Vous êtes sur la page 1sur 12

Rencana Kebutuhan Bahan dan Material

Proyek : Residential Cluster Akasia ( Rumah Type 49)


Lokasi : Tallasa City, Makassar, Sulawesi Selatan

VOLUME SATUAN
NO. URAIAN PEKERJAAN
[VOL.] [SAT.]
B PEKERJAAN PONDASI
1 Pek. Panjang Pondasi P1 26.20 m
Volume Pondasi 6.68 m
Batu Belah 1.2 m 8.02 m
Pc/ Semen 136 kg/m 908.48 kg
Pasir 0.554/m 3.70 m
2 Pek. Panjang Pondasi P2 20.00
Volume Pondasi 5.10 m
Batu Belah 1.2 m 6.12 m
Pc/ Semen 136 kg/m 693.60 kg
Pasir 0.554/m 2.83 m
3 Pek. Panjang Pondasi P3 10.10
Volume Pondasi 1.89 m
Batu Belah 1.2 m 2.27 m
Pc/ Semen 136 kg/m 257.04 kg
Pasir 0.554/m 1.05 m
4 Pas. Besi Angkur Pondasi (8) 22.60 m
Total
Batu Belah 16.40 m
Pc/Semen 1,859.12 kg
Pasir 7.57 m
C PEKERJAAN STRUKTUR SLOOF DAN KOLOM
1 Pek. Sloof S1 150/250 52.40 m'
Tulangan 410 209.60 m
Sengkang 8 - 200 183.40 m
Pekerjaan Mutu Beton K-225 1.96 m
1 m = 371Pc/kg 727.16 kg
1 m = 698 Pasir beton/m 1368.08 kg
1 m = 1047 kerikil/m 2052.12 kg
2 Pek. Sloof S2 150/200 4.10 m'
Tulangan 410 16.40 m
Sengkang 8 - 200 12.30 m
Pekerjaan Mutu Beton K-225 0.12 m
1 m = 371Pc/kg 44.52 kg
1 m = 698 Pasir beton/m 83.76 kg
1 m = 1047 kerikil/m 125.64 kg
3 Pek. Kolom Praktis 130/130 ( 4.3 m ) 8 titik
Tulangan 48 140.16 m
Sengkang 6 - 200 73.58 m
Pekerjaan Mutu Beton K-175 0.59 m
1 m = 326 Pc/kg 192.34 kg
1 m = 760 Pasir pasang/m 448.40 kg
1 m = 1026 kerikil/m 605.34 kg

Pek. Kolom Praktis 130/130 ( 3.2 m ) 6 titik


Tulangan 48 78.72 m
Sengkang 6 - 200 41.43 m
Pekerjaan Mutu Beton K-175 0.32 m
1 m = 326 Pc/kg 104.32 kg
1 m = 760 Pasir pasang/m 243.20 kg
1 m = 1026 kerikil/m 328.32 kg

Pek. Kolom Praktis 130/130 ( 2.8 m ) 3 titik


Tulangan 48 34.56 m
Sengkang 6 - 200 18.14 m
Pekerjaan Mutu Beton K-175 0.14 m
1 m = 326 Pc/kg 45.97 kg
1 m = 760 Pasir pasang/m 107.16 kg
1 m = 1026 kerikil/m 144.67 kg

Pek. Kolom K2 200/130 (4.2 m) 2 titik


Tulangan 410 34.56 m
Sengkang 8 - 200 18.14 m
Pekerjaan Mutu Beton K-225 0.23 m
1 m = 371Pc/kg 85.33 kg
1 m = 698 Pasir beton/m 160.54 kg
1 m = 1047 kerikil/m 240.81 kg

Pek. Kolom K2 200/130 (3.2 m) 1 titik


Tulangan 410 13.12 m
Sengkang 8 - 200 3.28 m
Pekerjaan Mutu Beton K-225 0.09 m
1 m = 371Pc/kg 33.39 kg
1 m = 698 Pasir beton/m 62.82 kg
1 m = 1047 kerikil/m 94.23 kg

