Annexure-I of Schedule G
Format for Contract Price Weightages for Highway Projects with Rigid Pavements
Contract Price Weightages

1.1 The Contract Price for this Agreement is Rs.

1.2 Proportions of the Contract Price for dProject


Highway shall be as specified below:

Weightage in

percentage
Item Stage for measurement of Physical Progress

1 2
A- Widening and strengthening of existing
road
(1) Earthwork up to top of the sub-grade
(2) Granular work (sub- base, shoulders)
GSi3
(3) Shoulders
(4) Bituminous work
(5) Rigid Pavement
(a) DIC
(b) PQC
(6) Widening and repair of culverts
(7) Widening and repair of minor bridges
Road works
including culverts, B- New realignment/bypass
minor bridges, (1) Earthwork up to top of the sub-grade
underpasses, (2) Granular work (sub- base, shoulders)
overpasses, GSB
approaches to
(3) Shoulders
ROB/RUB/ Major
(4) Bituminous work (
Bridges/ Structures
(5) Rigid Pavement
(but excluding
service roads)

(
0

C.
abilitation and up-gradation of NH-66 (Erstwhile 17) from Km 241/300 to Km 281/300 fArawali - Kante section] to

r lane with paved shoulder in the state - 68-


Unit Qty,
to the
Contract Price
3 4 5

Km 35.028 5.07%

Km 35.028 1.73%

Km 35.028 7.99%
Km 35.028 37.97%
No.
No.

Km 3.77 1.17%

Km 3.77
0.87%
Km 3.77

(a) D C Km 3.77
(b) PQC Km 3.77
C- New culverts, minor bridges,
underpasses, overpasses on existing road,
realignments, bypasses:
) Culverts No 198 / .71:8
(2) Minor bridges 1
(a) Foundation No. 8 oi ,i
(b) Sub-structure No. 8 1,4 lizi,i ,-
\- ., ,4, c, ,
(c) Super-structure (including crash No
barriers etc. complete)
(3) Cattle/Pedestrian underpasses
(a) Foundation No. 1

Kante section] to
1.72%
7.46%

--..%
4
,..

--
1.19%