 1-MG-AG-001-6 BEARING AREA BLOWER 88BN-1 10.07 11.19 0.90 90.00 88.8 11.2 12.6 5.8 NEMA 15HP
SUBSTATION NO. :
1-OC-EDB-001
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 40 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 1-MG-AG-001-61 SPACE HEATER 23QS-1 FOR 1-MG-AG-001-20 0.23 0.23 1.00 98.00 100.0 0.2 0.2 0.0 120V, AC
19 1-MG-AG-001-8 LOAD COUPLING COMP VENT FAN 88VG-1 5.03 5.59 0.90 90.00 85.4 5.6 6.5 3.4 NEMA 7.5HP
DEMAND LOAD TOTAL 227.8 257.7 120.4 3.8 4.3 2.1 1.0 1.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
1-OC-EDB-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 227.8 257.7 120.4 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 228.94 258.96 121.03
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 41 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 1-MG-AG-001-34 WATER WASH PUMP 88TW-1 10.07 11.19 0.90 90.00 85.0 11.2 13.2 6.9 NEMA 15HP
2 1-MG-AG-001-35 WATER WASH PUMP MOTOR HEATER 23TW-1 0.06 0.06 1.00 98.00 100.0 0.1 0.1 0.0
3 1-MG-AG-001-37 WATER WASH SKID SP HEATER 23WS-1 10.00 10.00 1.00 98.00 100.0 10.2 10.2 0.0
4 1-MG-AG-001-38 WATER WASH TANK IMMER HEATER 23WK-1 25.00 25.00 1.00 98.00 100.0 25.5 25.5 0.0
5 1-MG-AG-001-39 WATER WASH TANK IMMER HEATER 23WK-2 25.00 25.00 1.00 98.00 100.0 25.5 25.5 0.0
6 1-MG-AG-001-69 WATER WASH VENT FAN MOTOR 88VW-1 0.34 0.37 0.90 90.00 90.0 0.4 0.4 0.2 NEMA 0.5HP
7 1-MG-AG-001-70 WATER WASH SKID SP HEATER BLOW 88WS-1 0.07 0.08 0.90 88.00 83.0 0.1 0.1 0.1 NEMA 0.1HP
DEMAND LOAD TOTAL 73.0 73.3 7.1 0.0 0.0 0.0 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
1-MG-AG-001-76
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 73 73.3 7.1 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 73 73.3 7.1
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 42 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 2-MH-AH-001-37 STACK DAMPER MAIN POWER 0.68 0.75 0.90 81.40 77.2 0.8 1.1 0.7
2 HV-AH-101 HP FEED WATER STOP MOV 1.29 1.43 0.90 80.00 50.0 1.6 3.2 2.8
3 HV-AH-105 HPECON.BYPASS MOV 0.68 0.75 0.90 80.00 50.0 0.8 1.7 1.5
4 HV-AH-115 HP DSH SPRAY WATER STOP MOV 0.34 0.38 0.90 80.00 50.0 0.4 0.9 0.7
5 HV-AH-120 HP SH INLET LINK MOV 0.05 0.06 0.90 80.00 50.0 0.1 0.1 0.1
6 HV-AH-122 HP DRUM INT B/D MOV 0.68 0.75 0.90 80.00 50.0 0.8 1.7 1.5
7 HV-AH-125 HP DRUM CONTINUOUS B/D MOV 0.18 0.20 0.90 80.00 50.0 0.2 0.4 0.4
8 HV-AH-130 HP SH 1&2 DRAIN MOV 0.34 0.38 0.90 80.00 50.0 0.4 0.9 0.7
9 HV-AH-135 HP SH 3&4 DRAIN MOV 0.34 0.38 0.90 80.00 50.0 0.4 0.9 0.7
10 HV-AH-140 HP STEAM START UP VENT MOV 0.34 0.38 0.90 80.00 50.0 0.4 0.9 0.7
11 HV-AH-141 HP DESH.SPRAY BYPASS MOV 0.34 0.38 0.90 80.00 50.0 0.4 0.9 0.7
12 HV-AH-310 RH DSH SPRAY STOP MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
13 HV-AH-315 RH DRAIN MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
14 HV-AH-325 RH START UP VENT STOP MOV 0.85 0.94 0.90 80.00 50.0 1.0 2.1 1.8
