1101(1)a2 Electrical Wire - 3.5mm TWG/THHN 4.00 roll 17,572.43 15.00% 10.00% 25.00% P 4,393.11
1101(1)a3 Electrical Wire - 5.5mm TWG/THHN 1.00 roll 5,800.60 15.00% 10.00% 25.00% P 1,450.15
1101(1)a4 Electrical Wire - 10.0mm TWG/THHN 20.00 meter 1,506.44 15.00% 10.00% 25.00% P 376.61
1101(3) Tumbler Switch 6.00 set 1,894.35 15.00% 10.00% 25.00% P 473.59
1101(6) Duplex Convenience Receptacles 23.00 set 8,407.66 15.00% 10.00% 25.00% P 2,101.92
1102(1)b Panelboard Circuit Breaker Type - LPA Flush Mounted, 1.00 set 14,645.97 15.00% 10.00% 25.00% P 3,661.49
1103(1)a1 Compact NEMA 1 Enclosure
Flourescent Lamp (CFL) 9.00 sets 6,058.15 15.00% 10.00% 25.00% P 1,514.54
1200(4)A7 Package Type Airconditioning Unit (PACU)-Ceiling Mounted 4.00 sets 166,768.40 0.00% P -
Inverter
PREPARED/SUBMITTED BY:
TOTAL
TOTAL COST UNIT COST
VAT[3] INDIRECT COST
APPROVED:
5.00 53,846.78 -
6.00 34,381.05 -
7.00 6,667.61 -
8.00 - -
9.00 222,455.57 -
10.00 54,974.16 -
11.00 30,197.46 - 30,197.46
12.00 307,884.48 - 307,884.48
13.00 177,688.72 - 177,688.72
16.00 - -
35.00 33,015.26 -
36.00 134,446.73 -
17.00 235,606.29 - 235,606.29
19.00 143,253.54 -
20.00 78,953.72 -
21.00 157,983.28 -
22.00 52,573.67 -
23.00 224,796.95 -
24.00 49,740.49 -
25.00 238,816.48 - 238,816.48
26.00 128,297.05 - 128,297.05
27.00 79,916.92 - 79,916.92
28.00 4,995.44 - 4,995.44
29.00 5,935.15 -
30.00 14,836.65 -
31.00 15,067.84 -
32.00 17,182.36 -
33.00 10,204.34 - 10,204.34
34.00 923.68 -
37.00 7,389.42 -
38.00 687.43 -
39.00 1,002.43 -
51.00 - -
41.00 22,710.93 - 22,710.93
42.00 4,169.05 -
43.00 3,515.84 -
44.00 23,063.82 -
45.00 7,613.29 -
46.00 1,977.20 - 1,977.20
47.00 2,486.34 - 2,486.34
48.00 11,035.06 - 11,035.06
49.00 19,222.83 - 19,222.83
50.00 7,951.32 -
52.00 175,106.82 -
2,894,968.31
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Cordillera Administrative Region
OFFICE OF THE DISTRICT ENGINEER
Bangued, Abra
PROGRAM OF WORK
ROGRAM OF WORK
m.
Multi-Purpose Building
,Steel
Reinforced Concrete
na
c.d.
NEEDED
1
1
1
2
1
1
2
ESTIMATED COST OF PROPOSED WORK
TOTAL COST
-
5,674.57
16,086.38
-
53,846.78
34,381.05
6,667.61
-
222,455.57
54,974.16
30,197.46
307,884.48
-
70,633.94
143,253.54
78,953.72
157,983.28
52,573.67
224,796.95
49,740.49
238,816.48
235,606.29
128,297.05
79,916.92
33,015.26
134,446.73
177,688.72
4,995.44
5,935.15
14,836.65
15,067.84
17,182.36
10,204.34
923.68
7,389.42
687.43
1,002.43
-
22,710.93
4,169.05
3,515.84
23,063.82
7,613.29
1,977.20
2,486.34
11,035.06
19,222.83
7,951.32
175,106.82
P 2,894,968.31
105,000.00
-
31.69
LORETO B. DACOROON
ASSISTANT DISTRICT ENGINEER
(CARETAKER)
SUMMARY OF ESTIMATES
P 2,894,968.31
105,000.00
P 3,000,000.00
31.69
5,674.57 -
16,086.38 -
0 0
53,846.78 -
34,381.05 -
6,667.61 -
0 0
222,455.57 -
54,974.16 -
30,197.46 -
307,884.48 -
177,688.72 -
0 0
33,015.26 -
134,446.73 -
235,606.29 -
70,633.94 -
143,253.54 -
78,953.72 -
157,983.28 -
52,573.67 -
224,796.95 -
49,740.49 -
238,816.48 -
128,297.05 -
79,916.92 -
4,995.44 -
5,935.15 -
14,836.65 -
15,067.84 -
17,182.36 -
10,204.34 -
923.68 -
7,389.42 -
687.43 -
1,002.43 -
0 0
22,710.93 -
4,169.05 -
3,515.84 -
23,063.82 -
7,613.29 -
1,977.20 -
2,486.34 -
11,035.06 -
19,222.83 -
7,951.32 -
175,106.82 -
2,894,968.31
OK PRE!
