Vous êtes sur la page 1sur 3

Items Issues Recommendations

no
01 Followings issues were encountered during
AC unit condensation pipes installation.
1. Condensation drain now connected Please refer recommended
through the pump types units but not connection detail in Fig-01
adequate method of information
provided about drain connection AC
unit in shop drawings.
Please provide AAV (air
2. Exhaust port have provided in the admittance valve) in horizontal
shop drawings for gravity flow drain connection, (Dont put 25mm
(not pump type drain) but onsite now exhaust port later any bugs or
pump type condensation. Since the cockroach could be go through
new installation units condensation there and block the drain pipe )
pipes all are connected through the select adequate pipe size &
pumped connection then there will be provide enough size riser pipe
a lot of possibilities to water flow and riser air vent.
through the exhaust port.

3. All condensation pipes are same as Recommended to focus the


25mm is not adequate to carry all contractor to calculate the
units condensation water. approximate water content in
humid days and proved enough
pipes size when more units are
connected in series of
condensation pipe. Refer Fig-2
4. Provided shop drawings does not
provided the vertical condensation
riser pipe details such as pipe branch
For design engineer input
pipe connection to riser from each
floor level, pipe size, support details,
Pipe vent connection to every 10
story or like that &etc.
Fig-1
Pump type indoor unit drain
connection

Fig-2
Series of indoor unit drain
connection