Académique Documents
Professionnel Documents
Culture Documents
Proposal Report
JULY,, 2010
JULY
Summary
DCT Partners(Korea)
Owner
DCT Partners Vietnam(Vietnam)
-
50,070 M2
Investment License : 2008. 6.
Master plan Approval 2009. 11
- 5Km
Construction permit :2010.2.11
, ,
Status Usage : APT, Commercial
Current site condition => Flat
- ,
,
Page 1
Location
Page 2
Surrounding
Page 3
Surrounding
22. Nguyen Van Triet 32. International General 42. Tan Dong Hiep
12. Vo Truong Toan
2. 434 Residential area Primary(HCMC Thu
Secondary School Hospital (1000 bed)(2010) Residential area
Duc)
3. Minh Tien Urban 13. : Vo Thi Sau 33. Nguyen Thai Binh
23. An Binh Plaza 43. Metro station (2013)
area Nursery school, Secondary school(2012)
5. QuanDoan 15. Di An High 25. Police University 35. Canary & KinderWorld
45. HCMC graveyard
4Hospital(180 beds) School (Thu Duc) International school
Page 4
Charm Plaza
Page 5
Charm Plaza
Area 50,070M2
Building 6 Buildings : A1, A2, B1 ,B2, B3, B4
Floor B1, G, 23F, (Partly B2)
Construction 17,487M2
Cons' Ratio 34.93%
Building Area 362,375
Swimming etc 935.5M2
Total Area 363,310M2
Building ratio 733%
Building Unit B G 1~23 Terrace Total
A1 690 4,546.7 3,761.2 70,097.1 3,047.7 81,452.7
A2 660 4,546.7 3,761.2 70,097.1 3,047.7 81,452.7
B1 456 1,846.0 2,140.8 41,512.0 1,725.0 47,223.8
B2 256 6,148.0 2,607.0 43,891.0 1,725.0 54,371.0
B3 368 5,106.0 2,140.8 41,595.5 1,725.0 50,567.3
B4 368 1,846.0 2,140.8 41,595.5 1,725.0 47,307.3
Total Area 2,798 24,039.4 16,551.9 308,788.2 12,995.4 362,374.9
A2 Building 1F 3,047M2, parking lot
B1 Building 1F 1,725M2 Service area
B2 Building b2F parking lot, G~4f 9,780M2 commercial, 5~7f 5,175M2 office, 8~23f APT
B3 Building b2F parking lot
Page 6
Charm Plaza B1 Block
Page 7
Masterplan
Phase1
Page 8
Charm Plaza
Bathroom
Basin American standard& INAX Normal TOTO Good
Toliet seat American standard& INAX Normal TOTO Good
shower American standard& INAX Normal TOTO Good
bidet tap American standard& INAX Normal TOTO Good
Shower cubicle American standard& INAX Normal Local Good
Public Area
Floor 400*400 Normal 400*400 Normal
Ceiling Render/Gypsum Board painting Normal Render/Gypsum Board painting Normal
Wall finishes Room : water painting Normal Room : water painting Normal
Page 10
Unit A
Unit A
Unit A
Project Time Line
2010 2011
Charm Plaza
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Construction permit
Foundation construction
Model house
Main Construction
Able to Sell(Register)
Public Relations
Selling
Page 11
CONFIDENTIAL
This document contains proprietary methodologies and knowledge and remains the property of Charm Engineering
These contents cannot be used or disclosed without written consent of Charm Engineering
2010, Charm Engineering
Thank you