01 SISTEMA DE AGUA
Impulsin inc. Pozo tubular S/.
Lnea de conduccin S/.
Reservario 25m3 S/.
Reservario 100m3 S/.
Red de distribucin S/.
Conexiones domiciliarias S/.
SISTEMA DE ALCANT
Conexiones domiciliarias S/.
Redes colectoras S/.
Buzones S/.
PTAR
Emisor S/.
PTAR S/.
Tanque Imhoff S/.
COMPONENTES
PRESUPUESTO TOTAL
PERFIL EXPEDIENTE TECNICO (S/.)
SISTEMA DE ALCANTARILLADO
587,594.36 S/. 756,171.57 S/. 168,577.21
2,573,463.23 S/. 2,437,333.72 S/. -136,129.51
819,443.51 S/. 776,135.75 S/. -43,307.77
PTAR
136,061.14 S/. 86,679.40 S/. -49,381.74
1,673,757.63 S/. 4,204,184.39 S/. 2,530,426.76
1,335,473.28 S/. 1,430,972.77 S/. 95,499.49
33.28%
-7.94%
-11.92%
16.23%
-10.48%
-30.09%
28.69%
-5.29%
-5.29%
-36.29%
151.18%
7.15%
-9.98%
-6.48%
-5.50%
-38.32%
95.26%
100.00%
19.98%
COMPONENTES Unidad de Medida PIP VIABLE
AGUA POTABLE
Captacin l/s 4.54
Lnea de conduccin m 1468.78
Sistema de utilizacin m 0
Reservorio Nuevo m3 125
Instalacin de 16,845.97 m.
SISTEMA DE ALCANTARILLADO
Conexiones domiciliarias Nmero 475
Redes colectoras m 18,012.82
Buzones und 230
Nmero personas
Capacitacin en educacin sanitaria 475
capacitadas
Mitigacin Ambiental % 50
4.54
1468.78
769
125
Instalacin de 16,845.97 m.
475
475
18,012.82
230
DUALES
256
2.78
3.86
475
475
50
1
1
1
VARIACION (%)
PIP A VERIFICAR VARIACION (3) =
COMPONENTES Unidad de Medida PIP A VIABLE (1) (4) = ((2)/(1)-
(2) (2)-(1)
1)*100
AGUA POTABLE
Captacin S/. 13,403.59 20,255.67 6,852.08 51.12%
Lnea de
S/. 3,650.08 5,785.04 2,134.96 58.49%
conduccin
Redes primarias
S/. 7,987.78 39,777.48 31,789.70 397.98%
rehabilitadas
Redes
secundarias S/. 61,278.53 79,170.15 17,891.62 29.20%
rehabilitadas
Conexiones
domiciliarias S/. 9,692.58 24,340.84 14,648.26 151.13%
nuevas
Lavaderos de
S/. 74,260.06 74,260.06 #DIV/0!
pozo alto nuevas
Pileta con
lavadero/escurrid S/. 63,704.14 -63,704.14 -100.00%
ero
Subtotal Agua
179,013.10 266,573.31 87,560.21 48.91%
Potable (I)
DISPOSICIN DE EXCRETAS
UBS de arrastre
S/. 0 529,615.84 529,615.84 Err:512
hidrulico
Tratamiento -
S/. 0 139,819.02 139,819.02 Err:512
Biodigestor
Unidad de
percolacin -
S/. 0 54,676.49 54,676.49 Err:512
zanja de
infiltracin
Letrina de hoyo
S/. 94,081.39 0 -94,081.39 -100
seco ventilado
Subtotal
94,081.39 724,111.35 630,029.96 669.66%
Saneamiento (II)
Total Costo
273,094.49 990,684.66 717,590.17 262.76%
Directo (III)
Capacitacin en
gestin/Capacitac
S/. 1,939.11 58,000.71 56,061.60 2891.1
in en Educacin
Sanitaria
Mitigacin
Ambiental y
S/. 346.6 18,486.96 18,140.36 5233.8
control del
ambiente
Supervisin S/. 15,000.00 39,382.59 24,382.59 162.55
Expediente
S/. 5,000.00 18,000.00 13,000.00 260
Tcnico
Total Costo
22,285.71 133,870.26 111,584.55 500.70%
Indirecto (IV)
Total Inversin
295,380.19 1,124,554.93 829,174.74 280.71%
(V)
% avance fsico a
la fecha
0
0
100
13.45
1.6
COMPONENTES PIP VIABLE
AGUA POTABLE
SISTEMA DE ALCANTARILLADO
LLADO
AS RESIDUALES
AGUA POTABLE
SISTEMA DE ALCANTARILLADO
LLADO
AS RESIDUALES
El expediente tcnico plantea este componente y No se presentan variaciones, salvo en costos por
se mide en das de capacitacin, siendo estos 12. actualizacin de estos.
El perfil este componente contempla una No se presentan variaciones, salvo en costos por
capacitacin de 7 meses. actualizacin de estos.
AGUA POTABLE
Captacin l/s 4.54
Lnea de conduccin m 1468.78
Sistema de utilizacin m 0
Reservorio Nuevo m3 125
SISTEMA DE ALCANTARILLADO
Conexiones domiciliarias Nmero 475
Redes colectoras m 18,012.82
Buzones und 230
Nmero personas
Capacitacin en educacin sanitaria 475
capacitadas
Mitigacin Ambiental % 50
4.54 0 0.00% 0
1468.78 0 0.00% 0
769 769 100.00% 0
125 0 0.00% 0
16,845.97 0 0.00% 0
475 0 0.00% 0
475 0 0.00% 0
18,012.82 0 0.00% 0
230 0 0.00%
SIDUALES
256 0 0.00% 0
2.78 0 0.00% 0
3.86 0 0.00% 0
475 0 0.00% 0
475 0 0.00% 0
50 0 0.00% 0
1 0 0.00% 0
1 0 0.00% 0
1 0 0.00% 0
COMPONENTES Unidad de Medida
01 SIST
Impulsin inc. Pozo tubular S/.
Lnea de conduccin S/.
Reservario 25m3 S/.
Reservario 100m3 S/.
Red de distribucin S/.
Conexiones domiciliarias S/.
SISTEM
Conexiones domiciliarias S/.
Redes colectoras S/.
Buzones S/.
Emisor S/.
PTAR S/.
Tanque Imhoff S/.
COMPONENTES
PRESUPUESTO TOTAL
PIP A VIABLE (1) PIP A VERIFICAR (2) VARIACION (3) = (2)-(1)
SISTEMA DE ALCANTARILLADO
587,594.36 S/. 756,171.57 S/. 168,577.21
2,573,463.23 S/. 2,437,333.72 S/. -136,129.51
819,443.51 S/. 776,135.75 S/. -43,307.77
PTAR
136,061.14 S/. 86,679.40 S/. -49,381.74
1,673,757.63 S/. 4,204,184.39 S/. 2,530,426.76
1,335,473.28 S/. 1,430,972.77 S/. 95,499.49
33.28% 0.00%
-7.94% 0.00%
-11.92% 0.00%
16.23% 0.00%
-10.48% 0.00%
-30.09% 0.00%
28.69% 0.00%
-5.29% 0.00%
-5.29% 0.00%
-36.29% 0.00%
151.18% 0.00%
7.15% 0.00%
-9.98% 0.00%
-6.48% 0.00%
-5.50% 0.00%
-38.32% 0.00%
95.26% 0.00%
100.00% 0.00%
19.98% 0.00%
MODIFICACIONES NO SUSTANCIALES: PIP VIABLE
Metas asociadas a la capacidad de produccin
Tecnologa de produccin
Mejoramiento de la red de
Red de distribucin primaria distribucin primaria, considerada
esta en 482.70 metros lineales
Mejoramiento de la red de
Red de distribucin secundaria. secundaria, considerada esta en
3,703.05 metros lineales.
Construccin de 77 conexiones
Conexiones domiciliarias
domiciliarias.
Construccin de 77 Piletas con
lavadero/escurridero.
En el perfil se ha determinado un
Capacitacin en gestin/Capacitacin en Educacin Sanitaria monto de
S/. 1,939.11.
En el perfil se ha determinado un
Mitigacin Ambiental y control del ambiente monto de
S/. 346.60
En el perfil se ha determinado un
Supervisin monto de
S/. 15,000.00
En el perfil se ha determinado un
Expediente Tcnico monto de
S/. 5,000.00
Cambio de alternativa de solucin por otra prevista en el estudio con el Alternativa seleccionada en el PIP
que se obtuvo la viabilidad. Viable.
8,987.04
3,687.67
31,789.70
17,891.62
14,648.26
10,555.92
630,029.96
56,061.60
18,140.36
24,382.59
13,000.00
COMPONENTES Unidad de Medida Situacin sin proyecto
AGUA POTABLE
Captacin l/s 0.44
Lnea de conduccin m 807.829
Sistema de utilizacin m 0
Reservorio Nuevo m3 25
SISTEMA DE ALCANTARILLADO
Conexiones domiciliarias Nmero 0
Redes colectoras m 0.00
Buzones und 0
Nmero personas
Capacitacin en educacin sanitaria 0
capacitadas
Mitigacin Ambiental % 0
4.54
1468.78
769
125
Instalacin de 16,845.97 m.
