PLANT

NORTH 48 NOS OF ANCHOR BOLTS M30


SUPPLIED WITH EQUIPMENT TO
R.2 BE INSTALLED BY CONTRACTOR.

CL OF FL5211
CONTRACTOR TO OBTAIN
TEMPLATE FROM VENDOR PRIOR
TO INSTALLATION OF EMBEDDED

E 219166
BOLTS

470
30MM THK GROUT

6300 BOS +100.200


3150 3150

4100 TOC +100.170

1195
1180 1740 1180
TEMPLATE TO BE
SUPPLIED BY
T16-200 HORIZONTAL LINKS VENDOR

665
3664

600

725
45 T25-200 TOP & BOTTOM

1100
B
2 X T16 VERTICAL BARS AROUND

---
T25-200 Z-BARS AT TEMPLATE
LOCATION OF BARS REFER TO

20
PLINTH EDGE (TYP.)
PLAN
0
87

45 60
0

=
52

200 x 20THK TEMPLATE TOC +99.400


200
=

(ID3464 / OD3864)
T16-200 U-BARS
= =

3150
1180
T16-250 L-BARS
DETAIL 1
SCALE 1:10 ---
T13-200 HORIZONTAL LINKS
60
0

65
THIS DRAWING

20
2 X 48T16 1325 LONG VERTICAL T16-200 TOP (PLINTH)
BARS AROUND TEMPATE
21
00

CL OF FL5211
N 249120

1740

4100

6300
= =
30

7.5
200 X 20MM THK TEMPLATE

B O U N D A R Y LINE

B O U N D A R Y LINE
(ID3464 / OD3864)

7.5
PLANT NORTH

A
--- TOC +100.170
PLINTH

7
.9
36
J
T

80
C

54
E

:2
:9

N
8

.2
2
4

C
.8

20
8


J
A L E N:100.000

E:100.000
A L E
T16-200 HORIZONTAL LINKS T25-200 Z-BARS AT KEYPLAN
PLINTH EDGE (TYP.) SCALE 1:2500

1180

3150
NOTES:

1. GENERAL NOTES OF CONCRETE AND FOUNDATIONS TO BE REFERRED TO DWG 000-131-102.


2. FOR EARTHING PLATES SEE DRAWING EARTHING SYSTEM PROVIDED BY CIVIL WORK CONTRACTOR.
T25-200 Z-BARS AT
TOC +99.400 PLINTH EDGE (TYP.) REFERENCE DRAWINGS:
(REFER TO LATEST REVISION)
FOUNDATION
000-161-101 Calculation for Foundations for Prereformer, Reformer, Waste Heat Recovery, Sulphur

1110
Absorbers, Instrument Air Compressor & Buffer
000-015-001 PLOT PLAN UNIT - PLAN VIEW
000-131-001 GENERAL ARRANGEMENT CIVIL WORK GUIDE DRAWING
000-015-103 (0) OVERALL FOUNDATION PLAN
C1C-131-030(4) FOUNDATION DRAWING ASSEMBLY REFORMER PACKAGE
C1C-131-031(3) FOUNDATION DETAILS REFORMER PACKAGE
C1C-101-032(2) LOADS ON FOUNDATION REFORMER PACKAGE

REFERENCE:
3664 T16-200 TOP (PLINTH) T25-200 TOP & BOTTOM
48 NOS OF ANCHOR BOLTS M30 1. REFERENCE LEVEL +100.000 = R.L +104.200m = 4,2m AMSL REFERENCE COORDINATES:
SUPPLIED BY ITT SEE DETAIL 1
PLAN VIEW FOR FOUNDATION FL5211
SCALE 1:25 DESIGN LOADING:

94
ERECTION LOAD 570 kN

3.9
04
OPERATING LOAD 650 kN JT
C

28
HORIZONTAL LOAD (WIND) 175 kN E:

N:
98

54.
34
MOMENT (WIND) 2715 kNm

C
.62

JT

220
870 2
LIVE LOAD 5 kPa


520 ALLOWABLE SOIL BEARING CAPACITY 86 kPa
48 NOS OF ANCHOR BOLTS M30 ALE N:100.000

ALE E:100.000
SUPPLIED WITH EQUIPMENT SEE DETAIL 1 2-M16 CHEMICAL ANCOR BOLTS 0.5 0 0.5 1.0 1.5 2.0 2.5
T16-200 BOTH WAYS 30MM THK GROUT (TYP.) SUPPLIED WITH EQUIPMENT
25MM CHAMFER (TYP.) 30MM THK GROUT
1:25 FULL SIZE A1
T25-200 Z-BARS AT ALL PLINTH EDGES 1 LAYER OF T13-200 BOTH WAYS

183
0.2 0 0.2 0.4 0.6 0.8 1.0

55
TOC +100.170 AT MID OF PLINTH
BOS +100.200
EL +100.00 1:10 FULL SIZE A1
EL. +100.000
2 X T16 1325 LONG 5 27/04/09 KH FOR RFC HT/AT AL
600

T16-200 HORIZONTAL
770

770

VERTICAL BARS T16-250 L-BARS FOR BCA ST01 SUBMISSION HT/AT AL


LINKS 4 31/03/09 KH
1 LAYER OF T13-200
BOTH WAYS AT MID T13-200 T16-200 U-BARS 3 25/03/09 KH ISSUE FOR MATERIAL TAKEOFF HT/AT AL

OF FOUNDATION HORIZONTAL
115

TOC +99.400 TOC +99.400 2 27/02/09 JT/HT FOR CLIENT'S REVIEW; AC CHECKS HT/AT AL
LINKS
1 16/01/09 JT/HT FOR CLIENT'S COMMENT HT/AT AL

T16-200 C-BARS ARD DATE


610

FOUNDATION EDGE REV (DD/MM/YY) DRAWN BY REVISIONS CHK'D BY APP'D BY


200 200
CONSULTING ENGINEERS :
200
900

900

T16-200 HORIZONTAL
LINKS 170 UPPER BUKIT TIMAH ROAD #19-02 BT TIMAH SHOPPING CENTRE

BOC +98.500 BOC +98.500 PROJECT: This document, which is L'AIR LIQUIDE's property, may contain

50 THK LEAN CONCRETE HERMES valuable confidential informations and must not be copied, or
disclosed without the prior written consent of L'AIR LIQUIDE

PROJECT TITLE:
EXISTING SAND TO BE
T25-200 BOTH WAYS COMPACTED TO 95 PROPOSED ERECTION OF HYDROGEN PLANT
TOP & BOTTOM 6300 PERCENT OF MODIFIEND SECTION B WITH SINGLE STOREY OFFICE BUILDING AND
PROCTOR DRY DENSITY SCALE 1:25
22kV SUB-STATION BUILDING ON LOT 2320V-pt
SECTION A MK 34 AT TEMBUSU AVENUE/TEMBUSU DRIVE 5
SCALE 1:25
ON JURONG ISLAND, SINGAPORE 4
DRAWING TITLE: SCALE JOB NUMBER FMT GROUP NBR 3
04-REFORMER AS 2
FOUNDATION FL5211 51-3282 A1 CIC-131-109
SHOWN 1