CIMENTACION CENTRAL

P= 77.52 T
PROF= 2m
qa= 13.5 T/m2
Co= 45 cm 2025 cm2
Co= 45 cm
CM= 48.8376 T
CV= 28.6824 T
hcimiento= 40 cm 0.4 m
d= 36 cm 0.36 m

A= 6.89 m2
dimension= 2.63
asumimos= 2,8X2,8 m 7.84 m2
l= 2.8 m 280 cm
2.8 m 280 cm

relleno= 23.52 T

PBS= 12.887755102 < qa 13.5


carga ultima = 1,2CM+1,6CV
104.49696 T

Esfuerzo Ultimo= P/A


= 13.33 T/m2

MOMENTO== WL2/2
M= 52.25 T-m

PUNZONAMIENTO= 11664 cm2 L= 81


0.81
CORTANTE DE PUNZONAMIENTO
Vu= 750.70 T = 0.85

Vu= 75.72 kg/cm2

Vcd= raiz f'c Vu<Vcd ok


14.49 kg/cm2

CORTE

d'= 1.22 m
Vu= 30.59 T

Vu= 3.57
Vcd= 0,53raizf'c
Vcd= 7.68

REFUERZO
M= 52.25 T-m
As= M*30/d
As= 43.5 cm2

CIMENTACION PERIMETRAL

P= 44.26 T
PROF= 2m
qa= 13.5 T/m2
Co= 45 cm 2025 cm2
Co= 45 cm
CM= 27.88 T
CV= 16.38 T
hcimiento= 40 cm 0.4 m
d= 36 cm 0.36 m

A= 3.93 m2
dimension= 1.98
asumimos= 2,2X2,2 m 4.84 m2
l= 2.2 m 220 cm
2.2 m 220 cm

relleno= 14.52 T

PBS= 12.1446280992 < qa 13.5


carga ultima = 1,2CM+1,6CV
59.66 T

Esfuerzo Ultimo= P/A


= 12.33 T/m2

MOMENTO== WL2/2
M= 29.83 T-m

PUNZONAMIENTO= 11664 cm2 L= 81


0.81
CORTANTE DE PUNZONAMIENTO
Vu= 249.62 T = 0.85

Vu= 25.18 kg/cm2

Vcd= raiz f'c Vu<Vcd ok


14.49 kg/cm2

CORTE

d'= 0.92 m
Vu= 6.09 T

Vu= 0.90
Vcd= 0,53raizf'c
Vcd= 7.68

REFUERZO
M= 29.83 T-m
As= M*30/d
As= 24.9 cm2

CIMENTACION ESQUINAS

P= 21.53 T
PROF= 2m
qa= 13.5 T/m2
Co= 45 cm 2025 cm2
Co= 45 cm
CM= 12.92 T
CV= 8.61 T
hcimiento= 40 cm 0.4 m
d= 36 cm 0.36 m

A= 1.91 m2
dimension= 1.38
asumimos= 1,50X1,50 m 2.25 m2
l= 1.5 m 150 cm
1.5 m 150 cm

relleno= 6.75 T

PBS= 12.57 < qa 13.5


carga ultima = 1,2CM+1,6CV
29.28 T

Esfuerzo Ultimo= P/A


= 13.01 T/m2

MOMENTO== WL2/2
M= 14.64 T-m
PUNZONAMIENTO= 11664 cm2 L= 81
0.81
CORTANTE DE PUNZONAMIENTO
Vu= 46.67 T = 0.85

Vu= 4.71 kg/cm2

Vcd= raiz f'c Vu<Vcd ok


14.49 kg/cm2

CORTE

d'= 0.57 m
Vu= 12.91 T

Vu= 2.81
Vcd= 0,53raizf'c
Vcd= 7.68

REFUERZO
M= 14.64 T-m
As= M*30/d
As= 12.2 cm2
ok

cm
m
ok

cm
m
ok
cm
m