REF:

REVISION:
AFIA Jeddah Factory Project DATE: 20/02/2016

Location AFIA Jeddah Factory Project Task/Activity STEEL WORK


Completed by: Date:
Completed by: Date:

Severity

Probability

Severity

Page 1 of 7 Health,
Safety, and Environmental
2 4 6 8 10
10 20 40 60 80 100 REF:
REVISION:
8 16 32 48 64 80
AFIA Jeddah Factory Project DATE: 20/02/2016
6 12 24 36 48 60
4 8 16 24 32 40
2
2 4 8 12 16 20
First aid

Unlikely

Probability

Page 2 of 7 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 20/02/2016

Minor injury or damage

Possible

Moderate injury or damage

Likely

Page 3 of 7 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 20/02/2016

Major injury or damage

Very Likely

10

Fatality or extensive damage

10

Imminent

Page 4 of 7 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 20/02/2016

RISK ACCEPTABILITY MATRIX

Risk Rating Acceptability level Action required &


priority

Unacceptable risk Shutdown the


installation immediate
R>80
correct action

(40:64) High risk Immediate corrective


action

(20:36) Important & possible Corrective action ASAP


risk

Page 5 of 7 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 20/02/2016

R<16 Acceptable risk Consider the necessary


of a corrective action

Potential P S Risk Existing control Risk After control Additional Control Final
Hazard Rat measure measure measure required risk
e P S
R
Electrical 8 10 80 Damage wires or not 4 4 16 Trained person, Proper
shock grounding of steel grounding and
cutting, grinding inspected tools use for
machine can cause of work with suitable PPE.
severe electric shock or
fatality.
Penetration 8 8 64 Pinch hands or feet 4 6 24 Training to workers,
hazard between two objects Make a platform or put
during shifting or anything which make
loading/unloading steel, gap between two
work is going on objects for safety
without training. penetration hazards.
ULD Hazard 8 6 48 Wrong posture of 4 4 16 Proper training of
manual handling and manual handling, use
overloading with trolley or crane for
manual handling cause shifting material.
of muscles pulling,
tiredness or injury.

Page 6 of 7 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 20/02/2016

Cut & 6 8 48 Steel bar corner or steel 2 2 4 Provide proper PPE


Abrasions wires (using joint steel), related job and Re-bar
cutting machines can cap used at corner of
cuts or abrasions to steel bars.
body.
Slip, Trip, 6 8 48 During walk can slipped 2 4 8 Proper housekeeping,
falling from steels bar, tripping proper safety shoes
hazards hazards when some must be provided and
material placed on care at job.
walkway.
Lifting hazard 6 10 60 During unloading steel 4 10 40 Crain and operator must
with crane must be have TUV, barricade the
fasten with proper sling area before start the
and equipment must be work.
inspected before
starting the job. It can
cause of falling hazard
and sever injury or
death can occurred in
result.

Page 7 of 7 Health,