DESIGN REQUIREMENTS AND GUIDELINES

MERIDIAN PARK, THE NEW LANDMARK INDUSTRIAL ESTATE AT


NEERABUP, WILL SET A NEW BENCHMARK FOR THE SUSTAINABLE
DEVELOPMENT OF INDUSTRIAL ESTATES IN WESTERN AUSTRALIA.
SHOWCASING INNOVATIVE URBAN DESIGN PRINCIPLES, MERIDIAN
PARK WILL BE A THRIVING COMMUNITY FOR INDUSTRY.
TABLE OF CONTENTS
PART ONE: GUIDING PRINCIPLES G PART THREE: SUPPORT INFORMATION S PART FOUR: APPENDICES A
Summary document which provides an introduction to Meridian This section outlines additional detail behind the intent of the A1 General Industrial Lots i
Park, an overview of the estate objectives, the key development Design Guidelines and provides support information whilst not A2 Service Industrial Lots ii
requirements and an explanation of the approvals process. specifically being mandatory. A3 Site Layout Guide iii
G1 Vision and Introduction 1 S1 Land Use and Business Types 16 A4 Site Layout - Detailed v
G2 Key Principles 2 S2 Requirements for General Industrial 17 A5 Site Layout Examples vi
G3 Purpose and Sustainability 3 S3 General Industrial Design Principles 18 A6 Stage 1-5 Overall Layout Plan xi
G4 Process 4 S4 Requirements for Service Industrial 19 A7 Plant Species List xii
G5 Requirements and Deliverables 5 S5 Landmark and DAP Sites 20 A8 Precedents xiv
S6 Architectural Guiding Principles 21-22 A9 Materials Guide and Precedents xviii
PART TWO: MANDATORY REQUIREMENTS M S7 Parking and Access 23 A10 City of Wanneroo Car Parking Standards xx
These are the minimum mandatory development requirements S8 Landscaping and Paving 24 A11 Design Guideline Checklists xxiii
and should be read in conjunction with Part Three, Best Practice S9 Service, Storage and Display Areas 25 A12 Credits xxviii
and Support Information, the Building Code of Australia (BCA), S10 Fencing 26
relevant Australian Standards and the requirements of the City of S11 Signage 27
Wanneroo. S12 Passive Solar Design 28
M1 Urban Design and Architectural Form 6 S13 Energy and Lighting 29
M2 Passive Design 7 S14 Water Management 30
M3 Parking and Access 8 S15 Material Selection 31-32
M4 Landscaping 9-10 S16 Management 33
M5 Service, Storage and Display Areas 11 S17 Cost Benefit Analysis 34-36
M6 Fencing and Signage 12
M7 Energy Management 13
M8 Water Management 14
M9 Management 15

Design Requirements and Guidelines December 2010


VISION AND INTRODUCTION G1
GUIDING PRINCIPLES G1.1 Introduction
This section of Guiding Principles is a Meridian Park, Neerabup is the next generation in industrial estate
design, setting standards in sustainability, social amenity and
summary of the Design Requirements
building quality.
at Meridian Park.
Driven by LandCorps forward-looking sustainability plan, the
development aims to lead the way in water and energy efficiency.

Meridian Park will also provide an employment base for the rapidly
expanding North West Corridor, which includes developments
such as LandCorps future sustainable residential development at
Alkimos.

Meridian Park
G1.2 Unique Vision

IV E
DR
Neerabup

ER
The designers of Meridian Park have challenged the traditional

TH
PEDERICK ROAD

MA
concept of the industrial precinct, aiming to create an intelligent WANNEROO
GOLF
CLUB

commercial development with a strong sense of place with a sound


economic and environmental future.

OAD
FLYNN DRIVE

AR R
P IN J
Working together, these Town Planners, Architects, Engineers

W
AN
m

NE
4k
and Developers have crafted an exciting vision for a commercial UP

ROO
AL
OND
JO

ROA
community that blends the features of; intelligent design, abundant

D
amenities, a desirable location and ecological sensitivity.
G1.3 Development Area
The Meridian Park development area comprises approximately 400
hectares of industrial land to be jointly developed by LandCorp and
the City of Wanneroo. Meridian Park is situated off Flynn Drive within
the 1000 hectare Neerabup Industrial Area, north of Wanneroo. The
Meridian Park development is expected to meet the industrial land
needs of Perths rapidly growing North West Corridor for the next
20 years.

G1.4 Web Address


landcorp.com.au/meridianpark

Design Requirements and Guidelines December 2010 1


G2
GUIDING PRINCIPLES

STAGES 1-5

KEY PRINCIPLES 4. Economic Development


Attract businesses that will provide employment self-sufficiency
G2 Key Principles of Meridian Park for the region.
LandCorp and the City of Wanneroos vision is to create a landmark
Support and encourage the growth of businesses following
industrial estate with a strong sense of place which demonstrates
establishment in Meridian Park.
efficient use of land, water, energy and resources
Generate job diversity and choice in the North West Corridor.
1. Quality
Showcasing innovative urban design principles, Meridian Park will Attract smart businesses and knowledge workers to the region.
be a thriving community for industry.
Attract investment and business uses that will present the best
2. Sustainability land-use opportunities for the region.
Meridian Park will set new benchmarks for sustainable industrial
development and design in Western Australia.

3. Design
Meridian Park has a strong architectural character which is
contemporary, distinctive and original. There will be a strong sense
of place for users and visitors.

2 Design Requirements and Guidelines December 2010


PURPOSE AND SUSTAINABILITY In support of these initiatives LandCorp and the City of Wanneroo
G3
are promoting leading practice in Industrial Park design through
GUIDING PRINCIPLES G3.1 Purpose of this document comprehensive design criteria, which will positively influence
The Meridian Park Design Requirements and Guidelines have the water, energy and resource efficiency, maintain and enhance the
following key functions: environment, and promote quality urban spaces within Meridian Park.

To outline the LandCorp and City of Wanneroo approvals process. Passive solar or climate responsive design, improved efficiency and
reduced consumption are incorporated into the principles of these
Provide guidance on the permitted type of businesses and
guidelines to enable more efficient use of energy and water.
developments.

Establish the site planning and built form requirements.

Provide guidance on landscaping and paving requirements.

Provide guidance on fittings and fixtures to meet the


sustainability objectives.

G3.2 How to use this document


These Design Requirements are divided into sections with a varying
level of detail to suit the readers requirements. The first section
prefixed with G, provides a high-level summary guide. The second Energy Efficiency
section prefixed with M, sets out the mandatory requirements. The
Water
third section prefixed with S, provides in-depth support technical Management Communication
information and best practice guidance. The final section is an
appendix prefixed with A, and contains reference diagrams and
information.

G3.3 Sustainability Initiatives


Amenity Waste
International and national initiatives acknowledge the issue of
CO2 emmissions and the impacts of climate change and a drying
climate. These initiatives set targets and actions to achieve overall
reductions in energy and water consumption and transport costs
through a variety of mechanisms, which align overall with the
objective of Sustainability. Achievement will not only ensure the Environmental Architecture and
long-term viability of Western Australia, but also save money for Quality Land Use Built Form
your business.

Design Requirements and Guidelines December 2010 3


G4 PROCESS Stage Two: Detailed Design Approval
GUIDING PRINCIPLES Step 6 Submit Detailed Design to Estate Architect
G4.1 Process
Stage One: Pre-Development Approval When you choose to develop at Meridian Park you will be Step 7 Endorsement of Detailed Design by Estate Architect.
required to follow the planning approvals process which includes Step 8 Lodge Building Licence application with City of Wanneroo
STEP 1 understanding and using the Design Guidelines and provisions
Attend Planning / Design Workshop with Estate Building Department.
of City of Wanneroo District Planning Scheme No 2. The Design
Architect. Estate Architect is available to discuss
applications prior to lodgement. Guidelines explain the process and methods available for Step 9 Approval of Building Licence by City of Wanneroo.
developers to achieve all of the key principles.
Step 10 Proceed with development.
STEP 2 Divided into two stages the planning and documentation of your
Lodge Development Application with Estate Architect development would proceed as follows:

Enter Into Agreement to Develop Land [Purchase or Lease]


STEP 3
Endorsement of Development Application by Estate at Meridian Park, by negotiating with LandCorp or their
Architect representatives.

Stage One: Pre-Development Approval


STEP 4 Step 1 Design Workshop [1 hour] with the Estate Architect to
Lodge Development Application with City of Wanneroo discuss planning and design prior to lodgement. If there are
parts of the Design Guidelines that you do not understand this is
STEP 5 an excellent time to ask those questions.
Receive Development Approvals
Step 2 Lodge Development Application with Estate Architect for
endorsement. See also column titled Submission requirements.
Stage Two: Detailed Design Approval Step 3 Endorsement of Development Application by Estate
Architect. This is required prior to your lodgement with the City of
STEP 6 Wanneroo.
Submit Detailed Design to Estate Architect
Step 4 Lodge your Development Application with City of
STEP 7 Wanneroo Planning Department.
Endorsement of Detailed Design by Estate Architect
Step 5 Receive Development Application approval from the City of
Wanneroo.
STEP 8
Apply for Building Licence with City of Wanneroo

4 Design Requirements and Guidelines December 2010


REQUIREMENTS AND DELIVERABLES G5.2 Submission Requirements G5
Developers are required at each stage to submit the following
GUIDING PRINCIPLES G5.1 Design Guideline Requirements
documents:
1. Architectural Form
Consolidated building uses and conditional lean-to additions Stage One
Clearly expressed entries Completed Stage 1 Check List
Active and glazed streetscape facades Completed Design Guidelines Certification
Visual amenity Site Plan
Buildings to engage the street with minimal set backs and Floor Plans of all levels including breeze path
Micro Climate Zones, (break-out spaces) to side boundary to Roof Plan
allow access, natural light, ventilation and landscaping Elevations of all building walls
2. Parking and Access Shadow Diagram
Accessible car parks, preferably shared to create efficiencies and
Stage Two
maximise developable land.
Completed Stage 2 Check List
3. Landscape
Site Plan showing fencing and landscaping
Sense of place, visual amenity, assisting sustainability. Low water
Extent and nature of the landscape including soil improvement
reliance. Micro-climate areas for staff break-out areas and activation
and mulch
of street frontages.
Plant species, numbers and locations
4. Service, Storage and Display Areas
Reticulation type and location
Secondary areas are screened with appropriately placed quality
Outdoor furniture and amenity details
visual screening.
Location and details of external lighting
5. Fencing and Signage
Details of boundary walls, fencing and gates
Minimise fencing, integration and aligned with building faade and
Extent and type of paving treatment.
compatible with building design.
Floor Plans of all buildings
6. Energy Efficiency
Shadow Diagram
To maximise use of passive technologies such as solar shading and
Elevations and Sections though all buildings
cross-ventilation to reduce the energy use of the buildings. All fixed
Breeze Path Diagram
appliances have minimum energy efficiency requirements.
Lighting Plan Specification and Locations
7. Water Management
Electrical Specification and Locations
Minimise the use of water with optional collection and reuse. All
Construction Waste Management Plan
storm water to be retained on site.
Star rating of sanitary fittings
8. Materials Selection
Use of high quality and interesting materials to contribute to a
positive streetscape and building elevations.
9. Management
Requirement to ensure Meridian Park maintains key principles.
Design Requirements and Guidelines December 2010 Building use and operation remains compliant and upholds required 5
standards.
M1 URBAN DESIGN AND ARCHITECTURAL FORM integrated into the facade as required on elevations visible from the
street.
MANDATORY REQUIREMENTS M1.1
Consolidate all customer service areas and employee amenities Developments that apply feature materials and colours to elements
This Mandatory Section of the Design of the built form to provide visual amenity are encouraged. Refer to
within the front building zone, and the operational area within the
Requirements establishes the rear building zone. Section A8 and A9 Precedents and Materials Guide.
minimum acceptable development M1.5
M1.2
criteria for key aspects applicable to all Developments of more than one building must be complimentary to
Design to setback requirements are listed below, see also Section
development within Meridian Park. S2, S6 and A3. each other in terms of scale.

6m fixed front setback M1.6


3m side setback (for a minimum length of 21m from the front Secondary street facing facades on corner Lots are to be of similar
boundary) to create a Micro-Climate Zone (see Landscape architectural quality as the prime street facade.
section M4.11 and Fencing and Signage section M6). Not
applicable to secondary street corner Lots. M1.7
Lean-to structures added to the predominant building mass must
M1.3 be a minimum height equivalent to two storey (7m).
Building designs are to provide visual interest to the street by
creating active building faades (predominantly glazed and M1.8
preferably with visible access points or opennings) and/ or other Building designs and landscape treatments are to address Crime
creative solutions that engage and respect the streetscape. Refer to Prevention through Environmental Design principles. Refer to
precedent studies in section A8 for examples. Section M4 and S7 for more details.