5 Pek. Kolom K15 150/130 4 titik


Tulangan 410 65.68 m
Sengkang 8 - 200 37.76 m
Pekerjaan Mutu Beton K-225 0.32 m
1 m = 326 Pc/kg 104.32 kg
1 m = 760 Pasir beton/m 243.20 m
1 m = 1029 kerikil/m 329.28 m

6 Pek. Kolom Praktis kusen


Tulangan 28 39.70 m
Sengkang 6 - 200 25.88 m
Pekerjaan Mutu Beton K-175 0.36 m
1 m = 326 Pc/kg 117.36 kg
1 m = 760 Pasir pasang/m 273.60 kg
1 m = 1026 kerikil/m 369.36 kg

7 Pek. Tie Beam 150/250 3.08 m


Tulangan 610 18.84 m
Sengkang 8 - 200 10.78 m
Pekerjaan Mutu Beton K-225 0.12 m
1 m = 326 Pc/kg 39.12 kg
1 m = 760 Pasir beton/m 91.20 m
1 m = 1029 kerikil/m 123.48 m

D PEKERJAAN STRUKTUR BALOK DAN RING BALL


1 Pek. Penulangan Balok B2B 3.08 m
Tulangan 710 21.56 m
Sengkang 8 - 200 13.86 m
Pekerjaan Mutu Beton K-225 0.14 m
1 m = 326 Pc/kg 45.64 kg
1 m = 760 Pasir beton/m 106.40 m
1 m = 1029 kerikil/m 144.06 m

2 Pek. Canopy BC 1 3.08 m


Tulangan 410 12.32 m
Sengkang 8 - 150 18.48 m
Pekerjaan Mutu Beton K-225 0.14 m
1 m = 326 Pc/kg 45.64 kg
1 m = 760 Pasir beton/m 106.40 m
1 m = 1029 kerikil/m 144.06 m

2 Pek. Canopy Depan


Tulangan 8 - 200 79.58 m
Pekerjaan Mutu Beton K-225 0.54 m
1 m = 326 Pc/kg 176.04 kg
1 m = 760 Pasir beton/m 410.40 m
1 m = 1029 kerikil/m 555.66 m

Pek. Canopy Belakang m


Tulangan 10 - 150 35.80
Tulangan 8 - 200 26.14 m
Pekerjaan Mutu Beton K-225 0.64 m
1 m = 326 Pc/kg 208.64 kg
1 m = 760 Pasir beton/m 486.40 m
1 m = 1029 kerikil/m 658.56 m

5 Pek. Penulangan Ring Balok RB2 130/200 3.08 m


Tulangan 48 12.32 m
Sengkang 6 - 200 8.62 m
Pekerjaan Mutu Beton K-225 0.08 m
1 m = 326 Pc/kg 26.08 kg
1 m = 760 Pasir beton/m 60.80 kg
1 m = 1029 kerikil kg/m 82.32 kg

6 Pek. Penulangan Balok Sopi - Sopi 28.78 m


Tulangan 48 115.10 m
Sengkang 6 - 200 80.58 m
Pekerjaan Mutu Beton K-225 0.75 m
1 m = 326 Pc/kg 244.50 kg
1 m = 760 Pasir beton kg/m 570.00 kg
1 m = 1029 kerikil kg/m 771.75 kg

Total Pembesian
Besi 6 248.23 m
Besi 8 824.28 m
Besi 10 427.88 m
Pc/Semen 2240.37 kg
Pasir Beton 4822.36 kg
Cipping 6769.66 kg

D PEKERJAAN DINDING BATA


1 Pek. Pas. Dinding 1/2 Bata Camp. 1:4 230.20 m
1m = 58 batu merah 19,567.00 bh
1m = 0.4000 sak/m 92.08 sak
1m = 0.0510 Pasir Pasang m/m 11.74 m
2 Pek. Plesteran dan Aci 1:4 438.15 m
1m = 6.2400 kg/m Dinding Plesteran 2734.06 kg
1m = 0.0240 pasir pasang m/m 10.52 m
1m = 3.2500 kg/m Dinding Acian 1423.99 kg

