Inspection
QA/QC IBP/01-00-IP-
Procedure
INSPECTION PROCEDURE
Client :
End User :
Project :
Project No. :
0 For Review
Rev Date of Issue Status Prepared Checked Approved
Page 1 of 3
Document Department Doc No.
Inspection
QA/QC IBP/01-00-IP-
Procedure
1. Scope
This procedure covers the minimum requirement of inspection have to be done on
Pressure Vessel start from material receiving inspection up to ready for shipment.
2. Reference
2.1 ASME Section VIII Div. 1
2.2 ASME Section V
2.3 ASME Section IX
2.4 ASME B31.3
2.5 Customer Specification
2.6 Quality Plan of each Equipment
3. Procedure
3.1 Material Receiving Inspection
3.1.1 All materials receiving have to be inspected for visual, dimensional and
material certificate. Visual and dimensional inspection has to be done to
make sure that all materials coming are met with Code and Customer
Specification.
3.1.2 All accepted materials will be segregated from rejected material to make sure
that only accepted materials are used for fabrication of these Pressure Vessel
3.1.3 Stainless Steel materials have to be segregated from Stainless Steel
materials to avoid contamination.
3.2.2 Make sure that all stamps have been done in accordance with Fabrication
procedure.
3.4 Welding.
3.4.1 During welding visual inspections have to be done to make sure that all
parameters weld have been met with qualified Welding Procedure
Specification.
3.4.2 After welding and prior to Radiographic Test or Penetrant Test, visual
inspection has to be done to make sure that all requirements as mentioned in
Inspection and Test Plan of each Pressure Vessel have been met.
Page 2 of 3
Document Department Doc No.
Inspection
QA/QC IBP/01-00-IP-
Procedure
3.5.3 Make sure that all equipment, which will be used for hydrostatic test, has
been calibrated and the range of pressure has been met with requirements.
3.5.4 During hydrostatic test, visual inspection has to be done to make sure that
there are no leakages on weld seam and flange connections.
3.5.5 After Hydrostatic Test, visual inspection has to be done to make sure that all
test water was drain and inside of vessels dried.
3.6.2 After painted visual and dimensional inspection has to be done to make sure
that the dried thickness of paint has been met with requirement.
3.7.2 Visual check to make sure that lashing method has been met with
requirement and the equipment sitting on truck correctly.
3.8 Documentation.
All report of inspections has to be collected as Manufacturer Data Report