15 HV-AH-326 RH DESH.SPRAY BYPASS MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
16 HV-AH-401 IP FEEDWATER MAIN STOP MOV 0.23 0.26 0.90 80.00 50.0 0.3 0.6 0.5
17 HV-AH-402 IP FEEDWATER SMALL STOP MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
SUBSTATION NO. :
2-MH-AH-001-28
RATED VOLTAGE :
480V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 43 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 HV-AH-410 IP DRUM S/H INLET LINK VENT MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
19 HV-AH-415 IP DRUM INT. B/D MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
20 HV-AH-420 IP DRUM CONT.B/D MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
21 HV-AH-425 IP SH DRAIN MOV 0.12 0.13 0.90 80.00 50.0 0.1 0.3 0.3
22 HV-AH-430 IP STEAM STOP MOV 0.84 0.93 0.90 80.00 50.0 1.0 2.1 1.8
23 HV-AH-431 IP STEAM START UP VENT MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
24 HV-AH-435 IP STEAM DRAIN MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
25 HV-AH-440 LP DR PEGGING STEAM STOP MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
26 HV-AH-441 IP STEAM PCV BYPASS MOV 0.84 0.93 0.90 80.00 50.0 1.0 2.1 1.8
27 HV-AH-501 CONDENSATE MAIN STOP MOV 0.58 0.64 0.90 80.00 50.0 0.7 1.4 1.2
28 HV-AH-502 CONDENSATE SMALL STOP MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
29 HV-AH-535 LP DRUM VENT MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
30 HV-AH-540 LP DRUM INT.B/D MOV 0.10 0.11 0.90 80.00 50.0 0.1 0.2 0.2
31 HV-AH-545 LP SH DRAIN MOV 0.12 0.13 0.90 80.00 50.0 0.1 0.3 0.3
32 HV-AH-550 LP START UP VENT STOP MOV 0.23 0.26 0.90 80.00 50.0 0.3 0.6 0.5
DEMAND LOAD TOTAL 0.0 0.0 0.0 12.7 24.8 21.4 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
2-MH-AH-001-28
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 0 0 0 480V
Max. Normal Running Load =F x X(%) + G x Y(%) + H x Z(%) 3.81 7.46 6.42
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 44 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 2-MH-AH-001-1 INSTRUMENT CABINET-1 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
2 2-MH-AH-001-2 INSTRUMENT CABINET-2 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
3 2-MH-AH-001-3 INSTRUMENT CABINET-3 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
4 2-MH-AH-001-30 HP DRUM LEVEL GAUGE LEFT 0.45 0.45 1.00 90.00 85.0 0.5 0.6 0.3
5 2-MH-AH-001-31 HP DRUM RDLI 0.34 0.34 1.00 90.00 85.0 0.4 0.4 0.2
6 2-MH-AH-001-33 LEVEL SWITCH IP 0.54 0.54 1.00 90.00 85.0 0.6 0.7 0.4
7 2-MH-AH-001-34 LEVEL SWITCH LP 0.54 0.54 1.00 90.00 85.0 0.6 0.7 0.4
8 2-MH-AH-001-4 INSTRUMENT CABINET-4 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
9 2-MH-AH-001-44 HP DRUM LEVEL GAUGE RIGHT 0.45 0.45 1.00 90.00 85.0 0.5 0.6 0.3
10 2-MH-AH-001-45 IP DRUM LEVEL GAUGE LEFT 0.20 0.20 1.00 90.00 85.0 0.2 0.3 0.1
11 2-MH-AH-001-46 IP DRUM LEVEL GAUGE RIGHT 0.20 0.20 1.00 90.00 85.0 0.2 0.3 0.1
12 2-MH-AH-001-47 LP DRUM LEVEL GAUGE LEFT 0.31 0.31 1.00 90.00 85.0 0.3 0.4 0.2