PEKERJAAN DINDING KERAMIK KAMAR MANDI / DAPUR


1 Kamar Mandi 200 x 400 (Polished) 17.36 m
2 Kitchen Set 20 x 20 4.89 m

TOTAL KESELURUHAN
BESI 6 20.69 bh
BESI 8 68.69 bh
BESI 10 35.66 bh
BATU PONDASI 16.40 m
SEMEN 298.52 sak
PASIR 21.53 m
CIPPING 5.0 m
Sloof 1
52.4
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.7 0.11+0.11+0.21+0.21+0.03+0.03
Jumlah Besi Besi Begel
262 Bh
Total Besi Begel
183.4 m

Sloof 2
4.1 2.05+2.05
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.6 0.11+0.16+0.11+0.16+0.03+0.03
Jumlah Besi Besi Begel
20.5 Bh
Total Besi Begel
12.3 m
0.90
kolom KP
35.04 4.38 17.52 140.16
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.42 0.09+0.09+0.09+0.09+0.03+0.03
Jumlah Besi Besi Begel
175.2 Bh 1401.6
Total Besi Begel
73.584 m 588.67
19.68 3.28 13.12 78.72
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.42 0.09+0.09+0.09+0.09+0.03+0.03
Jumlah Besi Besi Begel
98.4 Bh
Total Besi Begel
41.328 m
8.64 2.88 11.52 34.56
63.36 Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.42 0.09+0.09+0.09+0.09+0.03+0.03
Jumlah Besi Besi Begel
43.2 Bh
Total Besi Begel
18.144 m

kolom K2
8.76 4.38 17.52 35.04 0.22776
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.56 0.16+0.09+0.16+0.09+0.03+0.03
Jumlah Besi Besi Begel
43.8 Bh
Total Besi Begel
24.528 m
3.28 13.12 0.08528
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.56 0.16+0.09+0.16+0.09+0.03+0.03
Jumlah Besi Besi Begel
5.85714 Bh
Total Besi Begel
3.28 m

Kolom K15
16.42 4.38 17.52 52.56 65.68 3.28
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.46 0.11+0.09+0.11+0.09+0.03+0.03
Jumlah Besi Besi Begel
82.1 Bh
Total Besi Begel 0.32019
37.766 m

Kolom Tie Bean


3.08 18.48
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.7 0.11+0.21+0.11+0.21+0.03+0.03
Jumlah Besi Besi Begel
15.4 Bh
Total Besi Begel
10.78 m

Balok B2A
3.08 21.56
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.9 0.11+0.31+0.11+0.31+0.03+0.03
Jumlah Besi Besi Begel
15.4 Bh
Total Besi Begel
13.86 m

Balok Canopy
3.08 12.32
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.9 0.31+0.11+0.31+0.11+0.03+0.03
Jumlah Besi Besi Begel
20.5333 Bh
Total Besi Begel
18.48 m

Balok RB1
58.22 232.88
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.46 0.09+0.11+0.09+0.11+0.03+0.03
Jumlah Besi Besi Begel
291.1 Bh
Total Besi Begel
133.906 m

Balok RB2
3.08 12.32
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.56 0.09+0.16+0.09+0.16+0.03+0.03
Jumlah Besi Besi Begel
15.4 Bh
Total Besi Begel
8.624 m

Balok Sopi - Sopi


28.78 115.12
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.56 0.09+0.16+0.09+0.16+0.03+0.03
Jumlah Besi Besi Begel
143.9 Bh
Total Besi Begel
80.584 m
Kolom K15
9.2 2.3
Panjang Satu Begel 150/250 ( Selimut Beton 2 cm)
0.13 0.11+0.09+0.11+0.09+0.03+0.03
Jumlah Besi Besi Begel
46 Bh
Total Besi Begel 0.1794
11.96 5.98 m
0.59

0.592176

0.146016
2

13.12
6.5
3.12
2.8
0.78
4
2.7
5.98
25.88

Vous aimerez peut-être aussi