3,000,000.00
-
ITEM 1100(7)f1 : Polyvinyl Chloride Pipes (PVC)-20mm
Unit of Measurement= meters Quantity= 300.00
Output= 40.5 ln.m./hr. Duration= 22.22
Say 23.00
1. Labor:
Foreman 1 23 71.95
Skilled 3 23 52.06
Unskilled 2 23 40.15
Sub-Total for 1
2. Equipment:
Minor Tools
10% of Labor Cost 1 23
Sub-Total for 2
2. Materials:
20mm diameter PVC Pipe meters 300 31.67
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 5 71.95
Skilled 2 5 52.06
Sub-Total for 1
2. Equipment:
Minor Tools
10% of Labor Cost 1 5
Sub-Total for 2
2. Materials:
4x4 Octagonal Junction Box pcs. 32 33.00
PVC Adapter pcs. 128 9.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
ITEM 1100(15) : Utility Boxes metal
Unit of Measurement= pcs. Quantity= 28.00
Output= 7 pcs./hr. Duration= 4.00
Say 4.00
1. Labor:
Foreman 1 4 71.95
Skilled 2 4 52.06
Sub-Total for 1
2. Equipment:
Minor Tools
10% of Labor Cost 1 4
Sub-Total for 2
2. Materials:
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 8 71.95
Skilled 4 8 52.06
Unskilled 2 8 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1 100
Sub-Total for 2
2. Materials:
3.5mm THHN Wire rolls 4 3,600.00
Electrical Tape pcs 4 35.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
ITEM 1101(1)a3 : Electrical Wire - 5.5mm TWG/THHN
Unit of Measurement= roll Quantity= 1.00
Output= 18.75 lm./hr. Duration= 0.05
Say 1.00
1. Labor:
Skilled 1 1 52.06
Unskilled 1 2 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1 100
Sub-Total for 2
2. Materials:
5.5mm THHN Wire rolls 1.00 5,550.00
Electrical Tape pcs 3 35.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Skilled 1 1 52.06
Unskilled 1 1 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1 100
Sub-Total for 2
2. Materials:
8.0mm THHN Wire meters 20.00 65.00
Electrical Tape pcs 3 35.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Skilled 2 5 52.06
Unskilled 2 5 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
Tumbler Switch Two-Gang set 1.00 130.00
Tumbler Switch One-Gang set 5.00 150.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Skilled 2 18 52.06
Unskilled 2 18 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
Duplex Convenience Outlet set 18.00 167.00
ACU outlet set 5.00 350.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
ITEM 1102(1)b : Panelboard Circuit Breaker Type - LPA Flush Mounted, NEMA 1 Enclosure
Unit of Measurement= set Quantity= 1.00
Output= Duration= 16.00
Say
1. Labor:
Foreman 1 16 71.95
Skilled 1 16 52.06
Unskilled 2 16 40.15
Sub-Total for 1
2. Equipment:
Sub-Total for 2
2. Materials:
60AMP Bolt-on Type Main Circuit Breaker (Koten) set 1.00 550.00
15AMP Bolt-on Type Branch Circuit Breaker (Koten) set 3.00 450.00
20AMP Bolt-on Type Main Circuit Breaker (Koten) set 2.00 450.00
30AMP Bolt-on Type Main Circuit Breaker (Koten) set 5.00 450.00
Panel Board Cabinet (Flush Type) set 1.00 6,000.00
14-Knock Out Holes , 12-Branches and 1-Main,
grounding terninal, neutral bus bar
32mm.0 Entrance cap set 1.00 100.00
32mm.0 RSC elbow set 3.00 95.00
32mm.0 RSC coupling set 3.00 50.00
32mm.0 Rigid steel conduit set 2.00 500.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
ITEM 1103(1)a1 : Compact Flourescent Lamp (CFL)
Unit of Measurement= sets Quantity= 9.00
Output= 1.0 set/hr. Duration= 9.00
Say 9.00
1. Labor:
Foreman 1 9 71.95
Skilled 2 9 52.06
Unskilled 2 9 40.15
Sub-Total for 1
2. Equipment:
Sub-Total for 2
2. Materials:
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
ITEM 1200(4)A7 : Package Type Airconditioning Unit (PACU)-Ceiling Mounted Inverter
Unit of Measurement= sets Quantity= 4.00
Output= set/hr. Duration= 24.00
Say 24.00
1. Labor:
Foreman 1 24 71.95
Skilled 2 24 52.06
Unskilled 2 24 40.15
Sub-Total for 1
2. Equipment:
Sub-Total for 2
2. Materials:
