01 Followings issues were encountered during
AC unit condensation pipes installation.
1. Condensation drain now connected Please refer recommended
through the pump types units but not connection detail in Fig-01
adequate method of information
provided about drain connection AC
unit in shop drawings.
Please provide AAV (air
2. Exhaust port have provided in the admittance valve) in horizontal
shop drawings for gravity flow drain connection, (Dont put 25mm
(not pump type drain) but onsite now exhaust port later any bugs or
pump type condensation. Since the cockroach could be go through
new installation units condensation there and block the drain pipe )
pipes all are connected through the select adequate pipe size &
pumped connection then there will be provide enough size riser pipe
a lot of possibilities to water flow and riser air vent.
through the exhaust port.
Fig-2
Series of indoor unit drain
connection