475
475
18,012.82
230
DUALES
256
2.78
3.86
50
1
1
1
CRONOGRAMA FSICO DE INVERSION, SEGN METAS
METAS
METAS
ml 384.50 384.50
ml 0 2,573.26 2,573.26 2,573.26 2,573.26
l/s 0 0.40 0.40 0.40 0.40
dias 0 0 0 0 0
meses 0 1 1 1 1
GLB 0 14.29% 14.29% 14.29% 14.29%
% 0 14.29% 14.29% 14.29% 14.29%
% 0 14.29% 14.29% 14.29% 14.29%
% 100% 0 0 0 0
% 0 14.29% 14.29% 14.29% 14.29%
% 0 14.29% 14.29% 14.29% 14.29%
UNIDAD DE MESES
MEDIDA 1 2 3 4 5
S/. 0 400,783.79 400,783.79 400,783.79 400,783.79
769.00
2,573.26 2,573.26 2,573.26 18,012.82 2573.26
0.40 0.40 0.40 2.78 0.397142857
0 0 12 12
1 1 1 7
14.29% 14.29% 14.29% 100%
14.29% 14.29% 14.29% 100%
14.29% 14.29% 14.29% 100%
0 0 0 100%
14.29% 14.29% 14.29% 100%
14.29% 14.29% 14.29% 100%
TOTAL POR
6 7 8 META
400,783.79 400,783.79 400,783.79 2,805,486.50 2,805,486.50
127,681.10 127,681.10
504,650.58 504,650.58 504,650.58 3,532,554.06 3,532,554.06
727,402.83 727,402.83 727,402.83 5,091,819.83 5,091,819.83
27,194.85 27,194.85 27,194.85
5,635.64 5,635.64 5,635.64 39,449.51
1,928.39 1,928.39 1,928.39 13,498.75
107,049.13 107,049.13 107,049.13 749,343.90
98,657.17 98,657.17 98,657.17 690,600.21
0.00 0.00 0.00 67,500.00
11,347.53 11,347.53 11,347.53 79,432.70
60,545.71 60,545.71 60,545.71 423,820.00
13,648,381.41
13,648,381.41
16845.97
18,012.82
2.78
PRESUPUESTO GENERAL
PROYECTO
PROPIETARIO
UBICACION
FECHA PROYECTO
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.04.06
01.03.04.07
01.03.04.08
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.05
01.04.05.01
01.04.06
01.04.06.01
01.04.07
01.04.07.01
01.04.07.02
01.04.07.03
01.04.07.04
01.04.08
01.04.08.01
01.04.08.01.01
01.04.08.01.02
01.04.08.01.03
01.04.08.02
01.04.08.02.01
01.04.08.02.02
01.04.08.03
01.04.08.03.01
01.04.08.03.02
01.04.08.03.03
01.04.08.03.04
01.04.08.03.04.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.04
01.05.04.01
01.05.04.02
01.05.04.03
01.05.05
01.05.05.01
01.05.06
01.05.06.01
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.05.07.04
01.05.08
01.05.08.01
01.05.08.01.01
01.05.08.01.02
01.05.08.01.03
01.05.08.02
01.05.08.02.01
01.05.08.02.02
01.05.08.03
01.05.08.03.01
01.05.08.03.02
01.05.08.03.03
01.05.08.04
01.05.08.04.01
01.06
01.06.01
01.06.01.01
01.06.02
01.06.02.01
01.06.02.02
01.06.02.03
01.06.02.04
01.06.02.05
01.06.02.06
01.06.03
01.06.03.01
01.06.03.02
01.06.03.03
01.06.03.04
01.06.03.05
01.06.03.06
01.06.03.07
01.06.03.08
01.06.04
01.06.04.01
01.06.04.02
01.06.04.03
01.06.04.04
01.06.04.05
01.06.04.06
01.06.04.07
01.06.04.08
01.06.04.09
01.06.04.10
01.06.04.11
01.06.04.12
01.06.04.13
01.06.04.14
01.06.04.15
01.06.04.16
01.06.04.17
01.06.04.18
01.06.04.19
01.06.04.20
01.06.04.21
01.06.04.22
01.06.04.23
01.06.04.24
01.06.04.25
01.06.05
01.06.05.01
01.06.05.01.01
01.06.05.01.02
01.06.05.02
01.06.05.02.01
01.06.05.02.02
01.06.05.02.03
01.06.05.03
01.06.05.03.01
01.06.05.03.02
01.06.05.03.03
01.06.05.03.04
01.07
01.07.01
01.07.01.01
01.07.02
01.07.02.01
01.07.02.02
01.07.02.03
01.07.02.04
01.07.02.05
01.07.03
01.07.03.01
01.07.04
01.07.04.01
01.08
01.08.01
01.08.01.01
01.08.02
01.08.02.01
01.08.02.02
01.08.02.03
01.08.02.04
01.08.02.05
01.08.02.06
01.08.03
01.08.03.01
01.08.03.02
01.08.03.03
01.08.04
01.08.04.01
01.08.04.02
01.08.04.03
01.08.04.04
01.08.04.05
01.08.04.06
01.08.04.07
01.08.05
01.08.05.01
01.08.05.02
01.08.05.03
01.08.05.04
01.08.05.05
01.08.06
01.08.06.01
01.08.06.02
01.08.06.03
01.08.06.04
02
02.01
02.01.01
02.01.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.03
02.01.03.04
02.01.03.05
02.01.03.06
02.01.03.07
02.01.03.08
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.01.05.03
02.01.05.04
02.01.05.05
02.01.05.06
02.01.05.07
02.02
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.03
02.02.03.01
02.02.04
02.02.04.01
02.02.05
02.02.05.01
02.02.05.02
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.01.01
02.03.02.01.02
02.03.02.01.03
02.03.02.01.04
02.03.02.01.05
02.03.02.01.06
02.03.02.02
02.03.02.02.01
02.03.03
02.03.04
02.03.05
03
03.01
03.01.01
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.03
03.01.03.01
03.01.03.02
03.01.04
03.01.04.01
03.01.04.02
03.01.04.03
03.01.05
03.01.05.01
03.01.05.02
03.01.05.03
03.01.06
03.01.06.01
03.01.06.02
03.01.07
03.01.07.01
03.01.07.02
03.01.07.03
03.01.07.04
03.01.07.05
03.01.07.06
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.03
03.02.03.01
03.02.04
03.02.04.01
03.02.04.02
03.02.04.03
03.02.05
03.02.05.01
03.02.06
03.02.06.01
03.02.06.02
03.03
03.03.01
03.03.01.01
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.02.04
03.03.02.05
03.03.02.06
03.03.03
03.03.03.01
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.05
03.03.05.01
03.03.05.02
03.03.05.03
03.03.06
03.03.06.01
03.03.06.02
03.03.07
03.03.07.01
03.03.07.02
03.03.07.03
03.03.07.04
03.03.07.05
03.03.07.06
03.03.07.07
03.03.07.08
03.03.07.09
03.03.07.10
03.03.07.11
03.03.07.12
03.03.07.13
03.03.07.14
03.03.07.15
03.03.07.16
03.03.07.17
03.03.07.18
03.03.08
03.03.08.01
03.03.08.02
03.03.08.03
03.04
03.04.01
03.04.01.01
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.02.04
03.04.02.05
03.04.02.06
03.04.02.07
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.03.04
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.05
03.04.05.01
03.04.05.02
03.04.06
03.04.06.01
03.04.06.02
03.04.06.03
03.04.06.04
03.04.06.05
03.04.07
03.04.07.01
03.04.07.02
03.04.07.03
03.04.07.04
03.04.07.05
03.04.07.06
03.04.07.07
03.04.07.08
03.04.07.09
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.05.02.03
03.05.02.04
03.05.02.05
03.05.02.06
03.05.02.07
03.05.03
03.05.03.01
03.05.03.02
03.05.04
03.05.04.01
03.05.04.02
03.05.04.03
03.05.04.04
03.05.04.05
03.05.04.06
03.05.04.07
03.05.04.08
03.05.04.09
03.05.04.10
03.05.04.11
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.02
03.06.02.01
03.06.02.02
03.06.02.03
03.06.03
03.06.03.01
03.06.03.02
03.06.03.03
03.06.04
03.06.04.01
03.06.04.02
03.06.04.03
03.06.05
03.06.05.01
03.06.05.02
03.06.06
03.06.06.01
03.06.06.02
03.06.06.03
03.07
03.07.01
03.07.01.01
03.07.01.02
03.07.01.03
03.07.02
03.07.02.01
03.07.02.02
03.07.02.03
03.07.02.04
03.07.03
03.07.03.01
03.07.03.02
03.07.03.03
03.07.03.04
03.07.03.05
03.07.03.06
03.07.03.07
03.07.04
03.07.04.01
03.07.04.02
03.07.04.03
03.07.04.04
03.07.05
03.07.06
03.07.06.01
03.07.06.02
03.07.06.03
03.07.07
03.07.07.01
03.07.07.02
03.07.07.03
03.07.08
03.07.08.01
03.07.08.02
03.07.09
03.07.09.01
03.07.09.02
03.07.09.03
03.08
03.08.01
03.08.02
03.08.03
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.02.03
03.09.02.04
03.09.02.05
03.09.03
03.09.03.01
03.09.03.02
03.09.03.03
03.09.03.03.01
03.09.03.03.02
03.09.04
03.09.04.01
03.09.04.02
03.09.05
03.09.05.01
03.09.05.02
03.10
03.10.01
03.10.01.01
03.10.01.02
03.10.01.03
03.10.01.04
03.10.01.05
03.10.01.06
03.10.01.07
03.10.01.08
03.10.01.09
03.10.01.10
03.10.01.11
03.10.01.12
03.10.02
03.10.02.01
03.10.02.02
03.10.02.03
03.10.02.04
03.10.02.05
03.10.02.06
03.10.02.07
03.10.02.08
03.10.02.09
03.10.02.10
03.10.02.11
03.11
03.11.01
03.11.01.01
03.11.02
03.11.02.01
03.11.02.02
03.11.02.03
03.11.02.04
03.11.02.05
03.11.02.06
03.11.03
03.11.03.01
03.11.04
03.11.04.01
03.11.05
03.11.05.01
03.11.05.02
04
04.01
05
05.01
06
06.01
Refo
[Son: Once millones doscientos cincuenta y cinco mil quinientos cuarenta y cuatro Nue
PRESUPUESTO GENERAL
AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL ALCANTARILLADO EN EL C.P. LA HUARACLLA, D
5/31/2015
Descripcin
AMPLIACION Y MEJORAMIENTO SISTEMA DE AGUA POTABLE
OBRAS PROVISIONALES
CARTEL DE OBRA (2.40x4.80m)
OFICINA, ALMACN Y CASETA DE GUARDIANA
CERCOS PROVISIONALES DE SEGURIDAD DE OBRA
SEGURIDAD Y SALUD
PLAN DE SALUD Y SEGURIDAD EN EL TRABAJO
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN DE SEGURIDAD TEMPORAL EN OBRA
CAPACITACIN DE SEGURIDAD Y SALUD EN OBRA
RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
RELLENO Y COMPACTACION
TENDIDO DE TUBERIA
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA HDPE SDR 9 RESISTENCIA ASTM F714 PE 3608 D=109.91 mm
REDUCCION DE 5 A 4
VALVULA PURGA
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
INSTALACION DE VALVULA DE PURGA TIPO T 5"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACONDICIONAMIENTO PASE AEREO
RETIRO DE CABLE EXISTENTE Y DADO
REPOCICION DE CABLE INCLUYE TEMPLADORES Y FORRO
DADO CONCRETO
REUBICACION TANQUE HDPE 25 M3 ETERNIT
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D=30M
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUES
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
MONTAJE DESMONTAGE DE TANQUE DE 25 M3
CASETA DE VALVULAS TANQUE
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO FY=4200 KG/CM2
REVOQUES, ENLUCIDOS Y PINTURAS
TARRAJEO FROTACHADO 1:5 E= 1.5 CM
PINTURA OLEO MATE EN MUROS EXTERIORES
VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
TAPA METALICA
TAPA METALICA DE 0.60x 0.60 M.