Sub-Total for 3
Direct Cost
OCM/CP
VAT 5%
ITEM COST
TOTAL UNIT COST
hours
hours
Amount
1,654.88
3,592.31
1,846.96
P 7,094.15
Amount
709.41
P 709.41
Amount
9,500.00
P 9,500.00
P 17,303.56
P 4,325.89
P 1,081.47
P 22,710.93
P 75.70
hours
hours
Amount
359.76
520.63
P 880.38
Amount
88.04
P 88.04
Amount
1,056.00
1,152.00
P 2,208.00
P 3,176.42
P 794.10
P 198.53
P 4,169.05
P 130.28
hours
hours
Amount
287.81
416.50
P 704.31
Amount
70.43
P 70.43
Amount
896.00
1,008.00
P 1,904.00
P 2,678.74
P 669.68
P 167.42
P 3,515.84
P 125.57
hours
hours
Amount
575.61
1,666.00
642.42
P 2,884.03
Amount
288.40
P 288.40
Amount
14,400.00
140.00
P 14,400.00
P 17,572.43
P 4,393.11
P 1,098.28
P 23,063.82
P 5,765.95
hours
hours
Amount
52.06
80.30
P 132.37
Amount
13.24
P 13.24
Amount
5,550.00
105.00
P 5,655.00
P 5,800.60
P 1,450.15
P 362.54
P 7,613.29
P 7,613.29
hours
hours
Amount
52.06
40.15
P 92.21
Amount
9.22
P 9.22
Amount
1,300.00
105.00
P 1,405.00
P 1,506.44
P 376.61
P 94.15
P 1,977.20
P 98.86
hours
hours
Amount
520.63
401.51
P 922.14
Amount
92.21
P 92.21
Amount
130.00
750.00
P 880.00
P 1,894.35
P 473.59
P 118.40
P 2,486.34
P 414.39
hours
hours
Amount
1,874.25
1,445.45
P 3,319.70
Amount
331.97
P 331.97
Amount
3,006.00
1,750.00
P 4,756.00
P 8,407.66
P 2,101.92
P 525.48
P 11,035.06
P 479.79
hours
hours
Amount
1,151.22
833.00
1,284.84
P 3,269.06
Amount
326.91
P 326.91
Amount
550.00
1,350.00
900.00
2,250.00
6,000.00
100.00
285.00
150.00
1,000.00
P 11,050.00
P 14,645.97
P 3,661.49
P 915.37
P 19,222.83
P 19,222.83
hours
hours
Amount
647.56
937.13
722.72
P 2,307.41
Amount
230.74
P 230.74
Amount
2,640.00
880.00
P 3,520.00
P 6,058.15
P 1,514.54
P 378.63
P 7,951.32
P 883.48
hours
hours
Amount
1,726.83
2,499.00
1,927.26
P 6,153.09
Amount
615.31
P 615.31
Amount
160,000.00
P 160,000.00
P 166,768.40
P -
P 8,338.42
P 175,106.82
P 43,776.70
Name of Project: CONSTRUCTION OF SENIOR CITIZEN'S BLDG.
Location: BANGUED, ABRA
DETAILED UNIT PRICE ANALYSIS
ITEM B.5 : Project Billboard / Signboard
Unit of Measurement= l.s. Quantity= 1.00
Output= Duration= 8.00 hours
Say 8.00 hours
1. Labor:
Skilled 1 8 52.06 416.50
Unskilled 1 8 40.15 321.21
Sub-Total for 1 P 737.71
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 73.77
Sub-Total for 2 P 73.77
Name and Specification Unit Quantity Unit Cost Amount
2. Materials:
A. For DPWH Standard Billboard:
Computer generated tarpaulin signs sq.ft. 32 50.00 1,600.00
Lumber bd.ft. 36 42.00 1,512.00
Common Nails Assorted kg. 1 80.00 80.00
1/4" Ordinary Plywood pcs. 1 320.00 320.00
Sub-Total for 3 P 3,512.00
Direct Cost P 4,323.48
OCM/CP 25% P 1,080.87
VAT 5% P 270.22
ITEM COST P 5,674.57
TOTAL UNIT COST P 5,674.57
2. Materials:
A. Personal Protective Equipment (PPE)
Safety Shoes man-days 960 7.67 7,363.20
Safety Helmet man-days 960 0.25 240.00
Safety Gloves man-days 960 2.77 2,659.20
Sub-Total for 3 P 10,262.40
Direct Cost P 13,927.60
OCM/CP 10% P 1,392.76
VAT 5% P 766.02
ITEM COST P 16,086.38
Page 40
TOTAL UNIT COST P 4,021.59
Page 41
ITEM 803 (1) a : Structure Excavation
Unit of Measurement= cu.m. Quantity= 75.00
Output= 1 cu.m./hr. Duration= 75.00 hours
Say 75.00 hours
1. Labor:
Foreman 1 75 71.95 5,396.34
Skilled 2 75 52.06 7,809.38
Laborer 8 75 40.15 24,090.75
Sub-Total for 1 P 37,296.47
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1.00 3,729.65
Sub-Total for 2 P 3,729.65
Sub-Total for 3 P -
1. Labor:
Foreman 1 14 71.95 1,007.32
Skilled 1 14 52.06 728.88
Unskilled 6 14 40.15 3,372.71
Sub-Total for 1 P 5,108.90
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 510.89
Sub-Total for 2 P 510.89
3. Materials:
3/4 Gravel cu.m. 33.73 610.00 20,575.30
Sub-Total for 3 P 20,575.30
Direct Cost P 26,195.09
OCM/CP 25% P 6,548.77
VAT 5% P 1,637.19
ITEM COST P 34,381.05
