VOLUME SATUAN
NO. URAIAN PEKERJAAN
[VOL.] [SAT.]
B PEKERJAAN PONDASI
1 Pek. Panjang Pondasi P1 26.20 m
Volume Pondasi 6.68 m
Batu Belah 1.2 m 8.02 m
Pc/ Semen 136 kg/m 908.48 kg
Pasir 0.554/m 3.70 m
2 Pek. Panjang Pondasi P2 20.00
Volume Pondasi 5.10 m
Batu Belah 1.2 m 6.12 m
Pc/ Semen 136 kg/m 693.60 kg
Pasir 0.554/m 2.83 m
3 Pek. Panjang Pondasi P3 10.10
Volume Pondasi 1.89 m
Batu Belah 1.2 m 2.27 m
Pc/ Semen 136 kg/m 257.04 kg
Pasir 0.554/m 1.05 m
4 Pas. Besi Angkur Pondasi (8) 22.60 m
Total
Batu Belah 16.40 m
Pc/Semen 1,859.12 kg
Pasir 7.57 m
C PEKERJAAN STRUKTUR SLOOF DAN KOLOM
1 Pek. Sloof S1 150/250 52.40 m'
Tulangan 410 209.60 m
Sengkang 8 - 200 183.40 m
Pekerjaan Mutu Beton K-225 1.96 m
1 m = 371Pc/kg 727.16 kg
1 m = 698 Pasir beton/m 1368.08 kg
1 m = 1047 kerikil/m 2052.12 kg
2 Pek. Sloof S2 150/200 4.10 m'
Tulangan 410 16.40 m
Sengkang 8 - 200 12.30 m
Pekerjaan Mutu Beton K-225 0.12 m
1 m = 371Pc/kg 44.52 kg
1 m = 698 Pasir beton/m 83.76 kg
1 m = 1047 kerikil/m 125.64 kg
3 Pek. Kolom Praktis 130/130 ( 4.3 m ) 8 titik
Tulangan 48 140.16 m
Sengkang 6 - 200 73.58 m
Pekerjaan Mutu Beton K-175 0.59 m
1 m = 326 Pc/kg 192.34 kg
1 m = 760 Pasir pasang/m 448.40 kg
1 m = 1026 kerikil/m 605.34 kg
Total Pembesian
Besi 6 248.23 m
Besi 8 824.28 m
Besi 10 427.88 m
Pc/Semen 2240.37 kg
Pasir Beton 4822.36 kg
Cipping 6769.66 kg
TOTAL KESELURUHAN
BESI 6 20.69 bh
BESI 8 68.69 bh
BESI 10 35.66 bh
BATU PONDASI 16.40 m
SEMEN 298.52 sak
PASIR 21.53 m
CIPPING 5.0 m
Sloof 1
52.4
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.7 0.11+0.11+0.21+0.21+0.03+0.03
Jumlah Besi Besi Begel
262 Bh
Total Besi Begel
183.4 m
Sloof 2
4.1 2.05+2.05
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.6 0.11+0.16+0.11+0.16+0.03+0.03
Jumlah Besi Besi Begel
20.5 Bh
Total Besi Begel
12.3 m
0.90
kolom KP
35.04 4.38 17.52 140.16
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.42 0.09+0.09+0.09+0.09+0.03+0.03
Jumlah Besi Besi Begel
175.2 Bh 1401.6
Total Besi Begel
73.584 m 588.67
19.68 3.28 13.12 78.72
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.42 0.09+0.09+0.09+0.09+0.03+0.03
Jumlah Besi Besi Begel
98.4 Bh
Total Besi Begel
41.328 m
8.64 2.88 11.52 34.56
63.36 Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.42 0.09+0.09+0.09+0.09+0.03+0.03
Jumlah Besi Besi Begel
43.2 Bh
Total Besi Begel
18.144 m
kolom K2
8.76 4.38 17.52 35.04 0.22776
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.56 0.16+0.09+0.16+0.09+0.03+0.03
Jumlah Besi Besi Begel
43.8 Bh
Total Besi Begel
24.528 m
3.28 13.12 0.08528
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.56 0.16+0.09+0.16+0.09+0.03+0.03
Jumlah Besi Besi Begel
5.85714 Bh
Total Besi Begel
3.28 m
Kolom K15
16.42 4.38 17.52 52.56 65.68 3.28
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.46 0.11+0.09+0.11+0.09+0.03+0.03
Jumlah Besi Besi Begel
82.1 Bh
Total Besi Begel 0.32019
37.766 m
Balok B2A
3.08 21.56
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.9 0.11+0.31+0.11+0.31+0.03+0.03
Jumlah Besi Besi Begel
15.4 Bh
Total Besi Begel
13.86 m
Balok Canopy
3.08 12.32
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.9 0.31+0.11+0.31+0.11+0.03+0.03
Jumlah Besi Besi Begel
20.5333 Bh
Total Besi Begel
18.48 m
Balok RB1
58.22 232.88
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.46 0.09+0.11+0.09+0.11+0.03+0.03
Jumlah Besi Besi Begel
291.1 Bh
Total Besi Begel
133.906 m
Balok RB2
3.08 12.32
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.56 0.09+0.16+0.09+0.16+0.03+0.03
Jumlah Besi Besi Begel
15.4 Bh
Total Besi Begel
8.624 m
0.592176
0.146016
2
13.12
6.5
3.12
2.8
0.78
4
2.7
5.98
25.88