Académique Documents
Professionnel Documents
Culture Documents
SHOP DWG#:
Works Location:
Date 28/01/2017
Time 7:30 AM
Discipline:
Civil
Architectural
Mechanical
Electrical
Other (State)
QA/QC
Yes No
Yes No
r Section's Comments & Sign-off:
Signature Comment's If Any
Signed By:
Signed By:
Date: Time:
Date: Time:
Approved
Approved with
comments
Rejected
N/A
Date:
Date:
abilities under the Contract. In case of any discrepancy between the inspected works and final approved designs, the Contractor
ccording to the final approved design without the right to claim extra cost and time.