BATERIA DE TANQUES HDPE 25 M3
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D=30M
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUE
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
TRASLADO Y MONTAGE TANQUE DE 25 M3
CASETA DE VALVULAS BATERIA TANQUES
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO FY=4200 KG/CM2
REVOQUES, ENLUCIDOS Y PINTURAS
TARRAJEO FROTACHADO 1:5 E= 1.5 CM
PINTURA OLEO MATE EN MUROS EXTERIORES
VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
TAPA METALICA
TAPA METALICA DE 0.60x 0.60 M.
RED DE DISTRIBUCION
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30 M.
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAP CLASE 10, D=3"
TUBERIA PVC SAP CLASE 10, D=2"
TUBERIA PVC SAP CLASE 10, D=1 1/2"
TUBERIA PVC SAP CLASE 10, D=1"
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA PVC SAP CLASE 10, D=2 1/2"
TUBERIA PVC SAP CLASE 10, D=3/4"
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS DE LA RED
SUMINISTRO Y COLOCACION TEE PVC 2"
SUMINISTROS Y COLOCACION TEE PVC 1"
SUMINISTRO Y COLOCACION TEE PVC 3"
SUMINISTRO Y COLOCACION TEE PVC 4"
SUMINISTRO Y COLOCACION TEE PVC 3/4"
SUMINISTRO Y COLOCACION TEE PVC 1 1/2"
SUMINISTRO Y COLOCACION TEE PVC 2 1/2"
SUMINISTRO Y COLOCACION CODO PVC 90 3/4"
SUMINISTRO Y COLOCACION CODO PVC 90 1"
SUMINISTRO Y COLOCACION CODO PVC 22.5 3/4"
SUMINISTRO Y COLOCACION CODO PVC 22.5 4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 1"
SUMINISTROS Y COLOCACION REDUCCION PVC 2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 1" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 2 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 3"
VALVULAS DE CONTROL Y PURGA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
VALVULAS Y ACCESORIOS
INSTALACION DE VALVULA DE CONTROL 1"
INSTALACION DE VALVULA DE PURGA 1"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACOMETIDAS DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION DE ZANJAS, CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25 X 0.35 TAPA FG
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25X0.35 TAPA FG
VALVULAS Y ACCESORIOS
INSTALACION DE ACCESORIOS EN ACOMETIDAS
LINEA DE IMPULCION
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
NIVELACION Y COMPACTACION
PLATAFORMADO DE LOSA PARA POZO (RELLENO ESTRUCTURAL)
PERFORACION DE POZO TUBULAR
FILTRO PARA POZO TUBULAR
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TENDIDO DE TUBERIA DESDE LA BOMBA HASTA EL TANQUE
TUBERIA HDPE SDR 7 RESISTENCIA ASTM F714 PE 4710 D=81.64 mm
TUBERIA HDPE SDR 9 RESISTENCIA ASTM F714 PE 3608 D=88.90 mm
TUBERIA HDPE SDR 11 RESISTENCIA ASTM F714 PE 3608 D=93.52 mm
TUBERIA HDPE SDR 17 RESISTENCIA ASTM F714 PE 3608 D=100.84 mm
PEGADO POR TERMOFUSION DE TUBERIA HDPE
FORRADO INTERIOR DE TUBO RANURADO PARA POZO TUBULAR
FORRADO INTERIOR DE TUBO LISO PARA POZO TUBULAR (TRAMO INICIAL)
VALVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL
INSTALACION DE TABLERO ARRANQUE AUTOMATICO INCLUYE CABLEADO
INSTALACION DE MEDIDOR DE ENERGIA ELECTRICA
INSTALACION VALVULA ANTI RETORNO
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL DE RESGUARDO
VARIOS
LIMPIEZA DE POZO TUBULAR
SUMINISTRO E INSTALACION DE TAPON PARA POZO Y CABLE PARA IZAJE DE BOMBA SUMERGIBLE
FLETE TERRESTRE
LIMPIEZA FINAL DE OBRA
IMPLEMENTACION SISTEMA DE ALCANTARILLADO
RED COLECTORA
TRAZO REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL PARA BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D=30M
CORTE DE PAVIMENTO ASFALTICO DE 2"
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
TUBERIA PVC SAL D = 10" (250 mm ISO)
TUBERIA PVC SAL D = 12"
CONSTRUCCIN DE BUZONES
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
CONCRETO EN BUZONES F'C=210 KG/CM2
CONCRETO EN BUZONES f'c=140 kg/cm2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TAPA DE CONCRETO ARMADO PARA BUZONES
INSTALACIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS.
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAL D = 6" (160 mm ISO) (Instalaciones Domiciliarias)
CONEXION DOMICILIARIA CACHIMBA
CONEXION DOMICILIARIA CACHIMBA
CAJA DE REGISTRO DE DESAGUE (12"x20")
CAJA DE REGISTRO DE DESAGUE (12" X 20")
DADO CONCRETO
OTROS
PRUEBA HIDRAULICA + REPOSICION DE PAVIMENTO
PRUEBA HIDRAULICA ALCANTARILLADO
REPOSICION PAVIMENTO FLEXIBLE E = 2" + BASE
INST. TUB. A CAMARA DE REJAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAL D=12" (300 mm ISO)(BUZON 105-CAMARA DE REJAS)
ROTURA DE ESPECIMENES DE CONCRETO, POR COMPRESION
PLACA RECORDATORIA (0.40X0.60m)
FLETE TERRESTRE Y RURAL
PLANTA DE TRATAMIENTO
CAMARA DE REJAS (01 Und)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL CAMARA DE REJAS
REFINE NIVELACION Y COMPACTACION CAMARA DE REJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M CAMARA DE REJAS
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY=4200 KG/CM2
REVOQUES ENLUCIDOS
TARRAJEO DE EXTERIORES 1:5 e=1:5cm
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E= 1.5 CM.
PINTURA LATEX DOS MANOS
ESCALINES Y REJILLA
ESCALERA PARA CAMARA DE REJAS FG 3/4"
REJILLA DE SEPARACION DE SOLIDOS (0.30 M DE ANCHO)
INST. TUB. - TANQUE IMHOFF
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
TUBERIA PVC SAL D = 12" (300 mm ISO) ( CAMARA DE REJAS TANQUE IMHOFF)
DESARENADOR
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION
REFINE Y NIVELACION
ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30 M.
CONCRETO SIMPLE
CONCRETO F'C=100 KG/CM2 PARA SOLADOS
CONCRETO ARAMADO
CONCRETO F'C=210 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO (OBRAS DE ARTE)
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE
VARIOS
COMPUERTA DE MADERA DE TRATADA 1"
VERTEDERO
CONSTRUCCIN DE TANQUE IMHOFF (02 Und)
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO C/MAQ.
EXCAVACION MANUAL
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 (IMHOFF)
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TAPA Y CAJAS
CONCRETO F'C=210 KG/CM2; (TAPA Y CAJAS)
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E=2 CM.
TARRAJEO DE EXTERIORES MEZCLA C:A 1:5
INST. TUB. A LECHO DE SECADO Y HUMEDAL ARTIFICIAL + ACCESORIOS
EXCAVACION MANUAL
REFINE NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CAJA DE REGISTRO DE ALBAILERIA 12" X 24" CON TAPA DE FF
TUBERIA PVC SAL D = 8" (200 mm ISO) (TANQUE IMHOFF - LECHO DE SECADO)
TUBERIA PVC SAL D = 10" (250 mm ISO) (TANQUE IMHOFF - HUMEDAL ARTIFICIAL)
TUBERIA PVC SAL D = 8" (200 mm ISO) (TANQUE IMHOFF - HUMEDAL ARTIFICIAL))
TUBERIA PVC SAL D=4" (TANQUE IMHOFF - HUMEDAL ARTIFICIAL)
VALVULA COMPUERTA FF TIPO MAZZA DE 8"
CANASTILLA DE BRONCE 8"
SOMBRERO DE VENTILACION PVC DE 8"
CODO PVC-SAL 8"x45
TEE PVC-SAL DE 8"
BARANDA DE TUBO FG PASAMANO 2"
ESCALERA FG 3/4"
COMPUERTA PARA LIMPIEZA DE LOS SOLIDOS FLOTANTES 0.70x 0.80 M.