Glazing should bring day lighting to customer service areas and M1.9
provide surveilance of the street. Submission Requirements:
Site plans, floor plans, section plans and building elevations are
Building entries should be clearly visible from the street and provide
to be submitted to the Estate Architect as part of Stage 1 Pre-
intuitive way-finding for visitors and present a positive corporate
Development Approval and Stage 2 Detailed Design Approval. Refer
image. Refer to the Estate Architect for additional explanation.
to Part G4 on Process and A11 for a Checklist for more details.
Additional shading devices may be required on east and west
elevations.

M1.4
Canopies, awnings and solar shading devices play an important role
in the character of a facade and are to be utilised and thoughtfully

6 Design Requirements and Guidelines December 2010


M2 PASSIVE DESIGN The maximum roof solar absorptance (SA) permitted is 0.5, refer
to BCA for colour classification and BASIX (NSW). Colorbond have
MANDATORY REQUIREMENTS M2.1 a number of Very Light (SA <0.35) and Light (SA <0.55) colorbond
All developments are to optimise the application of passive solar steel roof solutions.
design principles (described in Section S12) and as required in the
Building Code of Australia, including; building orientation, shading, M2.6
natural lighting and cross-flow ventilation etc. Street facing Ceiling voids are to be ventilated to remove excess heat in summer.
facades, which are to be prominently glazed to satisfy the urban
design principles, must be appropriately shaded from solar heat
gain.

M2.2
External shading devices (overhangs, directional louvers, shutters
and awnings) are to be provided for all north, west and east facing
openings exposed to solar heat gain.

M2.3
Provide a suitable level of natural lighting to the floor level of all
buildings by incorporating strategically placed windows, light
shelves, light wells, awning reflectors etc into the overall design.

If this can not be demonstrated by the developer and determined


by the Estate Architect by casual review of the drawings and
good design practice, then a computer model may be requested
to confirm that at least 30% of the total floor area of all buildings
achieve a Daylight Factor (DF) of 2.0% as measured at 1.0m above
floor level measured under a uniform design sky.

M2.4
Hi level (clerestory) operable windows and vent openings are to be
provided within the building to ensure cross ventilation and heat
purging.

M2.5
Pale coloured roof and wall materials are to be used to reduce heat
gain in summer and reduce cooling energy levels and costs.

Design Requirements and Guidelines December 2010 7


PARKING AND ACCESS M3
MANDATORY REQUIREMENTS M3.1
For safety and way-finding reasons public parking is to be located
within the public parking zone near the front (prime street) adjacent
the cross-over, as indicated in the plan on this page. See also
Support Information section S7 and Appendix sections A4 and A10.

primary setback
6m 15 m 40 m
3m 3m priority building zone
Service vehicle zone depth
from rear of primary building zone

Micro Climate Zone

3m
3
landscaped Zone A Zone B Zone C
setback PRIORITY BUILDING ZONE GENERAL INDUSTRIAL USE AREA GENERAL INDUSTRIAL
zone EXTENSION ZONE

2
optional dual access

5.5 m 1.5 m
parking bays

dual use pathway

alignment of screen if rear is used for external storage


PUBLIC PARKING ZONE
additional car parking
Zone D
bays as required
EXTENSION AREA OR
STORAGE/DISPLAY AREA
IF SCREENED
4 5 6 7 8 9 10 11 12 13 14 15

two way optional direct access to


crossover parking bays kerbs would VEHICLE SERVICE AND ACCESS AREA
need to be re-aligned
21 Property Boundary

11
location of adjoining lot's dual access road which could be by private
agreement between neighbours, a shared accessway for both lots
(max 11m wide, shown dotted)

NEIGHBOURING PROPERTY

4 5 6 7 8 9

the adjoining lot's service area is generally located here


and could by private agreement between adjoining
neighbours be a shared zone to allow for greater turning
circle and access facilities

8 Design Requirements and Guidelines December 2010


M4 LANDSCAPING M4.8
Soil Conditioner (humus) is to be used in all planted areas to
MANDATORY REQUIREMENTS M4.1
help retain soil moisture and nutrients and mulch used in all soft
Total landscaping (hard and soft) to be a minimum of 8% and a landscape areas to maximise water retention.
maximum of 10% of the total site area. Landscaping can exceed 10%
of the site area on the condition that all irrigation to plants is from M4.9
harvested water or none of the plants are irrigated. Watering of soft landscaped areas to be provided by automatic,
electronic controlled drip irrigation system. Application rates should
M4.2
be in accordance with the Water Corporation Waterwise guidelines
Maximum irrigated soft landscape, i.e. planting, permitted per (www.watercorporation.com.au/W/waterwise_index.cfm).
development, shall not exceed 60% (80% for corner Lots) of the
specified total landscaping requirement. M4.10
Provide centralised controller and integrated moisture sensors for
M4.3
all reticulation systems. Moisture sensors must be properly set
Shade trees must be provided 1 per 10 linear metres along the up, tested for the soil conditions and maintained. Sensors should
street boundary of any site. be designed to turn off irrigation when soil moisture levels do not
M4.4 require watering and therefore minimise water use.

A minimum of 1 shade tree per 4 car-parking bays is to be provided M4.11


in accordance with District Planning Scheme Number 2. The micro-climate zone is a side setback open to the street
M4.5 which enourages increased landscaping, natural light and cross-
ventilation into the building and potentially a break-out space for
Planting density for all landscape areas must be a minimum of 2
staff or simply a visual amenity seen from inside the building.
plants per square metre.
It is a 3 metre side [landlocked] set back with a minimum depth of
M4.6 21 metres from the front [prime street] boundary. It is encouraged
Turf can be used only for specifically designated passive recreation to continue for the length of the development to enhance the
purposes, including protected lunchtime breakout spaces but is amenity for users but is mandatory for 21 metres. It can serve as
limited to 10% of the total landscaping requirement. Turf is not a service corridor for storage and the like whilst also providing high
permitted for any other purpose including aesthetic reasons. level openable windows and natural light. Refer to sections S6 and
S8.
M4.7
Plant species (trees and shrubs) must be selected from those
listed in Appendix A7.

Design Requirements and Guidelines December 2010 9


M4.12 PROPERTY BOUNDARY
M4
Minimise impervious paving (as far as practicable) by using
MANDATORY REQUIREMENTS VERGE PLANTING AND IRRIGATION TO BE DESIGNED AND
INSTALLED BY LANDCORP AND MAINTAINED BY ADJACENT
pervious paving and direct stormwater from impervious areas to
PRIVATE LAND OWNER
landscape areas.
VERGE PLANTING TO BE INCLUDED IN ADJACENT PRIVATE
M4.13 LAND OWNERS LANDSCAPE THEME AND WORKS
(PLANTING AND IRRIGATION TO BE DESIGNED, INSTALLED
All stormwater shall be harvested or infiltrated onsite. AND MAINTAINED BY ADJACENT PRIVATE LOT OWNER)

M4.14 FOOTPATH

Swales are to be provided within car parking areas where possible PARALLEL PARKING
to direct stormwater runoff into landscape areas and promote
NOTE: STREET TREES TO BE AS PER ESTATE STREET TREE
recharge of groundwater.
MASTER PLAN TO BE INSTALLED BY LANDCORP AND
MAINTAINED BY ADJACENT PRIVATE LOT OWNER. PRIVATE
M4.15 TREES TO BE SELECTED AND MAINTAINED BY ADJACENT
PRIVATE LOT OWNER.
Where car parking and hardstand areas are large, soak-wells are
required to be provided.

Refer to Department of Waters stormwater manual. www.water.


wa.gov.au

M4.16
Submission Requirements:
Proponents are required to develop a landscape plan (at 1:100 or
1:200 scale) which provides details of the landscaping proposed
within the lot and addresses the above mandatory design
requirements. The landscape plan will be assessed by the Estate
Architect and will need to identify:
Extent and nature of the landscape treatments including soil
improvement and mulch finishes;
Plant species, numbers and locations;
Reticulation type and location;
Location and nature of outdoor furniture and amenities;
Location and details of external lighting;
Extent and type of boundary walls, fencing and gates; and
Extent and type of paving treatment.
Picture courtesy of LandCorp

10 Design Requirements and Guidelines December 2010


M5 SERVICE, STORAGE AND DISPLAY AREAS
MANDATORY REQUIREMENTS M5.1
Service and storage areas must be screened behind the front
building line and from the street. Landscaping and fencing can be
utilised to screen these areas.

M5.2
Screens must be of high quality and complimentary to the building
facades.

M5.3
Screening method must include some visually permeable
components to maintain a sense of site openness. Screening of
unsightly elements is required but not at the price of creating large
expanses of solid screen walls. Material selection of the screen
walls requires carefully consideration.

M5.4
Front setback of display areas must be in line with the building line.

Design Requirements and Guidelines December 2010 11


FENCING AND SIGNAGE M6.6
M6
Signage material and lighting is to be consistent with the
MANDATORY REQUIREMENTS M6.1
architectural treatment.
Security fencing is permitted along the side (non-street) and rear
boundaries but fencing to any street frontage (including corner M6.7
developments) is to be kept to a minimum and not to be forward of Submission Requirements:
the building line. Proponents are required to submit the following to the Estate
Architect as part of the Stage 2 Detailed Design Approval (refer to
M6.2
Section G4 for more details).
The landscaped micro-climate zone is encouraged to be un-fenced Fencing plan including materials, finishes and colours.
and open to the street. If a fence is required it must equal or better Specifications of external signage.
the detail in section S10 as determined by the Estate Architect.

M6.3
The minimum standard for fencing is black powder-coated square
metal vertical posts and top and bottom horizontal support rails.

M6.4
One free standing or composite pylon sign per lot will be permitted
and shall:
Be symmetrical to the facade or aligned with key features such
as a blade wall or other architectural element in the building
facade
Not exceed 12 m in height
Not exceed 20 m2 face area

M6.5
No flood lighting is to be utilised to illuminate signage. Electron-
luminescent strips and fluorescent side-lit panels are preferred.
Halo lighting and/or indirect illuminations or internally illuminated
signs are preferred to direct lighting.

12 Design Requirements and Guidelines December 2010


ENERGY MANAGEMENT M7.5
M7
Submission Requirements:
MANDATORY REQUIREMENTS M7.1
Proponents are required to submit the following plans to the Estate
Predicted annual base building energy consumption allowances Architect as part of the Stage 2 Detailed Design Approval. Refer to
need to comply with the Building Code of Australia (BCA) JV3 (or Section G4 for more details.
lastest version) protocols and assessed by the City of Wanneroo. Breeze path diagram
M7.2 Shadow diagram
Detailed lighting plan and specifications of electrical fixtures and
Minimum 80% of the selected lamps for internal use are to have
fittings.
an efficacy of at least 90 lumens/Watt output and manufacturers
quoted life of 20,000 hours.

M7.3
Minimum 80% of the selected lamps for external use are to have
an efficacy of at least 65 lumens/Watt output and manufacturers
quoted life of 20,000 hours.
No external up-lighting to be used.
All external luminaries are to have an upward light component of
less than 4%.
No stray lighting such as floodlighting to be used to illuminate
signage.
Glare or light spill should not adversely impact adjoining
properties or passing motorists. Preferred corporate signage
lighting is internal, halo, or well-focussed indirect lighting.

M7.4
Provision of solar hot water systems (minimum 4 star rating), or
5 star gas or heat pumps system for all buildings that require hot
water facilities.

Design Requirements and Guidelines December 2010 13


M8 WATER MANAGEMENT
MANDATORY REQUIREMENTS M8.1
Install 4 star rated dual flush toilets, 6 star urinals or waterless
urinals (where installed) and 3 star rated fittings and appliances.

M8.2
Shower and personal storage facilities are to be provided on-site for
all developments that exceed 2000m2 GLA.

M8.3
Submission Requirements:
Proponents are required to submit specifications and
manufacturers star rating for the proposed sanitary fittings to the
Estate Architect as part of the Stage 2 Detailed Design Approval
(refer to Section G4 for more details).

14 Design Requirements and Guidelines December 2010


M9 MANAGEMENT
MANDATORY REQUIREMENTS M9.1
Verge areas shall be maintained (including reticulation) and not
modified (unless otherwise approved by LandCorp) by property
owners.

M9.2
Businesses should be aware of their environmental obligations
regarding the transport, storage, use and disposal of materials
and substances used on site including the need for regulatory
approvals from the Water Corporation, Department of Environment
and Conservation, Department of Minerals and Petroleum and Local
Government.

M9.3
All developments to minimise the use of toxic materials.

M9.4
All developments to comply with AS 1668 minimum fresh air rates.

M9.5
Submission Requirements:
Proponents are required to prepare and submit to the Estate
Architect a Waste Construction Management Plan for the proposed
development as part of the Stage 2 Detailed Design Approval (refer
to Section G4 for more details).

Construction Waste Management Plan (CWMP). Template to be


provided by LandCorp.

