Académique Documents
Professionnel Documents
Culture Documents
Surveyor:
Items
10
11
12
13
14
SITE SURVEY REPO
Surveyor:
CHECKS
Site Code
Site Name
Site coordinate/Longitude
Site coordinate/Latitude
Tower type
HBA
For site missing working platform and those where platform is far from antennas (>3m) , availability
of space on tower leg for temporary installation of 3 new Nokia RF modules + 1 FPFC (Yes or No)
Qty & range of CB used at customer PDU to protect working ALU equipment 50A, 63A, 80A, 125A?
Are existing power cables (blue & black), from customer PDU to BTS,in good conditions (NOT
damaged, BURNT)? Qty/Lenght/size of cables
Qty of free breaker on MD4G, LRO, 19 rack PDU
Other findings
VEY REPORT
Date:
INPUTS COMMENTS
Dist-to-Antenna S1 ( ) Dist-to-Antenna S2 ( )
YES or NO [m] [m]
S1 ( ) [m] S2 ( ) [m]
Number of Mast ( )
YES or NO
S1 ( ) [m] S2 ( ) [m]
YES or NO
YES or NO
SITE_VIEW
BTS_VIEW
Dist-to-Antenna S3 TOWER_VIEW
( ) [m]
S3 ( ) [m]
ROOFTOP VIEW WITH ALL MASTS
POSSIBLE POINT FOR RFM
INSTALLATION BETWEEN ROOFTOP
MASTS
S3 ( ) [m]
GROUNDING POINTS
TOWER VIEW
GROUNDING POINTS
from main rectifier(Good visibility on the amperage values)
GROUNDING POINTS
mperage values)
e amperage values)
C : Flexi Power distribution Fuse C/D
FPK
FPKA