TOTAL UNIT COST P 1,019.30
Page 42
Page 43
ITEM 804 (1) a : Embankment
Unit of Measurement= cu.m. Quantity= 75.00
Output= 6.225 cu.m./hr. Duration= 12.05 hours
Say 12.00 hours
1. Labor:
Foreman 1 6 71.95 431.71
Skilled 2 6 52.06 624.75
Unskilled 6 12 40.15 2,890.89
Sub-Total for 1 P 3,947.35
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 394.73
Plate Compactor 1 6 123.00 738.00
Sub-Total for 2 P 1,132.73
2. Materials:
Additional Common Borrow cu.m. 200.00 -
Sub-Total for 3 P -
1. Labor:
Foreman 1 19 71.95 1,367.07
Skilled 2 19 52.06 1,978.38
Unskilled 6 19 40.15 4,577.24
Sub-Total for 1 P 7,922.69
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
One Bager Mixer 1 19 172.00 3,268.00
Concrete Vibrator 1 19 545.00 10,355.00
Minor Tools 10% of Labor Cost 1 792.27
Sub-Total for 2 P 14,415.27
Page 44
Page 45
Name and Specification Unit Quantity Unit Cost Amount
2. Materials:
40 Kgs. Portland Cement bags 422.00 250.00 105,500.00
Washed Sand cu.m. 23.40 560.00 13,104.00
Washed Gravel cu.m. 46.80 610.00 28,548.00
Sub-Total for 3 P 147,152.00
1. Labor:
Foreman 1 14 71.95 1,007.32
Skilled 4 14 52.06 2,915.50
Unskilled 6 14 40.15 3,372.71
Sub-Total for 1 P 7,295.52
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
One Bager Mixer 1 7 172.00 1,204.00
Minor Tools 10% of Labor Cost 1 729.55
Sub-Total for 2 P 1,933.55
2. Materials:
40 Kgs. Portland Cement bags 93.60 250.00 23,400.00
Washed Sand cu.m. 5.20 560.00 2,912.00
Washed Gravel cu.m. 10.40 610.00 6,344.00
Sub-Total for 3 P 32,656.00
1. Labor:
Foreman 1 16 71.95 1,151.22
Skilled 4 16 52.06 3,332.00
Unskilled 6 16 40.15 3,854.52
Sub-Total for 1 P 8,337.74
Page 46
Page 47
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Materials:
1. Labor:
Foreman 1 16 71.95 1,151.22
Skilled 3 16 52.06 2,499.00
Unskilled 6 16 40.15 3,854.52
Sub-Total for 1 P 7,504.74
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 20 750.47 750.47
2. Materials:
4.5mm thick Fiber Cement Board pcs. 102 400.00 40,800.00
1'x2' PPGI Air vent pcs. 12 500.00 6,000.00
1" Metal Black Screw pcs. 5,100 1.00 5,100.00
Sub-Total for 3 P 51,900.00
Page 48
Page 49
ITEM 1008 (1) : Aluminum Glass Windows/Doors
Unit of Measurement= sq.m. Quantity= 37.20
Output= 0.72 sq.m./hr. Duration= 51.67 hours
Say 52.00 hours
1. Labor:
Foreman 1 52 71.95 3,741.47
Skilled 2 52 52.06 5,414.50
Unskilled 1 52 40.15 2,087.87
Sub-Total for 1 P 11,243.83
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 52 1,124.38 1,124.38
Sub-Total for 2 P 1,124.38
2. Materials:
Aluminum framed Sliding Doors & Window
(Powder Coated) with 6mm thk bronze glass and sq.m. 27.60 2,800.00 77,280.00
Insect Screen
1. Labor:
Foreman 1 8 71.95 575.61
Skilled 2 8 52.06 833.00
Unskilled 2 8 40.15 642.42
Sub-Total for 1 P 2,051.03
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 205.10
Sub-Total for 2 P 205.10
Page 50
Page 51
Name and Specification Unit Quantity Unit Cost Amount
2. Materials:
1. Labor:
Foreman 1 77 71.95 5,540.25
Skilled 4 77 52.06 16,035.25
Unskilled 2 77 40.15 6,183.29
Sub-Total for 1 P 27,758.79
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 76 2,775.88 2,775.88
Sub-Total for 2 P 2,775.88
2. Materials:
Gauge 26 Pre-painted Rib-type PPGI Sheet(Long Span) ln.m. 299.00 370.00 110,630.00
Gauge 24 Pre-painted Ridge Roll ln.m. 22.60 168.00 3,796.80
Gauge 24 Pre-painted End Flassing(2.44m) ln.m. 26.80 168.00 4,502.40
Gauge 24 Pre-painted Gutter (2.44m) ln.m. 45.00 168.00 7,560.00
2"Self Drilling Screw (Tekscrew) pcs. 3,500.00 2.50 8,750.00
5/32" Blind rivets boxes 4.00 800.00 3,200.00
Touch-up paint lit. 2.00 150.00 300.00
Roof Sealant lit. 5 400.00 2,000.00
Sub-Total for 3 P 140,739.20
Page 52
Page 53
ITEM 1018(1) : Tiles and Trims (Toilet)
Unit of Measurement= sq.m. Quantity= 34.30