INSTALACION DE MOTOBOMBA
SUMINISTRO Y COLOCACION MOTOBOMBA 3.5 HP.
SUMINISTRO E INST. TUB. PVC 2" C - 7.5
CODO PVC SAP 2"X90
LECHO DE SECADO DE SOLIDOS (02 Unid)
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
RELLENO Y COMPACTACION CON MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
FILTRO DE ARENA FINA
FILTRO DE GRAVA FINA
FILTRO DE GRAVA GRUESA
OBRAS DE CONCRETO SIMPLE
SOLADO 1:8 PARA e = 4"
CONCRETO CIMIENTO CORRIDO 1:10 +30% P.M.
CONCRETO F'C=140 KG/CM2 LOSA DE FONDO
ENCOFRADO Y DESENCOFRADO DE CANALETAS
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E=2.0 CM.
TARRAJEO DE EXTERIORES MEZCLA C:A 1:5 E = 1.5cm
COBERTURAS
VIGAS DE MADERA 6" x 3"
VIGAS DE MADERA 4" x 3"
CORREAS DE MADERA 3" x 2"
ANCLAJE EN VIGA DE MADERA Y COLUMNA
COBERTURA CON CALAMINA GALVANIZADA
INST. TUB. A LECHO DE SECADO - QUEBRADA
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CAJA DE REGISTRO DE ALBAILERIA 12" X 24" CON TAPA DE FF
TUBERIA PVC SAL D = 8" (200 mm ISO) (C8 - DESCARGA FINAL)
TUBERIA PVC SAL D = 6"
CODO PVC SAL 6"X90.
HUMEDAL ARTIFICIAL (02 Unid)
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
GRAVA DE 1/2"
CUERPO DE PIEDRA GRAVA 2" - 4"
LECHO FILTRANTE GRAVA 1"
COBERTURAS INPERMEABLES
GEOMEMBRANA DE PVC E = 5mm
GEOTEXTIL NT 3000
INST. TUB. ACCE. + OTROS
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CODO PVC SAL 4"X90.
VALVULA COMPUERTA FF TIPO MAZZA DE 4"
TUBERIA PVC SAL D=4" (HUMEDAL ARTIFICIAL - C8)
TUBO DE PVC 2" AGUJEROS DE 1/2" @ 5cm
TEE PVC-SAL 4"x2"
COMPRA Y SEMBRADO DE CARRIZO A CADA 0.50M
CAMARA DE CONTACTO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
SEALIZACIN DE SEGURIDAD TEMPORAL EN OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO C/MAQ.
REFINE Y NIVELACION
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
CONCRETO SIMPLE
SOLADO DE CONCRETO FC=100Kg/CM2 E=0.10m CEMENTO TIPO V
CONCRETO f'c=140 kg/cm2 EN DESCARGA
EMPEDRADO CON MORTERO 1:4
CONCRETO ARAMADO
CONCRETO F'C=210 KG/CM2; PARA ESTRUCTURAS DE CEMENTO TIPO V
ENCOFRADO Y DESENCOFRADO DE MUROS CARA VISTA
ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN EXTERIORES C:A=1:5 E=1.5 CM
TARRAJEO CON IMPERMEABILIZANTE
VARIOS
VERTEDERO DE ALUMINIO CON EMPAQUETADURA DE JEBE
TAPA METALICA EN CAMARA DE CONTACTO 0.70 X 0.70
ESCALERA DE GATO
CASETA DE CLORACIN
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
SEALIZACIN DE SEGURIDAD TEMPORAL EN OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ESTRUCTURAS DE CAMARA
REFINE Y NIVELACION
RELLENO Y CON MATERIAL PROPIO: MANUAL
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
CONCRETO SIMPLE
CONCRETO CIMIENTO CORRIDO 1:10 +30% P.M. PARA CIMIENTO CORRIDOS
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT
CONCRETO F'C=175 KG/CM2 EN BASE DE TANQUE DOSIFICADORES
ENCOFRADO Y DESENCOFRADO EN BASE DE TANQUE DOSIFICADORES
CONCRETO F'C=140 KG/CM2 EN ESCALINATA DE DE TANQUE DOSIFICADORES
ENCOFRADO Y DESENCOFRADO EN ESCALINATA DE DE TANQUE DOSIFICADORES
CONCRETO ARAMADO
CONCRETO F'C=175KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
ALBAILERIA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN INTERIORES Y EXTERIORES
CIELO RASO CON MEZCLA DE CEMENTO-ARENA
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO E=0.05M ESPESOR 1:5 CEMENTO ARENA
VEREDA DE CONCRETO F'C=140 kG/CM2 DE 4"
ENCOFRADO Y DESENCOFRADO
PINTURA
PINTURA LATEX EN MUROS INTERIORES YEXTERIORES 02 MANOS
PINTURA LATEX EN CIELO RASO 02 MANOS
TUBERIAS, VLVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION TUBERIA DE DRENAJE PVC DN 63 MM C-10
TANQUE DOSIFICADOR INCLUYE VALVULA Y ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN CASETA DE CLORACION
CERCO PERIMETRICO DE PTAR
CERCO PERIMETRICO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
OBRAS DE PROPECION LINEA DE COLECTORA PTAR 01
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION EN TALUD
EXCAVACION PARA COLCHON DE AMORTIGUAMIENTO
COMPACTACION EN FONDO DE CIMENTACION
RELLENO Y COMPACTACION (MATERIAL PROPIO)
ELIMINACION DE MATERIAL EXCEDENTE
MUROS
ACOPIO DE PIEDRA MEDIANA PARA GAVIONES
TRASLADO DE PIEDRA MEDIANA PARA GAVIONES
MALLA PARA GAVIONES
GAVION TIPO CAJA DE 5X1X1
GAVION TIPO CAJA DE 5X1X2.5
COLCHON DE AMORTIGUAMIENTO
CONCRETO PARA ESCOLLERA (F'C=175KG/CM2 +30% P.M.)
ENCOFRADO Y DESENCOFRADO
VARIOS
ACONDICIONAMIENTO DE ACCESO A PTAR 01
LIMPIEZA FINAL DE OBRA
MUROS DE CONTENCION EN PLANTAS DE TRATAMIENTO
MURO DE CONCRETO ARMADO
TRAZO Y REPLANTEO
EXCAVACION DE TERRENO C/MAQ.
RELLENO Y CON MATERIAL PROPIO: MANUAL
CONFORMACION BASE GRANULAR (E=0.10M)
CONCRETO F'C=175 KG/CM2; MUROS
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60
JUNTA ASFALTICA
CURADO DE CONCRETO
TUBERIA DREN D=4"
TUBERIA DREN PERFORADO D=4"
GRAVA DE 1/2"
MURO DE CONCRETO CICLOPEO
TRAZO Y REPLANTEO
EXCAVACION DE TERRENO C/MAQ.
RELLENO Y CON MATERIAL PROPIO: MANUAL
CONFORMACION BASE GRANULAR (E=0.10M)
CONCRETO 1:8+25% P.M. PARA MUROS
ENCOFRADO Y DESENCOFRADO
JUNTA ASFALTICA
CURADO DE CONCRETO
TUBERIA DREN D=4"
TUBERIA DREN PERFORADO D=4"
GRAVA DE 1/2"
EMISOR QUEBRADA
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL DE BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MAT. ZARANDEADO
RELLENO Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
CONSTRUCCIN DE BUZONES
CONSTRUCCION DE BUZONES DE CONCRETO H=1.20 m.