Design Requirements and Guidelines December 2010 15


LAND USE AND BUSINESS TYPES Service Industrial Zone:
S1
Industry (light)
SUPPORT INFORMATION S1.1 Permitted Land Uses Laundry
The permitted uses listed below still require planning approval in Auction Room
accordance with the City of Wanneroo District Planning Scheme Warehouse
This section provides background No.2. Car Park
information in support of the Mandatory General Industrial Zone:
Car Wash
Dry Cleaning Premises
Requirements and outlines examples of Car Park
Showroom
acceptable best practice. Car Wash
Transport Depot
Dry Cleaning Premises
Vehicle Sales/Hire Premises
Fuel Depot
Veterinary Consulting Rooms
General Industry
Veterinary Hospital
Light Industry
Storage Yard Permitted Uses must comply with the Mandatory Requirements
Landscape Supplies contained in Part Two (M1-M9) of this document and will require
Laundry Estate Architect approval prior to applying for Council approval.
Milk Depot
Motor Vehicle Repairs S1.2 Discretionary Land Uses
Salvage Yard Land uses not specified as Permitted may be approved as a
Transport Depot Discretionary Use under the City of Wanneroo District Planning
Vehicle Sales/Hire Premises Scheme No.2. Clarification regarding discretionary uses should be
Warehouse sought from both LandCorp and the City of Wanneroo prior to the
Wood yard lodgement of any application.

16 Design Requirements and Guidelines December 2010


S2 REQUIREMENTS FOR GENERAL INDUSTRIAL
SUPPORT INFORMATION S2.1 Application
General Industrial lots are highlighted in the overall
plan on this page.

S2.2 Building Setbacks and Layout


The required building setbacks have been
established giving consideration to the following:
Good streetscape outcomes
Adjoining properties and buildings
Solar aspect and breeze paths
Development form
Crime Prevention Through Environmental
Design (CPTED) principles

Stage 1-5 Overall Plan

micro climate
zone
3 m Nom. building width 22 m 1.5 6 m 5.5 m 6m 0.6 m
internal carpark

3
solar shading access road Priority General industrial use area General industrial
building extension zone

2
width zone

1
parking Extension Area or
Storage/Display
814

area if screened

two way crossover


vehicle service and access area
access road
micro climate glazed elevation
landscaped with solar shading
zone Street Elevation Typical Plan

primary
General Indu strial General Indu strial General Indu strial
S cale: 1:5 00 S cale: 1:4 00 S cale: 1:4 00

setback
6m 15 m 40 m
Service vehicle zone
blade walls

Nom.12
Priority

Nom.9.5
glazed elevation general industrial use area
building
with solar
zone
shading
Longitudinal Section
Design Requirements and Guidelines December 2010 17
GENERAL INDUSTRIAL DESIGN PRINCIPLES boundary and encouraged for the depth of the whole site. Non-
S3
landscaped areas greater than 21m from the street boundary
SUPPORT INFORMATION S3.1 Guiding Principles General Industrial Development should be screened from view.
There is scope to create a number of built form designs that
comply with the mandatory requirements. Listed below are some 8. Skylights to promote natural light through the roof.
explanatory notes on the main design principles. Please also refer 9. Parking between the building facade and the street should be
to Appendix A8and A9 for a number of inspirational precedents. avoided (other than roadside embayment parking bays). Off
1. The desired built form outcome is for simple singular building street parking and hardstand areas are located to the sides of
masses of consistent height (equivalent to two storeys) to buildings to create openness to maximise land use efficiencies
incorporate administration, showroom and industrial uses. whilst maintaining good urban design principles.
Traditional lean-to offices are discouraged.
S3.2 Corner Lots
2. Buildings are placed to create a pairing effect with adjoining Primary Street frontage will be determined by LandCorp
developments. This promotes a unified streetscape, rhythmic Secondary Street setbacks: minimum 3 metres, except as varied
urban design, centralised cross-over locations and opportunities by a Detailed Area Plan
for shared access and serviceability. The front setbacks are
reduced to 6m to bring the buildings close to the street and S3.3 Internal Zones (refer to plan diagram in M3)
create a boulevard feel. Zone A: Office/ Administration Use, fixed setback 6 metres from
front boundary and 3 metre side setback for microclimate zone
3. Side walls can be expressed as feature (blade) walls which are Zone B: Main Building Mass, maximum 21 metres setback from
allowed to extend 3m into the primary setback zone. front boundary and permitted but discouraged zero side setback
Zone C: Zero setback permitted to rear and side
4. Front elevations would ideally be predominantly glazed or
contribute positively to the streetscape in another way (refer to
M1.3 and precedents in section A8).

5. General orientation is to be perpendicular to the street and to


have side access servicing from the open hardstand/ parking
area.

6. Openings (windows, clerestory windows, doors, roller shutters)


in the side walls promote cross ventilation.

7. 3m side setbacks create a linear micro-climate zone between


neighbouring buildings. This landscaped zone provides a
breakout space for staff and promotes greater natural light and
cross-ventilation. This is mandatory within 21m of the prime lot

18 Design Requirements and Guidelines December 2010


REQUIREMENTS FOR SERVICE INDUSTRIAL Secondary Building Mass (smaller scaled building proportionate
S4
to Main Building Mass) should front the primary street (this will
SUPPORT INFORMATION S4.1 Application assist with screening of service yard).
Service Industrial lots within Stages 1 to 5 are highlighted on the Corner lots can locate rainwater tanks on the secondary street
plan in Appendix A2. behind the front setback line. All other lots can locate rainwater
tanks within the setback zone.
S4.2 Building Setbacks and Layout
Service areas should be screened by the Secondary Building
The general requirements of the two service industrial development Mass.
scenarios are outlined below. Guidance from the Estate Architect Car parking and shared crossovers are encouraged to be located
will be required in determining setbacks for individual lots in each on the primary street.
scenario. (Read in context with the diagrams on this page) Secondary Building Mass should front the primary street and
Main Building Mass should be built to the side boundary screen service areas behind.
(secondary street boundary for corner lots) to maintain built 6m wide access-way is to be maintained through to rear and
edge. any adjoining lots.

water 6m connection service road


tanks
Main Service Yard area
Main

1064
Building Building
Shade Mass Mass
structure
shown
dashed

Secondary
Building
Mass

Typical Plan

Service yard solar shading architectural service yard


solar shading architectural
water area behind device blade walls area
device blade walls
tanks

814

glazed shopfronts glazed shopfronts Crossovers side entrance off secondary building
parking area mass in section

Street Elevation Cross Section

Design Requirements and Guidelines December 2010 19


S5 LANDMARK AND DAP SITES The key objectives of landmark sites are:
To promote prominent architectural form on corner elements to
SUPPORT INFORMATION S5.1 provide a reference point in the built form and landscape.
Sites in key prominent locations have been nominated as landmark Encourage additional height elements where appropriate to
sites and the development on these sites are guided by Detailed keynote a point of difference with the balance of the estate and
Area Plans (DAPs). demark estate points of entry.
Ensure articulated facades which provide aesthetic appeal and
overlook to feature open spaces.
Provide for variations to setback requirements where necessary
to create prominent feature elements.
Provide some guidance to preferred land uses.

20 Design Requirements and Guidelines December 2010


ARCHITECTURAL GUIDING PRINCIPLES - URBAN AND 3. Microclimate Landscape Strip
S6
ARCHITECTURAL FORM A mandatory 3m wide landscape zone is to be created along the
SUPPORT INFORMATION side boundary for a minimum length of 21 metres from the front
S6.1 Objective boundary. Typically, adjoining lots mirror each other thus creating
To create a high quality, best practice, industrial estate with a strong a micro-climate zone 6m wide on the side boundary which is
sense of place for users and visitors, by the use of distinctive, flexible preferably unfenced (see conditions, S10) and visually connected
and environmentally responsible architecture and urban design. to the streetscape. It is encouraged that this feature is carried
through to the whole length of the buildings thus creating a linear
This section expands on the architectural design intent and
courtyard with opportunities for cross-ventilation, natural light, etc.
reasoning behind the mandatory and best practice initiatives.
A screen can be placed 21m from the front boundary to screen non-
S6.2 Guiding Principles - Architectural Design landscape uses if this micro-climate zone does not extend to the
1. Blade Walls full length of the building. At 3m wide is allows openings in the side
The side perimeter walls can be extended into the setback zone if building walls and greater flexibility for passive solar design and
required. This would be encouraged to provide strong street facing improved amenity for occupants. See NPV benefits in S17.
facade definition, with the added benefits of providing support 4. Shared Access
for solar shading devices to shade street facades . They can also The placement of buildings in a side by side paired clustering,
provide good integrated signage opportunities. creates opportunities for neighbouring buildings to share turning
2. Singular Building Mass circle and vehicle circulation zones to maximise efficiency.
A uniform building volume and scale, equivalent to at least two Crossover locations are strategically placed to facilitate shared
storeys, to contain all building functions would provide a strong access arrangements.
streetscape for the estate. It would articulate the hit and miss Standard legal pro-forma agreements for the sharing of access-
pattern derived by the location of crossovers which effectively ways and microclimate zones with an adjoining land owner are
determines the building locations on smaller Lots. It is a more available from LandCorp.
efficient use if land and would enhance the effectiveness of the
required micro-climate space which is placed between buildings, 5. Vehicle Parking
thus creating a micro-climate for staff, landscaping, openings, etc. Parking areas for General Industrial lots are not permitted between
the building and the street (other than embayment parking bays).

Design Requirements and Guidelines December 2010 21


S6 This creates positive, interactive streetscapes. Vehicle servicing S6.3 Best Practice Recommendations
and parking is to be placed to the sides of the building, or to the rear. Adaptable Buildings
SUPPORT INFORMATION Service Industrial lots have partial street edge parking, but not in Provide simple adaptable buildings that can easily be converted
front of the primary building zone. or divided and therefore remain flexible for future use, without
diluting the simple expressive nature of the shared estate
6. Flexible Design
aesthetic.
The built form principles of the design guidelines are based on
Paired developments facilitate sharing of car parking, turning
simple, best practice architecture, which can be applied to any of
areas and cross-overs.
the permitted uses and be adaptable for future use. The desired
Provide minimum two-storey front faades and ideally a
built form is for a simple, efficient, well executed and functional
singular built form mass to create a strong streetscape and a
building solution that is conceived with care and attention to detail,
good urban design.
materiality, scale and context.

7. Crime Prevention Through Environmental Design


Reduced building setbacks, side service areas open to the street
and predominantly glazed street facades all provide good visual
connectivity to the public zones and hence crime prevention
qualities.

CPTED Principles:
Maximise passive surveillance of street and public areas
Parking areas should be visible from adjacent properties.
Ensure building design limits the ability for unauthorized entries.
Design to ensure clear demarcation between the public and
private realm.
Ensure the design does not provide areas with minimal or no
surveillance.

8. Visual Amenity
This requirements permits individuality within the design
provisions. The underlining design principles are robust enough
to transcend interpretation by proponents. This estate aims to set
a new cultural standard in industrial building design and create a
shared aesthetic and strong sense of place. The design ideas are
simple enough to have longevity and create quality spaces for all to
appreciate.

22 Design Requirements and Guidelines December 2010


PARKING AND ACCESS minimise unnecessary hardstand area. This will have a desirable
S7
effect on streetscape amenity through limiting the occurrences of
SUPPORT INFORMATION S7.1 Objective crossovers and increased road safety through minimising access
To provide a high level of accessibility for businesses, employees locations.
and visitors to the estate whilst maximising developable Crossover locations will be provided by LandCorp, refer to
land through the use of on-street parking and shared access Appendix A4, A5 and A6.
arrangements.
S7.4 Best Practice Recommendations
S7.2 Requirements
In order to create more efficient use of land, site layout should
Provision of the required number of bays is based on the intended facilitate the sharing of vehicle access and turning/movement
use of the site, as specified by the City of Wanneroo District radiuses. Applicants are advised to liaise with the Estate Architect in
Planning Scheme No.2 outlined in Appendix A9 (also refer to City of this regard (specifically relating to the placement of trees within car
Wanneroo direct). parking and truck turning movements).
S7.3 Efficient Parking and Access Arrangements Adjoining lot owners are encouraged to liaise with each other to
PARKING PLACEMENT facilitate shared parking and access arrangements that maximise
Public car parking for each site is to be located within the public vehicle access-ways and turning radiuses.
parking zone at the front of the property, refer M3 and M4. A template for a Deed of Agreement for Reciprocal Access can
be provided on request from LandCorp. See also examples in
On-street parking, where provided by LandCorp, can be Appendix A5.
offset against City of Wanneroo parking requirements (i.e.
if a development requires 10 bays and 2 on-street carpark
embayments are provided, only 8 bays are required to be provided
within the property).

Where there are multiple tenancies, the offset shall apply across the
entire site and not for individual tenancies.

