PILE DRIVING
12.1.2. Pile driving should be carried out only under the supervision of
a competent person
12.1.6. If two pile drivers are erected at one place, they should be
separated by a distance at least equal to the longest leg
12.1.8. The hoses of steam and air hammers should be securely lashed
to the hammer to prevent whipping if a connection breaks
12.3.4. When not in use, the hammer should be blocked at the bottom
of the leads
12.4.1. When pile drivers are working over water, a suitable boat
should be kept readily available at all times