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA PARA TUBERIAS 200MM
LIMPIEZA FINAL DE OBRA
CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
CAPACITACIN EN A+O+M
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
CAPACITACIN EN EDUCACION SANITARIA
MITIGACIN AMBIENTAL
RECUPERACION DE AREAS AFECTADS
COSTO DIRECT
Gastos General
Utilid
Sub Tot
IG
VALOR REFERENCIA
Supervisi
Liquidaci
Reformulacion Expediente Tcni
TOTAL
[Son: Once millones doscientos cincuenta y cinco mil quinientos cuarenta y cuatro Nuevos Soles con secenta
L
2,783,960.11
AGUA
8,971.52
CAPACITACIN EN ADMINISTRACION OPERACION Y 12,527.32
CAPACITACIN EN A+O+M + EDUCACION SANITARI 4,242.45
MITIGACIN AMBIENTAL
SANEAMIENTO
CAPACITACIN EN ADMINISTRACION OPERACION Y 19,574.33
CAPACITACIN EN A+O+M + EDUCACION SANITARI 27,332.47
MITIGACIN AMBIENTAL 9,256.30
SUB TOTAL CD GG UTIL
11,255,544.61 11,255,544.61
594,688.98
247,932.70
28,340.59
247,986.30
1,753,570.06
664,926.15
36,271.85
50,647.92
17,152.22
11,151,472.63 104,071.99
PRESUPUESTO GENERAL
PROYECTO
PROPIETARIO
UBICACION
FECHA PROYECTO
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.04.06
01.03.04.07
01.03.04.08
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.05
01.04.05.01
01.04.06
01.04.06.01
01.04.07
01.04.07.01
01.04.07.02
01.04.07.03
01.04.07.04
01.04.08
01.04.08.01
01.04.08.01.01
01.04.08.01.02
01.04.08.01.03
01.04.08.02
01.04.08.02.01
01.04.08.02.02
01.04.08.03
01.04.08.03.01
01.04.08.03.02
01.04.08.03.03
01.04.08.03.04
01.04.08.03.04.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.02.04
01.05.02.05
01.05.03
01.05.03.01
01.05.03.02
01.05.04
01.05.04.01
01.05.04.01.01
01.05.04.01.01.01
01.05.04.01.01.02
01.05.04.01.01.03
01.05.04.01.02
01.05.04.01.02.01
01.05.04.01.02.02
01.05.04.01.02.03
01.05.04.01.03
01.05.04.01.03.01
01.05.04.01.03.02
01.05.04.01.04
01.05.04.01.04.01
01.05.04.01.04.02
01.05.04.01.05
01.05.04.01.05.01
01.05.04.01.05.02
01.05.04.01.05.03
01.05.04.01.05.04
01.05.04.02
01.05.04.02.01
01.05.04.02.01.01
01.05.04.02.01.02
01.05.04.02.02
01.05.04.02.02.01
01.05.04.02.02.02
01.05.04.02.02.03
01.05.04.02.03
01.05.04.02.03.01
01.05.04.02.03.02
01.05.04.02.03.03
01.05.04.02.04
01.05.04.02.04.01
01.05.04.02.04.02
01.05.04.02.04.03
01.05.05
01.05.05.01
01.05.05.02
01.05.06
01.05.06.01
01.05.06.02
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.05.07.04
01.05.07.05
01.05.07.06
01.05.08
01.05.08.01
01.05.08.02
01.05.08.03
01.05.08.04
01.05.08.05
01.05.08.05.01
01.05.08.05.02
01.05.08.05.03
01.05.08.06
01.05.08.06.01
01.05.08.07
01.05.08.07.01
01.05.08.08
01.05.08.08.01
01.05.08.08.02
01.05.08.08.03
01.05.08.08.04
01.06
01.06.01
01.06.01.01
01.06.02
01.06.02.01
01.06.02.02
01.06.02.03
01.06.02.04
01.06.02.05
01.06.02.06
01.06.03
01.06.03.01
01.06.03.02
01.06.03.03
01.06.03.04
01.06.03.05
01.06.03.06
01.06.03.07
01.06.03.08
01.06.04
01.06.04.01
01.06.04.02
01.06.04.03
01.06.04.04
01.06.04.05
01.06.04.06
01.06.04.07
01.06.04.08
01.06.04.09
01.06.04.10
01.06.04.11
01.06.04.12
01.06.04.13
01.06.04.14
01.06.04.15
01.06.04.16
01.06.04.17
01.06.04.18
01.06.04.19
01.06.04.20
01.06.04.21
01.06.04.22
01.06.04.23
01.06.04.24
01.06.04.25
01.06.05
01.06.05.01
01.06.05.01.01
01.06.05.01.02
01.06.05.02
01.06.05.02.01
01.06.05.02.02
01.06.05.02.03
01.06.05.03
01.06.05.03.01
01.06.05.03.02
01.06.05.03.03
01.06.05.03.04
01.07
01.07.01
01.07.01.01
01.07.02
01.07.02.01
01.07.02.02
01.07.02.03
01.07.02.04
01.07.02.05
01.07.03
01.07.03.01
01.07.04
01.07.04.01
01.08
01.08.01
01.08.01.01
01.08.02
01.08.02.01
01.08.02.02
01.08.02.03
01.08.02.04
01.08.02.05
01.08.02.06
01.08.03
01.08.03.01
01.08.03.02
01.08.03.03
01.08.04
01.08.04.01
01.08.04.02
01.08.04.03
01.08.04.04
01.08.04.05
01.08.04.06
01.08.04.07
01.08.05
01.08.05.01
01.08.05.02
01.08.05.03
01.08.05.04
01.08.05.05
01.08.06
01.08.06.01
01.08.06.02
01.08.06.03
01.08.06.04
02
02.01
02.01.01
02.01.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.03
02.01.03.04
02.01.03.05
02.01.03.06
02.01.03.07
02.01.03.08
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.01.05.03
02.01.05.04
02.01.05.05
02.01.05.06
02.01.05.07
02.02
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.03
02.02.03.01
02.02.04
02.02.04.01
02.02.05
02.02.05.01
02.02.05.02
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.01.01
02.03.02.01.02
02.03.02.01.03
02.03.02.01.04
02.03.02.01.05
02.03.02.01.06
02.03.02.02
02.03.02.02.01
02.03.03
02.03.04
02.03.05
03
03.01
03.01.01
03.01.01.01
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.03
03.01.03.01
03.01.03.02
03.01.04
03.01.04.01
03.01.04.02
03.01.04.03
03.01.05
03.01.05.01
03.01.05.02
03.01.05.03
03.01.06
03.01.06.01
03.01.06.02
03.01.07
03.01.07.01
03.01.07.02
03.01.07.03
03.01.07.04
03.01.07.05
03.01.07.06
03.01.08
03.01.08.01
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.03
03.02.03.01
03.02.04
03.02.04.01
03.02.04.02
03.02.04.03
03.02.05
03.02.05.01
03.02.06
03.02.06.01
03.02.06.02
03.03
03.03.01
03.03.01.01
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.02.04
03.03.02.05
03.03.02.06
03.03.03
03.03.03.01
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.05
03.03.05.01
03.03.05.02
03.03.05.03
03.03.06
03.03.06.01
03.03.06.02
03.03.07
03.03.07.01
03.03.07.02
03.03.07.03
03.03.07.04
03.03.07.05
03.03.07.06
03.03.07.07
03.03.07.08
03.03.07.09
03.03.07.10
03.03.07.11
03.03.07.12
03.03.07.13
03.03.07.14
03.03.07.15
03.03.07.16
03.03.07.17
03.03.07.18
03.03.08
03.03.08.01
03.03.08.02
03.03.08.03
03.04
03.04.01
03.04.01.01
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.02.04
03.04.02.05
03.04.02.06
03.04.02.07
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.03.04
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.05
03.04.05.01
03.04.05.02
03.04.06
03.04.06.01
03.04.06.02
03.04.06.03
03.04.06.04
03.04.06.05
03.04.07
03.04.07.01
03.04.07.02
03.04.07.03
03.04.07.04
03.04.07.05
03.04.07.06
03.04.07.07
03.04.07.08
03.04.07.09
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.05.02.03
03.05.02.04
03.05.02.05
03.05.02.06
03.05.02.07
03.05.03
03.05.03.01
03.05.03.02
03.05.04
03.05.04.01
03.05.04.02
03.05.04.03
03.05.04.04
03.05.04.05
03.05.04.06
03.05.04.07
03.05.04.08
03.05.04.09
03.05.04.10
03.05.04.11
03.06
03.06.01
03.06.02
03.06.03
03.07
03.07.01
03.07.01.01
03.07.01.02
03.07.02
03.07.02.01
03.07.02.02
03.07.02.03
03.07.02.04
03.07.02.05
03.07.03
03.07.03.01
03.07.03.02
03.07.03.03
03.07.03.03.01
03.07.03.03.02
03.07.04
03.07.04.01
03.07.04.02
03.07.04.03
03.07.04.04
03.07.04.05
03.07.05
03.07.05.01
03.07.05.02
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.01.03
03.08.01.04
03.08.01.05
03.08.01.06
03.08.01.07
03.08.01.08
03.08.01.09
03.08.01.10
03.08.01.11
03.08.01.12
03.08.02
03.08.02.01
03.08.02.02
03.08.02.03
03.08.02.04
03.08.02.05
03.08.02.06
03.08.02.07
03.08.02.08
03.08.02.09
03.08.02.10
03.08.02.11
03.09
03.09.01
03.09.01.01
03.09.02
03.09.02.01
03.09.02.02
03.09.02.03
03.09.02.04
03.09.02.05
03.09.02.06
03.09.03
03.09.03.01
03.09.04
03.09.04.01
03.09.05
03.09.05.01
03.09.05.02
04
04.01
05
05.01
06
06.01
7
7.01
07.01.01
07.01.01.01
07.01.01.02
07.01.01.03
07.01.01.04
07.01.02
07.01.02.01
07.01.03
07.01.03.01
07.01.03.02
07.01.04
07.01.04.01
07.01.04.02
07.01.04.03
7.02
07.02.01
07.02.01.01
07.02.01.02
07.02.02
07.02.02.01
07.02.02.02
07.02.02.03
07.02.02.04
07.02.02.05
07.02.03
07.02.03.01
07.02.03.02
07.02.03.03
07.02.04
07.02.04.01
07.02.04.02
07.02.05
07.02.05.01
07.02.05.02
07.02.05.03
07.02.05.04
07.02.06
07.02.06.01
07.02.07
07.02.07.01
07.02.07.02
07.02.07.03
07.02.08
07.02.08.01
7.03
07.03.01
VAL
Superv
Plan de Mon
Reformulacion
[Son: trece millones trecientos ochenta y dos mil cuatrocientos treinta y tres
02
03
04
05
06
07
PRESUPUESTO GENERAL
AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL ALCANTARILLADO EN EL C.P. LA HUARACLLA, D
8/31/2016
Descripcin
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL.
ELIMINACION DE MATERIAL EXCEDENTE D=30M
RELLENO Y COMPACTACION
TENDIDO DE TUBERIA
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA HDPE SDR 9 RESISTENCIA ASTM F714 PE 3608 D=109.91 mm
REDUCCION DE 5 A 4
VALVULA PURGA
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
INSTALACION DE VALVULA DE PURGA TIPO T 5"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACONDICIONAMIENTO PASE AEREO
RETIRO DE CABLE EXISTENTE Y DADO
REPOCICION DE CABLE INCLUYE TEMPLADORES Y FORRO
DADO CONCRETO
REUBICACION TANQUE HDPE 25 M3 ETERNIT
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D=30M
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUES
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
MONTAJE DESMONTAGE DE TANQUE DE 25 M3
CASETA DE VALVULAS TANQUE
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO FY=4200 KG/CM2
REVOQUES, ENLUCIDOS Y PINTURAS
TARRAJEO FROTACHADO 1:5 E= 1.5 CM
PINTURA OLEO MATE EN MUROS EXTERIORES
VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
TAPA METALICA
TAPA METALICA DE 0.60x 0.60 M.