13 2-MH-AH-001-48 LP DRUM LEVEL GAUGE RIGHT 0.31 0.31 1.00 90.00 85.0 0.3 0.4 0.2
14 2-MH-AH-001-49 IP DRUM RDLI 0.16 0.16 1.00 90.00 85.0 0.2 0.2 0.1
15 2-MH-AH-001-5 INSTRUMENT CABINET-5 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
16 2-MH-AH-001-50 LPDRUM RDLI 0.24 0.24 1.00 90.00 85.0 0.3 0.3 0.2
17 2-MH-AH-001-6 INSTRUMENT CABINET-6 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
SUBSTATION NO. :
2-MH-AH-001-36
RATED VOLTAGE :
120V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 45 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 2-MH-AH-001-7 INSTRUMENT CABINET-7 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
19 2-MH-AH-001-8 INSTRUMENT CABINET-8 0.50 0.50 1.00 90.00 85.0 0.6 0.6 0.3
DEMAND LOAD TOTAL 8.9 10.1 4.9 0.0 0.0 0.0 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
2-MH-AH-001-36
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 8.9 10.1 4.9 120V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 8.9 10.1 4.9
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 46 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 6-MC-PI-001-A AIR COMPRESSOR MAIN MOTOR A 115.00 132.00 0.87 94.00 92.0 122.3 133.0 52.1
2 6-MC-PI-001-A-1 OIL PUMP MOTOR 1.50 2.20 0.68 90.00 85.0 1.7 2.0 1.0
3 6-MC-PI-001-A-2 COOLING FAN MOTOR 1 3.00 3.70 0.81 90.00 85.0 3.3 3.9 2.1
4 6-MC-PI-001-A-3 COOLING FAN MOTOR 2 3.00 3.70 0.81 90.00 85.0 3.3 3.9 2.1
5 6-MC-PI-001-A-4 CONTROL POWER 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7
6 6-MC-PI-001-B AIR COMPRESSOR MAIN MOTOR B 115.00 132.00 0.87 94.00 92.0 122.3 133.0 52.1
7 6-MC-PI-001-B-1 OIL PUMP MOTOR 1.50 2.20 0.68 90.00 85.0 1.7 2.0 1.0
8 6-MC-PI-001-B-2 COOLING FAN MOTOR 1 3.00 3.70 0.81 90.00 85.0 3.3 3.9 2.1
9 6-MC-PI-001-B-3 COOLING FAN MOTOR 2 3.00 3.70 0.81 90.00 85.0 3.3 3.9 2.1
10 6-MC-PI-001-B-4 CONTROL POWER 1.00 1.00 1.00 90.00 85.0 1.1 1.3 0.7
DEMAND LOAD TOTAL 131.8 143.9 57.9 0.0 0.0 0.0 131.8 143.9 57.9 SUBSTATION NO. :
Continuous Intermittent Stand by
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP 2485 SHEET NO.: 47 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 6-MU-AJ-PP-01A O2 SCAVENGER INJECTION PUMP A 0.20 0.75 0.27 83.00 58.0 0.2 0.4 0.3 NEMA 1 HP
2 6-MU-AJ-PP-01B O2 SCAVENGER INJECTION PUMP B 0.20 0.75 0.27 83.00 58.0 0.2 0.4 0.3 NEMA 1 HP
3 6-MU-AJ-PP-01C AUTO STROKE SERVO MOTOR O2 SCAV A 0.09 0.10 0.90 90.00 90.0 0.1 0.1 0.0
4 6-MU-AJ-PP-01D AUTO STROKE SERVO MOTOR O2 SCAV B 0.09 0.10 0.90 90.00 90.0 0.1 0.1 0.0
5 6-MU-AJ-PP-02A AMINE INJECTION PUMP A 0.20 0.75 0.27 83.00 58.0 0.2 0.4 0.3 NEMA 1 HP
6 6-MU-AJ-PP-02B AMINE INJECTION PUMP B 0.20 0.75 0.27 83.00 58.0 0.2 0.4 0.3 NEMA 1 HP
7 6-MU-AJ-PP-03A HP PHOSPHATE INJECTION PUMP A 1.10 1.50 0.73 88.93 58.1 1.2 2.1 1.7 NEMA 2 HP
8 6-MU-AJ-PP-03B HP PHOSPHATE INJECTION PUMP B 1.10 1.50 0.73 88.93 58.1 1.2 2.1 1.7 NEMA 2 HP
9 6-MU-AJ-PP-04A IP PHOSPHATE INJECTION PUMP A 0.20 0.75 0.27 83.00 58.0 0.2 0.4 0.3 NEMA 1 HP
