1/,1(,INSPECTION SYSTEMS
163(&7,216 QUALIFICATION
<67(064 8$/,),&$7,21 33
|L| Complete
lLl Process
Verification
(8.2.2 and 0.1)
. NO . NO .
DId lLl process run - _' Account for Impact - _ispectlon results not
as intended ? of discrepancies verified
'Ksuccessfully
YES
Are historical data Are data consistent _/ Level 1 validation
available for line ? with historical data ? achieved
k
A
Level 2 validation
achieved
Risk-based
Field validation Pass Level 2
determination of
measurements Validation check
required validation
taken? (8.2.6) (0.2)
level
V
Data accuracy not Perform Level 3 validation: lel 3 validation: use estimated
validatedacceptable for estimate as-run : tool accuracy in pipeline integrity
low risk lines only performance (0.3) \ management decisions
Figure ,QVSHFWLRQ5HVXOWV9HULILFDWLRQDQG9DOLGDWLRQ3URFHVV
)LJXUH 6lnspection Results Verification and Validation Process