RESERVORIO DE CONCRETO ARMADO 100 M3
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS DE RESERVORIOS Y CAJA DE VALVULAS DE 1.00-1.60M
EXCAVACION DE PARA UAS DE VEREDAS
NIVELACION INTERIOR Y APISONADO EN FONDO DE RESERVORIO Y CASETA DE VALVULAS E=4'' C/EQUIPO LIVIANO CON
MATERIALE PROPIO
AFIRMADO DE 4'' PARA VEREDAS CON EQUIPO LIVIANO
ELIMINACION DE MATERIAL EXCEDENTE MANUAL DIST./PRO=30M
OBRAS DE CONCRETO SIMPLE
SOLADO PARA RESERVORIO E=4'' MEZCLA CEM:HOR 1:12 (CON CEMENTO TIPO II)
CIMIENTOS CORRIDOS F'C=140 KG/CM2 +30% DE PIEDRA GRANDE (CON CEMENTO TIPO II)
OBRAS DE CONCRETO ARMADO
CASETA DE VALVULAS BATERIA TANQUES
COLUMNAS
CONCRETO EN COLUMNAS PARA CASETA DE VALVULAS F'C=175 KG/CM2 (CEMENTO TIPO II)
VIGAS
CONCRETO EN VIGAS PARA CASETA DE VALVULAS F'C=175 KG/CM2 (CEMENTO TIPO II)
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADO EN CAJA DE VALVULAS H=0.20M
RESERVORIO
CIMINETO
CONCRETO EN CIMIENTO REFORZADO F'C=245 KG/CM2 (CON CEMENTO TIPO II)
ACERO EN CIMIENTO REFORZADO FY=4200 KG/CM2 GRADO 60
PAREDES DE RESERVORIO
CONCRETO EN PARED CIRCULAR DE RESERVORIO F'C=175 KG/CM2 (CEMENTO TIPO II)
VEREDAS
VEREDA DE CONCRETO 1:8 DE 4'' CON BRUAS DE CANTO Y TRANSVERSALES (INCLUYE ENCOFRADO)
TAPA METALICA CON PLANCHA ESTRIADA E=3/16'' DIAMETRO DE 0.50M SEGUN DISEO
PUERTA METALICA CON PLANCHA Y PERFILES DE FIERRO SEGUN DISEO
VENTANA METALICA CON MARCO DE ANGULO DE 2X1/4'' Y FIERRO CUADRADO VERTICAL DE 3/4'' SEGUN DISEO
COLOCACION DE VENTANA
COLOCACION DE PUERTA
PINTURA
PINTURA LATEX EN EXTERIORES DE RESERVORIO
PINTURA ANTICORROSIVA ZINCROMATO ACABADO CON ESMALTE SINTETICO EN ESCALERA METALICA CON TUBO DE 2'' Y 1''
VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUE
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
TRASLADO Y MONTAGE TANQUE DE 25 M3
RED DE DISTRIBUCION
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30 M.
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAP CLASE 10, D=3"
TUBERIA PVC SAP CLASE 10, D=2"
TUBERIA PVC SAP CLASE 10, D=1 1/2"
TUBERIA PVC SAP CLASE 10, D=1"
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA PVC SAP CLASE 10, D=2 1/2"
TUBERIA PVC SAP CLASE 10, D=3/4"
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS DE LA RED
SUMINISTRO Y COLOCACION TEE PVC 2"
SUMINISTROS Y COLOCACION TEE PVC 1"
SUMINISTRO Y COLOCACION TEE PVC 3"
SUMINISTRO Y COLOCACION TEE PVC 4"
SUMINISTRO Y COLOCACION TEE PVC 3/4"
SUMINISTRO Y COLOCACION TEE PVC 1 1/2"
SUMINISTRO Y COLOCACION TEE PVC 2 1/2"
SUMINISTRO Y COLOCACION CODO PVC 90 3/4"
SUMINISTRO Y COLOCACION CODO PVC 90 1"
SUMINISTRO Y COLOCACION CODO PVC 22.5 3/4"
SUMINISTRO Y COLOCACION CODO PVC 22.5 4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 1"
SUMINISTROS Y COLOCACION REDUCCION PVC 2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 1" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 2 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 3"
VALVULAS DE CONTROL Y PURGA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
VALVULAS Y ACCESORIOS
INSTALACION DE VALVULA DE CONTROL 1"
INSTALACION DE VALVULA DE PURGA 1"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACOMETIDAS DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION DE ZANJAS, CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25 X 0.35 TAPA FG
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25X0.35 TAPA FG
VALVULAS Y ACCESORIOS
INSTALACION DE ACCESORIOS EN ACOMETIDAS
LINEA DE IMPULCION
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
NIVELACION Y COMPACTACION
PLATAFORMADO DE LOSA PARA POZO (RELLENO ESTRUCTURAL)
PERFORACION DE POZO TUBULAR
FILTRO PARA POZO TUBULAR
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TENDIDO DE TUBERIA DESDE LA BOMBA HASTA EL TANQUE
TUBERIA HDPE SDR 7 RESISTENCIA ASTM F714 PE 4710 D=100.91 mm
TUBERIA HDPE SDR 11 RESISTENCIA ASTM F714 PE 3608 D=115.60 mm
TUBERIA HDPE SDR 17 RESISTENCIA ASTM F714 PE 3608 D=124.69mm
TUBERIA HDPE SDR 17 RESISTENCIA ASTM F714 PE 3608 D=124.17 mm
PEGADO POR TERMOFUSION DE TUBERIA HDPE
FORRADO INTERIOR DE TUBO RANURADO PARA POZO TUBULAR
FORRADO INTERIOR DE TUBO LISO PARA POZO TUBULAR (TRAMO INICIAL)
VALVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL
INSTALACION DE TABLERO ARRANQUE AUTOMATICO INCLUYE CABLEADO
INSTALACION DE MEDIDOR DE ENERGIA ELECTRICA
INSTALACION VALVULA ANTI RETORNO
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL DE RESGUARDO
VARIOS
LIMPIEZA DE POZO TUBULAR
SUMINISTRO E INSTALACION DE TAPON PARA POZO Y CABLE PARA IZAJE DE BOMBA SUMERGIBLE
FLETE TERRESTRE
LIMPIEZA FINAL DE OBRA
IMPLEMENTACION SISTEMA DE ALCANTARILLADO
RED COLECTORA
TRAZO REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL PARA BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D=30M
CORTE DE PAVIMENTO ASFALTICO DE 2"
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
TUBERIA PVC SAL D = 10" (250 mm ISO)
TUBERIA PVC SAL D = 12"
CONSTRUCCIN DE BUZONES
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
CONCRETO EN BUZONES F'C=210 KG/CM2
CONCRETO EN BUZONES f'c=140 kg/cm2_x000D_
JUNTA ASFALTICA
CURADO DE CONCRETO
TUBERIA DREN D=4"
TUBERIA DREN PERFORADO D=4"
GRAVA DE 1/2"
EMISOR QUEBRADA
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL DE BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MAT. ZARANDEADO
RELLENO Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
CONSTRUCCIN DE BUZONES
CONSTRUCCION DE BUZONES DE CONCRETO H=1.20 m.
