Vous êtes sur la page 1sur 3

8.

By (B) mild poisoning can still actors,


Confirmation test A. CO
B. chlorine
( Institution part ) C. ammonia
9. After turning mechanical overhaul, turning part of the (B) should be firmly attached to the
Name:_________________________ score:____________________ complex,
--------------------------------------------------------------------------------------------------------------------- A. the security cover
I. Choice question B. protective cover
1. Scaffolding to the same set; in the embedded pole, when first the soil: ( ) C. protective devices
A. compacted 10. Overhaul, after the work has indeed seized the value for the end of the installation of the (C)
B. fill in real has been removed,
C. heap good A. partition
2. Winter below minus ( ) to open high work B. the valve
A. 1 C. Cover Plate
B. 10 11.
C. 5 II.
3. If there is inside the container or tank body or raw material residues of harmful gas, to carry 1. firmly implement the policy of power production safety first safety is everyone's
out ( ) ______________at all levels of leadership must lead by example to encourage the people to
A. clean rely on the masses to play _________supervision institutions and mass organizations, the role
B. clear of the security procedures and strict supervision of the implementation of
C. ventilation 2. in the production, all production departments must strictly implement the three votes
4. All should have high temperature insulation, when the surface temperature of 5 degrees, not (___________, operation ticket, hot work job ticket), three systems (shift change system,
___________,__________________)
more than (B) degrees.
3. Violations of _________and __________due to the accident, one of the main obstacles and
A. 40 those responsible for serious attempts, in addition to relevant regulations, it should also
B. 50 instruct the system to learn the rules and pass the examination only after induction.
C. 60 4. the production plant inside and outside the workplace, holes or pits must be covered with
5. Fats and oils are not allowed, and (A) contact ( ). __________ with the ground solid lid, For repair work, remove the ______ to be temporary
A. oxygen fence, temporary construction after the playing of the hole must restitution
B. hydrogen 5. the production plant and warehouse should be equipped with the necessary
C. nitrogen __________equipment such as fire extinguisher fire hydrant hose cloth with sand box and
6. In the original scope of work of the votes to increase security measures for the work of any other fire tools, _________ equipment should be regularly inspected and tested to ensure
readily available tools are not allowed to fire other uses
responsible person consent (C) agreed. 6. mouth size holes all down the stairs and platforms must be installed not less than ______mm
A. work ticket issuer high railings and not less than ______mm high retaining plate such as the need to overhaul
B. work permits were the railings removed during the installation of temporary shelter must be selected and the end
C. work and work permits were issued tickets of the railings in the maintenance immediately loaded back to the original height of
7. All kinds of operating personnel should take safety education and job skills training, by (B) ______mm to make changes from time railing
induction. 7. all staff should learn to stifle aid method of__________, cardiopulmonary resuscitation
A. the leadership agreed to detailed electrical safety rules (power plants and substations electrical parts) Appendix 7 and
B. passing the examination are familiar with the burn injury burn gas poisoning first aid
C. all evaluation 8. a hot work during the work of every 2 to 4 hours, determination of a combustible gas,
_________, flammable vapor or ______concentration levels are eligible, or anomaly of that
increase should be found to fail to ___________for Hot Work and then to identify the cause the work site. ( )
or rule out the danger may not be reconsidered before the hot work. 2. Work permit should be reissued if safety measures and ranges listed in original work permit
9. any person to enter the production site (Office of the control room, duty room and need to be changed after commissioning. ( )
maintenance room except the team) must wear ________ 3. For hot work in any zone at production site, hot work permit must be completed. ( )
10. against the railing on the back wheel on the safety of ___________or _______on the 4. One person can double as person in charge of work of two work permits at the same time.
operation of equipment such as walking and sitting on sitting in the pipeline necessary to do ( )
security work to be 5. The operation permit without number can be used. ( )
6. To check the load distribution is not in electrical operation permit ( )
11. Periodic test and interchange work should be done by the assigned personnel in the specified 7. Operation permit can only be completed with one operation task, and each operation item can
time in accordance with the ____________ and ______________instructions, and work only contain one step of operation. ( )
content, time, test personnel, equipment condition and test result should be recorded in the 8. Successor must only carry out work after taking over the work, and precursor could not leave
dedicated periodic test logbook. his post until shift procedure has been handled. ( )
12. Before insulation resistance is measured, appropriate megger must be selected based one 9. In major operation or accident, shift can be handled. ( )
equipment __________ and checked for its conditions 10. Shift should not be handled in case one of the followings:
13. Any equipment defect found during test and interchange should be immediately reported to Abnormal operation is being handled or major operation did not come to an end. ( )
the unit supervisor or shift supervisor and record and defect _____________ should be made. 11. If successor found problem in inspection of post dedicated equipments on site, he can solve it
Notify the maintenance personnel to eliminate the defect promptly. If the defect can not be by himself. ( )
eliminated in a short time, the operators should enhance supervision and take necessary 12. Operation to be switched is not switched, tested is not tested during regular switching and
safety _________to prevent accident. test, and shifts to be handled are not handled or incompletely. ( )
14. The precondition for system preparation after overhaul is to enquire equipment alteration 13. Equipment defects should be eliminated, and have not been eliminated by inspection. ( )
items in the overhaul plan and define _________and _________alternation items. 14. If inspector doubts or does not understand equipment in inspection, he is not allowed to
15. The purpose of static and dynamic drive is to check that facility passage and protection action tamper with equipments or make equipments out of service. ( )
are normal. To avoid omission, the ________should be listed for check in accordance with 15. Inspection mainly includes the followings: Sanitary conditions of equipment and system in
I&C and electric contents. production site. ( )
16. General valve drive standard should be completed in electronic form. 16. When megger is used to measure the insulation of high voltage equipment, two persons
Mainly the following items are defined:____________, valve number,__________ , full open should work together and wear insulating Shoes. ( )
time, full close time, reserved travel, signature of operator on duty, signature of person for 17. Starting test items after overhaul are divided into conventional test and special test. (
maintenance and standby description )
17. Work permit is a document that has the flow and specification requiring to be 18. Work permit should not be reissued if safety measures and ranges listed in original work
strictly__________, must be accepted by some examination and approval procedures and permit need to be changed after commissioning. ( )
aims at implementing safety measures in inspection, in order to ensure that inspection works 19. Work licensor is responsible for acceptance of work permit after recovery measures is
of power and production equipments are carried out smoothly, protect and guarantee the completed and test is qualified . ( )
_________of persons and equipment 20. The equipment systems whose commissioning has been completed partially and acceptance
18. If company departments and units participating in operation need to take isolation measures test certificates have been already co-signed by construction, commissioning, building and
in inspection, they must apply for work permits and choose proper kinds of work permit production units. ( )
based on_________________.
19. Safety technical department is responsible for review of equipment ___________and IV. Simple answer
environmental protection. 1. What is the executive process of operation permit?
20. The stand-alone equipment systems that must be put into operation before complete 2. List the items of incorrect operation permit (at least 15 items).
unit________, and need to be operated and monitored by person on duty. 3. What is regular walk down
4. What is shift inspection
III. True or false question V. Understanding question
1. After work permit handled, person in charge of work with it leads crew of work team to enter 1 Tell the understanding and views of the institutions.
2 What is your suggestion for our company institutions?

Vous aimerez peut-être aussi