Output= 1.12 sq.m./hr. Duration= 30.63 hours
Say 31.00 hours
Designation No. of Person No. of Hours Hourly Rate Amount
1. Labor:
Foreman 1 31 71.95 2,230.49
Skilled 2 31 52.06 3,227.88
Unskilled 2 31 40.15 2,489.38
Sub-Total for 1 P 7,947.74
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools-10% of Labor Cost 1 31 794.77 794.77
Sub-Total for 2 P 794.77
2. Materials:
300x300mm Tiles sq.m. 34.30 850.00 29,155.00
note: with tile trim, adhesive and tile grout and cement
base
Sub-Total for 3 P 29,155.00
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools
10% of Labor Cost 1 183 11,441.78 11,441.78
Sub-Total for 2 P 11,441.78
2. Materials:
1. Labor:
Foreman 1 22 71.95 1,582.93
Skilled 6 44 52.06 13,744.50
Unskilled 3 44 40.15 5,299.97
Sub-Total for 1 P 20,627.39
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Steel Scaffoldings w/ Flatform 12 22.00 12.50 3,300.00
Minor Tools 10% of Labor Cost 1 2,062.74
Sub-Total for 2 P 5,362.74
Page 56
Page 57
Name and Specification Unit Quantity Unit Cost Amount
2. Materials:
Concrete Surface: Sq.m. 550.0
Concrete Neutralizer Gal. 24.00 420.00 10,080.00
Patching compoud Gal. 18.00 320.00 5,760.00
Flat Latex Primer Gal. 24.00 500.00 12,000.00
Semi-Gloss Latex Gal. 21.00 520.00 10,920.00
Latex Tinting colors pint 6.00 100.00 600.00
Ceiling Surface: Sq.m. 266.00
Glazing Putty Gal. 11.00 420.00 4,620.00
Flat Wall Enamel Gal. 11.00 580.00 6,380.00
Enamel Quick Dry Gal. 14.00 580.00 8,120.00
Paint Thinner pint 4.00 300.00 1,200.00
Tinting Color pint 4.00 100.00 400.00
9" Roller brush Pcs. 10.00 55.00 550.00
Pan Pcs. 6.00 95.00 570.00
Pallet knives Pcs. 6.00 50.00 300.00
4" Paint brush Pcs. 6.00 85.00 510.00
#80 3M Sand paper Ft. 150.00 65.00 9,750.00
Sub-Total for 3 P 71,760.00
Direct Cost P 97,750.13
OCM/CP 25% P 24,437.53
VAT 5% P 6,109.38
ITEM COST P 128,297.05
TOTAL UNIT COST P 233.27
1. Labor:
Foreman 1 26 71.95 1,870.73
Skilled 2 26 52.06 2,707.25
Unskilled 4 26 40.15 4,175.73
Sub-Total for 1 P 8,753.71
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools
10% of Labor Cost 1 26 875.37
Sub-Total for 2 P 875.37
Page 58
Page 59
Name and Specification Unit Quantity Unit Cost Amount
2. Materials:
L20x20 Wall Angle (2.44m) pcs. 92 80.00 7,360.00
Double Metal Furring (5.0m) pcs. 112 170.00 19,040.00
Carrying Channel (5.0m) pcs. 51 165.00 8,415.00
1" self tapping screw pcs. 5,451 1.00 5,451.00
1/8"x1" Tox with screw pcs. 332 2.00 664.00
1/8x1/2" Blind Rivets box 4 600.00 2,400.00
W-Clip pcs. 462 15.00 6,930.00
Consumables (drill bit,screw bit,riveter,c-clamp etc.) lot 1 1,000.00 1,000.00
Sub-Total for 3 P 51,260.00
Direct Cost P 60,889.08
OCM/CP 25% P 15,222.27
VAT 5% P 3,805.57
ITEM COST P 79,916.92
TOTAL UNIT COST P 300.44
1. Labor:
Foreman 1 21 71.95 1,510.98
Skilled 4 21 52.06 4,373.25
Unskilled 2 21 40.15 1,686.35
Sub-Total for 1 P 7,570.58
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools
10% of Labor Cost 1 21 757.06
Sub-Total for 2 P 757.06
2. Materials:
Page 60
ITEM 1043(2) b : CHB Non Load Bearing Wall - 125mm
Unit of Measurement= sq.m. Quantity= 222.00
Output= 3.1875 sq.m./hr. Duration= 69.65 hours
Say 70.00 hours
1. Labor:
Foreman 1 70 71.95 5,036.59
Skilled 4 70 52.06 14,577.50
Unskilled 4 70 40.15 11,242.35
Sub-Total for 1 P 30,856.44
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools
10% of Labor Cost 1 70 3,085.64
Sub-Total for 2 P 3,085.64
2. Materials:
125mm thick CHB Non-load Bearing pcs. 2,914 12.00 34,965.00
40 kg. Cement bags 120 250.00 29,938.78
Fine Sand cu.m. 6 560.00 3,589.74
1. Labor:
Foreman 1 70 71.95 5,036.59
Skilled 4 70 52.06 14,577.50
Unskilled 4 70 40.15 11,242.35
Sub-Total for 1 P 30,856.44
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools
