Académique Documents
Professionnel Documents
Culture Documents
General remarks :
Is the chosen laboratory accredited for tests according to IEC60945:2002 or for tests according
to similar standards and does the scope of the laboratorys accreditation cover the performed
tests?
Define the device type of each part of the EUT carefully (portable / protected / exposed /
submerged).
Define rules for PC (performance check) and PT (performance test), if these are not defined in
the related performance standard let BSH-Cert have a glance at your definitions prior to tests.
The laboratory has to document the measuring equipment used during the tests and the
calibration status of it in its test report.
The results of the tests should also include the serial numbers and/or revisions of the EUT
(equipment under test).
For some equipment (e.g. AIS / VDR / gyro compass / navigation lights ...) additional
requirements are defined in the specific performance standards. Some of these tests
(requirements) are able to cover / fulfil the IEC60945 requirements (tests).
Perform all the tests with the same equipment (same revision / assembly) as it is presented to
BSH-Cert for the type test (not similar types or old / different versions).
If the laboratory deviates from the requirements of the IEC60945:2002 : this should be
discussed with BSH-Cert in advance and there must be a clear statement in the test report why
they have done this.
If you are not sure that your test plan fulfil the requirements : please ask BSH-Cert in advance.
For modified EUTs it might be sufficient to repeat not all tests according IEC60945. You can
discuss this with BSH-Cert.
It is sometimes not necessary to test all possible combinations of the EUT. You should order
the test for the worst case combination, maybe after a short discussion with BSH-Cert.
8.3 : Switch off the device before you start, switch on after 10 16 h in the temperature and dont forget the PC
Low temperature (8.4) 20 C PT 15 C PT 25 C PT N/A
With Extreme power Extreme power PC Extreme power PC Extreme power PC
supply (storage 30 C) PC
8.4.2 : Switch off the device before you start this test , switch on the EUT after 10 16 h in the temperature and perform the PT and
the extreme power supply test (7.1) with the PC.
Thermal shock (8.5) Start 70C 1h in N/A
25C water 1h. PT
8.5 : Dont forget the test for portable equipment and perform the PT
Drop onto hard surface 6 drops from 1 m PC N/A
(8.6.1)
8.6.1 : This test is applicable only to portable VHF radios and dont forget the PC
Drop into water (8.6.2) 3 drops from 20 m PC N/A
Environmental condition Normal power supply Extreme power supply (each applied for at least 5 min)
voltage frequency
AC 10 % 5%
DC +30% -10% -
Dry heat PT Performance test Max Volt. Min Freq. = worst case
all possible 4 combinations Performance check PC
Damp heat PC Performance check
Low temperature PT Performance test Min Volt. Max Freq. = worst case
all possible 4 combinations Performance check PC
Normal temperature PT Performance test Performance test PT
Definitions of the Performance criteria (quoted from chapter 10.1 of the IEC60945:2002)
Performance criterion A: Performance criterion B: Performance criterion C:
the EUT shall continue to operate as the EUT shall continue to operate as temporary degradation or loss of function or
intended during and after the test. No intended after the test. No degradation of performance is allowed during the test,
degradation of performance or loss of performance or loss of function is allowed, provided the function is self-recoverable, or
function is allowed, as defined in the as defined in the relevant equipment can be restored at the end of the test by the
relevant equipment standard and in the standard and in the technical specification operation of the controls, as defined in the
technical specification published by the published by the manufacturer. During the relevant equipment standard and in the
manufacturer; test, degradation or loss of function or technical specification published by the
performance which is self-recoverable is manufacturer.
however, allowed, but no change of actual
operating state or stored data is allowed.
Definitions of PC and PT (quoted from chapter 3.1.4 and 3.1.6 of the IEC60945:2002)
Its required that the results of PC / PT are documented in the test reports.