Staff parking may be located within the public parking zone or can
be located within the roadway, circulation and screened parking
zone as indicated in section M3.
Specific parking requirements contained in the City of Wanneroo
District Planning Scheme No.2 is outlined in Appendix A10.

SHARED ACCESS ARRANGEMENTS


The lot configuration within Meridian Park has been designed to
promote sharing of vehicle access and turning/movement areas to

Design Requirements and Guidelines December 2010 23


S8 LANDSCAPING AND PAVING 2. Micro-Climate Zone Design
Provide a shady break-out space for staff amenity.
SUPPORT INFORMATION S8.1 Objective Tree planting is encouraged to provide shade and direct and filter
Landscape plays an important role in creating a strong sense of winds towards openings in buildings to reduce heat loads during
place, providing a high level of amenity and assisting in thermal and summer and create a controlled environment.
solar efficiency. Water tanks and bicycle racks may also be located in this space,
These benefits must also be balanced against the need to minimise but not at the expense of the provision of amenity for staff.
potable water consumption. Through appropriate design, detailing Provide and reinforce natural surveillance and clear sightlines
and species selection these objectives can be mutually achieved. through the design of the hard and soft landscape.

S8.2 Landscape and Paving 3. Solar Screen Planting


LandCorp will be provided street verge landscaping to establish a Planting of shade trees within the green zones, shown in section
uniformly high standard and sustainability measures within the M2 will help reduce heat loads to the building during summer whilst
streetscape. allowing heat and light to penetrate the building during winter.

With the exception of street trees, the landscaping of verges will 4. Hardstand and Paving Areas
occur after construction on each individual lot to avoid damage The treatment of hardstand and paving areas will have significant
during the construction phase. implications for the quality and quantity of stormwater generated by
a site, as well as having implications for microclimate and amenity.
Street trees will be provided at the time of road construction to
ensure uniform growth throughout each stage of the development. Permeable surfaces should be maximised in order to reduce
stormwater runoff. Examples of permeable paving include
It is the owners responsibility to ensure that street trees gravel, compacted graded gravel, TERRABOND porous paving and
adjacent to their lot are protected during the construction phase. segmental paving.

S8.3 Best Practice Recommendations Refer to Department of Waters, Stormwater Management Manual:
1. Water Sensitive Landscape Design www.water.wa.gov.au
Use dry planting and low water usage plants where possible and
group plants with similar water requirements (hydrozoning) for
most efficient water usage for all species.
Mulch all planted areas with 75mm thick mulch to help the water
retention properties of the soil.
Slope paved areas and driveways away from buildings and
towards planting areas minimising concentration of water flow.
Incorporate opportunities for the recycling of grey and black
water from the development to be used for irrigation purposes.
Where available, property owners should use topsoil and mulch
from stockpiles from the estate.
24 Design Requirements and Guidelines December 2010
SERVICE, STORAGE AND DISPLAY AREAS S9
SUPPORT INFORMATION S9.1 Objective
All aspects of a development that are visible from the street
or adjoining public areas, need to contribute positively to the
streetscape, urban design principles and estate aesthetics.

S9.2 Best Practice Recommendations


Screening should be used to conceal unsightly items and areas that
do not contribute to the streetscape.
Screens should be strategically placed to achieve this objective,
be of a similar quality to the building facades and integrated with
the buildings where possible.

Design Requirements and Guidelines December 2010 25


S10 FENCING 3

SUPPORT INFORMATION S10.1 Objective Front street boundary line


Limited fencing

6000 Setback
3000
permitted on front
All aspects of a development that make up the visible elements

Blade wall
boundary of
micro-climate zone.
viewable from the street or adjoining public areas need to be given Preference is for no
fencing, but if it is
the same level of design sensitivity and integration as the building required by the

Side Lot boundary line


developer, then it must
facades. meet the quality and
detailing standards of
the design guidelines.
They must also contribute positively to the quality of the Chain or link mesh is not
permited.

15000
BUILDING
streetscape and the shared aesthetic of the estate. Fencing permitted on side
boundary of micro-climate
zone, but not encouraged.
S10.2 Micro Climate Zone Ideally should match
front section (street facing) or
similar post fence by Gryffin or
It is preferred that the mandatory minimum area of micro climate equivalent. Chain mesh not
permitted.
zone (3m x 21m) is unfenced and seen as a wrapping of the verge SK27_CD

Screen or fence permitted at


around the street facade. If a fence is required, then it must be the end of the mandatory
climate zone depth (21m
constructed as per the diagrams on this page. from boundary)

S10.3 Best Practice Recommendations Part Plan


Fencing transparency should be sensitive to the needs of screening
from public view unsightly storage or service areas and at the same
Fence configuration with square mild steel Horizontal support rails (dotted) are not
time maintaining the objective of an open and active faade. square (shs) or tubular (chs) posts, paint preferred but are permitted
finished. on the condition they are fixed to the
Minimum overall openness is 50% and inside, no more than two and the
All fencing should be in keeping with the theme of the estate and maximum 1600mm top rail must be set out min. 400mm
above finished ground level. lower than the top of vertical posts.
complement the proposed built form.
60 80
Minimal fencing is preferred to promote the urban design
principles of openness and intuitive way-finding.

400 Min.
Materials used for fencing should be of similar quality as the
building facades and be strategically placed to be integrated to Building

1600 Max. height


the buildings.
Building street facades should not be screened or fenced to

Side boundary
ensure a connection between the streetscape and public realm
is retained.

Elevation Detail
3000

26 Design Requirements and Guidelines December 2010


SIGNAGE S11
SUPPORT INFORMATION S11.1 Signage
Signage should be sensitively located so as not to detract from
the facade or streetscape and not be excessive in scale or
quantity. Materials and lighting of the sign should compliment the
architecture.

Often it is found that the graphic effectiveness of a sign is in the


space around text and its placement.
A discrete sign on the edge of a substrate can be more effective
than a huge sign that dominates the backing material, be it a wall
or building facade.
Signage to the blade walls should be treated with care and not
distract from the facade expression.
Creative solutions are encouraged, for instance the use of super-
graphics as suggestive signs (refer to reference project images)
used as effective background textures or images.
Materials within the buildings can be effective signage, for
example by facade material selections or corporate colours.
Signs could offer solar shading, or be part of the glazed facade
treatment.
Utilise durable and environmentally conscious materials and
technologies

Design Requirements and Guidelines December 2010 27


S12 PASSIVE SOLAR DESIGN Provision of well considered landscaping is necessary for valuable
shade throughout summer and to allow for the permeation of winter
SUPPORT INFORMATION S12.1 Objective sun (refer to Section M2 and M4 for more details on landscaping).
To optimise passive solar gain and improve overall building
performance through energy efficient design and fitout. 3. Cross Ventilation
Orientation and openings should maximise natural cross flow
S12.2 Guiding Principles ventilation. Some of the fundamental built form and urban design
The orientation of buildings on the site should be planned to principles of Meridian Park is to provide and encourage side
promote natural lighting, ventilation and heating and cooling. setbacks that allow good cross ventilation through external wall
Passive Solar Design decreases the reliance upon mechanical openings appropriately placed on the building facades, in addition to
heating or cooling thereby reducing energy loads and operational roller shutters.
costs. These simple and logical design factors can significantly 4. Energy Efficient Lighting
reduce everyday running costs of buildings with little or no
additional building cost. Refer to Section M2 The use of high efficacy lamps will have little impact on installation
costs in real terms yet can achieve a typical +10% energy saving on
1. Natural Daylight installation when compared with lower efficacy light sources such
Natural daylight provides less heat gain than most types of artificial as metal halide and T8 fittings.
light for equivalent lighting levels. The largest energy savings can be made by the installation of
Skylights and Clerestory windows enable natural daylight to daylight/occupancy control systems which provide an average five
permeate the building without loss of privacy or usable floorspace. year payback through energy savings.
Skylights provide some of the best ways to admit daylight and
distribute it evenly thereby saving energy and improving visual
comfort levels.

2. Passive Solar Shading


Exposed west and east facing surfaces, openings and windows di f
fus
es
should be minimised or adequately shaded. Shade structures ou
the
rn
UV filtered sunlight

da
are highly visible items and must be of suitable quality and be yli
gh
t

integrated into the facade and architecture. Awnings can be


oversailing roof canopies, light shelves, vertical and/or horizontal
louvres or screens.
Unshaded west and east facing high mass walls (e.g: concrete pre-
South North
cast or tilt-up panels) should be externally clad to minimise heat
gain and insulated to isolate thermal mass internally and minimise
heat radiation to the interior.

28 Design Requirements and Guidelines December 2010


ENERGY AND LIGHTING S13
SUPPORT INFORMATION S13.1 Best Practice Recommendations
Where installed heating and cooling systems to achieve a minimum
4 star energy rating.

INTERNAL LIGHTING
All internal lighting to be integrated with a lighting management
system
The size of individually switched zones does not exceed 500m2
for rear building zone
Switching is clearly labelled and easily accessible by building
occupants
All areas with sufficient natural daylight (DF of 2.0% for 30% of
GFA) shall incorporate daylight linked lighting controls to switch-
off lights (eg. Photo-cell sensors.)
An automated time clock control system is provided to all areas
All internal lighting to incorporate Power Factor improvement
measures within the fitting.
Light levels to be in accordance with AS 1680 Interior Lighting
Part 2
All lamp fittings shall have a minimum Light Output Ratio of 0.75

EXTERNAL LIGHTING
External lighting can be linked to photo-cell sensors and/or time
clock control
Signage can be illuminated by electron-luminescent strips and
fluorescent side-lit panels.

RENEWABLE ENERGY
Photovoltaic (PV) panels and small scale wind turbines can be
installed on developments to offset energy demand.
Smart meters can be installed on all developments wishing to
use PV to provide surplus power to grid.

Design Requirements and Guidelines December 2010 29


S14 WATER MANAGEMENT rainwater for toilet flushing, cold water laundry (if required)
and irrigation purposes. Where there is insufficient roof area,
SUPPORT INFORMATION S14.1 Objective equivalent volumes of rain water will need to be harvested from
To minimise the impact of Meridian Park on scarce water resources other surfaces with appropriate filtration and redirected to the
through the implementation of a total water management approach rainwater tank.
and water sensitive urban design principles. Rainwater tanks can be located in the micro-climate zone. There
are a number of storage solutions available that suit the linear
S14.2 Rainwater Harvesting
nature of the micro-climate zone whilst also allowing general
The storage/tanks should ideally achieve a 65% target reduction in access. Water storage solutions can also have excellent thermal
potable water use if 90 kilolitres per gross hectare is plumbed into sink properties that benefit the thermal performance of the
toilets and landscape irrigation systems. buildings through careful placement and selection of storage
Capacity of the rainwater tanks is based on a ratio of 90 kL/Ha to be types.
adjusted for individual developments based on lot sizes. For a 2000
m2 lot, the tank size to achieve a 65% potable water reduction is
approximately 18 kilolitres. Smaller lots or strata lots could provide a
pro-rata amount of storage.

The capacity of the on-site rainwater tanks may need to be adjusted


to accommodate specific end user requirements and projected
employee numbers.

S14.3 Storage Tanks

Rainwater tanks can be located within the designated landscape


areas, or side setback micro-climate zone, integrated into the overall
building design, installed below ground or screened as required.

It is not necessary to screen the tanks from prime street views if


there has been adequate consideration into the design, placement
and finish of storage tanks.

Rainwater tank overflow is to be directed into designated landscape


areas.

S14.4 Best Practice Recommendations


All developments should aim to provide a minimum roof area
equivalent to 50% of the total lot area to harvest the required

30 Design Requirements and Guidelines December 2010


MATERIAL SELECTION FLANKING WALLS
S15
Flanking walls (side external walls) are key visual cues to the
SUPPORT INFORMATION S15.1 Objective estate aesthetic and should be designed with suitable quality and
Buildings are to utilise appropriate materials to reflect the quality materials and convey visual solidity. Materials and finishes to
and values of the Meridian Park development and contribute consider:
positively to the architectural aesthetic of the estate. Pre-cast concrete finished with coloured pigments, relief details,
exposed aggregate, sand blasted finish, broom finish, artists
S15.2 Best Practice Recommendations
moulds or attached artwork.
Building materials and finishes should be selected taking into Textured paint and/or render.
consideration the recommendations and guidelines below. The Framed panel cladding, (Alucobond, CFC, Vitrepanel, or similar)
best practice recommendations and materials selection examples Rain screens to protect heavy mass walls from absorbing
in Appendix A9 contain some of the more creative materials that unwanted solar heat.
would be considered suitable. At the Estate Architect review stage, Rammed earth with limestone additive obtained from onsite.
proposals will be assessed for specific suitability and quality of Corrugated metal sheeting with appropriate finishing.
materials. Insulated panels or composite panels with metal outer facing
EXTERNAL BUILDING MATERIALS (Kingspan or similar)
Material properties to consider:
Suitability to the location and exposure to view from the street
and adjacent open areas.
Thermal properties including insulation and thermal sink.
Reflectivity in general.
Maintenance, durability and life cycle expectation.
Use of recycled materials.
Embodied energies of fabrication, assembly, transport, and re-
use.
Textural aesthetic quality and visual interest.
Extent, scale and proportion in context of the overall building
and its application.