10 6-MU-AJ-PP-04B IP PHOSPHATE INJECTION PUMP B 0.20 0.75 0.27 83.00 58.0 0.2 0.4 0.3 NEMA 1 HP
DEMAND LOAD TOTAL 2.1 3.5 2.8 0.0 0.0 0.0 2.1 3.5 2.8 SUBSTATION NO. :
Continuous Intermittent Stand by
6-MU-AJ-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 2.1 3.5 2.8 480V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 2.1 3.5 2.8
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP 2485 SHEET NO.: 48 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 DWH-0002 ELECTRIC WATER HEATER ADMIN BLDG 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4
2 DWH-0003 ELECTRIC WATER HEATER ADMIN BLDG 2.00 2.00 1.00 90.00 85.0 2.2 2.6 1.4
3 DWH-0004 ELECTRIC WATER HEATER ADMIN BLDG 1.20 1.20 1.00 90.00 85.0 1.3 1.6 0.8
RECEPTACLE TYPE
4 MSI-0001 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
5 MSI-0002 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
6 MSI-0003 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
7 MSI-0004 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
8 MSI-0005 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
9 MSI-0006 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
10 MSI-0007 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
11 MSI-0008 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
12 MSI-0009 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
13 MSI-0010 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
14 MSI-0011 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
15 MSI-0012 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
16 MSI-0013 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
17 MSI-0014-A MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
SUBSTATION NO. :
RP-003
RATED VOLTAGE :
120V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 49 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
RECEPTACLE TYPE
18 MSI-0014-B MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
19 MSI-0015-A MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
20 MSI-0015-B MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
21 MSI-0015-C MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
22 MSI-0015-D MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
23 MSI-0016 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
24 MSI-0017 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
25 MSI-0018 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
26 MSI-0019 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
27 MSI-0020 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
28 MSI-0021 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
29 MSI-0022 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
30 MSI-0023 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
31 MSI-0024 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
32 MSI-0025 MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