10% of Labor Cost 1 70 3,085.64
Sub-Total for 2 P 3,085.64
2. Materials:
A. Formworks
1/2" Ordinary Plywood (4x8ft) - Two(2) Uses pcs. 28 620.00 17,360.00
Good Lumber (multiple uses) bd.ft. 1,862 42.00 78,199.80
Assorted Naills kgs 74 80.00 5,880.00
Page 61
Sub-Total for 3 P 101,439.80
Page 62
ITEM 902(1) : Reinforcing Steel(Deformed)
Unit of Measurement= kgs. Quantity= 9,818.80
Output= 179.5125 kgs./hr. Duration= 54.70 hours
Say 54.00 hours
1. Labor:
Foreman 1 54 71.95 3,885.37
Skilled 6 54 52.06 16,868.25
Unskilled 6 54 40.15 13,009.01
Sub-Total for 1-Grade 40 P 33,762.62
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 5% of Labor Cost 1 675.25
Bar Cutter 1 14 219.75 2,966.63
Bar Bender 1 41 351.50 14,235.75
Cargo Truck 1 1,102.00 -
Sub-Total for 2 P 17,877.63
2. Materials:
910 pcs-10mm diam. Reinforcing Steel bars kgs. 3,367.00 36.00 121,212.00
280 pcs-16mm diam. Reinforcing Steel bars kgs. 1,492.40 36.00 53,726.40
GI Wire #16 kgs. 100.00 80.00 8,000.00
Total kgs. 4,859.40
Sub-Total for 3 P 182,938.40
1. Labor:
Foreman 1 13 71.95 935.37
Skilled 4 13 52.06 2,707.25
Unskilled 4 13 40.15 2,087.87
Sub-Total for 1 P 5,730.48
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 573.05
Welding Machine 1 61.95 61.95 3,837.80
Cut-off Machine 1 4.00 30.00 120.00
Sub-Total for 2 P 4,410.85
Page 63
Name and Specification Unit Quantity Unit Cost Amount
2. Materials:
90 pcs.1.0mm, 2x3" C-purlins kgs. 648.00 50.00 32,400.00
13 pcs. 1.0mm, 2x10" C-purlins kgs. 201.50 50.00 10,075.00
Red Lead Primer gal. 3 400.00 1,200.00
Welding Rod kgs. 43.00 110.00 4,730.00
Sub-Total for 3 P 43,675.00
1. Labor:
Foreman 1 25 71.95 1,798.78
Skilled 4 25 52.06 5,206.25
Unskilled 2 25 40.15 2,007.56
Sub-Total for 1 P 9,012.59
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
2. Equipment:
Minor Tools 10% of Labor Cost 1 901.26
Welding Machine 1 206 61.95 12,761.70
Sub-Total for 2 P 13,662.96
2. Materials:
80 pcs 3/16"x2x2 Angle Bar kgs. 1,240.00 40.00 49,600.00
25 pcs 3/16"x2x2 Angle Bar kgs. 287.50 40.00 11,500.00
10 mm.thk, Base plate kgs. 200.00 40.00 8,000.00
Welding Rod kgs. 87.00 110.00 9,570.00
Red Lead Primer gal. 8 400.00 3,200.00
Assorted Sizes Paint Brush l.s. 1 1000.00 1,000.00
16mmx450 A307 Anchor Bolt pc. 36 100.00 3,600.00
Sub-Total for 3 P 86,470.00
Page 64
ITEM 1001 (1) a : Pipe - 50mm diameter PVC
Unit of Measurement= ln.m. Quantity= 20.00
Output= 6.2625 ln.m./hr. Duration= 3.19
Say 3.00
1. Labor:
Foreman 1 3 71.95
Skilled 2 3 52.06
Unskilled 2 3 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
50mm PVC Pipe Series 600 ln.m. 20.00 100.00
63mm 90deg. PVC elbow pcs. 6.00 45.00
63mm Sanitary Tee pcs. 5.00 60.00
63mm P-Trap pcs. 2.00 120.00
Solvent Cement cc 100.00 1.50
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 1 71.95
Skilled 2 1 52.06
Unskilled 2 1 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
Page 65
Name and Specification Unit Quantity Unit Cost
2. Materials:
100mm PVC Pipe Series 600 ln.m. 8.00 200.00
100mm PVC -90 deg. Elbow Series 600 pcs 2.00 95.00
100mm PVC -Santary Tee Series 600 pcs 4.00 195.00
100mmx50mm PVC -Tee Adapter Series 600 pcs 6.00 165.00
100mm Cleanout with Plug Series 600 pcs 4.00 95.00
Solvent Cement cc 200.00 1.50
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 7 71.95
Skilled 2 7 52.06
Unskilled 2 7 40.15
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
75mm PVC Pipe Series 600 ln.m. 42.00 165.00
75mm PVC 90 deg. elbow Series 600 pcs 30.00 70.00
Solvent Cement cc 200.00 1.50
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
Page 66
ITEM 1002 (5) a1 : Polyprophylene Random Copolymer (PPR-C) Pipes - 1/2" diam. PN10
Unit of Measurement= pcs. Quantity= 50.00
Output= 3.40 pc./hr. Duration= 14.80
Say 15.00