Design Requirements and Guidelines December 2010 31


S15 STREET FACADES
Should generally be transparent and could consist of:
SUPPORT INFORMATION Glass; clear with film, screen-printed, sandblasted or cast glass
panels, colour backed glass with vinyl adhesive sheeting or high
performance low-e glass.
Integrated solar shading devices into the faade, louvres,
vertical mesh screens, awnings (galvanised, anodised or
powder coated), timber screens.

FINISHES
Finishes for external walls should provide visual interest. Some
options include:
Bold colours in limited areas as architectural highlights
Textured paint
Galvanised metal
Smooth finished concrete
Exposed aggregate precast concrete
Corrugated metal sheeting
Cor Ten steel
Metal faced composite panels
Metal rain screens
Metal mesh
Perforated metal screens
Timber
Terracotta rain screens,
Polycarbonate multi cell panels
Stack bonded concrete block

Appendix A9 contains more examples of materials selection options.

32 Design Requirements and Guidelines December 2010


MANAGEMENT S16
SUPPORT INFORMATION S16.1 Objective
To ensure that high quality built form, visual amenity, water
sensitive landscaping and other longer term sustainability
objectives are achieved and maintained.

S16.2 Best Practice Recommendations


High standards are required to achieve best practice principles and
corporate responsibility to environmental issues on all levels.

CONSTRUCTION
Site construction should be undertaken with minimal resource
waste to landfill by engaging a waste management company with
proven recycling strategies.

BUILDING MANAGEMENT
Incorporate appropriate environmental management and
pollution prevetion practices.
Encourage water use efficiency and reuse opportunities in the
ongoing management.
Businesses should provide on-site recycling bins and transfer
waste to the Mindarie Regional Council Facility.
Maximise energy efficiency and use of renewable energy.
Promote appropriate waste management practices including
waste avoidance, recovery and recycling.

Design Requirements and Guidelines December 2010 33


S17 COST BENEFIT ANALYSIS The assessment evaluated the Guidelines in three key components
including Energy Efficiency, Water Efficiency or Aesthetic and
SUPPORT INFORMATION In developing the Meridian Park Industrial Estate (the Estate), Amenity value. The assessment included monetised values for
LandCorp has demonstrated its commitment to quality sustainable greenhouse gas emissions, tenant/occupant health, tenant/
industrial land development through the application of the Meridian occupant productivity, and aesthetic amenity.
Park Design Guidelines (the Guidelines). The design and planning
of the Estate focuses on maximising the efficient use of land, The Meridian Park Guidelines were assessed against a Business
water, energy and resources. The Estate is a leading example of an as Usual (BAU) or standard Industrial development. This entailed
industrial precinct that maximises benefits to developers, tenants the modelling of a Meridian Park building design and comparing
and the community alike through high quality sustainable design. it against a typical BAU design. All results are presented as a
comparison to the BAU.
Planning for the estate follows both national and international
trends in efficient and sustainable industrial building design and Based on the results of the Economics assessment, LandCorp has
land development. In developing these Guidelines, LandCorp made significant changes to the original Meridian Park Guidelines,
has continued to review and assess the cost effectiveness, and many of the previous Mandatory requirements are now Best
sustainability and implementation implications of the Guideline Practice. As the costs of water and energy increase in the coming
provisions, to ensure both direct capital and operating savings and years, as many expect, many of the Best Practice provisions will
benefits, as well as productivity and social amenity benefits within become more cost effective and move towards mandatory practice.
the Estate. LandCorp will review the Guidelines on a periodic basis in response
to market conditions. A summary of the results of the Worley
LandCorp invited Worley Parsons, with input from other design Parsons study is contained in the following sections. A full copy
professionals, to undertake an evaluation of the key provisions of the Worley Parsons report can be made available on request to
and requirements of the Guidelines in order to ascertain and detail LandCorp.
the cost effectiveness and benefits. The first phase of this was a
desktop review which found that the majority of the provisions
could be implemented at little or no additional cost when compared
with a standard industrial development. A second phase, based
on Worley Parsons EcoNomics Assessment, looked at the costs
and benefits of the various Guideline provisions in more detail.
Economics is a sophisticated way of assessing the financial,
social and environmental implications of the Guidelines across the
full life-cycle. The EcoNomics assessment has enabled LandCorp
to quantify the key provisions in the Guidelines in monetary terms,
and strike a practical balance between energy, water, and resource
efficiency, against the investment required by purchasers required
to achieve these outcomes.

34 Design Requirements and Guidelines December 2010


COST BENEFIT ANALYSIS - RESULTS Best Practice recommendations that require 10 years for the energy
savings to overcome the capital costs.
S17
SUPPORT INFORMATION The Energy Efficiency analysis demonstrated that the following
provisions are financially, environmentally and socially economic, As capital costs for renewable energy systems and carbon pollution
compared with the BAU design within the first 5 years: becomes costed the economics and payback for alternative energy
Shade trees systems will improve.
Hi level clerestory operable windows and vents
The Water Efficiency analysis highlighted the relatively low capital
Ceiling void ventilation
cost of the selected design requirements, coupled with a relatively
High efficacy lamps
low benefit value due to the cost of water in Western Australia
Solar Hot Water or heat pumps and
currently $1.17/kL. The majority of the requirements assessed were
Smart Meters
only economic, in comparison to the BAU, after a period of time..
This reflects research globally that indicates highly energy efficient
All provisions are NPV negative for the first 5 years, with the
buildings can generate a 7 to 12 percent increase in net operating
following provisions economic within 10 years.
income by reducing operating costs (Fox 2008). The relatively low
Maximum irrigated soft landscaping shall not exceed 60%,
current cost of energy in Western Australia, however, resulted in
Watering of soft landscaped areas to be provided by automatic,
some requirements only becoming economic after 5 to 10 years.
electronic controlled drip irrigation system and
Lighting management systems and PV/Wind turbine systems are Plant species to be selected from the selected list

Energy Efcient Provisions Water Efciency Provisions

Net Present Value ($) for 2030 Net Present Value ($) for 2030
70K 3K
61.00
2.50
2.30
53K

2K

35K
29.10
26.00
1K
17.80 0.80
18K

7.50 6.90
1.30 1.30 0
0K 0K
Trees Meters Ceilings Vents Solar HW Lamps Lighting PV Irrigation Plants Landscaping Plant Density

Economics assessment of Energy Efficiency Provisions under base case Economics assessment of Water Efficiency Provisions under base case
conditions compared with BAU conditions compared with BAU
Design Requirements and Guidelines December 2010 35
S17 COST BENEFIT ANALYSIS - RESULTS References

SUPPORT INFORMATION The Aesthetic and Amenity Value analysis highlighted the benefit of Fox, R (2008) Getting the true assessment of a LEED-certified
climate responsive orientation design and landscaping for building buildings value is worth the inconvenience The Sustainable
occupants. Enterprise Report: Turning Awareness into Action, Deloitte & Kyoto
The combined requirement of (Design to setback 6m front Publishing, 2008
and 3m side and Microclimate zone to be created in 3m space
between buildings) was the most economic of the requirements.

The benefits associated with visual connection and access of


building staff to external landscapes, in particular the micro-climatic
zone, resulted in significant health and wellbeing benefits.

The following Best Practice requirements are also NPV positive and
economic:
Site layout to enable shared parking and access arrangements
and
Provide blade walls and minimum two storey front faade

Aesthetic and Amenity Provisions

Net Present Value ($) for 2030


90K
80.80

60K

29.50
30K
21.40

0K
Setback Shared Parking Blade Walls

Economics assessment of Aesthetic and Amenity Provisions under base case conditions
compared with BAU

36 Design Requirements and Guidelines December 2010


APPENDICES A1
General Industrial Lots
The lot and built form layout is indicative only. It is subject to
change and detailed design. Layout plan depicts proposed ultimate
Site
configuration.
Lot Boundary

Landscape

Secondary Building Zone

AVERY STREET AVERY STREET

1012 1013 STAGE 5A

1032 1031 1030

GREENWICH PARADE
Primary Building Envelopes
1010 1011 1014
1069

PINNACLE DRIVE
1066
1049 1068
HORIZON TERRACE

General Industrial 1
ORBIT STREET

1050 1051 General Industrial 2


1027 1028 1029
1009 1008 1007 1015

1048
DAP Site 1

AXIS PARADE STAGE 1 AXIS PARADE DAP Site 2

1006 1016 1026


STAGE 2
Service Industrial - C 1
1042 1041 1040 1039 1038 1037
8002
Service Industrial - C 2
PEAK WAY

1005
1017 1025
1065
Service Industrial - A 1
1004 1062

PINNACLE DRIVE
1018 1024
STAGE 3
GREENWICH PARADE

LONGITUDE AVENUE
Service Industrial - A 2

1043 1044
1036 1019 1023 1033
1003
Service Industrial - B 1

1061 Service Industrial - B 2


WARMAN STREET
1060
1034
HEM
ISH 1002
ERE 1020 1022
STR
EET
1071
PEAK WAY

1072 1035
1073
1080 1063
HEMISHERE STREET STAGE 4
1074 1064

1079
1078 STAGE 5B 1075 PINNACLE DRIVE

1076 1055 1056


GREENWICH PARADE

1077 1001 1021 1057 1058 1059


GL
OB
AL
RO
AD

Design Requirements and Guidelines December 2010 8001 i


RING STREET

FLYNN DRIVE
A2APPENDICES
Service Industrial Lots
The lot and built form layout is indicative only. It is subject to
change and detailed design. Layout plan depicts proposed ultimate
configuration. Site

Lot Boundary

Landscape

Secondary Building Zone

AVERY STREET AVERY STREET

1012 1013 STAGE 5A

1032 1031 1030

GREENWICH PARADE
Primary Building Envelopes
1010 1011 1014
1069

PINNACLE DRIVE
1066
1049 1068
HORIZON TERRACE

General Industrial 1
ORBIT STREET

1050 1051 General Industrial 2


1027 1028 1029
1009 1008 1007 1015

1048
DAP Site 1

AXIS PARADE STAGE 1 AXIS PARADE DAP Site 2

1006 1016 1026


STAGE 2
Service Industrial - C 1
1042 1041 1040 1039 1038 1037
8002
Service Industrial - C 2
PEAK WAY

1005
1017 1025
1065
Service Industrial - A 1
1004 1062

PINNACLE DRIVE
1018 1024
STAGE 3
GREENWICH PARADE

LONGITUDE AVENUE
Service Industrial - A 2

1043 1044
1036 1019 1023 1033
1003
Service Industrial - B 1

1061 Service Industrial - B 2


WARMAN STREET
1060
1034
HEM
ISH 1002
ERE 1020 1022
STR
EET
1071
PEAK WAY

1072 1035
1073
1080 1063
HEMISHERE STREET STAGE 4
1074 1064

1079
1078 STAGE 5B 1075
1076 1055 1056 PINNACLE DRIVE
GREENWICH PARADE

1077 1001 1021 1057 1058 1059


GL
OB
AL
RO
AD

8001
ii Design Requirements and Guidelines December 2010 RING STREET

FLYNN DRIVE
B
A A

6
6
Building Envelope Landscape Access
B Vehicles Flexible

A:
APPENDICES
Priority zone, for location of office,
reception, showroom, public
A: 6m setback zone for landscaping. Note
blade walls will project 3m into this area.
A:
Two independant 6m wide two way
crossovers can be constructed with A: Car parking, circulation, service yard and
turning circle zone is predominantly to the
A: The rear area and full width behind the vehicle
service area and parking zone could be an
A3
interface, staff areas, etc. Area can be a medium strip of 0.5m on each Lot, to side of the building for a number extention of the building envelope or a
Site Layout Guide 1-3 create a 'pairing effect' of traffic nodes.
shared with industrial uses from zone B.
Mandatory side set back of 3m to B: Mandatory 3m wide micro-climate landscape
strip 15m deep and visible from the street. This effectively locates the buildings on
of reasons; one being that there is an
opportunity for neighbouring Lots to
screened hardstand or storage area.

create micro-climate zone. Width could Could accommodate water tanks. the opposite side of the site, to the share the service yard area and therefore Demonstration of how the building width can
be independant to zone B, but intent vehicle/ parking zone which is accessed C C accommodate vehicles of larger turning B: vary to provide more space but needs to be
is to create a singular building mass. Continuation of 3m wide breakout area directly from the crossover. circles. Parking should be closer to the traded off with in site vehicle requirements.
Street elevation must be glazed and as C: micro-climate zone, landscape strip. 25.2 street and service vehicles towards the Minimum distance from side boundary 13.7m.
transparent as possible (with solar shading) Can be used to locate stormwater
Shared crossover access is encouraged
rear. D
to present an active edge to the street. holding tanks. If used for storage or is
not landscaped sufficiently, it needs to be
B: and arranged by agreement between
19.6
C
Demonstration of how the area for vehicles
General industrial building use zone. appropriately screened from view. neighbouring owners. B: 13.7be varied to suit the building width and
can
3