33 MSI-0026-A MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
RECEPTACLE TYPE
34 MSI-0026-B MULTISPLIT A/C ADMIN BLDG 0.10 0.10 1.00 90.00 85.0 0.1 0.1 0.1
120V, AC
SUBSTATION NO. :
RP-003
RATED VOLTAGE :
120V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 50 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
DEMAND LOAD TOTAL 3.8 5.4 3.8 5.7 6.8 3.6 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
RP-003
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 3.8 5.37 3.8 120V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 5.51 7.36 4.88
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 51 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 DWH-0001 ELEC WATER HEAT MAIN AND WARE 1.20 1.20 1.00 90.00 85.0 1.3 1.6 0.8
RECEPTACLE TYPE
2 MSI-0001 MULTI SPLIT A/C MAIN AND WARE H 1 1.10 1.10 1.00 90.00 85.0 1.2 1.4 0.7
120V, AC
RECEPTACLE TYPE
3 MSI-0002 MULTI SPLIT A/C MAIN AND WARE H 2 1.00 1.00 1.00 90.00 85.0 1.1 1.2 0.6
120V, AC
RECEPTACLE TYPE
4 MSI-0003 MULTI SPLIT A/C MAIN AND WARE H 3 1.00 1.00 1.00 90.00 85.0 1.1 1.2 0.6
120V, AC
RECEPTACLE TYPE
5 MSI-0004 MULTI SPLIT A/C MAIN AND WARE H 4 1.00 1.00 1.00 90.00 85.0 1.1 1.2 0.6
120V, AC
DEMAND LOAD TOTAL 4.5 5.1 2.5 1.3 1.6 0.8 0.0 0.0 0.0 SUBSTATION NO. :
Continuous Intermittent Stand by
RP-004
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 4.5 5.1 2.5 120V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 4.89 5.6 2.74
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 52 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-ED-EL-001-C 480V L/C1 DC CONTL SUPPLY C 2.00 2.00 1.00 90.00 2.2
2 0-ED-EL-002-C 480V L/C2 DC CONTL SUPPLY C 2.00 2.00 1.00 90.00 2.2
3 0-ED-EL-003-C 480V L/C3 DC CONTL SUPPLY C 2.00 2.00 1.00 90.00 2.2
4 0-ED-EL-004-C 480V ESS DC CONTL SUPPLY C 2.00 2.00 1.00 90.00 2.2
15 CJN01 DC SUPPLY FIELD FLASHING STG 14.00 14.00 1.00 90.00 15.6
SUBSTATION NO. :
0-DP-DC-001
RATED VOLTAGE :
250V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 53 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
19 MAV23AP005-M01 EMERGENCY OIL PUMP (STG) 10.00 10.00 1.00 90.00 11.1 NEMA 13.4HP
0-DP-DC-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 63.5 250V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 63.5
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 54 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
4 PP-5-001 230kV LINE FEEDER PANEL 0.30 0.30 1.00 90.00 0.3
5 PP-5-002 230kV GSU-1 FEEDER PANEL 0.10 0.10 1.00 90.00 0.1
6 PP-5-003 230kV GSU-2 FEEDER PANEL 0.10 0.10 1.00 90.00 0.1
7 PP-5-004 230kV BUS BAR PROTECTION PANEL 0.15 0.15 1.00 90.00 0.2
8 PP-5-005 230kV LINE FEEDER CONTROL PANEL 0.10 0.10 1.00 90.00 0.1
9 PP-5-006 230kV GSU-1 FEEDER CONTROL PANEL 0.10 0.10 1.00 90.00 0.1
10 PP-5-007 230kV GSU-2 FEEDER CONTROL PANEL 0.10 0.10 1.00 90.00 0.1
12 PP-5-009 230kV FAULT RECODER PANEL 0.10 0.10 1.00 90.00 0.1
0-DP-DC-002