Designation No. of Person No. of Hours Hourly Rate
1. Labor:
Foreman 1 15.00 71.95
Skilled 2 15.00 52.06
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
PPR Pipes - 1/2"diam.x4.00m PN10 pcs. 50.00 100.00
1/2"0 Coupling pcs. 50.00 25.00
1/2"0 Elbow pcs. 20.00 30.00
1/2"0 Tee pcs. 8.00 35.00
1/2"0 male / female adaptor pcs. 7.00 165.00
1/2"0 Union paatente pcs. 1.00 80.00
1/2"x3" Nipple pcs. 7.00 30.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
ITEM 1002(9) : Water Closet
Unit of Measurement= set Quantity= 2.00
Output= 0.25 pc./hr. Duration= 8.00
Say
Designation No. of Person No. of Hours Hourly Rate
1. Labor:
Foreman 1 8 71.95
Skilled 1 8 52.06
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
Water Closet 1.6gpf Including Fittings with
accessories (Elongated) American Std. or sets 2.00 6,000.00
Equivalent
Sub-Total for 3
Direct Cost
OCM/CP 25%
Page 67
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 4 71.95
Skilled 2 4 52.06
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
Lavatory Including Fittings and Accessories
(American Std. or Equivalent) sets 2.00 3,500.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 1 71.95
Skilled 2 1 56.64
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
Ceramic Tissue Holder pcs. 2.00 250.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
Page 68
TOTAL UNIT COST
1. Labor:
Foreman 1 8 71.95
Skilled 2 8 56.64
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
Stainless counter sink with Lever Type Faucet and pcs. 1.00 4,000.00
Stainless Drain
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 1 71.95
Skilled 2 1 56.64
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
1/2" Gate Valve pcs. 1.00 320.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
Page 69
VAT 5%
ITEM COST
TOTAL UNIT COST
1. Labor:
Foreman 1 1 71.95
Skilled 2 1 56.64
Sub-Total for 1
2. Equipment:
Minor Tools 10% of Labor Cost 1
Sub-Total for 2
2. Materials:
4x4" Stainless Steel Floor Drain pcs. 2.00 280.00
Sub-Total for 3
Direct Cost
OCM/CP 25%
VAT 5%
ITEM COST
TOTAL UNIT COST
Page 70
hours
hours
Amount
215.85
312.38
240.91
P 769.14
Amount
76.91
P 76.91
Amount
2,000.00
270.00
300.00
240.00
150.00
P 2,960.00
P 3,806.05
P 951.51
P 237.88
P 4,995.44
P 249.77
hours
hours
Amount
71.95
104.13
80.30
P 256.38
Amount
25.64
P 25.64
Page 71
Amount
1,600.00
190.00
780.00
990.00
380.00
300.00
P 4,240.00
P 4,522.02
P 1,130.50
P 282.63
P 5,935.15
P 741.89
hours
hours
Amount
503.66
728.88
562.12
P 1,794.65
Amount
179.47
P 179.47
Amount
6,930.00
2,100.00
300.00
P 9,330.00
P 11,304.12
P 2,826.03
P 706.51
P 14,836.65
P 353.25
Page 72
hours
hours
Amount
1,079.27
1,561.88
P 2,641.14
Amount
264.11
P 264.11
Amount
5,000.00
1,250.00
600.00
280.00
1,155.00
80.00
210.00
P 8,575.00
P 11,480.26
P 2,870.06
P 717.52
P 15,067.84
P 301.36
hours
hours
Amount
575.61
416.50
P 992.11
Amount
99.21
P 99.21
Amount
12,000.00
P 12,000.00
P 13,091.32
P 3,272.83
Page 73
P 818.21
P 17,182.36
P 8,591.18
hours
hours
Amount
287.81
416.50
P 704.31
Amount
70.43
P 70.43
Amount
7,000.00
P 7,000.00
P 7,774.74
P 1,943.68
P 485.92
P 10,204.34
P 5,102.17
hours
hours
Amount
71.95
113.28
P 185.23
Amount
18.52
P 18.52
Amount
500.00
P 500.00
P 703.75
P 175.94
P 43.98
P 923.68
Page 74
P 461.84
hours
hours
Amount
575.61
906.24
P 1,481.85
Amount
148.19
P 148.19
Amount
4,000.00
P 4,000.00
P 5,630.04
P 1,407.51
P 351.88
P 7,389.42
P 7,389.42
hours
hours
Amount
71.95
113.28
P 185.23
Amount
18.52
P 18.52
Amount
320.00
P 320.00
P 523.75
P 130.94
Page 75
P 32.73
P 687.43
P 687.43
hours
hours
Amount
71.95
113.28
P 185.23
Amount
18.52
P 18.52
Amount
560.00
P 560.00
P 763.75
P 190.94
P 47.73
P 1,002.43
P 501.21
Page 76
I. HAULING COST OF FINE/COARSE AGGREGATES
HAULING DISTANCE = 5 KMS.
