LAMPIRAN C2

Project Proposal
Demand-Driven Innovation Project by Public-Private Research Network (PPRN)

(1) Researcher Background (Muhammad)

1. Lead Researcher MUHAMMAD BIN MAJID

2. Address Research Institute DRB-HICOM UNIVERSITY OF AUTOMOTIVE


MALAYSIA,
KOMPLEKS AUTOMOTIF DRB-HICOM PEKAN,
LOT 1449, PT2204,
KAWASAN PERINDUSTRIAN PERAMU JAYA,
26607 PEKAN,
PAHANG DARUL MAKMUR

3. Team Members
1. MUHAMMAD BIN MAJID
2. GURSHARAN KAUR A/P KARTAR SINGH
3. DR KYLE LEE KHAI LOON
4. RAJA SITI NURHIDAYAH RAJA IDRIS
5. NURUL AINI OTHMAN
6. HALIMI HASHIM

4. Field of Research Expertise

5. Contact Information 09 424 2745/ 017-3907993


(phone & email) muhammad@dhu.edu.my

*Please attach the brief CV of lead researcher and team members

(2) Project Summary

1. Project Title SMART SIFU APP.

2. Name of Company SIFU MANDARIN

3. Project Duration 5 MONTHS

4. Project Start 1st NOVEMBER 2016

5. Project End 30th APRIL 2017

6. Estimated Cost

(3) Proposal Content


(i) Executive Summary (Sharon)

Traditional teaching method is concerned with the classroom is being teacher


oriented. The lessons usually are taught by the teacher using blackboard and
with the present of the teacher. The students are fully dependable on the
teacher to receive lessons and information. Therefore, this method needs more
teaching staff for a larger number of students. Besides that, there are few
disadvantages by using this conventional teaching method such as:
1. Learners who have difficulties in studying will be unable to cope with
how the lesson is delivered.
2. The learners will have very limited access to learn more especially when
they are outside of the classroom.
Our mission is to help SIFU MANDARIN by providing a smart app to bring a
change in their teaching method from traditional teaching to 21 st century
teaching method.

The total estimation cost of our Smart App is RM30,620 which estimation time
to complete the 21st century teaching method. Thank you for your consideration
of our request.

(ii) Problem Statement (Sharon)


The current method/ process is
1. Teachers have to travel all over Malaysia to teach Mandarin.
2. The demand of learning Mandarin has increased.
3. Insufficient Mandarin teacher at Sifu Mandarin to fulfill the customers need.
(iii) Project Objective (Sharon)
1. To design and fabricate Sifu Smart App an effective 21st Century teaching
method to support their existing E Learning book.
(iv) Proposed Solution (Aini)
The solution to the stated issues and above mentioned problems are by the
developing a pressure meat shredder machine as shown in
Figure 1.
Beater column

Cover

Pressure
regulator

Beater blade

Bowl

Stove

Figure 1: Design of pressure meat shredder machine

Pressure Meat Shredder machines specifications:


a. Dimension;
i. Cooker: 900mm (L) x 900mm (W) x 750mm (H)
ii. Base Cooker: 1000mm (L) x 1000mm (L) x 600mm (H)
iii. Shredder Stand: 1500mm (H) x 300mm (W)

b. Weight;
i. Cooker: 15kg
ii. Base Cooker: 10kg
iii. Shredder Stand: 30kg
c. Power: 2hp
(v) Project Scope (Muhammad)
1. To Design and develop a Mandarin Bahasa Malaysia application for
Kelas Sifu Mandarin.
2. The characteristics of the SMART SIFU application will be as follows:
a) Aims to teach you the language is by repetition, conversation, and
audibly speaking
b) Use the listening, reading, writing and speaking task to improve your
language skills, take on interactive learning exercises and quizzes and
stay motivated with regular feedback.
c) Translate sentences or phrase. You can tract your translation history
and searches.
(vi) Milestone (Dr Kyle)
Activity Duration (days)
1. Collecting data and analysis 7 day
2. Designing concept of pressure cooker, 7 day
Meat shredder machine
3. Developing prototype 20 day
4. Testing the prototype 2 day
(Milestone 1: Working prototype)
5. Evaluating and improving design 7 day
6. Finalizing design 5 day
7. Constructing model of pressure cooker, 60 day
Shredder machine
8. Testing the model 50 day
9. Evaluating and improving the model 14 day
10. Confirming the model 2 day
(Milestone 2: Working model)

Milestone Date
1. Working prototype 6 Oct 2016
2. Working model 9 Jan 2017

Gantt Chart:
(vii) Deliverable/ Expected Outcome (Muhammad)
1. Able to teach the language by repetition, conversation, and audibly
speaking.
2. To use the listening, reading, writing and speaking task to improve the
language skills, take on interactive learning exercises and quizzes and
stay motivated with regular feedback.
3. Translate sentences or phrase.
4. Able to tract translation history and searches.
(viii Proposed Budget
)
Budget Type Description Amount (RM)
1. Researchers 4 Researchers allowances 8,000
Professional fees (RM400/month)

2. Travelling & Travelling DHUAM to WMK 3200


transportation Supply & Services (RM800 per
travel - Total 4 times)

3. Rental of Equipment Fabrication tools (Vise Grip, 1500


Toolbox, Grinder, Cutting Tool)

MIG Welding Rental 1500


ARC Welding Rental 1500
Bending Machine 800
7. Research material and 316 Stainless steel plate 2000
supplies (T: 3.0mm, L:1600xW:1200mm)

Angle iron 300


(T: 2.0mm, L:40ft)
316 Stainless steel rod 1000
(T: 20mm, L: 1800mm

Hollow bar 200


(T: 1.5mm, L: 60ft

Mild steel plate 450


(T: 2.0mm, L:1000mm x 1000mm)

Inner Rubber RIng 250


(T: 2.0, L: 850mm)

Brushless motor 2hp 3000


Indicator 80
Motor controller 1500
Switches 70
Harness 250
Castor wheel 300
Ball bearing 170
Motor mounting 270
Gear 450
Shaft 350
Screw 100
Bolt and Nut 80
Valve 180
Paint 1000
Grinding Disk 120
28. Maintenance and minor Nill
repair services
29. Professional services/ Honorarium 2000
consultancy
30. Total Cost RM30,620