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 8.1 250V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 8.1
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 55 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 1-MG-AG-001-A EMERGENCY LUBE OIL PUMP 88QE-1 13.42 14.91 0.90 90.00 14.9 NEMA 20HP
2 1-MG-AG-001-B EMERGENCY SEAL OIL PUMP 88ES-1 6.71 7.46 0.90 90.00 7.5 NEMA 10HP
0-DP-DC-003
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 40.1 125V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 40.1
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 56 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
1 0-DP-UPS-001-1 UPS SUPPLY FOR CCR 18.00 18.00 1.00 89.00 85.0 20.2 23.8 12.5
2 0-DP-UPS-001-10 UPS SUPPLY DUCT BURNER 1.00 1.00 1.00 89.00 85.0 1.1 1.3 0.7
3 0-DP-UPS-001-11 CHEMICAL DOSING SYS 1.00 1.00 1.00 89.00 85.0 1.1 1.3 0.7
4 0-DP-UPS-001-12 WEATHER STATION 0.50 0.50 1.00 89.00 85.0 0.6 0.7 0.3
5 0-DP-UPS-001-13 PI SERVER DESK 0.70 0.70 1.00 89.00 85.0 0.8 0.9 0.5
6 0-DP-UPS-001-14 DRUM LEVEL INDICATOR 2.00 2.00 1.00 89.00 85.0 2.2 2.6 1.4
7 0-DP-UPS-001-15 UPS SUPPLY FOR SWYD 0.85 0.85 1.00 89.00 85.0 0.9 1.1 0.6
8 0-DP-UPS-001-16 UPS SUPPLY FOR CJN10 STG 2.00 2.00 1.00 89.00 85.0 2.2 2.6 1.4
9 0-DP-UPS-001-18 TELE COMMUNICATION 1.00 1.00 1.00 89.00 85.0 1.1 1.3 0.7
10 0-DP-UPS-001-2 UPS SUPPLY FOR CCR STNBY 18.00 18.00 1.00 89.00 85.0 20.2 23.8 12.5
11 0-DP-UPS-001-3 UPS SUPPLY FOR GTG PNL 3.50 3.50 1.00 89.00 85.0 3.9 4.6 2.4
12 0-DP-UPS-001-4 STEAM TURBINE CNTRL PNL 3.00 5.00 0.60 89.00 85.0 3.4 4.0 2.1
13 0-DP-UPS-001-5 STEAM TURBINE CNTRL PNL 3.00 5.00 0.60 89.00 85.0 3.4 4.0 2.1
14 0-DP-UPS-001-6 CEMS PACKAGE 1.20 1.20 1.00 89.00 85.0 1.3 1.6 0.8
15 0-DP-UPS-001-7 SWAS MAIN PNL 1.40 1.40 1.00 89.00 85.0 1.6 1.9 1.0
16 0-DP-UPS-001-8 SWAS REMOTE PNL 0.20 0.20 1.00 89.00 85.0 0.2 0.3 0.1
17 0-DP-UPS-001-9 UPS SUPPLY DUCT BURNER 1.00 1.00 1.00 89.00 85.0 1.1 1.3 0.7
SUBSTATION NO. :
0-DP-UPS-001
RATED VOLTAGE :
120V
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 57 OF 58
EQUIPMENT LOAD EFFIC POWER DESIGN LOAD
Seri. EQUIPMENT SERVICE NAME NO. BHP POWER (AB) at load at load (KW = AD ; KVA = KWE ; Kvar=KVAsin) REMARKS
POLE A B C D E F G H
18 0-EX-EX-003-B TARIFF METERING UPS SUPL 0.50 0.50 1.00 89.00 85.0 0.6 0.7 0.3
19 G023-GC GE CHROMATOGRAPH 1.80 1.80 1.00 89.00 85.0 2.0 2.4 1.3
20 G028-WM-1 FUEL GAS WOBBE METER A 1.50 1.50 1.00 89.00 85.0 1.7 2.0 1.0
21 G028-WM-2 FUEL GAS WOBBE METER B 1.50 1.50 1.00 89.00 85.0 1.7 2.0 1.0
22 G028-WM-3 FUEL GAS WOBBE METER AUX 4.50 4.50 1.00 89.00 85.0 5.1 5.9 3.1
DEMAND LOAD TOTAL 51.8 60.8 32.0 0.0 0.0 0.0 24.7 29.0 15.3 SUBSTATION NO. :
Continuous Intermittent Stand by
0-DP-UPS-001
kW kVA kVAR RATED VOLTAGE :
Normal Running Load = F x X(%) 51.8 60.8 32 120V
Max. Normal Running Load = F x X(%) + G x Y(%) + H x Z(%) 51.8 60.8 32
SAMSUNG ENGINEERING CO., LTD. ELECTRICAL LOAD SUMMARY JOB NO. : SP2485 SHEET NO.: 58 OF 58