B: Encouraged to have 3m side setback to parking arrangement. Examples shown


continue micro-climate zone. Service Landscape strip could extend to rear. If a shared crossover is used, it is more are based on:
access from the side or rear. D: efficient land use even if the two way 13.7m for single aspect parking off access
crossover is 11m wide for very large road
Rear area could be building area if vehicles, shown dotted. 19.6m for single aspect parking off internal
C: required or service zone. If it is used for road
storage or hardstand it should be 25.2m for double aspect parking off internal
screened from the street. road
C

40
B

3
A

15
B B

21
A

3
Blade Walls
A Building Envelope Landscape Access
Two independa
A: External side walls expressed as blade walls
set back 3m from street boundary.
A: Priority zone, for location of office,
reception, showroom, public
A: 6m setback zone for landscaping. Note
blade walls will project 3m into this area.
A: crossovers can
Side walls enclose office, showroom interface, staff areas, etc. Area can be a medium strip
create a 'pairing
with industrial use to the rear into singular
building mass, with minimum two storey
shared with industrial uses from zone B.
Mandatory side set back of 3m to B: Mandatory 3m wide micro-climate landscape
strip 15m deep and visible from the street. This effectively
street elevation. Width of building will be a create micro-climate zone. Width could Could accommodate water tanks. the opposite sid
factor of use function and external vehicle be independant to zone B, but intent vehicle/ parking
and servicing requirements including parking. is to create a singular building mass. Continuation of 3m wide breakout area directly from the
Street elevation must be glazed and as C:micro-climate zone, landscape strip.
The external wall nearest the side boundary transparent as possible (with solar shading) Can be used to locate stormwater
Single Lot B: needs to be set back 3m for the first 21m from to present an active edge to the street. holding tanks. If used for storage or is
B:
Shared crossov
General Industrial Use the prime (street) boundary. Beyond 21m it is DnA Architects 3-12-2007, 0615_DD1_CD4
not landscaped sufficiently, it needs to be and arranged b
neighbouring o
encouraged but not mandatory. It is hoped that General industrial building use zone. appropriately screened from view.
proponents will see the benefits and adopt the B: Encouraged to have 3m side setback to
micro-climate zone for the length of the building. continue micro-climate zone. Service Landscape strip could extend to rear. If a shared cros
access from the side or rear. D: efficient land us
Extended parapet walls at least 1.5m above crossover is 11
roof level to create a common architectural Rear area could be building area if vehicles, shown
expression of main walls as 'blade elements'. C: required or service zone. If it is used for
storage or hardstand it should be
Width of building influenced by on site screened from the street.
parking, service area and internal building
area requirements.

Possible building widths shown dotted highlight


C: variation, which would be a product of building
use and vehicle requirements. Examples shown
are based on:
13.7m for single aspect parking off access road
19.6m for single aspect parking off internal road
25.2m for double aspect parking off internal road

Design Requirements and Guidelines December 2010 iii


B
A A

6
6
Building Envelope Landscape Access
B Vehicles Flexible

A: A3forAPPENDICES
Priority zone, location of office,
reception, showroom, public
A: 6m setback zone for landscaping. Note
blade walls will project 3m into this area.
A:
Two independant 6m wide two way
crossovers can be constructed with A: Car parking, circulation, service yard and
turning circle zone is predominantly to the
A: The rear area and full width behind the vehicle
service area and parking zone could be an
interface, staff areas, etc. Area can be a medium strip of 0.5m on each Lot, to side of the building for a number extention of the building envelope or a
Site Layout Guide 4-6 create a 'pairing effect' of traffic nodes.
shared with industrial uses from zone B.
Mandatory side set back of 3m to B: Mandatory 3m wide micro-climate landscape
strip 15m deep and visible from the street. This effectively locates the buildings on
of reasons; one being that there is an
opportunity for neighbouring Lots to
screened hardstand or storage area.

create micro-climate zone. Width could Could accommodate water tanks. the opposite side of the site, to the share the service yard area and therefore Demonstration of how the building width can
C be independant to zone B, but intent vehicle/ parking zone which is accessed accommodate vehicles of larger turning B: vary to provide more space but needs to be
is to create a singular building mass. Continuation of 3m wide breakout area directly from the crossover. circles. Parking should be closer to the traded off with in site vehicle requirements.
Street elevation must be glazed and as
25.2
C: micro-climate zone, landscape strip. street and service vehicles towards the Minimum distance from side boundary 13.7m.
transparent as possible (with solar shading) Can be used to locate stormwaterD Shared crossover access is encouraged
rear.
to19.6
present an active edge to the street.
C
holding tanks. If used for storage or is
not landscaped sufficiently, it needs to be
B: and arranged by agreement between Demonstration of how the area for vehicles A
13.7
General industrial building use zone. appropriately screened from view.
3 neighbouring owners. B: can be varied to suit the building width and
B: Encouraged to have 3m side setback to parking arrangement. Examples shown
continue micro-climate zone. Service Landscape strip could extend to rear. If a shared crossover is used, it is more are based on:
access from the side or rear. D: efficient land use even if the two way 13.7m for single aspect parking off access
crossover is 11m wide for very large road
Rear area could be building area if vehicles, shown dotted. 19.6m for single aspect parking off internal
C: required or service zone. If it is used for road 19.5
storage or hardstand it should be 25.2m for double aspect parking off internal
screened from the street. road
C
40

B
B

55
A

61
B
A
15

11
B
A A

6
3

6
Building Envelope Landscape Access
B Vehicles Flexible
Two independant 6m wide two way
pressed as blade walls
et boundary.
A: Priority zone, for location of office,
reception, showroom, public
A: 6m setback zone for landscaping. Note
blade walls will project 3m into this area.
A: crossovers can be constructed with A: Car parking, circulation, service yard and
turning circle zone is predominantly to the
A: The rear area and full width behind the vehicle
service area and parking zone could be an
ce, showroom interface, staff areas, etc. Area can be a medium strip of 0.5m on each Lot, to side of the building for a number extention of the building envelope or a
create a 'pairing effect' of traffic nodes.
he rear into singular
nimum two storey
shared with industrial uses from zone B.
Mandatory side set back of 3m to B: Mandatory 3m wide micro-climate landscape
strip 15m deep and visible from the street. This effectively locates the buildings on
of reasons; one being that there is an
opportunity for neighbouring Lots to
screened hardstand or storage area.

of building will be a create micro-climate zone. Width could Could accommodate water tanks. the opposite side of the site, to the share the service yard area and therefore Demonstration of how the building width can
and external vehicle be independant to zone B, but intent vehicle/ parking zone which is accessed accommodate vehicles of larger turning B: vary to provide more space but needs to be
ments including parking. is to create a singular building mass. Continuation of 3m wide breakout area directly from the crossover. circles. Parking should be closer to the traded off with in site vehicle requirements.
Street elevation must be glazed and as C: micro-climate zone, landscape strip. street and service vehicles towards the Minimum distance from side boundary 13.7m.
est the side boundary transparent as possible (with solar shading) Can be used to locate stormwater rear.
to present an activeSingle Lotstreet. Shared crossover access is encouraged
3m for the first 21m from
ndary. Beyond 21m it is
edge to the
General Industrial Use
holding tanks. If used for storage or is
not landscaped sufficiently, it needs to be
B: and arranged by agreement between
DnAtheArchitects
Demonstration of how 3-12-2007,
area for vehicles 0615_DD1_CD4
andatory. It is hoped that General industrial building use zone. appropriately screened from view. neighbouring owners. B: can be varied to suit the building width and
e benefits and adopt the B: Encouraged to have 3m side setback to parking arrangement. Examples shown
the length of the building. continue micro-climate zone. Service Landscape strip could extend to rear. If a shared crossover is used, it is more are based on:
access from the side or rear. D: efficient land use even if the two way 13.7m for single aspect parking off access
s at least 1.5m above crossover is 11m wide for very large road
ommon architectural Rear area could be building area if vehicles, shown dotted. 19.6m for single aspect parking off internal
alls as 'blade elements'. C: required or service zone. If it is used for road
storage or hardstand it should be 25.2m for double aspect parking off internal
enced by on site screened from the street. road
and internal building

hs shown dotted highlight


be a product of building
ements. Examples shown

ct parking off access road


ct parking off internal road
ect parking off internal road

iv Design Requirements and Guidelines December 2010


APPENDICES A4
Site Layout - Detailed

verge primary setback


5000 6000 15000 40000 nominal 19019

priority building zone Minimum service vehicle zone depth


3000 3000
from rear of primary building zone
set back blade
for blade walls preferred micro climate zone for landscaping and break out spaces, with picture windows and access doors. If this area is used for

pathway
dual use walls any other use it needs to be suitably screened from the street.
The 3m distance from the boundary also facilitates wall openings to encourage daylight and natural ventilation and could be
of micro climate

an ideal location for stormwater storage tanks.


parking infront
no street

screen
mandatory priority section of
3000

micro climate zone for landscaping tanks tanks


boundary external wall
alignment

encourage windows looking onto landscaped area encourage access doors and windows in this blade wall looking onto landscaped (micro climate) area

predominantly glazed
two storey street
3

elevation with solar


shading (see details)
Zone A Zone B Zone C
Nominal building width 22343

general industrial use can be


Priority building zone
general industrial use area extended to rear boundary
location of administration,
2

reception, customer and staff areas

preferred non staff


entry via street
facade should dual access parking bays be provided (dotted) off the internal
access road, this would be the effective location of the central external
wall (dotted) which maintains a 1.5m side path Alternative A alignment of central external wall
1

1500

landscaped setback optional dual access


part of the road reserve

alternative entry and location of windows


zone parking bays
5500

preferred alignment of central external wall


1500

access road width path


side

preferred location for roller shutter and


service access openings
internal carpark

1500

alignment of screen if rear is used for external storage


6000

max. internal access road


Alternative B alignment of central external wall
1500

25200
Zone D
parking bays

parking
landscaped

general industrial use can be extended

19600
into this area or if properly screen be
5500

4 5 6 7 8 9 10 11 12 13 14 15
used for external storage or display, and-the-like

additional car parking

13700
bays as required 21000

optional direct access to parking bays


two way kerbs would need to be re-aligned
6000

crossover vehicle service and access area

median strip, f lush or kerbed to suit adjoining lots


500

11000

the adjoining lot's service area is generally located here and could by private
location of adjoining lot's dual access road which could be
agreement between adjoining neighbours be a shared zone to allow for greater
by private agreement between neighbours, a shared
turning circle and access facilities
accessway for both lots (max 11m wide, shown dotted) for
greater eff iciency, access for heavier vehicles and increased
building streetscape frontage

DnA Architects 05-12-2007, 0615_PD1.3_CD3


Design Requirements and Guidelines December 2010 v
vi
A5APPENDICES
Site Layout Examples

15m Office / Showroom 6m


ROAD H

Design Requirements and Guidelines December 2010


Showroom / Recreation / Bulky Goods / Veterinary

landscaped area for staff /


Store micro climate

Showroom / Recreation / Bulky Office Showroom /


Goods / Veterinary Display
GBA 900sqm
Internal Display: 285sqm
Office Area: 140sqm
Store: 475sqm

shared access
road, suitable for
service vehicles
25m ROAD RESERVE

Type Example 20 November 2007

TE.01
APPENDICES
Site Layout Examples

Logistics / Salvage / Transport Depot

ROAD H

rainwater tanks landscaped area for staff / micro climate

Design Requirements and Guidelines December 2010


and service yard.