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA PARA TUBERIAS 200MM
LIMPIEZA FINAL DE OBRA
CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
CAPACITACIN EN A+O+M
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
CAPACITACIN EN EDUCACION SANITARIA
MITIGACIN AMBIENTAL
RECUPERACION DE AREAS AFECTADS
SISTEMA DE UTILIZACION PARA
SUMINISTRO MATERIALES
ARMADOS
ARMADO PMI-3
ARMADO PSV4-3
ARMADO PTSV4-3
ARMADO SAM-3
CABLES Y CONDUCTORES
CONDUCTOR ALUMINIO AAAC 3x35mm2
RETENIDAS
RETENIDA INCLINADA TIPO V1
RETENIDA VERTCIAL TIPO V2
PUESTAS A TIERRA
PUESTA A TIERRA TIPO PAT-1
PUESTA A TIERRA TIPO PAT-2
PUESTA A TIERRA TIPO PAT-3
MONTAJE ELECTROMECANICO
OBRAS PRELIMINARES
REPLANTEO TOPOGRAFICO Y REUBICACION DE ESTRUCTURAS
DESPEJE ARBOLES DENTRO DE LA FRANJA DE SERVIDUMBRE_x000D_
EXCAVACION,RELLENO Y COMPACTACION
EXCAVACION EN TERRENO NORMAL_x000D_
EXCAVACION EN TERRENO ROCOSO
RELLENO Y COMPACTACIN PARA CIMENTACIN DE POSTE _x000D_
RELLENO Y COMPACTACIN PARA INSTALACIN BLOQUE DE ANCLAJE_x000D_
RELLENO Y COMPACTACIN PARA PUESTA A TIERRA_x000D_
INSTALACION POSTES DE CONCRETO
TRANSPORTE DE POSTE DE CONCRETO 13 METROS A PUNTOS IZAJE
IZADO DE POSTE DE CAC 13 /300_x000D_
IZADO DE POSTE DE CAC 13 /400_x000D_
INSTALACION DE RETENIDAS
INSTALACION DE RETENIDA INCLINADA TIPO V1
INSTALACION DE RETENIDA VERTICAL TIPO V2
MONTAJE DE ARMADOS
MONTAJE ARMADO PMIC-3
MONTAJE ARMADO PSV-3
MONTAJE ARMADO PSVA-3
MONTAJE ARMADO SAM-3P
MONTAJE CONDUCTORES DE ALEACION DE ALUMINIO
TENDIDO Y PUESTA EN FLECHA CONDUCTOR AAAC 3x35 mm2_x000D_
INSTALACION DE PUESTA A TIERRA
INSTALACION PAT-1
INSTALACION PAT-2
INSTALACION PAT-3
PRUEBAS Y PUESTA EN SERVICIO
PRUEBAS Y PUESTA EN SERVICIO RED PRIMARIA
TRANSPORTE DE MATERIALES Y EQUIPOS
TRANSPORTE DE MATERIALES Y EQUIPOS
COSTO DIRECTO
Gastos Generales
Utilidad
Sub Total
IGV
VALOR REFERENCIAL
Supervisin y Liquidacin
Plan de Monitoreo Arqueolgico
Reformulacion Expediente Tcnico
TOTAL :
[Son: trece millones trecientos ochenta y dos mil cuatrocientos treinta y tres soles con 00 centim
TOTAL PRESUPUESTO
TANGIBLES
INTANGIBLES
TOTAL
COSTOS DIRECTOS
COSTO SOCIALES
COSTOS PRIVADOS
SISTEMA DE AGUA POTABLE
SISTEMA DE ALCANTARILLADO
SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES
COSTO DE COMPONENTES A PRECIOS PRIVADOS Y SOCIALES
COMPONENTE
SISTEMA DE AGUA POTABLE
SISTEMA DE ALCANTARILLADO
SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES
TOTAL
ENERAL
2,377,530.93
10,834.16
und 1.00 494.16 494.16
m2 120.00 32.20 3,864.00
m 200.00 32.38 6,476.00
36,522.15
mes 7.00 745.23 5,216.61
mes 7.00 1,645.90 11,521.30
mes 7.00 375.26 2,626.82
mes 7.00 416.25 2,913.75
mes 7.00 1,389.56 9,726.92
mes 7.00 645.25 4,516.75
157,890.46
3,319.44
m2 1,468.78 0.69 1,013.46
m2 1,468.78 1.57 2,305.98
42,639.21
m 1,468.78 19.31 28,362.14
m3 14.88 17.07 254.00
m3 957.86 14.64 14,023.07
66,163.47
m 769.00 23.41 18,002.29
m 700.00 68.54 47,978.00
und 2.00 91.59 183.18
3,458.14
m2 0.36 0.69 0.25
m2 0.36 1.57 0.57
m3 0.18 29.26 5.27
m3 0.23 17.07 3.93
m2 0.36 2.29 0.82
und 1.00 1,293.28 1,293.28
und 1.00 1,077.01 1,077.01
und 1.00 1,077.01 1,077.01
42,310.20
m 45.00 1.60 72.00
m 48.00 864.57 41,499.36
und 2.00 369.42 738.84
17,267.37
67.80
m2 30.00 0.69 20.70
m2 30.00 1.57 47.10
871.55
m3 16.15 29.26 472.55
m2 30.00 2.29 68.70
m3 19.35 17.07 330.30
934.50
m2 30.00 31.15 934.50
5,540.29
m2 8.10 51.12 414.07
m3 9.00 450.78 4,057.02
kg 237.60 4.50 1,069.20
3,025.35
und 1.00 3,025.35 3,025.35
468.43
und 1.00 468.43 468.43
2,563.96
m 24.40 58.48 1,426.91
und 1.00 417.70 417.70
m3 1.28 369.42 472.86
GLB 1.00 246.49 246.49
3,795.49
1,274.28
m3 1.58 339.54 536.47
m2 13.13 51.12 671.21
kg 14.80 4.50 66.60
486.20
m2 15.80 24.64 389.31
m2 10.52 9.21 96.89
2,035.01
und 1.00 792.20 792.20
und 1.00 52.68 52.68
und 1.00 1,077.01 1,077.01
113.12
und 1.00 113.12 113.12
199,374.54
133.31
m2 58.99 0.69 40.70
m2 58.99 1.57 92.61
1,481.98
m3 3.87 29.26 113.24
m3 1.06 29.26 31.02
m2 45.59 2.29 104.40
3,073.27
m3 2.68 339.54 909.97
42,898.36
17,536.27
m3 20.18 450.78 9,096.74
kg 1,875.45 4.50 8,439.53
19,237.52
m3 14.98 339.54 5,086.31
1,026.06
m2 19.16 39.38 754.52
1,921.89
und 1.00 792.20 792.20
und 1.00 52.68 52.68
und 1.00 1,077.01 1,077.01
3,025.35
und 1.00 3,025.35 3,025.35
2,342.15
und 5.00 468.43 2,342.15
115,447.49
m 47.12 58.48 2,755.58
und 1.00 417.70 417.70
m3 2.82 369.42 1,041.76
GLB 5.00 22,246.49 111,232.45
1,085,819.92
26,616.63
m 16,845.97 1.58 26,616.63
707,291.93
m 16,845.97 29.26 492,913.08
m 16,845.97 2.05 34,534.24
m 6,608.59 2.85 18,834.48
m3 6,064.55 21.89 132,753.00
m3 947.59 10.24 9,703.32
m3 947.59 19.58 18,553.81
135,250.77
m 161.92 14.44 2,338.12
m 481.10 8.50 4,089.35
m 1,908.67 7.55 14,410.46
m 3,645.95 8.37 30,516.60
m 538.50 23.41 12,606.29
m 345.97 10.56 3,653.44
m 9,763.85 4.46 43,546.77
m 16,845.97 1.43 24,089.74
6,286.92
und 4.00 38.78 155.12
und 41.00 20.07 822.87
und 2.00 47.95 95.90
und 2.00 66.04 132.08
und 30.00 15.96 478.80
und 22.00 25.70 565.40
und 4.00 33.85 135.40
und 8.00 17.16 137.28
und 3.00 19.16 57.48
und 6.00 17.68 106.08
und 1.00 20.56 20.56
und 11.00 21.46 236.06
und 4.00 28.92 115.68
und 2.00 30.03 60.06
und 69.00 21.11 1,456.59
und 35.00 21.91 766.85
und 17.00 25.22 428.74
und 7.00 27.11 189.77
und 1.00 28.22 28.22
und 1.00 28.91 28.91
und 1.00 35.31 35.31
und 2.00 38.01 76.02
und 1.00 38.01 38.01
und 2.00 39.91 79.82
und 1.00 39.91 39.91
210,373.67
526.03
m2 373.00 0.69 257.37
m2 171.12 1.57 268.66
3,172.98
m3 55.38 29.26 1,620.42
m3 69.23 17.07 1,181.76
m2 161.92 2.29 370.80
206,674.66
und 90.00 91.23 8,210.70
und 2.00 147.06 294.12
und 92.00 1,077.01 99,084.92
und 92.00 1,077.01 99,084.92
321,540.73
7,505.00
m 4,750.00 1.58 7,505.00
204,923.48
m 4,750.00 29.26 138,985.00
m 4,750.00 2.05 9,737.50
m 4,750.00 2.85 13,537.50
m3 1,710.00 21.89 37,431.90
m3 267.19 19.58 5,231.58
83,215.25
und 475.00 175.19 83,215.25
25,897.00
und 475.00 54.52 25,897.00
548,281.60
2,158.75
m2 1,375.00 1.57 2,158.75
145,138.91
m3 907.50 29.26 26,553.45
m3 1,134.38 19.58 22,211.16
m2 100.00 2.29 229.00
m3 4,690.93 18.56 87,063.66
hm 107.00 72.56 7,763.92
m3 7.02 187.71 1,317.72
13,734.01
m3 20.44 450.78 9,213.94
kg 805.09 4.50 3,622.91
m2 17.55 51.12 897.16
93,032.45
m 100.00 62.40 6,240.00
m 350.00 55.11 19,288.50
m 400.00 52.00 20,800.00
m 625.28 44.88 28,062.57
und 14.00 17.20 240.80
m 77.00 174.34 13,424.18
m 30.00 165.88 4,976.40
256,790.40
und 1.00 125,931.30 125,931.30
GLB 1.00 4,289.52 4,289.52
und 1.00 443.76 443.76
und 2.00 380.31 760.62
und 1.00 125,365.20 125,365.20
37,427.08
GLB 1.00 380.77 380.77
GLB 1.00 942.21 942.21
- A PRECIOS DE MERCADO
CANTARILLADO EN EL C.P. HUARACLLA, DISTRITO DE JESUS -
CA ALTERNATIVA I
Und. PRECIOS PRIVADOS FC PRECIOS SOCIALES
glb 2,377,530.93 1,879,319.32
0.7 1,664,271.65 0.85 1,414,630.90
12,969,424.38 10,528,675.83
570,752.70 518,814.20
13,540,177.08 11,047,490.03
MITIGACION GG UTI
1,964,849.43 25% 1,978,474.23 2,115,464.43 2,241,715.49
2,366,362.17 31% 2,382,771.16 2,547,755.02 2,699,805.21
3,410,872.02 44% 3,434,523.93 3,672,331.49 3,891,496.49