Equipment Rental:
1- Dumptruck 6-8 tons, 4 cu.m. P 807.00 /hour
P 6,456.00 /day
= P 97.35 /CU.M.
TOTAL = ###
B. LABOR
Manpower NO. Rate/Day
Construction 1 P 277.30
Painter 3 P 209.90
Laborer 3 P 194.70
Labor Cost
VAT
Mark-up
PAINTING 1 80.00
II. HAULING COST OF BUILDING MATERIALS
Equipment Rental:
1- Dumptruck 6-8 tons, 4 cu.m. P 807.00 /hour
P 6,456.00 /day
Manpower:
6-Laborers @ P 25.00/man hr. P 150.00 /hour
P 1,200.00 /day
Travel Velocity:
Loaded: 15.00 Kph
Unloaded: 20.00 Kph
Distance: 0.00 Km.
Loaded: 0.00 km. X 60.00 Min./hour
15.00 Kph
= 0.00 minutes
GITW # 16
= P 733.70 per trip
6000 Kgs.
0.1222833333 /Bd.Ft. Pick-up at Site
0.12 60 P 60.12
Total Cost
#REF!
#REF!
#REF!
#REF!
#REF!
Total cost
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
MARK-UP
#REF!
#REF!
P -
P -
P -
P -
P -
#REF! #REF!
#REF!
#REF!
#REF!
TIMESPOT SCHEDULE
No. of Trips per day : 8*60/ 132 = 3.64 trips say = 4 trip / day
Vehicle Used / Capacity of Truck : Dumptruck / 200 bags
Volume Hauled per day : 4 trips x 200 bags = 800 bags
LABOR :
No. of Laborers : 5
Rate per day : P317.84
No. of Days : 1
P1,589.20
RENTAL :
Equipment Used : Dumptruck
Rate per day : P4,847.00
No. of days : 1
P4,847.00
For Cement
Total Cost : P 6,436.20
Unit Cost : 8.05
Cost at Source : P 250.00 /bag
Manual Hauling :
Actual Cost : 258.05 /bag
say P 258.00 /bag
TIMESPOT SCHEDULE
No. of Trips per day : 8*60/ 178 = 2.70 trips say = 3.0 trip / day
Vehicle Used / Capacity of Truck : Dumptruck / 4.5 cu.m.
Volume Hauled per day : 3 trips x 4.5 cu.m. = 13.5 cu.m.
LABOR :
No. of Laborers :
Rate per day :
No. of Days :
RENTAL :
Equipment Used : Dumptruck
Rate per day : P4,847.00
No. of days : 1
P4,847.00
GRAVEL
Total Cost : P4,847.00
Unit Cost : 359.04
Cost @ Source : 885.00
Actual Cost : 1,244.04
say 1,244.00 /cu.m.
TIMESPOT SCHEDULE
No. of Trips per day : 8*60/ 226 = 2.12 trips say = 2 trip / day
Vehicle Used / Capacity of Truck : Dumptruck / 5,000 kgs.
Volume Hauled per day : 2 trips x 5,000 kgs. = 10000 kgs.
RSB
LABOR : CAPABILITY
No. of Laborers : 5
Rate per day : P317.84
No. of Days : 1
P1,589.20
RENTAL :
Equipment Used : Dumptruck
Rate per day : P4,847.00
No. of days : 1
P4,847.00
RSB
Total Cost : P6,436.20
Unit Cost : 0.64
Cost @ Source ### 38.00 /kg.
Actual Cost : 38.64
say 38.60 /kg.
Structural Steel
Total Cost : P6,436.20
Unit Cost : 0.64
Cost @ Source ### 48.00 /kg.
Actual Cost : 48.64
say 48.60 /kg.
263
250
13
298
302
4
302
250
52
5.25 4
5.65 7.06
29.6625 28.24