Logistics / Salvage / Transport Depot


Screened Storage Yard Warehouse
GBA 600sqm
Warehouse: 385sqm
Office Area: 215sqm
External Storage Yard: 620

Office

Screened Storage Yard

6 7 8 9 10

5 4 3 2 1

shared access
road, suitable for
service vehicles
25m ROAD RESERVE
A5

vii

Type Example 20 November 2007

TE.02
viii
A5APPENDICES
Site Layout Examples

Light Industry / Vehicle Repair

ROAD H

Design Requirements and Guidelines December 2010


landscaped area for staff / micro climate
Light Industry / Vehicle Repair
GBA 550sqm Warehouse Workshop Office
Warehouse / Workshop: 400sqm
Notional Office Area: 150sqm

External Work Yard

shared access
road, suitable for
service vehicles
25m ROAD RESERVE

Type Example 20 November 2007

TE.04
APPENDICES
Site Layout Examples

Manufacturing / Warehousing

ROAD H

Design Requirements and Guidelines December 2010


landscaped area for staff / micro climate

Manufacturing / Warehouse
GBA 958sqm Warehouse Workshop
Warehouse: 475sqm
Workshop: 120sqm
Work Yard: 185sqm
Office Area: 120sqm

External Work Yard

Office

11 10 9 8 7 6 18 19 20 5 4 3 2 1

16 15 14 13 12
shared access
road, suitable for
service vehicles
25m ROAD RESERVE
A5

ix

Type Example 20 November 2007

TE.05
x
A5APPENDICES
Site Layout Examples

15m Office / Showroom 6m


ROAD H

Design Requirements and Guidelines December 2010


Trade Boat, Caravan or Vehicle Display / Sales / Hire

landscaped area for staff / micro climate

Trade, Boat, Caravan or Vehicle External Display Yard Workshop Office Showroom / Display
Display / Sales / Hire
GBA 560sqm
Internal Display: 285sqm
Office Area: 140sqm
Workshop: 135sqm
External Display Yard: 620sqm

Screened Storage Yard External Display

shared access
road, suitable for
service vehicles
25m ROAD RESERVE

Type Example 20 November 2007

TE.03
APPENDICES A6
Stage 1-5 Overall Plan Site

The lot and built form layout is indicative only. It is subject to Lot Boundary

change and detailed design. Layout plan depicts proposed ultimate Landscape

configuration. Secondary Building Zone

AVERY STREET AVERY STREET

1012 1013 STAGE 5A

1032 1031 1030

GREENWICH PARADE
Primary Building Envelopes
1010 1011 1014
1069

PINNACLE DRIVE
1066
1049 1068
HORIZON TERRACE

General Industrial 1
ORBIT STREET

1050 1051 General Industrial 2


1027 1028 1029
1009 1008
1007 1015
1048
DAP Site 1

AXIS PARADE STAGE 1 AXIS PARADE DAP Site 2

1006 1016 1026


STAGE 2
Service Industrial - C 1
1042 1041 1040 1039 1038 1037
8002
Service Industrial - C 2
PEAK WAY

1005
1017 1025
1065
Service Industrial - A 1
1004 1062

PINNACLE DRIVE
1018 1024
STAGE 3
GREENWICH PARADE

LONGITUDE AVENUE
Service Industrial - A 2

1043 1044
1033
1036 1019 1023
1003
Service Industrial - B 1

1061 Service Industrial - B 2


WARMAN STREET
1060
1034
HEM
ISH 1002
ERE 1020 1022
STR
EET
1071
PEAK WAY

1072 1035
1073
1080 1063
HEMISHERE STREET STAGE 4
1074 1064

1079
1078 STAGE 5B 1075
PINNACLE DRIVE
1076 1055 1056
GREENWICH PARADE

1077 1001 1021 1057 1058 1059


GL
OB
AL
RO
AD

8001

Design Requirements and Guidelines December 2010 RING STREET


xi
FLYNN DRIVE
Tree Species
Public Open

Potentially
Screening

invasive
Carpark

Feature
Median
Private

Verge/

Space
Land

Species Name Common Name Comments


Agonis flexuosa* Peppermint
Allocasuarina cunninghamiana River Sheoak
Smooth barked apple-
Angophora costata*
myrtle
Use in wet /
Banksia littoralis Swamp Banksia
dampland areas
Banksia menziesii* Fire-Wood Banksia
Banksia prionotes* Acorn Banksia
Brachychiton discolor x

populneus
Brachychiton gregorii Desert Kurrajong
Brachychiton populneo-
Pink Kurrajong
acerifolius
Casuarina obesa Swamp Sheoak
Delonix regia Poinciana
Use in high water
Eucalyptus botryoides Bangalay
table areas
Eucalyptus caesia* Gungurru Plant en masse
Eucalyptus calophylla 'Rosea' Pink Marri
Eucalyptus calophylla** Marri
Eucalyptus erythrocorys* Illyarrie Plant en masse
Eucalyptus ficifolia* Red Flowering Gum
Eucalyptus gomphocephala Tuart
Eucalyptus grandis Rose Gum
Eucalyptus leucoxylon**
Eucalyptus maculata** Spotted Gum
Willow Leaved
Eucalyptus nicholii**
Peppermint
Eucalyptus platypus Coastal Moort
Eucalyptus sideroxylon Pink Mugga Mugga
Eucalyptus spathulata** Swamp Mallet
Eucalyptus stoatei Scarlet Pear Gum
Eucalyptus todtiana Prickly Bark
Ficus macrophylla Moreton Bay Fig
Use only when
Ficus rubiginosa Port Jackon Fig there is a lot of
space
Hymenosporum flavum Queensland
Magnolia grandiflora
Melaleuca lanceolata** Rottnest Tea Tree
Melaleuca linariifolia** Snow in Summer
Use in high water
Melaleuca preissiana
table areas
Melaleuca quinquenervia Cajeput
Melaleuca rhaphiophylla
Metrosideros excelsa Christmas bush
Nuytsia floribunda* WA Christmas Tree
Podocarpus elatus Plum Pine
Tipuana tipu Tipuana

Design Requirements and Guidelines December 2010


Plant Species List
A7APPENDICES

xii
xiii
A7

Shrubs
Verge/ Median
Private Land

Public Open

Potentially
Screening

invasive
Carpark

Feature

Space

Species Name Common Name Comments


Acacia saligna**
Adenanthos cygnorum Woolybush
Adenanthos cuneatus Coastal Jug Flower
Adenanthos meisneri
Adenanthos sericeus Coastal Woolybush
Anigozanthos flavidus x Suitable for
Kangaroo Paw
pulcherrimus microclimate area
Anigozanthos flavidus x rufus Kangaroo Paw
Banksia ashbyii*
Banksia baxteri*
Banksia burdettii
Banksia hookeriana*
Banksia speciosa* Ric-Rac Banksia
Banksia victoriae*
Beaufortia sparsa* Swamp Bottlebrush
Beaufortia squarrosa* Sand Bottlebrush
Callistemon 'Kings Park
Callistemon citrinus Crimson Bottlebrush
Callistemon phoeniceus
Calothamnus quadrifidus* One-Sided Bottlebrush
Chamelaucium uncinatum* Geraldton Wax
Darwinia citriodora**
Dianella revoluta
Dianella tasmanica
Dianella utopia
Dianella variegata Varigated Dianella
Eucalyptus macrocarpa* Rose of the West
Eucalyptus rodantha
Eucalyptus tetragona
Grevillea 'Ellendale Pool'
Grevillea 'Honeygem'
Grevillea 'Joe Mason'
Grevillea bipinnatifida*
Grevillea biternata
Grevillea crithmifolia
Grevillea obtusifolia
Suitable for
Hakea laurina
microclimate area
Hakea francisiana Sea Urchin Hakea
Hakea petiolaris
Suitable for
Hypocalymma angustifolium Swan River Myrtle
microclimate area
Kunzea baxteri
Kunzea pulchella
Leucophyta brownii Cushion Bush
Suitable for
Macrozamia reidlei*
microclimate area

Design Requirements and Guidelines December 2010


Melaleuca coccinea*
Melaleuca elliptica
Melaleuca hypericifolia**
Melaleuca nesophila**
Suitable for
Murraya exotica Orange Jessamine
microclimate area
Suitable for
Philodendron xanadu
microclimate area
Protea 'Duchess of Perth'
Protea eximia Broadleaf Sugarbush
Plant Species List
Protea magnifica Queen Sugarbush
APPENDICES

Protea scolymocephala Thistle Sugarbush


Verticordia grandis Scarlet Feather Flower
Verticordia nitens Christmas Morrison
Xanthorrhoea preissii* Grass Tree
Groundcovers
Private Land

Public Open

Potentially
Screening

invasive
Carpark

Feature
Median
Verge/

Space

Species Name Common Name Comments


Adenanthos cuneatus 'Coral

Carpet'
Convolvulus mauritanicus
Eremophila glabra Emu bush
Not to be used
within 500m of bush
Gazania rigens forever or 200m of
dampland/remnant
bushland
Grevillea crithmifolia 'Prostrata'
Grevillea obtusifolia 'Prostrata'
Grevillea 'Sea Spray'
Grevillea thelemanniana*
Hemiandra pungens*
Suitable for
Hibbertia scandens
microclimate area
Myoporum parvifolium
Patersonia occidentalis* Native Iris
Climbers
Private Land

Public Open

Potentially
Screening

invasive
Carpark

Feature
Median
Verge/

Space
Species Name Common Name Comments
Suitable for
Cissus rhombifolia "Ellen
microclimate areas-
Danica'
shade planting only
Suitable for
Hardenbergia comptoniana Native Wisteria
microclimate area
Kennedia prostrata Running Postman
Suitable for
Trachelospermum jasminoides Chinese Star-Jasmine
microclimate area

Design Requirements and Guidelines December 2010


Plant Species List
A7APPENDICES

xiv
A8 APPENDICES
Precedents

Design Requirements and Guidelines December 2010 xv


APPENDICES A8
Precedents

xvi Design Requirements and Guidelines December 2010


A8 APPENDICES
Precedents

Design Requirements and Guidelines December 2010 xvii


APPENDICES A8
Precedents

xviii Design Requirements and Guidelines December 2010


A9 APPENDICES
Materials Guide and Precedents DnA Architects 14-11-2007, 0615_R10_CD3
Note: formerly Drawing Number R5

Wall - concrete Wall - concrete Glass facade Glass facade Metal facade Feature stonework Rendered wall Corrugated Timber cladding
sheeting

Precast concrete Smooth finish Painted concrete Textured paint and relief artwork in concrete Metal mesh Polycarbonate facade High quality metal post fencing
concrete screens

Concrete pavers with rebates Riverbed stones Granite and marble off cuts for flooring Stone flooring

Design Requirements and Guidelines December 2010 xix


APPENDICES A9
Materials Guide and Precedents

xx Design Requirements and Guidelines December 2010


A10 APPENDICES
City of Wanneroo Car Parking Standards

Design Requirements and Guidelines December 2010 xxi


APPENDICES A10
City of Wanneroo Car Parking Standards

xxii Design Requirements and Guidelines December 2010


A10 APPENDICES
City of Wanneroo Car Parking Standards

Design Requirements and Guidelines December 2010 xxii


xxiii
0615 Meridian Park Design Guidelines Checklist - 5 Oct 2010 Revision 2
A11

MERIDIAN PARK Self


LandCorp Assessment
Design Guideline Stage 1 Checklist - Pre-development Assessment Compliant Non Compliant
Documents
Completed Stage 1 Check List (this document)
Completed Design Guidelines Certication Application
Site Plan
Floor Plans of all buildings including breeze path information
Shadow Diagram
Elevations
Design Requirements
Urban and Architectural Form M1
Consolidated customer service and employee amenities within front building
zone
Operational area within rear building zone
6m front set back for building
3m side set back for minimum 21m from front boundary
Service Industrial lots have 6m access way to rear
Active building edges to street and adjacent open parking areas
Secondary street facades of similar quantity to primary facade
Ancillary use areas contained within the same built form envelope.
Parking and Access M3
Required car parking bays provided
Public parking within parking zone
Landscaping M4
Micro-climate zone provided
Landscaping (hard and soft) between 8% and 10% of Site Area
Shade trees provided to east and west building walls and 1 per 10m on front
boundary. One shade tree per four car bays.
Impermeable hardstand limited as far as practicable

Design Requirements and Guidelines December 2010


Service, Storage and Display Areas M5
Service areas screened behind front building line
Display areas in line or behind building line
Design Guidelines Checklist - Stage 1

/Volumes/Projects-2/0615 Meridian PK Design Guidelines/0615 Project Filing/2 Client/2.3 Report/Design Guidelines/Feb - Aug 2010 DG
Revised Layout/Revised DG Checklist Feb & Oct 2010/101005 DG Stage 1 Checklist Rev 2
APPENDICES

xxiii
xxiv
101005 DG Stage 1 Checklist Rev 2
xxv

MERIDIAN PARK Self


LandCorp Assessment
Design Guideline Stage 1 Checklist - Pre-development Assessment Compliant Non Compliant
Fencing and Signage M6
Fencing to front and secondary streets kept to minimum
Front fence behind building line (building line does not include blade walls)
Conditional fence in front of micro-climate zone
Fence complies with minimum standard
Pylon sign symmetrical or aligned with facade
Sign is less than 12m height and 20m2 surface area
Passive Design M7
Development optimises use of passive solar design
External shading to all north, east and west facade openings
Minimize east and west glazing not facing street
High level openable windows and vents provided for heat purging
All roong has solar absorbance of 0.5 or less
Ceiling voids ventilated

Design Requirements and Guidelines December 2010


Design Guidelines Checklist - Stage 1

101005 DG Stage 1 Checklist Rev 2


APPENDICES
A11
0615 Meridian Park Design Guidelines Checklist - 5 Oct 2010 Rev 2
A11