MITIGACION GG UTI
2,485,735.25 25% 2,502,972.01 2,664,136.96 2,812,667.62
2,993,689.88 31% 3,014,448.93 3,208,547.59 3,387,430.17
4,315,101.55 44% 4,345,023.63 4,624,797.23 4,882,638.40
9,794,526.68 100% 9,862,444.57 10,497,481.78 11,082,736.19
OS Y SOCIALES
PRIVADOS SOCIALES
3,463,798.09 2,803,722.56
4,171,617.74 3,376,657.21 8,243,767.47
6,012,965.57 4,867,110.26
13,648,381.41 11,047,490.03
INC IGV
2,805,486.50 127,681.10
12,784.31
583.11
4,559.52
7,641.68
43,096.14
6,155.60
13,595.13
3,099.65
3,438.23
11,477.77
5,329.77
186,310.74
3,916.94
1,195.88
2,721.06
50,314.27
33,467.33
299.72
16,547.22
78,072.89
21,242.70
56,614.04
216.15
4,080.61
0.30
0.67
6.22
4.64
0.97
1,526.07
1,270.87
1,270.87
49,926.04
84.96
48,969.24
871.83
20,375.50
80.00
24.43
55.58
1,028.43
557.61
81.07
389.75
1,102.71
1,102.71
6,537.54
488.60
4,787.28
1,261.66
3,569.91
3,569.91
552.75
552.75
3,025.47
1,683.75
492.89
557.97
290.86
4,478.68
1,503.65
633.03
792.03
78.59
573.72
459.39
114.33
2,401.31
934.80
62.16
1,270.87
133.48
133.48
235,261.96
157.31
48.03
109.28
1,748.74
133.62
36.60
123.19
1,446.05
9.26
4,922.28
2,168.30
2,753.98
67,567.39
16,947.33
2,490.78
580.95
1,134.70
775.13
3,626.46
1,073.76
1,845.12
707.58
6,615.98
3,169.20
3,446.78
1,385.00
1,041.70
343.30
2,829.11
613.01
428.41
1,254.08
533.61
50,620.06
20,692.80
10,734.15
9,958.65
22,700.27
6,001.85
7,780.48
8,917.94
2,601.79
749.23
1,227.03
625.53
4,625.20
1,354.23
1,455.90
1,815.08
1,210.75
890.33
320.42
9,003.68
4,145.51
4,858.18
3,135.64
2,072.41
87.59
759.50
116.60
49.77
49.77
147,516.18
2,060.39
295.61
285.12
45.54
2,267.83
934.80
62.16
1,270.87
3,569.91
3,569.91
2,763.74
2,763.74
136,228.04
3,251.58
492.89
1,229.28
131,254.29
1,281,267.51
31,407.62
31,407.62
834,604.48
581,637.43
40,750.40
22,224.69
156,648.54
11,449.92
21,893.50
159,595.91
2,758.98
4,825.43
17,004.34
36,009.59
14,875.42
4,311.06
51,385.19
28,425.89
7,418.57
183.04
970.99
113.16
155.85
564.98
667.17
159.77
161.99
67.83
125.17
24.26
278.55
136.50
70.87
1,718.78
904.88
505.91
223.93
33.30
34.11
41.67
89.70
44.85
94.19
47.09
248,240.93
620.72
303.70
317.02
3,744.12
1,912.10
1,394.48
437.54
243,876.10
9,688.63
347.06
116,920.21
116,920.21
379,418.06
8,855.90
8,855.90
241,809.71
164,002.30
11,490.25
15,974.25
44,169.64
6,173.26
98,194.00
98,194.00
30,558.46
30,558.46
646,972.29
2,547.33
2,547.33
171,263.91
31,333.07
26,209.17
270.22
102,735.12
9,161.43
1,554.91
16,206.13
10,872.45
4,275.03
1,058.65
109,778.29
7,363.20
22,760.43
24,544.00
33,113.83
284.14
15,840.53
5,872.15
303,012.67
148,598.93
5,061.63
523.64
897.53
147,930.94
44,163.95
449.31
1,111.81
41,877.68
725.16
3,532,554.06
2,689,640.10
3,379.83
3,379.83
1,161,603.30
492,488.55
2,551.18
43,573.01
55,421.44
167,498.77
183,974.25
3,452.68
212,643.42
871,659.70
670,977.82
58,607.52
142,074.36
649,617.45
571.51
575.14
296,698.21
58,706.44
35,063.31
177,438.84
80,563.99
632,907.64
5,756.34
5,756.34
231,965.18
106,601.50
7,468.67
19,345.66
35,335.71
63,213.64
115,855.35
115,855.35
40,714.72
40,714.72
238,616.06
211,796.14
26,819.93
210,006.31
123,803.42
26,781.46
97,021.96
866.33
353.28
148.13
15.73
40.73
26.18
92.48
30.03
513.05
513.05
750.13
831.07
83,755.36
5,091,819.83
9,563.10
13.04
13.04
406.92
213.38
38.04
155.50
444.74
348.23
96.51
4,321.30
2,160.13
1,454.35
706.82
834.18
366.34
312.46
155.37
843.44
474.57
368.87
657.84
50.41
15.73
40.73
7.49
30.42
513.05
2,041.64
2,041.64
16,286.56
61.10
47.97
13.13
645.02
335.95
39.02
270.05
487.19
487.19
9,239.75
4,218.62
906.69
4,114.45
2,446.53
2,446.53
3,406.97
2,804.91
602.06
506,286.78
337.36
337.36
74,078.74
6,123.92
3,143.66
5,128.33
27,509.15
619.54
31,554.14
6,693.46
6,693.46
338,842.40
223,044.01
72,407.86
43,390.54
17,882.19
2,400.63
13,031.91
2,449.66
8,681.12
5,839.60
2,841.52
28,180.50
5,015.71
520.62
1,348.53
3,001.99
754.94
1,948.51
3,766.35
289.28
1,391.41
1,008.58
1,520.22
717.44
118.66
577.54
575.51
4,616.73
474.57
533.93
31,591.01
31,347.34
32.69
210.98
235,735.82
570.57
570.57
113,428.83
37,775.42
790.66
27,547.22
31,597.80
8,009.91
2,098.54
5,609.28
16,707.58
2,040.40
5,474.17
8,167.55
1,025.47
66,010.40
25,011.99
13,117.78
27,880.64
9,801.46
7,591.16
2,210.29
21,843.84
1,918.67
5,823.71
2,934.48
1,606.59
9,560.38
7,373.14
1,596.52
165.71
429.21
955.46
240.31
974.26
695.70
1,979.01
336.96
1,225,880.25
10,853.83
10,853.83
858,753.19
206,499.95
15,831.38
155,406.40
178,257.61
33,639.38
235,479.09
33,639.38
154,631.46
88,017.52
66,613.94
201,641.77
1,658.67
151.91
393.49
912.32
330.34
268.00
3,560.20
337.92
178.46
555.54
193,294.92
52,113.79
41,472.85
985.77
9,655.17
1,085,861.97
6,502.90
1,397.82
5,105.08
130,721.86
48,493.65
1,443.40
2,932.37
6,079.35
71,773.10
519,945.13
114,498.63
36,524.22
368,922.28
363,040.50
5,881.78
423,984.47
95,981.52
3,728.49
104,363.85
40,905.35
179,005.26
4,707.61
3,982.45
725.16
1,929,423.86
1,892,728.60
5,830.96
73,821.50
3,539.94
16,197.12
1,038,856.05
272,124.78
380,795.19
1,807.38
3,127.04
6,174.52
6,009.46
84,444.68
36,695.26
143.57
135.31
17.69
335.85
29,000.40
4,263.67
1.33
48.99
397.33
272.56
2,078.56
30,667.69
285.23
285.23
7,782.17
2,558.02
73.86
620.72
1,607.81
2,127.79
793.99
11,327.30
11,327.30
10,166.31
10,166.31
1,106.67
381.52
725.16
27,194.85
27,194.85
39,449.51
39,449.51
13,498.75
13,498.75
127,681.10
94,757.76
85,241.76
38,583.73
11,787.75
5,512.58
29,357.70
1,229.32
1,229.32
1,367.76
636.68
731.08
6,918.93
3,075.08
1,537.54
2,306.31
28,580.64
314.55
209.28
105.27
2,866.71
525.96
180.45
729.54
229.39
1,201.37
3,907.92
2,338.74
697.41
871.77
186.66
82.96
103.70
11,334.17
3,730.77
756.03
518.63
6,328.74
183.58
183.58
1,203.36
678.92
209.78
314.66
8,583.69
8,583.69
4,342.70
4,342.70
11,637,684.60 11,637,684.60
749,343.90
690,600.21
13,077,628.71
13,077,628.71
IGV
2,672,053.64
3,218,082.03
4,638,540.16
5,890,135.67
IGV
3,318,947.79
3,997,167.60
5,761,513.31
13,077,628.71
01 SISTEMA DE AGUA POTABLE
DISTRIBUCIN 1
CONEXIN DOMIC
SISTEMA DE ALCANTARILLADO
CONEXIONES DOM
REDES COLECTORAS
BUZONES
PTAR
EMISOR
PTAR
TANQUE IMHOFF
PTAR
EXPED
2,933,167.60
CD OTROS SUB TOTAL CD GG
11,637,684.60
11,637,684.60 749,343.90
0.00
2,749,606.05 55,880.45 2,805,486.50 180,643.68
SANEAMIENTO
20,639.01 20,639.01 1,328.93
29,939.45 29,939.45 1,927.78
10,244.62 10,244.62 659.65
100.00
690,600.21 13,077,628.71
166,482.39 3,152,612.57
39,172.70 741,798.25
11,280.69 213,618.09
1,233.69 23,361.91
14,244.58 269,744.03
77,577.83 1,469,061.37
22,972.90 435,028.92
209,627.83 3,969,641.04
39,931.72 756,171.57
128,710.12 2,437,333.72
40,985.99 776,135.75
302,157.34 5,721,836.56
4,577.34 86,679.40
222,013.54 4,204,184.39
75,566.46 1,430,972.77
0.00 0.00
1,613.79 30,559.70
2,341.00 44,330.65
801.04 15,168.97
7,576.82 143,479.23
389.03 21,710.52
564.34
193.11
1,224.75 68,348.79
1,776.66
607.93
ET PAMA SUP Y LIQ TOTAL DE PTO
13,648,381.41
67,500.00 79,432.70 423,820.00 13,648,381.41
13,648,381.41
16,272.17 19,148.77 102,169.92 3,290,203.43
22815.1580634 3,313,018.59
28727.9155628 4,171,617.74
41408.3882908 6,012,965.57
0 0.00
1038.34559183 150,779.51
93,989.81