MERIDIAN PARK Self


LandCorp Assessment
Design Guideline Stage 2 Checklist - Pre-development Assessment Compliant Non Compliant
Documents
Completed Stage 2 Check List (this document)
Site Plan
Fencing Plan
Landscape Plans
Extent and nature of the landscape treatments including soil improvement
and mulch nishes;
Plant species, numbers and locations;
Reticulation type and location;
Location and nature of outdoor furniture and amenities;
Location and details of external lighting;
Extent and type of boundary walls, fencing and gates; and
Extent and type of paving treatment.
Floor Plans of all buildings
Shadow Diagram
Elevations and Sections though all buildings
Breeze Path Diagram
Lighting Plan Specication and Locations
Electrical Specication and Locations
Construction Waste Management Plan
Design Requirements
Urban and Architectural Form M1
Consolidated customer service and employee amenities within front
building zone
Operational area within rear building zone
6m front set back for building
3m side set back for minimum 21m from front boundary

Design Requirements and Guidelines December 2010


Active building edges to street and adjacent open parking areas and
secondary street facades of similar quantity to primary facade
Design Guidelines Checklist - Stage 2

/Volumes/Projects-2/0615 Meridian PK Design Guidelines/0615 Project Filing/2 Client/2.3 Report/Design Guidelines/Feb - Aug 2010 DG
Revised Layout/Revised DG Checklist Feb & Oct 2010/101005 DG Stage 2 Checklist Rev 2
APPENDICES

xxvi
100224 DG Stage 2 checklist
xxvii

MERIDIAN PARK Self


LandCorp Assessment
Design Guideline Stage 2 Checklist - Pre-development Assessment Compliant Non Compliant
Parking and Access M3
Required car parking bays provided
Public parking within parking zone
Landscaping M4
Micro-climate zone provided
Shade trees provided to east and west building walls and 1 per 10m on front
boundary. One shade tree per four car bays.
Planting density in all areas minimum two plants per m2
General landscaping in accordance with gures in section M3
Irrigated soft landscape does not exceed 60% (80% for corner Lots) of
landscape and limited turf
Soil conditioner specied in all planted areas
All plant species from Appendix 7 including deciduous trees
No invasive plant species within 500m of Bush Forever sites or
conversation area
Watering of soft landscape area provided by automatic electronic controlled
drip irrigation system using harvested rain water
Irrigation system has integrated moisture sensors
All soft landscape areas are mulched
All storm water harvested on site (into swales, soak wells and/or landscape
areas)
Service, Storage and Display Areas M5
Service areas screened behind front building line
Display areas in line or behind building line
Fencing and Signage M6
Fencing to front and secondary streets kept to minimum
Front fence behind building line (building line does not include blade walls)
Conditional fencing in front of micro-climate zone

Design Requirements and Guidelines December 2010


Fence complies with minimum standard
Pylon sign symmetrical or aligned with facade
Design Guidelines Checklist - Stage 2

Sign is less than 12m height and 20m2 surface area


/Volumes/Projects-2/0615 Meridian PK Design Guidelines/0615 Project Filing/2 Client/2.3 Report/Design Guidelines/Feb - Aug 2010 DG
Revised Layout/Revised DG Checklist Feb & Oct 2010/101005 DG Stage 2 Checklist Rev 2
APPENDICES
A11
0615 Meridian Park Design Guidelines Checklist - 5 Oct 2010 Rev 2
A11

MERIDIAN PARK Self


LandCorp Assessment
Design Guideline Stage 2 Checklist - Pre-development Assessment Compliant Non Compliant
Passive Design M2
Development optimises use of passive solar design
External shading to all north, east and west facade openings
Minimize east and west glazing not facing street
High level openable windows and vents provided for heat purging
All roong has solar absorbance of 0.5 or less
Ceiling voids ventilated
Energy Management M7
Solar hot water (4-star), gas (5-star) or heat pump system
Minimum 80% internal lamps have efcacy of <90 lumens/Watt and 20,000
hour lamp life
Minimum 80% external lamps have efcacy of <65 lumens/Watt and
20,000 hour lamp life
Water Management M8
Minimum 4-star dual ush toilets specied
Minimum 6-star waterless urinals specied (if applicable)
Minimum 3-star ttings and appliances (i.e. dishwashers, washing
machines etc.)
Shower and personal storage facilities provided if development exceeds
2,000sqm GLA
Management M9
Maintenance program for verge areas in place
Appropriate licences and works approvals in compliance with
environmental regulations
Development complies with AS 1668 minimum fresh air rates
Construction Waste Management Plan submitted

Design Requirements and Guidelines December 2010


Design Guidelines Checklist - Stage 2

/Volumes/Projects-2/0615 Meridian PK Design Guidelines/0615 Project Filing/2 Client/2.3 Report/Design Guidelines/Feb - Aug 2010 DG
Revised Layout/Revised DG Checklist Feb & Oct 2010/101005 DG Stage 2 Checklist Rev 2
APPENDICES

xxviii
A12 APPENDICES
Credits

CONTACTS, CONTRIBUTORS AND CONSULTANT TEAM: IMAGES CREDITS

LandCorp M2 A8 (left to right)


1. Huanacu Warehouse & Office by tFPS Chile Row 1:
David Lewis and Greg Ryan
M4 1. ANZAC Hall. Canberra, ACT, Australia. Denton Corker Marshall
Westfarmers Building Level 6, 40 The Esplanade Perth WA 6000 1. Image courtesy Landcom. 2. O Museum. Canberra, ACT, Australia. Kazuyo Sejima + Ryue Nishima/
08 9482 7499 landcorp@landcorp.com.au SANAA
M5
3. Karmoy Fishing Museum. Karmoy, Rogeland, Norway. Snohetta
landcorp.com.au/meridianpark 1. Eko Park Expo Pavillion. Warsaw, Poland. Autorska Pracownia
Architektury Kurylowicz & Associates Row 2:
Benchmark Projects 2. Parish Centre. Podersdorf Amsee, Austria. Lichtblau architects. 1. New Helexpo Gates. Thessaloniki, Greece. Katerina Tsigarida Architects
Brett Chivers 3. Ercol Factory. UK. Hordern Cherry Lee Architects 2. Vina Las Ninas. Santa Cruz, Chile. Mathias Klotz
4. ARCA. Osbourne Park, WA. Harry Seidler Architects.
Level 4, 10 Eastbrook Terrace, East Perth WA 6004
M6 Row 3:
Taylor Burrell Barnett 1. Business Communication Centre, IT Park Saarland, Germany. 1. Dyson Headquarters. Malmesbury, UK. WilkinsonEyre
2. GKD Headquarters Building, Maryland, USA. Dominique Perrault. 2. Recall Information Centre, Greystanes NSW. Lacoste + Stevenson
Karen Wright
Architects
187 Roberts Road, Subiaco WA 6008 3. Herzog & de Meuron Architects
S1 5. Perth Convention Centre. Cox Howlett & Bailey Woodland
DnA Architects 1. Fogtech Building, Koln by Georg Giebeler / 4000 architekten 6. Ruffi Sports Complex. Marseille, France. Remy Marciano
Wayne Dufty S2
1. Ruffi Sports Complex. Marseille, France. Remy Marciano Row 4:
20 Jersey Street, Jolimont WA 6014 1. Lume Mediacenter. Helsinki, Finland. Heikkinen-Komonen Architects
S3
Blackwell & Associates 1. Danpalon facade, Hobart Airport by Hassell Architects 2. An Turas. Tiree, Inner Hebrides, Scotland, UK. Sutherland Hussey
Architects
Tony Blackwell S6 3. Eko Park Expo Pavillion. Warsaw, Poland. Autorska Pracownia
550 Stirling Highway Peppermint Grove, WA 6011 1. Sports Facilities Area, Educare School, Mexico. TEN Arquitectos. Architektury Kurylowicz & Associates
2. National Library diet Japan
Cossill Webley 3. Cartier Watch Factory, Bern by Jean Nouvel Row 5:
John Barham S7 1. Art Centre College of Design, Pasadena, California by Daly Genik
1. Hakuou High School. Wakayanagi, Japan. Kajima & Sampei Architects
431 Roberts Road, Subiaco WA 6008 S9 2. Curtin University, Bentley WA.
Worley Parsons 1. MetalART Industries 3. Imola Business Park, Kewdale WA. Feldhusen Choy Design.
2. Hakuou High School. Wakayanagi, Miyagi Prefecture, Japan. Kazuhiro 5. Caltrans District 7 Headquarters, Los Angeles, Calafornia by Morhosis
Paul Hardisty, Andre Garnaut Kajima and Mitsumasa Sampei.
Level 7, QV1 250 St Georges Terrace Perth WA 6000 S11
CBRE 1. Recall Information Centre. Lacoste + Stevenson Architects
2. Gate 1 pylon sign by DnA Architects photo by Acorn
Warick Irving
S15
4/ 225 St Georges Terrace, Perth WA 6000 1. Carpark Northbridge wall detail
Turner & Townsend 2. Steven Holl, Nelson-Atkins Museum of Art Kansas City
3. St Andrews House by Sean Godsell Architect
Ian Dunlop - Level 5 London House Perth WA 6000
S17
1. Air Cargo Center Vienna, Austria: Treusch architecture
Design Requirements and Guidelines December 2010 xxix
APPENDICES A12
Credits

Row 6: A9
1. Het Valkhof Museum. Nijmegen, Netherlands. UN Studio. Row 1: (left to right)
2. Sheep Farm House, Kyneton, Victoria, Australia. Denton Corker Marshall. 3. Faller PharmaServiceCenter, Binzen, Germany. pfeifer roser Kuhn
3. Combined Heat Power plant and Office Building. Luxembourg. Paul Architecten.
Bretz. 4. Business Communication Centre, IT Park Saarland. Saarbruken,
4. Town Hall and Theatre. Ijsselstein, Netherlands. UN Studio & Bretz Germany. ARUS.
5. 50 Argo Street. South Yarra, VIC. OConner + Houle Architecture 5. Image from BlueScope Lysaght

Row 7: Row 4:
3. Fogtech Building, Koln, Germany by Georg Giebeler / 4000 architekten 1. GKD Headquarters Building
5. Concordia Textiles Head Office. Waregem, Belgium. Vincent van Duysen. 2. The British School in The Netherlands. Holland. Kraaij van ger Urbis.
3. Cinema. Rotterdam, Holland. Koen van Velsen.
Row 8: 4. Olympia Fields. Illinois, USA. Weiss / Manfredi Architects
1. Air Cargo Center Vienna, Austria: Treusch architecture
2. Sainsbury Supermarket, Deal, Kent, UK. Lifschultz Davidson. Row 5:
3. Agricultural Park. Hayami-gun, Oita, Japan. Toyo Ito & Associates 1. GKD Headquarters Building. CAmbridge, MAryland, USA. Dominique
4. GKD Headquarters Building, Maryland, USA. Dominique Perrault Perrault
2. Telecom Authority Building. Oporto, Portugal. Joao Alvaro Rocha & Jose
Row 9: Manuel Gigante.
1. Gallery of Horiyuji Treasures, Tokyo Museum: Taniguchi & Assoc. 3. Coreten Faade Building
2. MPreis Supermarket. Wattens, Austria. Dominique Perrault. 4. Caltrans District 7 Headquarters. Los Angeles, California, USA.
3. Imola Business Park, Kewdale WA. Feldhusen Choy Design. Morphosis.
4. House at Maple Avenue. Singapore. WOHA 5. Recall Information Centre, Greystanes NSW. Lacoste + Stevenson
Architects
Row 10:
1. Sports Facilities Area, Educare School, Mexico. TEN Arquitectos. Row 6:
2. Sheep Farm House, Australia: Denton Corker Marshall. 6. Palacio de Congresos. Santiago de Compostela, Spain. Alberto Noguerol
3. Three Houses. Beinwil, Switzerland. Gmur-Vacchini Architekten y Pilar Diez Architects.
7. Casa Ponce. Buenos Aires, Argentina. Mathias Klotz
Row 11:
1. Tempo Office Building, Subiaco, WA. Giorgi Group.
2. Airport Building
3. Hakuou High School. Wakayanagi, Miyagi Prefecture, Japan. Kazuhiro
Kajima and Mitsumasa Sampei / C+A Associate Architects.
4. V42 House. Bangkok, Thailand. Duangrit Bunnag Architect
5. An Turas. Tiree, Inner Hebrides, UK. Sutherland Hussey Architects

Row 12:
1. An Turas. Tiree, Inner Hebrides, Scotland, UK. Hussey Architects
2. Tulach atSolais Monument. Oulart Hill, Wexford, Ireland. Scott Tallon
Architects
3. House of Silence. Konigsmunster, Germany. Peter Kulka.

xxx Design Requirements and Guidelines December 2010 xxix

Vous aimerez peut-être aussi